Underground Piping Fabrication Status (GRE

South Island (Sub contractor AJES)


Drawing Status Spool Status
Piping Total No. ISO with
No. System Line Shop Field Cumu Balance to
Class ISO dwg. Approved
Numbers Scope Scope lative Fabricate
Rev A17 Weld Map

1 FW (GRE) A11V 156 375 375 517 239 461 56

2 SW (GRE) A11V 1 2 2 5 1 5 0
3 PW (GRE ) A31V 15 34 34 55 120 14 41
4 DC ( GRE) A21V 1 19 19 37 21
5 DO (GRE) A11V 22 43 43 50 2
6 DC ( CS) A59AN 4 4 3 6 0
7 DC ( CS) B59AN 4 56 56 74 2
8 DC ( CS) E9AN 1 14 14 39 0
9 DC ( CS) F8AN 1 17 17 40 0
10 DF (CS) A51A 4 7 7 23 0
11 NG (CS) A51A 2 4 4 11 0
12 PA (CS) A51A 2 4 4 11 0
13 IA (SS) A51E 1 3 0 6 0
Total 214 582 578 874 385 480

North Island (Subcontractor -AJES)


Drawing Status Spool Status
Piping Total No. ISO with
No. System Line Shop Field Cumu Balance to
Class ISO dwg. Approved
Numbers Scope Scope lative Fabricate
Rev A17 Weld Map
1 FW (GRE ) A11V 187 400 396 481 241 110 371
2 DO (GRE) A11V 22 38 38 50 21
3 DC (GRE) A21V 1 11 11 21 12
4 PW (GRE) A31V 10 26 15 38 28
5 SW (GRE) A11V 1 2 2 3 0
6 DC ( CS) B59AN 14 62 26 74 13
7 DC ( CS) E9AN 1 5 5 12 10
8 DC ( CS) F8AN 5 11 9 17 10
9 DF (CS) A51A 3 7 4 24 3
10 NG (CS) A51A 3 6 5 17 0
11 PA (CS) A51A 3 7 6 17 0
12 IA (SS) A51E 1 2 2 9 0
Total 251 577 519 763 338 110

Central Island (Sub Contractor - NBHH)


Drawing Status Spool Status
Piping Total No. ISO with
No. System Line Shop Field Cumu Balance to
Class ISO dwg. Approved
Numbers Scope Scope lative Fabricate
Rev A8 Weld Map
1 FW (GRE ) A11V 170 319 203 444 196 110 334
2 DO (GRE) A11V 8 13 6
3 DC ( CS) B59AN 25 56 0
Total 203 388 209
tatus (GRE.CS & SS)
as of 10 June 2015
Dia -inch Status %
Shop Field Cumu Balance to Remarks
Completed
Scope Scope lative Fabricate

11972 9678 11128 844 92.95%

144 144 144 0 100.00% SW Lines Completed


292 478 62 230 21.23%
202 221
360 182
48 0
516 248
192 116
216 112
92 46
34 20
34 20
22 14
14124 11279 11334 80.25%

Dia -inch Status %

Remarks
Shop Field Cumu Balance to
Completed
Scope Scope lative Fabricate

12639 9230 1988 10651 15.73%


328 178
205 133
202 178
96 96
474 294
116 72
161 102
76 54
26 16
26 16
24 10
14373 10379 1988

Dia -inch Status %

Shop Field Cumu Balance to Remarks


Completed
Scope Scope lative Fabricate

14548 9777 2817 11731 19.36%


Underground Piping Fabrication Status (GRE
South Island (Sub contractor AJES)
Drawing Status Spool Status
Piping Total No. ISO with
No. System Line Shop Field Cumu Balance to
Class ISO dwg. Approved
Numbers Scope Scope lative Fabricate
Rev A17 Weld Map

1 FW (GRE) A11V 156 375 375 517 239 490 27

2 SW (GRE) A11V 1 2 2 5 1 5 0
3 PW (GRE ) A31V 15 34 34 55 120 14 41
4 DC ( GRE) A21V 1 19 19 37 21
5 DO (GRE) A11V 22 43 43 50 2
6 DC ( CS) A59AN 4 4 3 6 0
7 DC ( CS) B59AN 4 56 56 74 2
8 DC ( CS) E9AN 1 14 14 39 0
9 DC ( CS) F8AN 1 17 17 40 0
10 DF (CS) A51A 4 7 7 23 0
11 NG (CS) A51A 2 4 4 11 0
12 PA (CS) A51A 2 4 4 11 0
13 IA (SS) A51E 1 3 0 6 0
Total 214 582 578 874 385 509

North Island (Subcontractor -AJES)


Drawing Status Spool Status
Piping Total No. ISO with
No. System Line Shop Field Cumu Balance to
Class ISO dwg. Approved
Numbers Scope Scope lative Fabricate
Rev A18 Weld Map
1 FW (GRE ) A11V 187 400 399 481 241 126 355
2 DO (GRE) A11V 22 38 38 49 21
3 DC (GRE) A21V 1 11 11 21 12
4 PW (GRE) A31V 11 28 26 56 63
5 SW (GRE) A11V 1 2 2 3 0
6 DC ( CS) B59AN 14 62 62 105 13
7 DC ( CS) E9AN 1 5 5 12 10
8 DC ( CS) F8AN 5 11 9 17 10
9 DF (CS) A51A 3 7 4 24 3
10 NG (CS) A51A 3 6 5 17 0
11 PA (CS) A51A 3 7 6 17 0
12 IA (SS) A51E 1 2 2 9 0
Total 252 579 569 811 373

Central Island (Sub Contractor - NBHH)


Drawing Status Spool Status
Piping Total No. ISO with
No. System Line Shop Field Cumu Balance to
Class ISO dwg. Approved
Numbers Scope Scope lative Fabricate
Rev A9 Weld Map
1 FW (GRE ) A11V 196 382 232 444 196 175 269
2 DO (GRE) A11V 10 15 8 20 5
3 DC ( CS) B59AN 35 77 0
Total 241 474 240
tatus (GRE.CS & SS)
as of 15 June 2015
Dia -inch Status %
Shop Field Cumu Balance to Remarks
Completed
Scope Scope lative Fabricate

11972 9678 11448 524 95.62%

144 144 144 0 100.00% SW Lines Completed


292 478 72 220 24.66%
202 221
360 182
48 0
516 248
192 116
216 112
92 46
34 20
34 20
22 14
14124 11279 11664 82.58%

Dia -inch Status %

Remarks
Shop Field Cumu Balance to
Completed
Scope Scope lative Fabricate

12639 9230 2320 10319 18.36%


328 178
205 133
229 317
96 96
432 332
116 72
161 102
76 54
56 34
52 32
24 10
14414 10590

Dia -inch Status %

Shop Field Cumu Balance to Remarks


Completed
Scope Scope lative Fabricate

15200 9777 3437 11763 22.61%


220 118
Underground Piping Fabrication Status (GRE
South Island (Sub contractor AJES)
Drawing Status Spool Status
Piping Total No. ISO with
No. System Line Shop Field Cumu Balance to
Class ISO dwg. Approved
Numbers Scope Scope lative Fabricate
Rev A17 Weld Map

1 FW GRE 156 378 378 517 239 487 30

2 SW GRE 1 2 2 5 1 5 0
3 PW GRE 15 34 34 55 120 14 41
4 DC GRE 1 19 19 37 21 2 35
5 DO GRE 22 43 43 50 2
6 DC CS 10 91 91 159 2
7 DF CS 4 7 7 23 0
8 NG CS 2 4 4 11 0
9 PA CS 2 4 4 11 0
10 IA SS 1 3 3 12 0
Total 214 585 585 880 385 508

North Island (Subcontractor -AJES)


Drawing Status Spool Status
Piping Total No. ISO with
No. System Line Shop Field Cumu Balance to
Class ISO dwg. Approved
Numbers Scope Scope lative Fabricate
Rev A18 Weld Map
1 FW GRE 187 400 399 481 241 153 328
2 DO GRE 22 38 38 49 21
3 DC GRE 1 11 11 21 12
4 PW GRE 11 28 26 56 63
5 SW GRE 1 2 2 3 0
6 DC CS 20 78 76 134 33
7 DF CS 3 7 4 24 3
8 NG CS 3 6 5 17 0
9 PA CS 3 7 6 17 0
10 IA SS 1 2 2 9 0
Total 252 579 569 811 373

Central Island (Sub Contractor - NBHH)


Drawing Status Spool Status
Piping Total No. ISO with
No. System Line Shop Field Cumu Balance to
Class ISO dwg. Approved
Numbers Scope Scope lative Fabricate
Rev A11 Weld Map
1 FW GRE 232 438 273 582 219 213 369
2 DO GRE 10 15 8 22 5
3 DC GRE 2 5 0 5 0
4 DC CS 116 249 0
Total 360 707 281
n Status (GRE.CS & SS)
as of 23 June 2015
Dia -inch Status %
Shop Field Cumu Balance to Remarks
Completed
Scope Scope lative Fabricate

12494 9180 11561 933 92.53%

144 144 144 0 100.00% SW Lines Completed


292 478 76 216 26.03%
202 221 36 166 17.82%
360 182
972 476
92 46
34 20
34 20
36 22
14660 10789 11817 80.61%

Dia -inch Status %

Remarks
Shop Field Cumu Balance to
Completed
Scope Scope lative Fabricate

12639 9230 2938 9701 23.25%


328 178
205 133
229 317
96 96
709 506
76 54
56 34
52 32
24 10
14414 10590

Dia -inch Status %

Shop Field Cumu Balance to Remarks


Completed
Scope Scope lative Fabricate

17196 11589 4121 13075 23.96%


214 130
26 8
Underground Piping Fabrication Status (GRE
South Island (Sub contractor AJES)
Drawing Status Spool Status
Piping Total No. ISO with
No. System Line Shop Field Cumu Balance to
Class ISO dwg. Approved
Numbers Scope Scope lative Fabricate
Rev A17 Weld Map

1 FW GRE 156 378 378 517 239 487 30

2 SW GRE 1 2 2 5 1 5 0
3 PW GRE 15 34 34 55 120 32 23
4 DC GRE 1 19 19 37 21 12 25
5 DO GRE 22 43 43 50 2
6 DC CS 10 91 91 159 2
7 DF CS 4 7 7 23 0
8 NG CS 2 4 4 11 0
9 PA CS 2 4 4 11 0
10 IA SS 1 3 3 12 0
Total 214 585 585 880 385 536

North Island (Subcontractor -AJES)


Drawing Status Spool Status
Piping Total No. ISO with
No. System Line Shop Field Cumu Balance to
Class ISO dwg. Approved
Numbers Scope Scope lative Fabricate
Rev A18 Weld Map
1 FW GRE 187 400 399 481 241 172 309
2 DO GRE 22 38 38 49 21
3 DC GRE 1 11 11 21 12
4 PW GRE 11 28 26 56 63
5 SW GRE 1 2 2 3 0
6 DC CS 20 78 76 134 33
7 DF CS 3 7 4 24 3
8 NG CS 3 6 5 17 0
9 PA CS 3 7 6 17 0
10 IA SS 1 2 2 9 0
Total 252 579 569 811 373

Central Island (Sub Contractor - NBHH)


Drawing Status Spool Status
Piping Total No. ISO with
No. System Line Shop Field Cumu Balance to
Class ISO dwg. Approved
Numbers Scope Scope lative Fabricate
Rev A11 Weld Map
1 FW GRE 232 438 279 582 219 224 358
2 DO GRE 10 15 8 22 5
3 DC GRE 2 5 0 5 0
4 DC CS 116 249 0 216 35
Total 360 707 287 243 259
n Status (GRE.CS & SS)
Date : 28 June 2015
Dia -inch Status %
Shop Field Cumu Balance to Remarks
Completed
Scope Scope lative Fabricate

12518 9156 11609 909 92.74%

144 144 144 0 100.00% SW Lines Completed


316 546 142 174 44.94%
202 221 66 136 32.67%
360 182
972 476
92 46
34 20
34 20
36 22
14708 10833 11961 81.32%

Dia -inch Status %

Remarks
Shop Field Cumu Balance to
Completed
Scope Scope lative Fabricate

12639 9230 3380 9259 26.74%


328 178
205 133
229 317
96 96
709 506
76 54
56 34
52 32
24 10
14414 10590

Dia -inch Status %

Shop Field Cumu Balance to Remarks


Completed
Scope Scope lative Fabricate

17196 11589 4793 12403 27.87%


214 130
26 8
1447 1004
18883 12731
Underground Piping Fabrication Status (GRE
South Island (Sub contractor AJES)
Drawing Status Spool Status
Piping Total No. ISO with
No. System Line Shop Field Cumu Balance to
Class ISO dwg. Approved
Numbers Scope Scope lative Fabricate
Rev A17 Weld Map

1 FW GRE 156 378 378 518 239 513 5

2 SW GRE 1 2 2 5 1 5 0
3 PW GRE 15 34 34 55 120 47 8
4 DC GRE 1 19 19 38 24 21 17
5 DO GRE 22 43 43 50 2
6 DC CS 10 91 91 159 2
7 DF CS 4 7 7 23 0
8 NG CS 2 4 4 11 0
9 PA CS 2 4 4 11 0
10 IA SS 1 3 3 12 0
Total 214 585 585 882 388 586

North Island (Subcontractor -AJES)


Drawing Status Spool Status
Piping Total No. ISO with
No. System Line Shop Field Cumu Balance to
Class ISO dwg. Approved
Numbers Scope Scope lative Fabricate
Rev A18 Weld Map
1 FW GRE 187 400 399 481 241 240 241
2 DO GRE 22 38 38 49 21
3 DC GRE 1 11 11 21 12
4 PW GRE 11 28 26 56 63
5 SW GRE 1 2 2 3 0
6 DC CS 20 78 76 134 33
7 DF CS 3 7 4 24 3
8 NG CS 3 6 5 17 0
9 PA CS 3 7 6 17 0
10 IA SS 1 2 2 9 0
Total 252 579 569 811 373

Central Island (Sub Contractor - NBHH)


Drawing Status Spool Status
Piping Total No. ISO with
No. System Line Shop Field Cumu Balance to
Class ISO dwg. Approved
Numbers Scope Scope lative Fabricate
Rev A11 Weld Map
1 FW GRE 232 438 279 582 219 288 294
2 DO GRE 10 15 8 22 5
3 DC GRE 2 5 0 5 0
4 DC CS 116 249 0 216 35
Total 360 707 287 243 259
n Status (GRE.CS & SS)
13-Jul-15
Dia -inch Status %
Shop Field Cumu Balance to Remarks
Completed
Scope Scope lative Fabricate

11687 10011 11651 36 99.69%

144 144 144 0 100.00% SW Lines Completed


316 546 188 128 59.49%
202 221 102 100 50.50%
360 182
972 476
92 46
34 20
34 20
36 22
13877 11688 12085 87.09%

Dia -inch Status %

Remarks
Shop Field Cumu Balance to
Completed
Scope Scope lative Fabricate

12639 9230 4638 8001 36.70%


328 178
205 133
229 317
96 96
709 506
76 54
56 34
52 32
24 10
14414 10590

Dia -inch Status %

Shop Field Cumu Balance to Remarks


Completed
Scope Scope lative Fabricate

17196 11589 6995 10201 40.68%


214 130
26 8
1447 1004
18883 12731
Underground Piping Fabrication Status (GRE
South Island (Sub contractor AJES)
Drawing Status Spool Status
Piping Total No. ISO with
No. System Line Shop Field Cumu Balance to
Class ISO dwg. Approved
Numbers Scope Scope lative Fabricate
Rev A17 Weld Map

1 FW GRE 156 378 378 518 239 513 5

2 SW GRE 1 2 2 5 1 5 0
3 PW GRE 15 34 34 60 120 55 5
4 DC GRE 1 19 19 38 24 25 13
5 DO GRE 22 43 43 50 2
6 DC CS 10 91 91 159 2
7 DF CS 4 7 7 23 0
8 NG CS 2 4 4 11 0
9 PA CS 2 4 4 11 0
10 IA SS 1 3 3 12 0
Total 214 585 585 887 388 598

North Island (Subcontractor -AJES)


Drawing Status Spool Status
Piping Total No. ISO with
No. System Line Shop Field Cumu Balance to
Class ISO dwg. Approved
Numbers Scope Scope lative Fabricate
Rev A18 Weld Map
1 FW GRE 187 400 399 481 241 266 215
2 DO GRE 22 38 38 49 21
3 DC GRE 1 11 11 21 12
4 PW GRE 11 28 26 56 63
5 SW GRE 1 2 2 3 0
6 DC CS 20 78 76 134 33
7 DF CS 3 7 4 24 3
8 NG CS 3 6 5 17 0
9 PA CS 3 7 6 17 0
10 IA SS 1 2 2 9 0
Total 252 579 569 811 373

Central Island (Sub Contractor - NBHH)


Drawing Status Spool Status
Piping Total No. ISO with
No. System Line Shop Field Cumu Balance to
Class ISO dwg. Approved
Numbers Scope Scope lative Fabricate
Rev A11 Weld Map
1 FW GRE 232 438 279 582 219 302 280
2 DO GRE 10 15 8 22 5
3 DC GRE 2 5 0 5 0
4 DC CS 116 249 0 216 35
Total 360 707 287 243 259
n Status (GRE.CS & SS)
21-Jul-15
Dia -inch Status %
Shop Field Cumu Balance to Remarks
Completed
Scope Scope lative Fabricate

11703 10011 11671 32 99.73%

144 144 144 0 100.00% SW Lines Completed


316 546 220 96 69.62%
206 221 126 80 61.17%
360 182
972 476
92 46
34 20
34 20
36 22
13897 11688 12161 87.51%

Dia -inch Status %

Remarks
Shop Field Cumu Balance to
Completed
Scope Scope lative Fabricate

12639 9230 5213 7426 41.25%


328 178
205 133
229 317
96 96
709 506
76 54
56 34
52 32
24 10
14414 10590

Dia -inch Status %

Shop Field Cumu Balance to Remarks


Completed
Scope Scope lative Fabricate

17196 11589 7647 9549 44.47%


214 130
26 8
1447 1004
18883 12731
Underground Piping Fabrication Status (GRE
South Island (Sub contractor AJES)
Drawing Status Spool Status
Piping Total No. ISO with
No. System Line Shop Field Cumu Balance to
Class ISO dwg. Approved
Numbers Scope Scope lative Fabricate
Rev A17 Weld Map

1 FW GRE 156 378 378 518 239 513 5

2 SW GRE 1 2 2 5 1 5 0
3 PW GRE 15 34 34 60 120 55 5
4 DC GRE 1 19 19 38 24 25 13
5 DO GRE 22 43 43 50 2
6 DC CS 10 91 91 159 2
7 DF CS 4 7 7 23 0
8 NG CS 2 4 4 11 0
9 PA CS 2 4 4 11 0
10 IA SS 1 3 3 12 0
Total 214 585 585 887 388 598

North Island (Subcontractor -AJES)


Drawing Status Spool Status
Piping Total No. ISO with
No. System Line Shop Field Cumu Balance to
Class ISO dwg. Approved
Numbers Scope Scope lative Fabricate
Rev A18 Weld Map
1 FW GRE 187 400 399 481 241 303 178
2 DO GRE 22 38 38 49 21
3 DC GRE 1 11 11 21 12
4 PW GRE 11 28 26 56 63
5 SW GRE 1 2 2 3 0
6 DC CS 20 78 76 134 33
7 DF CS 3 7 4 24 3
8 NG CS 3 6 5 17 0
9 PA CS 3 7 6 17 0
10 IA SS 1 2 2 9 0
Total 252 579 569 811 373

Central Island (Sub Contractor - NBHH)


Drawing Status Spool Status
Piping Total No. ISO with
No. System Line Shop Field Cumu Balance to
Class ISO dwg. Approved
Numbers Scope Scope lative Fabricate
Rev A11 Weld Map
1 FW GRE 232 661 291 582 219 325 257
2 DO GRE 10 15 8 22 5
3 DC GRE 2 5 0 5 0
4 DC CS 116 249 0 216 35
Total 360 930 299 243 259
n Status (GRE.CS & SS)
27-Jul-15
Dia -inch Status %
Shop Field Cumu Balance to Remarks
Completed
Scope Scope lative Fabricate

11735 10011 11679 56 99.52%

144 144 144 0 100.00% SW Lines Completed


316 546 220 96 69.62%
206 221 126 80 61.17%
360 182
972 476
92 46
34 20
34 20
36 22
13929 11688 12169 87.36%

Dia -inch Status %

Remarks
Shop Field Cumu Balance to
Completed
Scope Scope lative Fabricate

12639 9230 5969 6670 47.23%


328 178
205 133
229 317
96 96
709 506
76 54
56 34
52 32
24 10
14414 10590

Dia -inch Status %

Shop Field Cumu Balance to Remarks


Completed
Scope Scope lative Fabricate

17196 11589 8429 8767 49.02%


214 130
26 8
1447 1004
18883 12731
Underground Piping Fabrication Status (GRE
South Island (Sub contractor AJES)
Drawing Status Spool Status
Piping Total No. ISO with
No. System Line Shop Field Cumu Balance to
Class ISO dwg. Approved
Numbers Scope Scope lative Fabricate
Rev A17 Weld Map

1 FW GRE 156 378 378 518 239 513 5

2 SW GRE 1 2 2 5 1 5 0
3 PW GRE 15 34 34 60 120 55 5
4 DC GRE 1 19 19 38 24 25 13
5 DO GRE 22 43 43 50 2
6 DC CS 10 91 91 159 2
7 DF CS 4 7 7 23 0
8 NG CS 2 4 4 11 0
9 PA CS 2 4 4 11 0
10 IA SS 1 3 3 12 0
Total 214 585 585 887 388 598

North Island (Subcontractor -AJES)


Drawing Status Spool Status
Piping Total No. ISO with
No. System Line Shop Field Cumu Balance to
Class ISO dwg. Approved
Numbers Scope Scope lative Fabricate
Rev A18 Weld Map
1 FW GRE 187 400 399 481 241 340 141
2 DO GRE 22 38 38 49 21
3 DC GRE 1 11 11 21 12
4 PW GRE 11 28 26 56 63
5 SW GRE 1 2 2 3 0
6 DC CS 20 78 76 134 33
7 DF CS 3 7 4 24 3
8 NG CS 3 6 5 17 0
9 PA CS 3 7 6 17 0
10 IA SS 1 2 2 9 0
Total 252 579 569 811 373

Central Island (Sub Contractor - NBHH)


Drawing Status Spool Status
Piping Total No. ISO with
No. System Line Shop Field Cumu Balance to
Class ISO dwg. Approved
Numbers Scope Scope lative Fabricate
Rev A11 Weld Map
1 FW GRE 232 661 291 582 219 373 209
2 DO GRE 10 15 8 22 5
3 DC GRE 2 5 0 5 0
4 DC CS 116 249 0 216 35
Total 360 930 299 243 259
n Status (GRE.CS & SS)
2-Aug-15
Dia -inch Status %
Shop Field Cumu Balance to Remarks
Completed
Scope Scope lative Fabricate

11783 10011 11767 16 99.86%

144 144 144 0 100.00% SW Lines Completed


316 546 220 96 69.62%
206 221 126 80 61.17%
360 182
972 476
92 46
34 20
34 20
36 22
13977 11688 12257 87.69%

Dia -inch Status %

Remarks
Shop Field Cumu Balance to
Completed
Scope Scope lative Fabricate

12639 9230 6751 5888 53.41%


328 178
205 133
229 317
96 96
709 506
76 54
56 34
52 32
24 10
14414 10590

Dia -inch Status %

Shop Field Cumu Balance to Remarks


Completed
Scope Scope lative Fabricate

17196 11589 9645 7551 56.09%


214 130
26 8
1447 1004
18883 12731
Underground Piping Fabrication Status (GRE
South Island (Sub contractor AJES)
Drawing Status Spool Status
Piping Total No. ISO with
No. System Line Shop Field Cumu Balance to
Class ISO dwg. Approved
Numbers Scope Scope lative Fabricate
Rev A17 Weld Map

1 FW GRE 156 378 378 518 239 513 5

2 SW GRE 1 2 2 5 1 5 0
3 PW GRE 15 34 34 60 120 55 5
4 DC GRE 1 19 19 38 24 25 13
5 DO GRE 22 43 43 50 2
6 DC CS 10 91 91 159 2
7 DF CS 4 7 7 23 0
8 NG CS 2 4 4 11 0
9 PA CS 2 4 4 11 0
10 IA SS 1 3 3 12 0
Total 214 585 585 887 388 598

North Island (Subcontractor -AJES)


Drawing Status Spool Status
Piping Total No. ISO with
No. System Line Shop Field Cumu Balance to
Class ISO dwg. Approved
Numbers Scope Scope lative Fabricate
Rev A18 Weld Map
1 FW GRE 187 400 399 481 241 382 99
2 DO GRE 22 38 38 49 21
3 DC GRE 1 11 11 21 12
4 PW GRE 11 28 26 56 63
5 SW GRE 1 2 2 3 0
6 DC CS 20 78 76 134 33
7 DF CS 3 7 4 24 3
8 NG CS 3 6 5 17 0
9 PA CS 3 7 6 17 0
10 IA SS 1 2 2 9 0
Total 252 579 569 811 373

Central Island (Sub Contractor - NBHH)


Drawing Status Spool Status
Piping Total No. ISO with
No. System Line Shop Field Cumu Balance to
Class ISO dwg. Approved
Numbers Scope Scope lative Fabricate
Rev A11 Weld Map
1 FW GRE 232 661 291 582 219 415 167
2 DO GRE 10 15 8 22 5
3 DC GRE 2 5 0 5 0
4 DC CS 116 249 0 216 35
Total 360 930 299 243 259
n Status (GRE.CS & SS)
2-Aug-15
Dia -inch Status %
Shop Field Cumu Balance to Remarks
Completed
Scope Scope lative Fabricate

11783 10011 11767 16 99.86%

144 144 144 0 100.00% SW Lines Completed


316 546 220 96 69.62%
206 221 126 80 61.17%
360 182
972 476
92 46
34 20
34 20
36 22
13977 11688 12257 87.69%

Dia -inch Status %

Remarks
Shop Field Cumu Balance to
Completed
Scope Scope lative Fabricate

12639 9230 7573 5066 59.92%


328 178
205 133
229 317
96 96
709 506
76 54
56 34
52 32
24 10
14414 10590

Dia -inch Status %

Shop Field Cumu Balance to Remarks


Completed
Scope Scope lative Fabricate

17196 11589 10863 6333 63.17%


214 130
26 8
1447 1004
18883 12731
Underground Piping Fabrication Status (GRE
South Island (Sub contractor AJES)
Drawing Status Spool Status
Piping Total No. ISO with
No. System Line Shop Field Cumu Balance to
Class ISO dwg. Approved
Numbers Scope Scope lative Fabricate
Rev A25 Weld Map

1 FW GRE 171 402 378 566 239 561 5

2 SW GRE 6 13 2 5 1 5 0
3 PW GRE 15 35 34 60 120 55 5
4 DC GRE 1 19 19 38 24 25 13
5 DO GRE 28 53 43 50 2
6 DC CS 10 87 91 159 2
7 DF CS 4 9 7 23 0
8 NG CS 2 4 4 11 0
9 PA CS 2 4 4 11 0
10 IA SS 1 3 3 12 0
Total 240 629 585 935 388 646

North Island (Subcontractor -AJES)


Drawing Status Spool Status
Piping Total No. ISO with
No. System Line Shop Field Cumu Balance to
Class ISO dwg. Approved
Numbers Scope Scope lative Fabricate
Rev A22 Weld Map
1 FW GRE 187 397 399 627 241 455 172
2 DO GRE 38 64 38 49 21
3 DC GRE 1 11 11 21 12
4 PW GRE 11 29 26 56 63
5 SW GRE 1 2 2 3 0
6 DC CS 20 78 76 134 33
7 DF CS 3 7 4 24 3
8 NG CS 2 5 5 17 0
9 PA CS 2 6 6 17 0
10 IA SS 1 2 2 9 0
Total 266 601 569 957 373

Central Island (Sub Contractor - NBHH)


Drawing Status Spool Status
Piping Total No. ISO with
No. System Line Shop Field Cumu Balance to
Class ISO dwg. Approved
Numbers Scope Scope lative Fabricate
Rev A19 Weld Map
1 FW GRE 369 751 661 582 219 515 67
2 DO GRE 59 60 8 22 5
3 DC GRE 56 135 0 5 0
4 DC CS 228 534 0 216 35
5 DO CS 2 1
Total 714 1481 669 243 259
n Status (GRE.CS & SS)
20-Aug-15
Dia -inch Status %
Shop Field Cumu Balance to Remarks
Completed
Scope Scope lative Fabricate

11783 10011 11767 16 99.86%

144 144 144 0 100.00% SW Lines Completed


316 546 220 96 69.62%
206 221 126 80 61.17%
360 182
972 476
92 46
34 20
34 20
36 22
13977 11688 12257 87.69%

Dia -inch Status %

Remarks
Shop Field Cumu Balance to
Completed
Scope Scope lative Fabricate

12639 9230 9055 3584 71.64%


328 178
205 133
229 317
96 96
709 506
76 54
56 34
52 32
24 10
14414 10590

Dia -inch Status %

Shop Field Cumu Balance to Remarks


Completed
Scope Scope lative Fabricate

17196 11589 13001 4195 75.60%


214 130
26 8
1447 1004

18883 12731
Underground Piping Fabrication Stat
South Island (Sub contractor AJES)
Drawing Status Spool Status
ISO with
Piping Total No. Approve
No. System Line Shop Field
Class ISO dwg. d
Numbers Scope Scope
Rev A25 Weld
Map
1 FW GRE 171 402 378 566 239

2 SW GRE 6 13 2 5 1

3 PW GRE 15 35 34 60 120
4 DC GRE 1 19 19 38 24
5 DO GRE 28 53 43 50 2
6 DC CS 10 87 87 88 2
7 DF CS 4 9 7 23 0
8 NG CS 2 4 4 11 0
9 PA CS 2 4 4 11 0
10 IA SS 1 3 3 12 0
Total 240 629 581 864 388
North Island (Subcontractor -AJES)
Drawing Status Spool Status
ISO with
Piping Total No. Approve
No. System Line Shop Field
Class ISO dwg. d
Numbers Scope Scope
Rev A22 Weld
Map
1 FW GRE 187 397 399 627 241
2 DO GRE 38 64 38 49 21
3 DC GRE 1 11 11 21 12
4 PW GRE 11 29 26 56 63
5 SW GRE 1 2 2 3 0
6 DC CS 20 78 76 134 33
7 DF CS 3 7 4 24 3
8 NG CS 2 5 5 17 0
9 PA CS 2 6 6 17 0
10 IA SS 1 2 2 9 0
Total 266 601 569 957 373
Fabrication Status (GRE.CS & SS)
###
Spool Status Dia -inch Status %

Balance Balance Remark


Cumu Shop Field Cumu Complet s
to to
lative Scope Scope lative ed
Fabricate Fabricate

561 5 11783 10011 11771 12 99.90%


SW Lines
5 0 144 144 144 0 100.00% Complet
ed
57 3 316 546 290 26 91.77%
25 13 206 221 126 80 61.17%
360 182
70 18 814 498 417 397 51.23%
92 46
34 20
34 20
36 22
718 13819 11710 12748 92.25%

Spool Status Dia -inch Status %

Balance Balance
Cumu Shop Field Cumu Complet Remarks
to to
lative Scope Scope lative ed
Fabricate Fabricate

504 123 12639 9230 9935 2704 78.61%


328 178
2 205 133 58
229 317
96 96
709 506
76 54
56 34
52 32
24 10
14414 10590
Underground Piping Fabrication Status (GRE
South Island (Sub contractor AJES)
Drawing Status Spool Status
Piping Total No. ISO with
No. System Line Shop Field Cumu Balance to
Class ISO dwg. Approved
Numbers Scope Scope lative Fabricate
Rev A25 Weld Map

1 FW GRE 171 402 378 566 239 561 5

2 SW GRE 6 13 2 5 1 5 0
3 PW GRE 15 35 34 60 120 60 0
4 DC GRE 1 19 19 38 24 34 4
5 DO GRE 28 53 43 50 2 11 39
6 DC CS 10 87 87 88 2 70 18
7 DF CS 4 9 7 23 0
8 NG CS 2 4 4 11 0
9 PA CS 2 4 4 11 0
10 IA SS 1 3 3 12 0
Total 240 629 581 864 388 741

North Island (Subcontractor -AJES)


Drawing Status Spool Status
Piping Total No. ISO with
No. System Line Shop Field Cumu Balance to
Class ISO dwg. Approved
Numbers Scope Scope lative Fabricate
Rev A22 Weld Map
1 FW GRE 187 400 400 627 241 504 123
2 DO GRE 38 64 38 49 21
3 DC GRE 1 11 11 21 17 2
4 PW GRE 11 29 26 56 63
5 SW GRE 1 2 2 3 0
6 DC CS 20 78 20 134 33
7 DF CS 3 7 4 24 3
8 NG CS 2 5 5 17 0
9 PA CS 2 6 6 17 0
10 IA SS 1 2 2 9 0
Total 266 604 514 957 378

Central Island (Sub Contractor - NBHH)


Drawing Status Spool Status
Piping Total No. ISO with
No. System Line Shop Field Cumu Balance to
Class ISO dwg. Approved
Numbers Scope Scope lative Fabricate
Rev A19 Weld Map
1 FW GRE 369 751 661 680 219 659 21
2 DO GRE 59 60 8 22 5
3 DC GRE 56 135 0 5 0
4 DC CS 228 534 0 216 35
5 DO CS 2 1
Total 714 1481 669 243 259
n Status (GRE.CS & SS)
29-Aug-15
Dia -inch Status %
Shop Field Cumu Balance to Remarks
Completed
Scope Scope lative Fabricate

11783 10011 11771 12 99.90%

144 144 144 0 100.00% SW Lines Completed


316 546 292 24 92.41%
206 221 189 17 91.75%
360 182 80 280 22.22%
814 498 808 6 99.26%
92 46
34 20
34 20
36 22
13819 11710 13284 96.13%

Dia -inch Status %

Remarks
Shop Field Cumu Balance to
Completed
Scope Scope lative Fabricate

12639 9230 10541 2098 83.40%


328 178
205 133 104
229 317
96 96
709 506 70 639 9.87%
76 54
56 34
52 32
24 10
14414 10590

Dia -inch Status %

Shop Field Cumu Balance to Remarks


Completed
Scope Scope lative Fabricate

17196 11589 16756 440 97.44%


214 130
26 8
1447 1004

18883 12731