: 20139
Time (Hrs)
Sl. No. Date Palce of visit
From To
2 2 April'14 7.30 20.00 KNL-TVM line
3 3 April'14 11.00 18.00 Quad & LILO lines
8 8 April'14 8.00 20.30 KNL-TVM line
KNL-TVM line &
9 9 April'14 8.00 23.00 Proddatur
Quad & LILO& KNL-TVM
10 10 April'14 8.30 21.00 lines
KNL-TVM line &
11 11 April'14 8.00 23.00 Proddatur
12 12 April'14 10.00 14.00 LILO & QUAD
13 13 April'14 9.30 15.00 KNL-TVM Line
14 14 April'14 8.00 20.30 KNL-TVM Line
Quad & LILO lines, L&T
15 15 April'14 8.30 21.00 Stores
Km Adm
Purpose
logged DA
TLC works 81 1
218 1
Stringing works inspection & to
appraise DGM about works.
208 1
TLC works 113 1
TLC works 122 1
TLC works 103 0.5
TLC works 65 0.5
208 1
Shutdown works 49 1
198 1
Shutdown works 137 1
TLC works 78 0.5
TLC works 191 0.5
TLC works 72 0.5
Total Days 19
(TRC Murty)
Emp. No. 20139
Ch. Manager,
CAO, Kurnool
Name: TRC Murty Emp. No.: 20139
Time (Hrs)
Sl. No. Date Palce of visit
From To
1 2 March'14 8.00 20.30 Quad & LILO lines
2 3 March'14 8.30 21.00 Quad & LILO lines
3 6 March'14 7.30 20.00 Quad & LILO lines
4 7 March'14 8.30 20.45 Quad & LILO lines
5 8 March'14 8.00 21.30 Quad & LILO lines
6 9 March'14 8.00 21.00 Quad & LILO lines
7 10 March'14 7.30 21.30 Quad & LILO lines
8 11 March'14 8.00 20.30 Quad & LILO lines
9 12 March'14 8.30 20.45 Quad & LILO lines
10 13 March'14 8.00 20.30 Quad & LILO lines
11 14 March'14 8.00 20.15 Quad & LILO lines
12 15 March'14 8.15 23.00 Quad & LILO lines
13 16 March'14 8.00 20.30 Quad & LILO lines
14 17 March'14 6.00 20.00 Quad & LILO lines
15 18 March'14 8.00 20.30 Quad & LILO lines
16 19 March'14 8.00 21.00 Quad & LILO lines
17 20 March'14 8.00 20.30 LILO lines
18 21 March'14 6.30 20.00 LILO lines
19 22 March'14 8.00 20.30 LILO lines
20 23 March'14 7.00 24.00 LILO lines
21 24 March'14 8.00 24.00 LILO lines
22 25 March'14 7.30 21.00 LILO lines
23 26 March'14 7.00 21.00 LILO lines
24 27 March'14 7.00 20.00 LILO lines
25 28 March'14 7.30 20.00 LILO lines
26 29 March'14 7.00 20.30 LILO lines
27 30 March'14 14.00 18.30 LILO lines
28 31 March'14 7.00 21.30 LILO lines
Designation: Manager
Km Adm
Purpose
logged DA
TLC works 72 1
TLC works 94 1
TLC works 163 1
TLC works 98 1
TLC works 101 1
TLC works 137 1
TLC works 84 1
TLC works 122 1
TLC works 139 1
TLC works 129 1
TLC works 83 1
TLC works 141 1
TLC works 139 1
TLC works 97 1
TLC works 71 1
TLC works 135 1
TLC works 160 1
TLC works 159 1
TLC works 69 1
TLC works 159 1
TLC works 79 1
TLC works 114 1
TLC works 190 1
TLC works 112 1
TLC works 119 1
TLC works 163 1
TLC works 99 0.5
TLC works 107 1
Total Days 27.5
(TRC Murty)
Emp. No. 20139
Manager, CAO, Kurnool
Name: TRC Murty Emp. No.: 20139 Designation:
Time (Hrs)
Sl. No. Date Palce of visit Purpose
From To
1 1 Feb'14 8.00 21.00 KNL-TVM line TLC works
2 2 Feb'14 8.30 15.00 Quad & LILO TLC works
3 3 Feb'14 8.00 16.00 Quad & LILO lines TLC works
4 5 Feb'14 8.00 20.30 Quad & LILO lines TLC works
KNL-TVM line, QUAD
5 6 Feb'14 8.00 21.00 &LILO
TLC works
6 7 Feb'14 8.30 20.45 Kurnool- via site TLC works
7 8 Feb'14 10.00 16.00 Quad & LILO lines TLC works
8 9 Feb'14 8.00 14.00 Quad & LILO lines TLC works
KNL-TVM line, QUAD
9 10 Feb'14 7.30 21.30 &LILO
TLC works
10 11 Feb'14 8.00 20.30 Quad & LILO lines TLC works
11 12 Feb'14 8.30 20.45 Quad & LILO lines TLC works
12 13 Feb'14 8.00 20.30 Quad & LILO lines TLC works
13 14 Feb'14 8.00 20.15 Quad & LILO lines TLC works
14 15 Feb'14 8.15 23.00 Quad & LILO lines TLC works
15 16 Feb'14 8.00 20.30 Quad & LILO lines TLC works
16 17 Feb'14 8.00 21.00 QUAD & LILO TLC works
17 18 Feb'14 8.00 16.00 QUAD & LILO TLC works
(TRC Murty)
Emp. No. 20139
Manager, CAO, Kurnool
Manager
Km Adm
logged DA
285 1
86 0.5
82 0.5
89 1
140 1
84 1
75 0.5
76 1
206 1
132 1
90 1
91 1
80 1
115 1
116 1
111 1
68 0.5
15
91 1
80 1
85 1
1
552
291 1
100 1
145 1
95 1
129 1
10
Name: TRC Murty Emp. No.: 20139 Designation:
Time (Hrs)
Sl. No. Date Palce of visit Purpose
From To
1 2 Jan'14 8.00 20.30 KNL-TVM line PTCC & TLC works
2 3 Jan'14 8.30 21.00 --do-- Forest works
3 5 Jan'14 8.00 20.30 Quad & LILO lines Fdn works & stores inspection
(TRC Murty)
Emp. No. 20139
Manager, CAO, Kurnool
Manager
Km Adm
logged DA
190 1
297 1
135 1
72 0.5
71 0.5
253 1
189 1
100 1
111 1
72 0.5
99 1
77 0.5
77 0.5
85 1
84 1
70 0.5
76 0.5
70 0.5
76 0.5
160 1
76 1
76 0.5
17
Name: TRC Murty Emp. No.: 20139
Time (Hrs)
Sl. No. Date Palce of visit
From To
1 1 Dec'13 8.00 20.30 Quad & LILO lines
2 2 Dec'13 8.30 21.00 --do--
Km Adm
Purpose
logged DA
Fdn works inspection 93 1
Fdn works inspection 101 1
Fdn works & stores inspection 84 1
Fdn, Erection & Strgg works & stores
inspection
173 1
Fdn works inspection & Sample
collection
112 1
Fdn works inspection 69 1
Fdn works inspection 85 1
To meet rail officals & Site inspection 202 1
Fdn works inspection 102 1
Fdn works & ROW clearane 307 1
Rly Crossing inspection & Fdn,
Erection works,
204 1
Fdn works inspection 157 1
DGPS Survey of CA land 320 1
DGPS Survey of Forest land 206 1
(TRC Murty)
Emp. No. 20139
Manager, CAO, Kurnool
Name: TRC Murty Emp. No.: 20139
Time (Hrs)
Sl. No. Date Palce of visit
From To
1 2 Nov'13 8.00 13.30 Quad & LILO lines
Km Adm
Purpose
logged DA
Fdn works inspection 68 0.5
Fdn works inspection 70 0.5 Contractor's vehicle
Fdn works inspection 72 0.5
Fdn works inspection 68 0.5
Fdn works inspection 80 0.5
Fdn works inspection 74 0.5
Fdn works inspection 75 1
Inspection of Site, Lab &
Testing of material
212 0.5
ROW & Fdn works 133 1
Fdn works 154 1
Stringing works & FDN works 85 1
Fdn works inspection 69 0.5 Contractor's vehicle
Fdn, Erection works 210 1
Fdn inspection & classification 68 0.5 Contractor's vehicle
Foundation works inspection &
Meeting
66 0.5
Fdn works inspection 72 0.5 Contractor's vehicle
Fdn works inspection 64 0.5
Survey & foundation works 70 1
Survey & foundation works 99 1
Survey & foundation works 120 1
14
(TRC Murty)
Emp. No. 20139
Manager, CAO, Kurnool
Name: TRC Murty Emp. No.: 20139
Time (Hrs)
Sl. No. Date Palce of visit
From To
1 1 Oct'13 8.00 17.00 Quad & LILO SS
Km Adm
Purpose
logged DA
Meeting & Site visit 69 0.5
Stringing site inspection 268 1
--do-- 72 0.5
--do-- 66 0.5
13.5
(TRC Murty)
Emp. No. 20139
Manager, CAO, Kurnool
Name: TRC Murty Emp. No.: 20139
Time (Hrs)
Sl. No. Date Palce of visit
From To
Site (KNL-TVM line
1 4 Sep'13 8.00 20.15
Part-1)
2 5 Sep'13 8.00 20.00 --do--
Proddatur to Kurnool
9 15 Sep'13 8.00 13.30
via site
Site ( LILO &
10 16 Sep'13 8.00 12.30 Quad lines)
Site ( LILO &
11 18 Sep'13 13.00 19.30 Quad lines)
Km Adm
Purpose
logged DA
Fdn, erection & stringing works
inspection
170 1
--do-- 281 1
--do-- 172 1
(TRC Murty)
Emp. No. 20139
Manager, CAO, Kurnool
Name: TRC Murty Emp. No.: 20139
Time (Hrs)
Sl. No. Date Palce of visit
From To
Site (KNL-TVM line
1 1 Aug'13 8.30 19.00
Part-1)
2 3 Aug'13 8.30 20.45 --do--
Proddatur to Kurnool
9 10 Aug'13 8.00 20.30
via site
Site (KNL-TVM line
10 13 Aug'13 8.00 21.00
Part-1)
Km Adm
Purpose
logged DA
Fdn & erection inspection 82 0.5
--do-- 143 1
--do-- 234 1
--do-- 178 1
--do--, Stringing works
arrangements
168 1
--do-- 217 1
Stringing works & stores inspection 310 1
(TRC Murty)
Emp. No. 20139
Manager, CAO, Kurnool
Name: TRC Murty Emp. No.: 20139
Time (Hrs)
Sl. No. Date Palce of visit
From To
Site (KNL-TVM line
1 3 July'13 8.00 20.30
Part-1)
2 5 July'13 8.30 16.30 --do--
Kurnool to Proddatur
3 6 July'13 8.00 19.00
via site
4 7 July'13 Proddatur
5 8 July'13 8.00 19.00 Proddatur
Proddatur to Papagni
8 11 July'13 10.00 21.00
river & Kurnool via site
Km Adm
Purpose
logged DA
Fdn & erection inspection 210 1
--do-- 105 0.5
120 1
Inspection of Soil investigation at 120 1
Papagni River crossong locations
of TW02 120 1
120 1
(TRC Murty)
Emp. No. 20139
Manager, CAO, Kurnool
Name: TRC Murty Emp. No.: 20139
Time (Hrs)
Sl. No. Date Palce of visit
From To
Site (KNL-TVM line
1 1 June'13 14.00 19.00
Part-1)
2 7 June'13 6.00
RHQ, Sec'bad
3 8 June'13 17.00
4 10 June'13 8.30 16.30 Site
5 11 June'13 8.00 19.00 Proddatur via site
Km Adm
Purpose
logged DA
Tower erection inspection 84 0.5
To attend Review meeting with M/s. 1
Bajaj
448
1
Fdn & erection inspection 98 0.5
Fdn, erection & stores inspection & 1
Progress review
476
1
Fdn & erection inspection 92 0.5
Fdn & erection inspection 105 0.5
Fdn & erection inspection 96 0.5
Fdn & erection inspection 190 1
Fdn & erection inspection 129 0.5
Fdn & erection inspection 164 1
Fdn & erection inspection 137 1
Fdn & stores inspection 0.5
Soil investigation at Papagni River 600 1
Fdn inspection 1
Fdn, erection & stores inspection &
Progress review
163 1
13.5
(TRC Murty)
Emp. No. 20139
Manager, CAO, Kurnool
Name: TRC Murty Emp. No.: 20139
Time (Hrs)
Sl. No. Date Palce of visit
From To
1 7 May'13 8.00 20.35 Site
2 9 May'13 8.00 21.00 Site
3 12 May'13 8.00 20.30 Site
67
Fdn inspection
90
Fdn inspection, Review of progress 200
with DGM
230
Field Qaulity Inspection 303
Fdn, Erection & Resurvey works 164
Foundation inspection 179
Tower Erection Inspection 69
(TRC Murty)
Emp. No. 20139
Manager, CAO, Kurnool
Name: TRC Murty Emp. No.: 20139
Time (Hrs)
Sl. No. Date Palce of visit
From To
1 1 June'13 14.00 19.00 Site & WRM
2 2 June'13
3 3 June'13
On leave
4 4 June'13
5 5 June'13
6 6 June'13 Office & DFO
7 7 June'13 6.00
RHQ, Sec'bad
8 8 June'13 17.00
9 9 June'13 Office, WRM
10 10 June'13 Site(7/0, 10/0)
11 11 June'13 8.00 19.00 Proddatur via site
Purpose Km logged
Tower erection inspection 84
(TRC Murty)
Emp. No. 20139
Manager, CAO, Kurnool
Name: TRC Murty Emp. No.: 20139
Time (Hrs)
Sl. No. Date Palce of visit
From To
1 1 May'13
2 2 May'13
3 3 May'13
4 4 May'13 On leave
5 5 May'13 Sunday
6 6 May'13
7 7 May'13 8.00 20.35 Site
8 8 May'13 Office
9 9 May'13 8.00 21.00 Site
10 10 May'13 Office
11 11 May'13 Office
12 12 May'13 8.00 20.30 Site
13 13 May'13 Office
Fdn Inspection
Fdn inspection
Fdn inspection
(TRC Murty)
Emp. No. 20139
Manager, CAO, Kurnool
Name: TRC Murty Emp. No.: 20139
Time (Hrs)
Sl. No. Date Palce of visit
From To
1 1 April'13 Office
2 2 April'13 8.00 21.00 Site, both stores
3 3 April'13 DFO office
7 7 April'13 Office
8 8 April'13 15.00
9 9 April'13 Secunderabad
10 10 April'13 23.30
11 11 April'13
12 12 April'13 8.00 20.30 Site, both stores
13 13 April'13 Office
14 14 April'13
15 15 April'13 11.00 19.30 Tungabhadra RF
20 20 April'13
21 21 April'13 8.30 22.00 Site
22 22 April'13 7.00 21.00 Sec'bad
23 23 April'13 APTRANSCO
24 24 April'13 Office
Purpose
Updation of record
Stores & Fdn inspection
To meet DFO
(TRC Murty)
Emp. No. 20139
Manager, CAO, Kurnool
Name: TRC Murty Emp. No.: 20139
Time (Hrs)
Sl. No. Date Palce of visit
From To
1 1 Mar'13 08.00 19.00 Sec-1-4
2 2 Mar'13 Office
3 3 Mar'13 08.15 20.30 Sec17-18 & 12-14
Office &
14 14 Mar'13 O/o DFO
15 15 Mar'13 Office
16 16 Mar'13 8.30 16.30 Site
17 17 Mar'13 Office
Site 3-4, 21-22,30-
18 18 Mar'13 8.00 21.00 32, Stores
19 19 Mar'13 Office
20 20 Mar'13 12.00 18.00 Site 1-4
21 21 Mar'13 8.00 20.30 Site 18-20
22 22 Mar'13 Office
23 23 Mar'13 14.00 18.00 Site 1-4
24 24 Mar'13 9.00 19.30 Site
25 25 Mar'13 Office
26 26 Mar'13 8.30 20.40 Site
27 27 Mar'13 Office
28 28 Mar'13 8.30 20.50 Site
29 29 Mar'13 8.00 21.30 Nellore-Gooty line
30 30 Mar'13 Office
31 31 Mar'13
Designation: Manager
ails
Mode of
Purpose
Transport
Dead DE & route inspection Jeep
Profiles checking
(TRC Murty)
Emp. No. 20139
Manager, CAO, Kurnool
Name: TRC Murty Emp. No.: 20139
Time (Hrs)
Sl. No. Date Palce of visit
From To
1 1 Feb'13 9.00 20.00 Site
2 2 Feb'13 On Leave
3 3 Feb'13 Sunday
4 4 Feb'13 10.00 20.00 Site
5 5 Feb'13 Office
6 6 Feb'13 Forest office
7 7 Feb'13 8.30 20.30 Site
8 8 Feb'13 8.00 21.00 Site
9 9 Feb'13
10 10 Feb'13
11 11 Feb'13
12 12 Feb'13
13 13 Feb'13
14 14 Feb'13 On Leave daughter's
15 15 Feb'13 marriage
16 16 Feb'13
17 17 Feb'13
18 18 Feb'13
19 19 Feb'13
20 20 Feb'13
21 21 Feb'13 Office
22 22 Feb'13 8.45 21.00 Site
23 23 Feb'13 8.30 17.00 SS & site
24 24 Feb'13 Bangalore
25 25 Feb'13 Bangalore
26 26 Feb'13 Office & DFO
27 27 Feb'13 9.00 21.30 Site & Proddatur
Mode of
Purpose
Transport
Fdn & Tower erection works TLC Jeep
Record updation
Fdn & Erection works TLC Jeep
PR Meeting
(TRC Murty)
Emp. No. 20139
Manager, CAO, Kurnool
Name: TRC Murty Emp. No.: 20139
Time (Hrs)
Sl. No. Date Palce of visit
From To
1 1 Jan'13 Office
2 2 Jan'13 DFO & FRO office
3 3 Jan'13 08.00 20.30 KNL-TVM line
4 4 Jan'13 Office
5 5 Jan'13 08.00 18.30 KNL-TVM line
6 6 Jan'13 08.30 20.30 KNL-TVM line
7 7 Jan'13 DFO & FRO office
8 8 Jan'13 08.30 19.30 KNL-TVM line
13 13 Jan'13 Sunday
14 14 Jan'13 DFO & FRO office
16 16 Jan'13 Office
17 17 Jan'13 DFO & FRO office
20 20 Jan'13 Sunday
21 21 Jan'13
22 22 Jan'13
23 23 Jan'13 Kadapa
30 30 Jan'13
31 31 Jan'13 RHQ, Sec'bad
Designation: Manager
Mode of
Purpose
Transport
Documentation
Forest proposal followup
Fdn & stores inspection TLC jeep
Documentation
Fdn & stores inspection TLC jeep
Fdn & stores inspection TLC jeep
Forest proposal followup
Fdn & stores inspection TLC jeep
Tower erection & Fdn inspection TLC jeep
Fdn & stores inspection TLC jeep
Forest proposal followup
On Leave
On Leave
Documentation
Fdn & erection sites inspection with
TLC jeep
D.M. Vig
Fdn sites & stores inspection with
TLC jeep
D.M. Vig
(TRC Murty)
Emp. No. 20139
Manager, CAO, Kurnool
Name: TRC Murty Emp. No.: 20139
Time (Hrs)
Sl. No. Date Palce of visit
From To
1 1 1 Dec'12 8.00 15.30 Site
2 2 2 Dec'12 9.30 18.30 Site
3 3 Dec'12 Office
3 4 4 Dec'12 8.30 20.00 Site
6 6 Dec'12 Office
15 15 Dec'12 Office
16 16 Dec'12 Office
17 17 Dec'12 OL
18 18 Dec'12 HPL
On leave
19 19 Dec'12 HPL
20 20 Dec'12 HPL
9 21 21 Dec'12 7.30 21.30 Site
22 22 Dec'12 Office
29 29 Dec'12 Office
Month: Dec'12
Mode of
Purpose
Transport
Foundation works, Safety Audit &
TLC jeep
WRM
Foundation works TLC jeep
Documentation
Realignment of
TLC jeep
Section19-20
Regional FQ Audit & Inspection report TLC jeep
Forest Office &
Profiles review
Source identification & Joint sample
Contr jeep
collection
Weekly meeting & medical camp
SSC jeep
review
Medical camp TLC jeep
Record work
Site Section 8-9 Contr jeep
AGM & DGM Visit Section 2-4 SSC &
realingmnet Contr jeep
Soft copy Profile verification
Fdn works SSC &TLC Jeep
(TRC Murty)
Emp. No. 20139
Manager, CAO, Kurnool
Site visit details - Nov'12
TLC jeep
TLC jeep
TLC jeep
Contr jeep
Contr jeep
TLC jeep
TLC jeep
TLC jeep
TLC jeep
TLC jeep
TLC jeep
TLC jeep
SSC jeep
Site visit details
2 05.10.12 Site
3 08.10.12 Site
4 10.10.12 Site
11.10.12 Site
5 12.10.12 Raichur
13.10.12 Site
7 18.10.12 Site
8
9 26.10.12 Site
10 27.10.12 Site
11 28.10.12 Site
12 29.10.12 Site
13 30.10.12 Site
Purpose
MOP visit