Vous êtes sur la page 1sur 42

Date

S/N Location

1 ZONE 5

2 ZONE 5

3 ZONE 1

4 ZONE 1
5 ZONE 1

6 ZONE 1

7 ZONE 1

8 ZONE 1
Prepared by RTO Representative:
Remark: Photo attached (1 page )

Photos taken on

RD259 PROPOSED BUS DEPOT AT LO

ON-GOING CBP WORKS AT ZONE 5 P

RD259 PROPOSED BUS DEPOT AT LO


ON-GOING REBAR INSTALLATION AT
TRENCH AT ZONE 1 PHASE 1

RD259 PROPOSED BUS DEPOT AT LO

ON-GOING RIGID PAVEMENT CASTIN


RD259 PROPOSED BUS DEPOT AT LO

ON-GOING INSPECTION OF WALL RE


UNDERGROUND FUEL TANK AT ZONE
RD276 Appointm

11/6/2014 WEDNESDAY

Chainage
RTO Representative: ALFREDO JR
to attached (1 page )

11/6/2014 WEDNESDAY

OSED BUS DEPOT AT LOYANG

BP WORKS AT ZONE 5 PHASE 2

OSED BUS DEPOT AT LOYANG


EBAR INSTALLATION AT UNDERGROUND 1400MM WIDE
ZONE 1 PHASE 1

OSED BUS DEPOT AT LOYANG

IGID PAVEMENT CASTING AT ZONE 1 PHASE 1


OSED BUS DEPOT AT LOYANG

NSPECTION OF WALL REBAR AND WALL FORMWORKS A


UND FUEL TANK AT ZONE 1 PHASE 1
C & V ENGINEER
Project Consultant Engineers GS
Maxwell House, # 09-04/05. 20, Max
Tel: 62260828 Fax:
Email : cveng0904@gmail.com

RD276 Appointment of Qualified Person ( Super


DAILY SITE R

Nature of works

ON-GOING CBP WORKS AT ZONE 5 PHASE 2

ON-GOING INSTALLATION OF PILE CAP


REINFORCEMENT BARS AT ZONE 5 PHASE 1

ON-GOING REBAR INSTALLATION AT


UNDERGROUND 1400MM WIDE PIPE TRENCH
AT ZONE 1 PHASE 1

ON-GOING SWFR INSTALLATION AT RIGID


PAVEMENT ZONE 1 PHASE 1
ON-GOING RIGID PAVEMENT CASTING AT ZONE
1 PHASE 1

ON-GOING CASTING OF 1200MM WIDE DRAIN


TOP SLAB COVER AT NEW ROAD
NORTHBOUND NEAR JUNCTION

ON-GOING INSPECTION OF WALL REBAR AND


WALL FORMWORKS AT UNDERGROUND FUEL
TANK AT ZONE 1 PHASE 1

ON-GOING CASTING OF RIGID PAVEMENT AT


NEW ROAD NORTHBOUND ZONE 1 PHASE 1
ALFREDO JR. ARIOS CLARO
(Name & signature)
UND 1400MM WIDE PIPE

PHASE 1
ALL FORMWORKS AT
NEERING PTE LTD
ngineers GST. Reg. No. 198202518K
/05. 20, Maxwell Road, Singapore 069113
2260828 Fax: 62225645
gmail.com Website : www.cvconslt.com

on ( Supervision) For Proposed Bus Depot at Loy


AILY SITE REPORT

Time (Hrs) Weather


8-12AM
0800-1930
Condition 1-6PM
RE

0800-1800 RTO

Total

0800-1800

VISITOR AT SITE:

0800-1900
0800-2400
SITE MEETING (IF ANY)

0800-1800

0800-2000 HTC MANPOWER

Project Manager 1

0800-2400 Project Coordinator 1

Site Manager 1

Project Engineer 2

Planning Engineer 1

Architect
Consultant

QECP

Site Supervisor 4

Rigger Signalman 1

Checked by RE R
RD259 PROPO

ON-GOING INS
PHASE 1

RD259 PROPO
ON-GOING SW

RD259 PROPO

ON-GOING CA
ROAD NORTH
RD259 PROPO

ON-GOING CA
ZONE 1 PHASE
SS ISO 9001:2008
FS 500171

at Loyang

Fine Drizzle Rain

Fine FINE Rain


WSHO 2

ECO 1

Safety Supervisor 1

Quantity Surveyor 1

SPRO 1

Surveyor 1
Tipper Truck Operator 1

Excavator Operator 12

Volvo Truck Operator 3

General Worker 44

TOTAL 78

d by RE Representative: Muthu Senthi


(Name & sign
9 PROPOSED BUS DEPOT AT LOYANG

OING INSTALLATION OF PILE CAP REINFORCEMENT BAR


E1

9 PROPOSED BUS DEPOT AT LOYANG


OING SWFR INSTALLATION AT RIGID PAVEMENT ZONE 1

9 PROPOSED BUS DEPOT AT LOYANG

OING CASTING OF 1200MM WIDE DRAIN TOP SLAB COVE


NORTHBOUND NEAR JUNCTION
9 PROPOSED BUS DEPOT AT LOYANG

OING CASTING OF RIGID PAVEMENT AT NEW ROAD NOR


1 PHASE 1
S ISO 9001:2008 Certificate No:
FS 500171

3
MACHINERY

EXCAVATOR 10

GENERATOR 3

ROLLER (1&10
2
TONS)

SOIL DRILL
1
MACHINE

VOLVO TRUCK 2

TIPPER TRUCK 1
MOBILE CRANE 1

TOTAL 20

Muthu Senthil Kumar


(Name & signature)
NFORCEMENT BARS AT ZONE 5
AVEMENT ZONE 1 PHASE 1

N TOP SLAB COVER AT NEW


T NEW ROAD NORTHBOUND