Académique Documents
Professionnel Documents
Culture Documents
02/11/2017 file:///var/www/apps/conversion/tmp/scratch_3/345130408.xlsx
Exiting Building Work
PROJECT : ATLAS WAREHOUSE ,KARACHI.
OWNER : ATLAS HONDA LIMITED
CIVIL WORK FOR 2nd FLOOR WASH ROOMS:
S.#. DESCRIPTION UNIT QTY RATE
DISMANTLING
1 Dismantling existing Below plinth and super structure ( Lean, Situ,
Footings, Plinth beam, Columns base floor, hard core, beams, slab etc.
complete dis mental ) including removal of debris from site and its Job 1 50,000
disposal as required by law and away from the site.
STRUCTURE WORKS
2 Provide and lay 1:3:6, mix cement/concrete machine made hollow
blocks with 1000 psi crushing strength for walls with 1:5 cement/sand
racked mortar including cost of scaffolding and curing.
i 6" thick hollow block wall sft 558 70
ii 4" thick hollow block wall sft 177 65
5 Provide and lay upto 2" - 8" thick, well vibrated cast in situ, 1:2:4,
concrete Screed on roof slab, with necessary slopes towards outlets,
so as to avoid any pools of water including making valleys and ridges. sft 335 62
6 Provide and lay water proofing using PG-2000 for wet area .
Recommended Manufacturer (Hi-Grip) sft 350 75
7 Provide, cut, lay and bind steel bars of required yield strength
conforming to BS 4449 to engineer's drawings and/or schedules. Seek
engineers approval of steel laid, before concreting.Include cost of
20swg
i) TORbinding
steelwire,
barssteel
of chairs,
60 Ksi spacers
minimumetc. strength
Any Recommended
Manufacturer: Amreeli or equivalent tons 1.20 110,000
FINISHING WORKS
9 Provide and apply 3/4" thick Internal plaster 1:4, ratio cement/ sand
rendering to all external surfaces including bends, corners, jambs,
recesses, with drips, grooves, moldings and Inculude the cost of
scaffolding .
Internal walls sft 875 45
10 Provide and apply 3/4" thick External plaster 1:4, ratio cement/ sand
rendering to all external surfaces including bends, corners, jambs,
recesses, with drips, grooves, moldings and Inculude the cost of
scaffolding .
External walls sft 575 50
Page 2
S.#. DESCRIPTION UNIT QTY RATE
11 Door Frames
Provide, make and Install Beech wood Door frame to take solid core or
glazed shutters. The Beech wood should be of the best quality well
seasoned and free from saps, knots, warps and other defects. The
frame should be properly joined by mortise and tenon, joint with hard
wooden pins and the joints should be coated with white lead before
being fitted together. The frame should be of section as per Drawing.
All faces other then conceled ones should be painted with a primer
coat before fixing in position etc also included Polyurethane polish
finish, beading, rebates, M.S holdfast, architraves, sealant as
required. Complete in all respects and conforming to the requirements
of drawings, and to the entire satisfaction of the Project consultant. All
wooden material to be properly treated with termite proofing
Frame sectional size 4" x 2" rft 85 495
Frame sectional size 6" x 2" rft 53 600
15 Raise flooring with clay pots & back filling & 1:3:6 CC floor 3"th cft 275 250
TOTAL CIVIL WORK.
2 Lay 6" thick cast in situ, 1:3:6, concrete (three parts of gravel, three
parts of aggregate mix, three parts of sand and one part of cement
by volume; with a water/ cement ratio of eight gallons per bag of
i cement).
6" thick Ram, consolidate and cure the co sft 80 100
Page 3
S.#. DESCRIPTION UNIT QTY RATE
FINISHING WORKS
4 Provide and apply 3/4" thick Internal and external double plaster 1:4,
ratio cement/ sand rendering to all external surfaces including bends,
corners, jambs, recesses, with drips, grooves, moldings and Inculude
the cost of
Internal scaffolding .
walls sft 600 50
6 Provide and fixing UPVC pipe in tank. 6" dia. rft 15 400
TOTAL SEPTIC TANK WORK.
Page 4
ting Building Work
AMOUNT
50,000
39,060
11,505
12,400
24,000
85,000
20,770
26,250
132,000
39,375
28,750
Page 5
AMOUNT
42,075
31,800
81,000
15,000
15,500
64,400
176,000
68,750
963,635
50,000
50,000
6,400
8,000
12,000
Page 6
AMOUNT
49,000
18,000
110,000
30,000
10,000
6,000
249,400
Page 7
Exiting Building Work
PROJECT : ATLAS WAREHOUSE ,KARACHI.
OWNER : ATLAS HONDA LIMITED
PLUMBING WORKS
8 Paper Holder
Provide and Fix (Owner provide) of C.P toilet paper holders with bracket and
screws and conforming to the requirements of drawings, and to the entire
satisfaction of the Project consultant. Nos. 2 650
9 Soap Dish
Provide and Fix chromium plated soap dish or Glass shelf standard size with
C.P screws and conforming to the requirements of drawings, and to the entire
satisfaction of the Project consultant. Nos. 2 750
10 Muslim Shower
Provide and FixMuslim showers, complete with Tee stop cock and controlled
spray head and conforming to the requirements of drawings, and to the
entire satisfaction of the Project consultant. Nos. 2 6,000
Page 1
S.No. DESCRIPTION UNIT QTY RATES
11 Bib Cock
Provide and Fix bib cock and conforming to the requirements of drawings,
and to the entire satisfaction of the Project consultant.
i. Short bib cock Nos. 3 950
ii. Long bib cock Nos. 3 1,250
MIrror
Provide and Fix "Belgium glass" with chromium plated screws and 3.2 mm
thick hard board and conforming to the requirements of drawings, and to the
entire satisfaction of the Project consultant. Sft 6 450
Coat Hook
Provide and Fix chromium plated coat hook in all W.C and conforming to the
requirements of drawings, and to the entire satisfaction of the Project No 2 100
consultant.
Clean Out
Provide and fix upvc clean out (Floor / ceiling type) with s/s cover, marking
requisite number of holes in walls, Plint or floor for pipe connection and
making good the same as necessary to the structure including rubber gasket
and clamp etc and conforming to the requirements of drawings, and to the
entire satisfaction of the Project consultant.
FCO 4" dia No 2 1,000
13 Gate valve
Provide and fix of Gate valve, Threaded ends, bronze body with union bonnet,
non-rising stem and wedge disc. suitable for 8.5 bars SWP and 250 deg. F.,
manufactured by KITZ (Japan) or approved equivalent and conforming to the
requirements of drawings, and to the entire satisfaction of the Project
i. consultant.
Dis 1/2" Nos. 2 1,000
ii. Dia 3/4" Nos. 2 1,200
iii. Dia 1" Nos. 1 1,500
iv. Dia 1 1/2" Nos. 1 2,000
14 UPVC Pipes
Provide and lay cast UPVC pipes( AGM Brand) including fittings such as
tees, elbows, sockets, hangers/supports etc. conforming to BSS for soil waste
and vent pipes as embedded in floor and walls or suspended from slab or
clamped to wall including plugs hangars, beds, Tees, Yees. Include for making
requisite number of holes in walls and floors where required and making
good the same as necessary to the structure labeling, testing to 6.5 feet
water height and conforming to the requirements of drawings, and to the
entire satisfaction of the Project consultant.
i. Dia 2" Rft. 30 450
ii. Dia3" Rft. 100 550
iii. Dia 4" Rft. 100 650
iv. Dia 6" Rft. 70 950
Page 2
S.No. DESCRIPTION UNIT QTY RATES
TOTAL COST
Page 3
ing Building Work
AMOUNT
32,000
27,000
12,000
45,000
20,000
2,000
1,300
1,500
12,000
Page 4
AMOUNT
2,850
3,750
2,700
200
2,000
15,000
24,000
52,000
56,000
2,000
2,400
1,500
2,000
13,500
55,000
65,000
66,500
6,000
Page 5
AMOUNT
10,000
5,000
###
Page 6