Bid Issue

GRDA Unit 3 Combined Cycle Project Heat Recovery Steam Generator


March 2014
178592.67.6130

00300.1 Not Used

00300.2 General Quotation Parameters

00300.2.1 Bidder's Contact Information


Bidder's Quotation Number
Bidder's Quotation Date
Corporate Information
Company Name
Purchase Order Addressee
Address/Number, Street
Address/State, Zip Code
Taxpayer ID Number (or EIN)
Technical Contact
Technical Contact Name
Title
Address/Number, Street
Address/City
Address/State, Zip Code
Email Address
Phone Number
Fax Number
Commercial Contact
Commercial Contact Name
Title
Address/Number, Street
Address/City
Address/State, Zip Code
Email Address
Phone Number
Fax Number

00300.2.2 Addenda
Number Date Description Received and Incorporated

00300.2.3 Quotation Validity Period, through June 9, 2014 per RFQ - Yes/No - If no,
advise number of days
00300.2.4 Quotation includes/excludes taxes - Included/Excluded
00300.2.5.1 Quotation Pricing firm through Quotation Validity Period - Yes/No
00300.2.5.2 Adjustment Pricing firm through End of Warranty - Yes/No
00300.2.5.3 Option Pricing firm through Quotation Validity Period - Yes/No
00300.2.5.4 Not Used
00300.2.6.1 All Exceptions are declared on Form 00300.2.6.1 - Yes/No
00300.2.6.2 All Clarifications are declared on Form 00300.2.6.2 - Yes/No

Section A
Heat Recovery Steam Generator
Source: 00300, 2009, v1.2 Page 1 of 60
Quotation Fill-In Information
Bid Issue
GRDA Unit 3 Combined Cycle Project Heat Recovery Steam Generator
March 2014
178592.67.6130

Form 00300.2.6.1 Declared Exceptions to the RFQ Requirements

00300.2.6.1.1 Not Used

00300.2.6.1.2 Technical Exceptions

Count Reference Stated Technical Exception


1
2
3
4
5
6
7
8
9
10

Section A
Heat Recovery Steam Generator
Source: 00300, 2009, v1.2 Page 2 of 60
Quotation Fill-In Information
Bid Issue
GRDA Unit 3 Combined Cycle Project Heat Recovery Steam Generator
March 2014
178592.67.6130

Form 00300.2.6.2 Declared Clarifications to the RFQ Requirements

00300.2.6.2.1 Not Used

00300.2.6.2.2 Technical Clarifications

Count Reference Stated Technical Clarification


1
2
3
4
5
6
7
8
9
10

Section A
Heat Recovery Steam Generator
Source: 00300, 2009, v1.2 Page 3 of 60
Quotation Fill-In Information
Bid Issue
GRDA Unit 3 Combined Cycle Project Heat Recovery Steam Generator
March 2014
178592.67.6130

00300.3 Quotation Pricing

Total Base Quotation Pricing - DDP/CIP Jobsite Location $ -

Price Breakdown
00300.3.1 Product Pricing (FCA-Factory Location)
HRSG equipment and associated materials $ -
Shop Assembled Modules $ -
Steel structure and casings $ -
Steam drums (HP, IP, LP) $ -
Inlet duct, outlet duct $ -
HRSG outlet expansion joint $ -
Internal piping $ -
Trims and valves $ -
Blowdown system including piping and components (excludes
blowdown tank) $ -
Silencers (safety valves, others) $ -
Platforms, ladders and stairs per specification $ -
One elevator (excludes installation cost) $ -
One freestanding stair tower (drums elevation to grade); one
partial stair tower (drums elevation to pipe rack) $ -
Penthouse support steel, girts, purlins $ -
Penthouse cladding, sag rods, flashing, doors, HVAC $ -
Steel stack with silencer
HRSG exhaust stack damper $ -
Hoists as required for SCR and CO catalysts sections $ -
SCR, ammonia injection system $ -
CO spool duct $ -
Duct burner, fuel skids, BMS $ -
HP, IP, LP and RH outlet electrically powered relief (EPOR)
valves $ -
100% hardness testing of T91 tube bends $ -

High pressure steam Final Stage attemperation (shipped loose) $ -


Reheat Final Stage attemperation (shipped loose) $ -
HP Economizer partial bypass system $ -
Transportation DAP/DDP $ -
Startup and Commissioning Spare Parts (see attached list) $ -
Technical Field Services (see 00300.1.3, Table 3.3 for days and
trips) $ -
Training (see 00300.1.3, Table 3.4 for days trips and number of
students) $ -
Operations & Maintenance Manuals $ -
Parent Company Guarantee valid from award through end of
the Warranty
Warranty Period
Period of 24 months from Commercial Operation $ -
Date $ -
Repaired/Replaced Warranty of 24 months from repair/replace,
not to exceed 48 months from Commercial Operation $ -
Taxes and Duties - All taxes (except sales and use), excises,
licenses, duties and fees of any duties, import taxes and export
taxes in accordance with Supplier's quoted delivery $ -
10% Letter of Credit valid from Delivery through Project Final
Completion $ -

Section A
Heat Recovery Steam Generator
Source: 00300, 2009, v1.2 Page 4 of 60
Quotation Fill-In Information
Bid Issue
GRDA Unit 3 Combined Cycle Project Heat Recovery Steam Generator
March 2014
178592.67.6130

$ -
Subtotal 00300.3.1 Product Pricing (FCA-Factory Location) $ -
00300.3.2 Supplemental Product Pricing
00300.3.2.1 Startup and Commissioning Spare Parts (from Table 3.2.1) $ -
00300.3.2.2 NOT USED
00300.3.2.3 Special Tools and Lift Fixtures (from Table 3.2.3) $ -
00300.3.2.4.1 Field Service Representative (from Table 3.2.4.1) $ -
00300.3.2.4.2 Training Service (from Table 3.2.4.2) $ -
00300.3.2.5 Shipping/Transportation (from Table 3.2.5) $ -
00300.3.2.6 Instruction Manuals (from Table 3.2.6) $ -
Subtotal 00300.3.2 Supplemental Product Pricing $ -

Sum of Subtotals (Should Equal Base Quotation Price Above) $ -

Section A
Heat Recovery Steam Generator
Source: 00300, 2009, v1.2 Page 5 of 60
Quotation Fill-In Information
Bid Issue
GRDA Unit 3 Combined Cycle Project Heat Recovery Steam Generator
March 2014
178592.67.6130

00300.3.2 Supplemental Product Pricing Tables


Bidder to note that pricing included in these tables is for product scope that will be included in the initial Purchase Order with the
successful Bidder. Pricing for Work deferred to a later date, such as adjustment pricing, option pricing and alternative scope pricing is
not included in these tables.

00300.3.2.1 Startup and Commissioning Spare Parts Bidder Response Column


Are startup spare or commissioining spare parts required? Yes/No
If Yes, Bidder has included Spare Parts in base quotation per RFP requirements Yes/No
If Yes, Bidder shall provide a priced list of construction/erection spare parts included in the quote in Table 3.2.1.
Table 3.2.1: Startup and Commissioning Spare Parts
Quantity Included
Item Description Manufacturer's Part Identification Unit of Measure Unit Price in PO Extended Price
$ - $ -
$ - $ -
$ - $ -
Subtotal: Table 00300.3.2.1 Startup Spare Parts Pricing $ -

00300.3.2.2 NOT USED

00300.3.2.3 Special Tools and Lift Fixtures Bidder Response Column


Are special tools and/or lift fixtures required? Yes/No
If Yes, Bidder has included special tools and lift fixtures in base quotation per RFP Yes/No
If Yes, Bidder shall provide a priced list of special tools included in the quote in Table 3.2.3.
Table 3.2.3: Special Tools and Lift Fixtures
Quantity Included
Item Description Manufacturer's Part Identification Unit of Measure Unit Price in PO Extended Price
$ - $ -
$ - $ -
$ - $ -
Subtotal: Table 00300.3.2.3 Special Tools and Lift Fixtures Pricing $ -

Table 3.2.4: Technical Services


00300.3.2.4.1 Field Service Representative Bidder Response Column
Bidder has included field service time in base quotation per RFP requirements Yes/No
If Yes, Bidder shall provide an itemized breakout of priced services included in the quote in Table 3.2.4.1
Table 3.2.4.1 Technical Field Services, Per Diem Rates and Expenses
Quantity Included
Unit of Measure Unit Price in PO Extended Price
HRSG Field service weeks included in the firm fixed lump $ -
sum price Week $ - 50
All-inclusive FIELD SERVICE shall include all salary and overhead, local lodging, travel between the jobsite and
local lodging, meals, and miscellaneous expenses. A week of service shall be defined as six (6), ten (10) hour
onsite workdays, Monday - Saturday:

HRSG Round trips included in the firm fixed lump sum price Trips $ - 4 $ -
Subtotal: Table 00300.3.2.4.1 Field Service Pricing $ -
00300.3.2.4.2 Training Service Bidder Response Column
Bidder has included Training time in base quotation per RFP requirements Yes/No
If Yes, Bidder shall provide an itemized breakout of priced services included in the quote in Table 3.2.4.2
Table 3.2.4.2 Technical Field Services, Per Diem Rates and Expenses
Quantity Included
Unit of Measure Unit Price in PO Extended Price
Training weeks included in the firm fixed lump sum price Week $ - 2 $ -
All-inclusive TRAINING shall include all salary and overhead, local lodging, travel between the jobsite and local
lodging, meals, and miscellaneous expenses. A week of service shall be defined as five (5), eight (8) hour onsite
workdays, Monday - Friday: 8am to 5pm. One week shall constitute one (1) training class.

Section A
Heat Recovery Steam Generator
Source: 00300, 2009, v1.2 Page 6 of 60
Quotation Fill-In Information
Bid Issue
GRDA Unit 3 Combined Cycle Project Heat Recovery Steam Generator
March 2014
178592.67.6130

00300.3.2 Supplemental Product Pricing Tables


Round trips included in the firm fixed lump sum price Trips $ - 2 $ -
All-inclusive ROUND TRIP shall include all expenses traveling to and returning from the lodging local to the
jobsite, from the Manufacturer's Field Service home base of operations. It shall include all transportation (air
and/or ground), parking, tolls, meals, travel per diem, any salary/overhead while traveling, and other
miscellaneous expenses associated with one round trip.

Subtotal: Table 00300.3.2.4.1 Training Pricing $ -

00300.3.2.5 Shipping/Transportation Bidder Response Column


Bidder has included transportation in base quotation per RFP requirements Yes/No
If Yes, Bidder shall provide an itemized breakout of transportation included in the quote in Table 3.2.5.
Table 3.2.5: Shipping/Transportation
Point of Quantity Included
Item Description Origin Carrier Type in PO Extended Price
Heat Recovery Steam Generator 1 Lot $ -
(Supplier to provide breakdown as required) $ -
$ -
$ -
$ -
Subtotal: Table 00300.3.2.5 Transportation Pricing $ -

00300.3.2.6 Instruction Manuals Bidder Response Column

Bidder has included pricing for Instruction Manuals in base quotation per Article Q501 Yes/No
If Yes, Bidder shall provided an itemized breakout Instruction Manual pricing included in the quote in Table 3.2.6.
Table 3.2.6: Instruction Manuals
Unit of Quantity Included
Item Description Media Measure Unit Price in PO Extended Price
Proof Copy of Instruction Manuals Electronic EA $ - 1 $ -

Final Copy of Instruction Manuals Electronic EA $ - 1 $ -

Subtotal: Table 00300.3.2.6 Instruction Manuals Pricing $ -

Section A
Heat Recovery Steam Generator
Source: 00300, 2009, v1.2 Page 7 of 60
Quotation Fill-In Information
GRDA Unit 3 Combined Cycle Project Heat Recovery Steam Generator Bid Issue
178592.67.6130 March 2014

00300.4 Unit Adjustment Pricing Tables

Table 4.1: Equipment Pricing


Unit Price Unit Price Delivery ARO
Item Number Item Description Unit of Measure (to Add) (to Delete) (WKS)
$ - ###
$ - ###
$ - ###
$ - ###

Table 4.2: Startup and Commissioning Spare Parts


Unit Price Unit Price Delivery ARO
Item Number Item Description Unit of Measure (to Add) (to Delete) (WKS)
$ - ###
$ - ###
$ - ###
$ - ###

Table 4.3: NOT USED

Table 4.4: Special Tools and Lift Fixtures


Unit Price Unit Price Delivery ARO
Item Number Item Description Unit of Measure (to Add) (to Delete) (WKS)
$ - ###
$ - ###
$ - ###
$ - ###

Table 4.5: Supplemental "Out-of-Base-Scope" Technical Assistance


Unit of Measure Unit Price
All-inclusive DAILY PER DIEM RATE shall include all salary and overhead, local lodging, travel between the jobsite and
local lodging, meals, and miscellaneous expenses. A day of service shall be defined as one, eight (8) hour onsite
workday in which all project construction and management personnel are working normal shifts:

Per diem Rate Monday through Friday (up to 8 hours) $/Day $ -


Per diem Rate Saturday (up to 8 hours) $/Day $ -
Per diem Rate Sunday / Holiday (up to 8 hours) $/Day $ -
All-inclusive RATE TO ADJUST above per diem rates for hours worked beyond an eight (8) hour onsite workday:
Adjustment Rate Monday through Friday beyond 8 hours) $/h $ -
Adjustment Rate Saturday (beyond 8 hours) $/h $ -
Adjustment Rate Sunday / Holiday (beyond 8 hours) $/h $ -
All-inclusive ROUND TRIP RATE shall include all expenses traveling to and returning from the lodging local to the
jobsite, from the Manufacturer's Field Service home base of operations. It shall include all transportation (air and/or
ground), parking, tolls, meals, travel per diem, any salary/overhead while traveling, and other miscellaneous expenses
associated with one round trip.

Round Trip Rate $/rt $ -

Section A
Heat Recovery Steam Generator
Source: 00300, 2009, v1.2 Page 8 of 60
Quotation Fill-In Information
Bid Issue
GRDA Unit 3 Combined Cycle Project Heat Recovery Steam Generator
March 2014
178592.67.6130

00300.5 Option Pricing Bidder Response Column


HRSG Thermal Stress Monitoring System per Section 15511.2.19.1 of the 67.6130
Specification $ -

Shipping frames that double as uprighting frames per Section 15511.3.1 of the 67.6130
Specification $ -

Shop fabrication of all hot piping and fittings 2 inches (65 mm) in nominal size and smaller
with a design temperature 300 F per Section 15221.1.1 of the 67.6130 Specification $ -
Erection of the Vertical Lift Service Car per Section 14201 of the 67.6130 Specification $ -

Allow for sufficient space in the SCR system for future addition of catalyst to meet a
maximum NOx requirement at the stack of 2 ppmvd @ 15% O2 at full duct firing.

Design and supply a standard or non-cascading blow down system. Price to include all
required piping and valves. $ -

00300.6 Not Used

00300.7 Logistics
00300.7.1 Jobsite Storage Requirements Bidder Response Column
Bidder's product included in the quotation has special storage requirements Yes/No
If Yes, special storage requirements are included with the quotation Yes/No
00300.7.2 Shipments
Manufactured in Bidder's own facility? Yes/No
Manufactured in facilities of others? If so list. Yes/No
If yes, list of other locations included with the quotation Yes/No
Origin Country
State
City

Number of Shipments Count


Total Number of Pieces per Shipment Count
Total Weight per Shipment lb
Total Volume per Shipment cu ft
Total Weight of Largest Single Component lb
Total Volume of Largest Single Component cu ft

00300.8 Subcontracting Bidder Response Column


Bidder proposes subcontracting any major portions of the Work Yes/No
If Yes, Sub-supplier List is included with the quotation Yes/No

Section A
Heat Recovery Steam Generator
Source: 00300, 2009, v1.2 Page 9 of 60
Quotation Fill-In Information
Bid Issue
GRDA Unit 3 Combined Cycle Project Heat Recovery Steam Generator
March 2014
178592.67.6130

00300.9 Delivery and Schedule

Bidder
00300.9.1 Delivery DAP Jobsite (originating Response
in US), DDP Jobsite (originating outside US) LD* Early Delivery** Required Delivery Column

90 Days
Delivery of all HRSG components Maximum Prior to
complete Plates Including Stack Anchor
Foundation LD Required Delivery 1-Dec-15 Yes/No
Bolt Template and Embeddment 3/3/2015 6/1/2015
Main Boiler Steel 7/3/2015 10/1/2015
Module Boxes & Drums 8/3/2015 11/1/2015
Non Pressure Parts 9/2/2015 12/1/2015
Large Bore Piping 9/2/2015 12/1/2015
Remaining Equipment except Catalyst 9/2/2015 12/1/2015
Casing, Liner Plates 6/3/2015 9/1/2015
Stair towers 7/3/2015 10/1/2015
Elevator 9/2/2015 12/1/2015
Stack 9/2/2015 12/1/2015
* "LD" indicates that delivery of the Goods after the "Required Delivery" date is subject to liquidated damages in
accordance with applicable articles of the RFP.

** Purchaser will not accept delivery of Goods at the Jobsite prior to the "Early Delivery" date unless previously
agreed by Purchaser in writing. Delivery in the period between the "Early Delivery" and "Required Delivery" date
is at the discretion of Supplier.
00300.9.1.1 Bidder will make single consolidated shipment. Yes/No
If No, Bidder has included a proposed staggered shipping schedule. Yes/No
00300.9.1.2 Bidder has provided a preliminary milestone schedule. Yes/No
00300.9.1.3 Bidder has provided a Standard Delivery/Completion schedule. Yes/No
00300.9.2 Schedule of Submittals and Applicable Liquidated Damages
Bidder confirms ability and commitment to meet all the required submittal dates. Yes/No
If No, Bidder has for each submittal to which the No applies stated the best possible submittal Yes/No
date as an exception.

Section A
Heat Recovery Steam Generator
Source: 00300, 2009, v1.2 Page 10 of 60
Quotation Fill-In Information
Bid Issue
GRDA Unit 3 Combined Cycle Project Heat Recovery Steam Generator
March 2014
178592.67.6130

00300.9.2 Schedule of Submittals and Applicable Penalty

Effective Date: TBD Estimated First Shipment Date: TBD


Project Delivery Date: December 1, 2015
The list is not all-inclusive. There are more requirements for Supplier to "provide notice," to "advise," to
"update," to "inform," etc., or to submit should a condition precedent occur. These have not been included in
the list. It will however remain Supplier's responsibility to comply with the submittal requirements whether or
not the submittal is actually included on the following:
Submittal Dates
Item Reference LD's
Submittal Item Calendar
No. Document Event Due Date Apply?
Days
Schedule of Submittals
1 676130 Commercial Submittals
2 676130 Insurance Certificates 30 After Effective Date No
3 676130 Transportation Plan including 30 Before Shipment of No
routing clearances Equipment
4 676130 Performance and Payment 7 After Effective Date No
Bond
5 676130 Engineering/Procurement/Prod 30 After Effective Date with No
uction/Testing and Monthly Updates
Inspection/Shipping Schedule
and Status Report
6 676130 Preshipment Inspection Notice 30 Before Shipment of No
Equipment
7 676130 Electronic Material List 30 Before Shipment of No
Equipment
8 676130 Shipping Notice 2 Full Work Days No
Notice
9 676130 Detailed Final Packing List of Upon Shipment and No
Shipment of Equipment With Materials List
10 676130 Hazardous materials With Each Shipment No
documentation and With Materials
List
11 676130 Proof Copy of Instruction 90 Before Shipment of No
Manuals Equipment
12 676130 Final Copy of Instruction 15 Before Shipment of No
Manuals Equipment
13 676130 Recommended Spare Parts 60 Before Shipment of No
List, with Unit Prices and Equipment
Names of Suppliers, Necessary
to Cover a 5 year period

14 676130 Startup and Commissioning 90 Before Shipment of No


Spare Parts List, Priced Equipment
15 676130 Quality Assurance/Quality With Proposal
Control Plan, ISO 9000
Certification

Section A
Heat Recovery Steam Generator
Source: 00300, 2009, v1.2 Page 11 of 60
Quotation Fill-In Information
Bid Issue
GRDA Unit 3 Combined Cycle Project Heat Recovery Steam Generator
March 2014
178592.67.6130

16 676130 Notice of Factory Inspection or 15 Before Test or Inspection No


Tests

17 676130 Copies Certified Test and 30 After Tests No


Inspection Reports
18 676130 Equipment storage 60 Before Shipment of No
requirements at site prior to Equipment
placing the equipment in
service
19 676130 Final (as-built) drawings and Before Substantial No
documentation Completion
20 676130 ASME Code Data Package 30 After Last shipment of No
pressure part
equipment
21 676130 Factory Acceptance Test 30 Before Test No
Procedure Including
Acceptance Criteria for
Programmable Logic Control
System

22 676130 Hydrostatic Testing Procedure 60 After Effective Date No


for HRSG
23 676130 Estimated sound pressure level 60 After Effective Date No
of equipment (at design
operating conditions) at any
location 5 ft above the floor and
3 ft away from the equipment
(dB to a reference of 20
micropascals, "A" Scale) Data
should be broken down by
octaves.

24 676130 Lubrication list, and initial fill 90 Before Shipment of No


requirements Equipment
676130 15511 Heat Recovery Steam
Generator Submittals

25 676130 HRSG shipping configuration, 60 After Effective Date No


number of modules, module
weight, and dimensions
26 676130 Supplier's Master Drawing List 30 After Effective Date No
(MDL)

27 676130 Engineering/Production/Fabrica 45 After Effective Date Yes


tion/Shipping Schedule
28 676130 Complete HRSG performance 60 After Effective Date Yes
data (includes all flows (flue
gas, steam, water), pressures,
temperature, etc. for unfired
and fired operating cases, for
all full and part load cases

Section A
Heat Recovery Steam Generator
Source: 00300, 2009, v1.2 Page 12 of 60
Quotation Fill-In Information
Bid Issue
GRDA Unit 3 Combined Cycle Project Heat Recovery Steam Generator
March 2014
178592.67.6130

29 676130 CFD flow model simulation test 30 After Test or Inspection No


report

30 676130 ASME code certifications 30 Before Start of Fabrication No

31 676130 Arrangement drawings and 60 After Effective Date Yes


terminal point locations for plant
layout and physical
arrangement and dimensions of
equipment furnished

32 676130 Arrangement drawings for all 180 After Effective Date Yes
auxiliary equipment - duct
burner, fuel gas skid, etc.

33 676130 Instrument and valve location 210 After Effective Date Yes
drawings indicating the location
of all instruments and valves
which require air, electrical, or
control interface with Purchaser

34 676130 Stair tower arrangement 75 After Effective Date No


drawings

35 676130 Duct outline drawings including 75 After Effective Date No


movements and clearances for
insulation, lagging, stiffeners,
expansion joints, and acoustic
shrouds (if furnished)

36 676130 Drum End Enclosures: General 180 After Effective Date No


arrangement drawings; HVAC
calculations; lighting design

37 676130 Certified loads for design of 60 After Effective Date Yes


Purchaser's structures
38 676130 Stack: PE certified Calculations 30 After Effective Date No
per ASME STS-1; Base ring
diameter; Anchor Bolt circle;
Recommended grout thickness;
Anchor bolt size, layout, and
materials (i.e. A36, A307, etc.)

Section A
Heat Recovery Steam Generator
Source: 00300, 2009, v1.2 Page 13 of 60
Quotation Fill-In Information
Bid Issue
GRDA Unit 3 Combined Cycle Project Heat Recovery Steam Generator
March 2014
178592.67.6130

39 676130 Preliminary Foundation Design 30 After Effective Date Yes


Information: Loads listed
separately (i.e. Dead, Live,
Seismic, wind, thermal, etc.) for
each support clearly indicating
load direction at each support
for each load case;
equipment/steel thermal
growth, plan dimensions,
thicknesses, and elevations of
sole plates, sub-sole plates;
shear posts, shear lugs;
Delineation of scope of supply
for all sole plates, sub-sole
plates, shear posts, shear lugs,
etc.; Locations, plan size,
thickness of all auxiliary
supports at grade for ladders,
stairs, and platforms. Anchor
bolt sizes, locations, and
materials (i.e. A36, A307, etc.)

40 676130 Final Foundation Design 60 After Effective Date Yes


Information: Loads listed
separately (i.e. Dead, Live,
Seismic, wind, thermal, etc.) for
each support clearly indicating
load direction at each support
for each load case;
equipment/steel thermal
growth, plan dimensions,
thicknesses, and elevations of
sole plates, sub-sole plates;
shear posts, shear lugs;
Delineation of scope of supply
for all sole plates, sub-sole
plates, shear posts, shear lugs,
etc.; Locations, plan size,
thickness of all auxiliary
supports at grade for ladders,
stairs, and platforms. Anchor
bolt sizes, locations, and
materials (i.e. A36, A307, etc.)

41 676130 Design pressure, temperature, 45 After Effective Date No


flow rate, and set point of safety
valves
42 676130 Valve list including valve size, 90 After Effective Date No
design temperature and
pressure class, etc.

Section A
Heat Recovery Steam Generator
Source: 00300, 2009, v1.2 Page 14 of 60
Quotation Fill-In Information
Bid Issue
GRDA Unit 3 Combined Cycle Project Heat Recovery Steam Generator
March 2014
178592.67.6130

43 676130 Pipeline list including design 75 After Effective Date No


temperature, pressure,
material, schedule, and size for
all pipe furnished
44 676130 Preliminary high pressure main 45 After Effective Date Yes
steam, hot reheat, and cold
reheat steam line terminal point
information including design
conditions (press, temp, flow),
outside diameter, wall
thickness, materials, 3D
locations, thermal movements,
and allowable forces and
moments

45 676130 Terminal point information, 60 After Effective Date Yes


including design conditions
(press, temp, flow), outside
diameter, wall thickness,
materials, 3D locations, thermal
movements, and allowable
forces and moments, for the
remaining systems

46 676130 Large bore piping isometric 60 After Effective Date Yes


drawings - Including valve,
pipe, and equipment weights
and stress isometric drawings
47 676130 Small bore piping isometric 210 After Effective Date No
drawings (including suggested
routing for blow down and drain
piping and header)
48 676130 Hanger details 90 After Effective Date No

49 676130 Piping and instrument diagrams 45 After Effective Date Yes


indicating all piping, valves, and
instrumentation being supplied
by the Supplier and clearly
identifying all interfaces with the
Purchaser

50 676130 Dimensional drawings including 60 After Effective Date Yes


overall dimensions, detailing all
power, control and
instrumentation junction box
sizes and locations and
maximum power, control and
instrumentation cable
termination requirements. Also
provide ground lug size and
location, if specified or
furnished

Section A
Heat Recovery Steam Generator
Source: 00300, 2009, v1.2 Page 15 of 60
Quotation Fill-In Information
Bid Issue
GRDA Unit 3 Combined Cycle Project Heat Recovery Steam Generator
March 2014
178592.67.6130

51 676130 Detailed wiring diagrams 60 After Effective Date Yes


showing all external
connections
52 676130 Functional description of the 90 After Receipt of Final Plant No
operation of equipment (Final Operating Philosophy
for HRSG, preliminary for Document
burner and SCR) including HP
and LP steam turbine bypass
system, if required, design and
operational requirements

53 676130 Final functional description of 180 After Effective Date No


the operation of SCR and
burner
54 676130 Preliminary HRSG I/O list with 75 After Effective Date No
termination information
including SCR and BMS
55 676130 Final HRSG I/O list with 210 After Effective Date Yes
termination information
including SCR and BMS
56 676130 Instrument data sheets (ISA 180 After Effective Date No
type or equal) and installation
details for control system
including estimated impulse
tubing requirements

57 676130 Detailed list of instrumentation 210 After Effective Date Yes


and control equipment listing
manufacturer, model number,
range, setpoint, signal level,
etc.
58 676130 Complete unit performance 60 After Effective Date No
data including all flue gas,
steam, and water flows,
pressures, pressure drops, and
temperatures and duct burner
fuel gas flows for all full and
part load heat balance cases

59 676130 Temperature profiles of the 60 After Effective Date No


HRSG gas side
60 676130 Performance curves for 210 After Effective Date No
auxiliary equipment including
pump performance curves

61 676130 Maximum allowable working 60 After Effective Date Yes


pressure of the HRSG as
defined by the ASME Boiler and
Pressure Vessel Code

Section A
Heat Recovery Steam Generator
Source: 00300, 2009, v1.2 Page 16 of 60
Quotation Fill-In Information
Bid Issue
GRDA Unit 3 Combined Cycle Project Heat Recovery Steam Generator
March 2014
178592.67.6130

62 676130 HRSG startup characteristics 90 After Receipt of CTG Start- No


for cold and hot starts, time in up curves and
hours shall be the abscissa, the Purchaser's start-up
ordinates shall be steam philosophy documents
pressure, temperature, and flow
along with exhaust temperature
for the HP, IP, and LP systems

63 676130 Duct burner emission curves 210 After Effective Date No


indicating NOx, CO, and
VOC/UHC predicted emissions
on a mass basis for the entire
operating range of the duct
burner

64 676130 Water volumes of the various 75 After Effective Date No


sections of the HRSG
65 676130 Station and Instrument air 45 After Effective Date Yes
requirements (Total Not-to-
Exceed)
66 676130 HRSG Purge volume 60 After Effective Date No
67 676130 PC based computer thermal 210 After Effective Date No
model of HSRG

Section A
Heat Recovery Steam Generator
Source: 00300, 2009, v1.2 Page 17 of 60
Quotation Fill-In Information
Bid Issue
GRDA Unit 3 Combined Cycle Project Heat Recovery Steam Generator
March 2014
178592.67.6130

68 676130 Guaranteed and expected 60 After Effective Date Yes


steam quality leaving each
steam drum over the entire
operating range
69 676130 HRSG fabrication and erection 120 After Effective Date No
drawings
70 676130 Recommended detailed 120 Before Shipment of First No
erection sequence and Delivery of Steel
procedure Structure
71 676130 Insulation requirements and 30 Before Shipment of No
details including detailed Equipment
insulation specifications,
drawings, and instructions for
field installation

72 676130 Package for preoperational 180 Before Shipment of No


cleaning of the HRSG. The Equipment
submittal shall include the
manufacturers chemical
cleaning procedures or
guidelines, calculations of the
operating and hydro boiler
volumes by section, HRSG
P&IDs, HRSG general
arrangement and elevations,
bundle arrangement drawings,
and isometric drawings of the
main steam and reheat
attemperator piping. The
bundle arrangement drawings
shall indicate the number and
size of tubes in each boiler
section, and the flow
configurations through them
(i.e. ventable and drainable
headers, or U-tubes).

676130 11506 Selective Catalytic


Reduction System, 11507
Catalyst for SCR and 11508
Ammonia System Submittals

73 676130 Preliminary detailed drawings 120 After Effective Date Yes


required to indicate
miscellaneous piping and wiring
connections (SCR).
74 676130 Final detailed drawings required 180 After Effective Date No
to indicate miscellaneous piping
and wiring connections (SCR).

Section A
Heat Recovery Steam Generator
Source: 00300, 2009, v1.2 Page 18 of 60
Quotation Fill-In Information
Bid Issue
GRDA Unit 3 Combined Cycle Project Heat Recovery Steam Generator
March 2014
178592.67.6130

74 676130 Drawings and data on 210 After Effective Date No


accessory equipment, including
valves, fittings, and other
components (SCR)

75 676130 Pipe layout drawings (SCR) 180 After Effective Date No

75 676130 Recommended location for all 210 After Effective Date No


pipe supports, recommended
type of pipe supports at each
location, and loads on each
pipe support (SCR)

76 676130 Pipeline list including design 180 After Effective Date No


temperature, pressure,
material, schedule, and size for
all SCR pipe furnished.

76 676130 Catalyst performance curves 210 After Effective Date No

77 676130 Flowmeter certification report 30 Before Shipment No


(Ammonia)

77 676130 Preliminary drawings indicating 120 After Effective Date No


pipe connection points
(Ammonia)

78 676130 Final detailed drawings 180 After Effective Date No


indicating pipe connections
points (Ammonia)
78 676130 Fan performance curve 180 After Effective Date No
(Ammonia)
79 676130 Preliminary Motor List, including 60 After Effective Date No
equipment tagging, equipment
description, voltage, and rated
and operating horsepower of
the motor loads.

79 676130 Final Motor List, including 120 After Effective Date No


equipment tagging, equipment
description, voltage, and rated
and operating horsepower of
the motor loads.

80 676130 Preliminary Electrical Load List, 60 After Effective Date No


including equipment tagging,
equipment description, voltage,
and the rated and operating
electrical loads.

Section A
Heat Recovery Steam Generator
Source: 00300, 2009, v1.2 Page 19 of 60
Quotation Fill-In Information
Bid Issue
GRDA Unit 3 Combined Cycle Project Heat Recovery Steam Generator
March 2014
178592.67.6130

80 676130 Final Electrical Load List, 120 After Effective Date No


including equipment tagging,
equipment description, voltage,
and the rated and operating
electrical loads.
E640 Low voltage Induction Motor
Submittals

81 E640 Motor nameplate data 180 After Effective Date No


82 E640 Completed motor information 180 After Effective Date No
sheets
83 E640 Electric Motor 180 After Effective Date No
Outline/Dimensional Drawing
676130 17052 Local Control Panels
Submittals
84 676130 Local Control Panel internal 180 After Effective Date Yes
wiring diagrams
85 676130 Panel external connection 180 After Effective Date Yes
diagrams
86 676130 Local Control Panel outline 180 After Effective Date Yes
dimension drawings
87 676130 Local Control Panel internal 180 After Effective Date No
arrangement drawings
88 676130 Control Panel layout drawings 180 After Effective Date No
676130 15225 General Service Pipe
Submittals
89 676130 Electronic weld map 60 Before Shipment of Yes
Equipment
90 676130 General Service Pipe Mill 14 After Shipment of No
certificates and documentation Equipment
required by ASME Boiler and
Pressure Vessel Code
91 676130 Testing and inspection 30 After Effective Date No
procedures for base materials,
including the extent of each
examination, stage of
manufacture at time of
examination

676130 15263 General Service Valves


(Furnished with Equipment)
Submittals
92 Typical standard drawing for 180 After Effective Date No
each valve type, size, pressure
class, material, locking devices,
and accessories

93 Mill test reports for ASME Boiler 14 After Shipment of No


and Pressure Vessel Code Equipment
valves

Section A
Heat Recovery Steam Generator
Source: 00300, 2009, v1.2 Page 20 of 60
Quotation Fill-In Information
Bid Issue
GRDA Unit 3 Combined Cycle Project Heat Recovery Steam Generator
March 2014
178592.67.6130

94 Hydrostatic shell and seat 30 After Shipment of No


leakage test reports for tests Equipment
required by ASME B16.34
676130 15268 C160 Control Valve
Submittals

95 Typical standard drawing for 180 After Effective Date No


each valve type, size, pressure
class, material, locking devices,
and accessories

96 Electrical schematic, wiring, 180 After Effective Date Yes


signal and motive air tubing
diagram (for field installation)

97 Control valve specification 180 After Effective Date No


sheets

98 Shell pressure test and seat With Instruction Manuals No


leakage test reports (for tests
required by ASME B16.34 and
ANSI/FCI 70-2, respectively)
99 676130 Control and motor operated 75 After Effective Date No
valve specification sheets
100 676130 Cross-sectional assembly views 180 After Effective Date No
of control valves indicating
materials used for each
component part
101 676130 Control Valve Electrical 180 After Effective Date Yes
schematic, wiring, signal and
motive air tubing diagram (for
field installation)
102 676130 Wiring Diagrams for electrical 180 After Effective Date No
accessories on valves (limit
switches, I/O converters, etc.)
676130 17053 Subsystem-
Programmable Logic Control
System Submittals
103 676130 PLC Control Logic 210 After Effective Date No
Configuration Package Users
Manual
104 676130 PLC Programming Software 210 After Effective Date No
Package
105 Complete bill of materials for 210 After Effective Date No
PLC system
106 676130 Operator Workstation Graphic 210 After Effective Date No
Displays Configuration Package
Users Manual

676130 15551 Dampers Submittals


107 676130 Stack damper and actuator 150 After Effective Date Yes
general arrangement drawings

Section A
Heat Recovery Steam Generator
Source: 00300, 2009, v1.2 Page 21 of 60
Quotation Fill-In Information
Bid Issue
GRDA Unit 3 Combined Cycle Project Heat Recovery Steam Generator
March 2014
178592.67.6130

108 Stack damper actuator wiring 150 After Effective Date Yes
drawings
676130 17051 Control Design and
Equipment Submittals
109 676130 HRSG and BMS (if provided) 120 After Receipt of plant Yes
Functional Control Diagrams operating philosophy
from Purchaser
110 676130 SCR Ammonia injection 180 After Effective Date Yes
Functional Control Diagrams
111 676130 Detailed Job Specific Control 180 After Effective Date No
System Serial Communications
Drawings and Documentation
(If provided)

112 676130 Hardcopy Color Printout of 180 After Effective Date No


Operator Graphic Displays with
Description of BMS Operation

113 676130 Detailed Job Specific Control 210 After Effective Date No
System Prefabricated Cable
Interconnection Drawings (if
provided)
114 676130 Detailed Job Specific Control 180 After Effective Date No
Equipment Cabinet dimensional
drawings (BMS/SCR)

115 676130 List of Control System 180 After Effective Date No


Prefabricated Interconnecting
Cables (if provided)
116 676130 Detailed Job Specific Control 180 After Effective Date No
System Power and Grounding
wiring diagrams (BMS/SCR)
117 676130 BMS and SCR Cabinet Internal 180 After Effective Date No
Arrangement Diagrams with
Terminal Block Layouts

118 676130 BMS Cabinet External Wiring 180 After Effective Date Yes
Connection Diagrams
119 676130 BMS Cabinet Internal Wiring 210 After Effective Date Yes
120 676130 Diagrams
BMS Factory Acceptance Test 30 Before Test No
Procedure
121 676130 BMS I/O list with termination 180 After Effective Date No
information
122 676130 Hardcopy of fully annotated 180 After Effective Date No
final BMS PLC control program
documentation
123 16142 Final drawings 60 After Effective Date Yes
124 16142 Schematic and wiring diagrams 60 After Effective Date Yes

E645 Electric Actuators .

Section A
Heat Recovery Steam Generator
Source: 00300, 2009, v1.2 Page 22 of 60
Quotation Fill-In Information
Bid Issue
GRDA Unit 3 Combined Cycle Project Heat Recovery Steam Generator
March 2014
178592.67.6130

131 E645 Control and Instrument Wiring 120 After Effective Date No
Diagrams

132 E645 Electric Actuator information 180 After Effective Date Yes
133 E645 sheets
Electricincluding
Actuator sizing data, 180 After Effective Date No
open/close travel times
Outline/Dimensional - for
Drawing
K100 Instrumentation .
motor operated valves and
134 K100 Instrument
dampers. For Location Plan
motor operators 90 After Effective Date Yes
Drawings
provide sizing data, open/close
135 K100 travel times,factory
Instrument and electric
calibration Upon Shipment of Yes
actuator
sheets data sheets. For Instruments
136 K100 Flow element calculation
pneumatic operators provide data 120 After Effective Date Yes
137 K100 sheets showing
ISA-format beta
datasheetsratio,
for
sizing calculations, pneumatic dP,
all 120 After Effective Date Yes
flow
Instruments
tubing, and wiring diagrams
138 K100 PTC 19.3 calculations for 120 After Effective Date Yes
steam line TW's vib failure
analysis confirming thermowells
will not fail in service or during
steam blow conditions

M200 Piping .

139 M200 Calculations to verify suitability


Q002 of integrally
General reinforced
Quality fittings
System .
for dissimilar
Requirements branch/header
materials
140 Q002 Quality Manual, controlled copy 30 After Effective Date

141 Q002 Certification Letter or Certificate 30 After Effective Date


of Authorization (copy), if
certified by a registered agency,
142 Q002 e.g., ASME Certificate
Subsupplier listing of 5 Before Issue of Subsupplier
Authorization, ISO Certificate Purchase Order
143 Q002 Inspection and test plan 30 After Effective Date
144 Q002 Notification of inspection/test 14 Before Test/Inspection
Q100 (for B&V Welding
General hold/witness points) .
Requirements

145 Q100 Welding Procedure 60 Before Start of Fabrication


Specifications (WPS) with
applicable Procedure
146 Q100 Procedures
Qualificationfor storing,(PQR)
Records issuing, 60 Before Start of Fabrication
and reconditioning of
147 Q100 Repair procedures associated 5 Afer Discovery of Repair
electrodes, wires, and fluxes
with a nonconformance report
148 Q100 Post-weld heat treatment 60 Before Start of Fabrication
procedures

Section A
Heat Recovery Steam Generator
Source: 00300, 2009, v1.2 Page 23 of 60
Quotation Fill-In Information
Bid Issue
GRDA Unit 3 Combined Cycle Project Heat Recovery Steam Generator
March 2014
178592.67.6130

149 Q100 Solution annealing heat 60 Before Start of Fabrication


treatment procedure, if required
150 Q100 Visual inspectors' qualifications 60 Before Start of Fabrication
and certificates
151 Q100 Nondestructive examination 60 Before Start of Fabrication
procedures
152 Q100 Root side purging procedures 60 Before Start of Fabrication

153 Q100 Nonconformance reports 5 After Discovery of Nonconf.

154 Q100 ASME/NBIC Data Reports 60 After Fabrication


Completion

155 Q100 Radiographs 14 After Fabrication


Completion

Q110 Welding of 9Cr-1Mo-V (Grade .


91) Materials

156 Q110 ASME B31.1 shop fabricated 21 Before Shipment


piping spools P91
documentation records
Q301 Manufacturer's Standard .
Coating

157 Q301 Shop drawings that identify 30 Before Start of Fabrication No


shop-applied coating systems
158 Q301 Manufacturer's product data 30 After Release to Proceed No
Q400 sheets
General Equipment .
159 Q400 Requirements
Shipment Plan providing details 30 After Effective Date No
Q502 of field assembly
Electrical Data work required
as described in the Supplier's
proposal.
160 Q502 Completed motor information 60 After Effective Date Yes
sheets
161 Q502 Completed electric actuator 60 After Effective Date Yes
information sheet

Section A
Heat Recovery Steam Generator
Source: 00300, 2009, v1.2 Page 24 of 60
Quotation Fill-In Information
Bid Issue
GRDA Unit 3 Combined Cycle Project Heat Recovery Steam Generator
March 2014
178592.67.6130
Bidder Complies Yes/No

Section A
Heat Recovery Steam Generator
Source: 00300, 2009, v1.2 Page 25 of 60
Quotation Fill-In Information
Bid Issue
GRDA Unit 3 Combined Cycle Project Heat Recovery Steam Generator
March 2014
178592.67.6130

Section A
Heat Recovery Steam Generator
Source: 00300, 2009, v1.2 Page 26 of 60
Quotation Fill-In Information
Bid Issue
GRDA Unit 3 Combined Cycle Project Heat Recovery Steam Generator
March 2014
178592.67.6130

Section A
Heat Recovery Steam Generator
Source: 00300, 2009, v1.2 Page 27 of 60
Quotation Fill-In Information
Bid Issue
GRDA Unit 3 Combined Cycle Project Heat Recovery Steam Generator
March 2014
178592.67.6130

Section A
Heat Recovery Steam Generator
Source: 00300, 2009, v1.2 Page 28 of 60
Quotation Fill-In Information
Bid Issue
GRDA Unit 3 Combined Cycle Project Heat Recovery Steam Generator
March 2014
178592.67.6130

Section A
Heat Recovery Steam Generator
Source: 00300, 2009, v1.2 Page 29 of 60
Quotation Fill-In Information
Bid Issue
GRDA Unit 3 Combined Cycle Project Heat Recovery Steam Generator
March 2014
178592.67.6130

Section A
Heat Recovery Steam Generator
Source: 00300, 2009, v1.2 Page 30 of 60
Quotation Fill-In Information
Bid Issue
GRDA Unit 3 Combined Cycle Project Heat Recovery Steam Generator
March 2014
178592.67.6130

Section A
Heat Recovery Steam Generator
Source: 00300, 2009, v1.2 Page 31 of 60
Quotation Fill-In Information
Bid Issue
GRDA Unit 3 Combined Cycle Project Heat Recovery Steam Generator
March 2014
178592.67.6130

Section A
Heat Recovery Steam Generator
Source: 00300, 2009, v1.2 Page 32 of 60
Quotation Fill-In Information
Bid Issue
GRDA Unit 3 Combined Cycle Project Heat Recovery Steam Generator
March 2014
178592.67.6130

Section A
Heat Recovery Steam Generator
Source: 00300, 2009, v1.2 Page 33 of 60
Quotation Fill-In Information
Bid Issue
GRDA Unit 3 Combined Cycle Project Heat Recovery Steam Generator
March 2014
178592.67.6130

Section A
Heat Recovery Steam Generator
Source: 00300, 2009, v1.2 Page 34 of 60
Quotation Fill-In Information
Bid Issue
GRDA Unit 3 Combined Cycle Project Heat Recovery Steam Generator
March 2014
178592.67.6130

Section A
Heat Recovery Steam Generator
Source: 00300, 2009, v1.2 Page 35 of 60
Quotation Fill-In Information
Bid Issue
GRDA Unit 3 Combined Cycle Project Heat Recovery Steam Generator
March 2014
178592.67.6130

Section A
Heat Recovery Steam Generator
Source: 00300, 2009, v1.2 Page 36 of 60
Quotation Fill-In Information
Bid Issue
GRDA Unit 3 Combined Cycle Project Heat Recovery Steam Generator
March 2014
178592.67.6130

Section A
Heat Recovery Steam Generator
Source: 00300, 2009, v1.2 Page 37 of 60
Quotation Fill-In Information
Bid Issue
GRDA Unit 3 Combined Cycle Project Heat Recovery Steam Generator
March 2014
178592.67.6130

Section A
Heat Recovery Steam Generator
Source: 00300, 2009, v1.2 Page 38 of 60
Quotation Fill-In Information
Bid Issue
GRDA Unit 3 Combined Cycle Project Heat Recovery Steam Generator
March 2014
178592.67.6130

00300.10 Technical Documents Required with Quotation (completed tables are required for the Base
Scope)
Technical input to 00300.6 Bid Submittals Required with Quotation
Reference
Submittal Item Yes/No
Document

Bid Submittals
11507 Catalyst for Selective Catalytic Reduction .
11507 Catalyst management plan for the first 5 years of operation
11507 The Supplier shall provide a statement regarding whether or not he accepts
return of spent catalyst as described in Article 11507.2.4.
11507 List of catalyst poisons and operating conditions that may reduce catalyst
life, performance, or structural integrity. The list of poisons shall include the
maximum quantities of poisons allowed (either individually or combination)
and the testing method which will be used as a basis for determining poison
levels.
11506 Selective Catalytic Reduction System .
11506 Drawings
11506 General arrangement and elevation plans of systems furnished.
11506 Preliminary piping and instrument diagrams designating all power actuated
valves and instruments.
11506 Major dimensions of major pieces of equipment.
11506 General description as to component or modular sizes to establish
construction and erection activities required onsite.
11506 Preliminary load information.
11508 Ammonia System .
11508 Preliminary piping and instrument diagram of ammonia flow control unit,
vaporized ammonia flow balancing arrangement, and ammonia injection grid.

11508 General arrangement, elevation, and plans of ammonia flow control unit.
11508 General arrangement, elevation, and plans of vaporized ammonia flow
balance arrangement.
11508 General arrangement, elevation, and plans of ammonia injection grid.
14201 Vertical Lift Service Car .
14201 General arrangement, elevation, and plan drawing.
14201 General description as to component or modular sizes to establish
construction and erection activities required onsite.
14201 Preliminary load information.
14201 Description of electrical components supplied.
15511 Heat Recovery Steam Generator .
15511 Listing of Work subcontracted to other Suppliers.
15511 Listing of Subsuppliers used.
15511 Bidder's preliminary engineering schedule.
15511 Bidder's procurement/production/shipping schedule.
15511 List of similar units in construction or operation
Preliminary P&IDs including scope of Supplier, Hydrotest boundaries, and
15511 ASME code boundaries.
15511 Description of unit startup
Equipment arrangement drawings from CT outlet expansion joint to outlet of
15511 stack inlet expansion joint - elevation, side, plan, etc. views

Section A
Heat Recovery Steam Generator
Source: 00300, 2009, v1.2 Page 39 of 60
Quotation Fill-In Information
Bid Issue
GRDA Unit 3 Combined Cycle Project Heat Recovery Steam Generator
March 2014
178592.67.6130

15511 Equipment arrangement drawings: duct burner, fuel skid, stair towers, etc.
15511 Provide drawings of the proposed manway doors, material specifications
(doors and gaskets), installation instructions, experience list with the
proposed design, specifically with cycling HRSGs
15511 Extent of piping fabrication performed off site
15511
Number of tube welds and header welds in HP section of HRSG by size/sch
15511
Number of tube welds and header welds in IP section of HRSG by size/sch
15511 Number of tube welds and header welds in Reheat section of HRSG by
size/sch
15511
Number of tube welds and header welds in LP section of HRSG by size/sch
15511 Number of field welds for components, by size/sch, composed of alloy
materials such as P/T11, P/T22, P/T91, etc.
15511 Number of tube welds and header welds in BOP piping
15511 Storage requirements for all materials
15511 Cleanliness specification for all pressure parts and piping by service
15511 Describe the extent of knocked-down shop fabrication versus shop
fabrication of ductwork box sections.
15511 Preliminary ductwork arrangement.
15511 Description of structural steel, grating, handrail, and embedments fabrication
and shipments by area
15511 Estimated structural steel quantity (tons)
15511 Estimated grating area (sf)
15511 Description of vessel preparation for shipment including provisions for
closure & rust prevention
15511 Preliminary Electrical Load List, including equipment tagging, equipment
description, voltage, and the rated and operating electrical loads.

Section A
Heat Recovery Steam Generator
Source: 00300, 2009, v1.2 Page 40 of 60
Quotation Fill-In Information
Bid Issue
GRDA Unit 3 Combined Cycle Project Heat Recovery Steam Generator
March 2014
178592.67.6130

00300.11 Technical Fill-In Data Required with Quotation (completed tables are required for the Base
Scope and Elective Option [if proposed])

Technical input to 00300.7 Technical Fill-In Data Required with Quotation


Reference
Submittal Item Tech Fill-In Data
Document
Technical Fill-In Data
11506 Selective Catalytic Reduction System .
11506 Bidder's Name
11506 Performance Guarantees When Firing Natural Gas
11506 Unit load, percent MCR
11506 SCR reactor inlet gas velocity distribution, percent of
point measured
11506 Less than 610 percent of average
11506 Less than 615 percent of average
11506 Maximum system pressure drop (catalyst charge,
flange-to-flange), psi (kPa)
11506 Reactor system maximum operating power
requirements
11506 kVA
11506 kW
11506 Voltage, volts
11506 Phase
11506 Maximum compressed air requirements, psig/scfm
(kPag/scmm)
11506 Plant (noninstrument) air
11506 Instrument air
11506 Maximum rated capacity of SCR system, flue gas
flow rate, lb/h (kg/h)
11506 Minimum load capability, percent of MCR flue gas
flow rate
11506 Minimum availability, percent (as defined on the SCR
System Specification Sheets)
11506 Performance guarantees are applicable for the full
range of expected operations (minimum to maximum
load.
11506 SCR Reactor
11506 Number of reactors
11506 Material of construction, ASTM designation
11506 Housing
11506 Liner
11506 Structural steel
11506 Flow distribution devices
11506 Catalyst protection screens
11506 Catalyst support frame
11506 Catalyst seal plates
11506 Nozzles
11506 Others
11506 Overall (outside) dimensions of catalyst housing, in.
(mm)

Section A
Heat Recovery Steam Generator
Source: 00300, 2009, v1.2 Page 41 of 60
Quotation Fill-In Information
Bid Issue
GRDA Unit 3 Combined Cycle Project Heat Recovery Steam Generator
March 2014
178592.67.6130

Technical input to 00300.7 Technical Fill-In Data Required with Quotation


11506 Height
11506 Width
11506 Depth
11506 Overall (inside) dimensions of catalyst housing, in.
(mm)
11506 Height
11506 Width
11506 Depth
11506 Housing shell plate thickness, in. (mm)
11506 Distance between ends of first catalyst later to
beginning of adjacent catalyst layers, in. (mm)
11506 Distance between flow distribution plates to AIG, in.
(mm)
11506 Distance between AIG to beginning of first catalyst
layer, in. (mm)
11506 Space provided for spare catalyst layer, in. (mm)
11506 Access provisions
11506 Design live load for stairs, platforms, and
walkways, lbf
11506 Grating
11506 Total floor area, ft2 (m2)
11506 Total stair tread, ft2 (m2)
11506 Access door size for personnel access to catalyst
layers and coupons, in. (mm)
11506 Access door size for personnel access to
ammonia injection grid, in. (mm)
11506 Number of test ports
11506 Reactor inlet
11506 Between Layers 1 and 2 (if applicable)
11506 Reactor outlet
11506 Size of test ports, in. (mm)
11506 Reactor inlet
11506 Between Layers 1 and 2 (if applicable)
11506 Reactor outlet
11506 Dimensions of each future catalyst block (L by W by
H), in. (mm)
11507 Catalyst for Selective Catalytic Reduction .
11507 Bidder's Name
11507 Type
11507 Active components
11507 Flue gas flow direction through catalyst
11507 Catalyst
11507 Manufacturer's identification
11507 Type (honeycomb, plate, etc.)
11507 Module frame material
11507 Catalyst pitch, in. (mm)
11507 Catalyst module dimensions, in. (mm)
11507 Width
11507 Length

Section A
Heat Recovery Steam Generator
Source: 00300, 2009, v1.2 Page 42 of 60
Quotation Fill-In Information
Bid Issue
GRDA Unit 3 Combined Cycle Project Heat Recovery Steam Generator
March 2014
178592.67.6130

Technical input to 00300.7 Technical Fill-In Data Required with Quotation


11507 Height (direction of flow)
11507 Catalyst layer dimensions, in. (mm)
11507 Width
11507 Length
11507 Height (direction of flow)
11507 Active components
11507 Catalyst substrate material
11507 Number of catalyst layers
11507 Number of modules per layers
11507 Catalyst elements per module
11507 Total catalyst volume, ft3 (m3)
11507 Maximum catalyst operating temperature, F (C)
11507 Minimum catalyst operating temperature, F (C)
11507 Specific surface area, ft2/ft3 (m2/m3)
11507 Total catalyst weight, lb (kg)
11507 General conditions
11507 Maximum flue gas flow rate allowed, lb/h (kg/h)
11507 Total pressure drop across the catalyst, psi (kPa)
11507 Guarantee conditions
11507 Minimum NOx reduction, percent
11507 Maximum NOx SCR exit emissions, lb/h (kg/h)
11507 Maximum conversion rate of SO2 to SO3
11507 Maximum ammonia emissions at SCR outlet
11507 Emission limits shall be based on the following
conditions
11507 Minimum catalyst life, h
11507 Temperature, F (C)
11507 Percent oxygen
11507 Atmospheric pressure, psia (kPa)
11508 Ammonia System .
11508 Bidder's Name
11508 General
11508 Ammonia area monitors
11508 Number
11508 Manufacturer
11508 Ammonia Vaporization
11508 Dilution air fans or flue gas recirculation fans
11508 Number
11508 Capacity, scfm (scmm)
11508 Head, in. wg (mmwg)
11508 Motor
11508 Power, kV
11508 Voltage
11508 Vaporization heat exchanger
11508 Number
11508 Manufacturer
11508 Heat exchanger medium (electric or steam)
11508 Maximum power requirements (if applicable)
11508 Fuel

Section A
Heat Recovery Steam Generator
Source: 00300, 2009, v1.2 Page 43 of 60
Quotation Fill-In Information
Bid Issue
GRDA Unit 3 Combined Cycle Project Heat Recovery Steam Generator
March 2014
178592.67.6130

Technical input to 00300.7 Technical Fill-In Data Required with Quotation


11508 kVA
11508 kW
11508 Voltage
11508 Phase
11508 Maximum steam requirements (if applicable)
11508 Fuel
11508 Flow, lb/h (kg/h)
11508 Pressure, psi (kPa)
11508 Temperature, F (C)
11508 Turndown, percent of design capacity
11508 Air outlet temperature, F (C)
11508 Materials
11508 Heat exchanger
11508 Piping
11508 Vaporizer
11508 Number
11508 Manufacturer
11508 Capacity (NH3), lb/h (kg/h)
11508 Turndown, percent
11508 Atomizing nozzle type
11508 Atomizing medium
11508 Compressed air requirements
11508 Pressure, psi
11508 Flow, scfm (scmm)
11508 Vaporizer outlet flow, scfm (scmm)
11508 Vaporizer outlet temperature, F (C)
11508 Outlet NH3 concentration, percent NH3 to dilution
air
11508 Minimum
11508 Maximum
11508 Materials
11508 Vaporizer
11508 NH3 piping
11508 Valves
11508 Nozzles
11508 Dimensions, diameter by height, in. (mm)
11508 Ammonia Injection Grid
11508 Manufacturer
11508 Piping material
11508 Number of independently adjustable ammonia
injection zones
11508 Nozzle matrix
11508 Nozzles
11508 Manufacturer
11508 Material
11508 Design flow, lb/h (kg/h)
11508 Total number installed
11508 Removal provisions
11508 Injection grid branch flow control valves

Section A
Heat Recovery Steam Generator
Source: 00300, 2009, v1.2 Page 44 of 60
Quotation Fill-In Information
Bid Issue
GRDA Unit 3 Combined Cycle Project Heat Recovery Steam Generator
March 2014
178592.67.6130

Technical input to 00300.7 Technical Fill-In Data Required with Quotation


11508 Number
11508 Material
11508 Injection grid branch flow measurement device type
11508
Describe methods used to measure NH3 distribution
11508 Describe provisions for optimizing reagent
distribution
11508 Dilution air/ammonia transfer pressure, psi (kPa)
11508 List of installations where this design has been used
recently
11508 Distance between injection grid and first catalyst
layer, in. (mm)
11508 Maximum Operating Power Requirements
11508 Vaporization system (if applicable)
11508 kVA
11508 kW
11508 Voltage
11508 Phase
11508 Total system supplied
11508 kVA
11508 kW
11508 Voltage
11508 Phase
11508 Maximum steam requirements
11508 Vaporization system
11508 Flow, lb/h (kg/h)
11508 Pressure, psi (kPa)
11508 Temperature, F (C)
11508 Maximum compressed air requirements
11508 Plant (non-instrument) air
11508 Pressure, psi (kPa)
11508 Flow, scfm (scmm)
11508 Instrument air
11508 Pressure, psi (kPa)
11508 Flow, scfm (scmm)
11508 Maximum ammonia supply capacity of system, lb/h
(kg/h)
11508 Minimum ammonia supply capability of system, lb/h
(kg/h)
11508
Describe tie-in locations for plant (non-instrument) air
11508 Describe tie-in locations for instrument air
11509 Oxidation Catalyst System .
11509 Casing and Spool Piece
11509 Casing material
11509 Spool piece dimensions
11509 Length, in. (mm)
11509 Width, in. (mm)
11509 Height, in. (mm)

Section A
Heat Recovery Steam Generator
Source: 00300, 2009, v1.2 Page 45 of 60
Quotation Fill-In Information
Bid Issue
GRDA Unit 3 Combined Cycle Project Heat Recovery Steam Generator
March 2014
178592.67.6130

Technical input to 00300.7 Technical Fill-In Data Required with Quotation


11509 Thickness of casing shell, in. (mm)
11509 Thickness of spool piece, in. (mm)
14201 Vertical Lift Service Car .
14201 Bidder's Name
14201 Drive mechanism
14201 Design capacity, lb (kg)
14201 Operating speed, fpm (m/s)
14201 Car size
14201 Length x width, in (mm)
14201 Height, in. (mm)
14201 Electrical load, kW
15221 Fabricated Steel Pipe .
15221 Bidder's Name
15221 Name of pipe
15221 Address of pipe fabricator
15221 Address of pipe manufacturer
15221 Name of fitting
15221 Address of fitting manufacturer
15221 Name of flange
15221 Address of flange manufacturer
15263
General Service Valves (Furnished with Equipment) .
15263 Bidder's Name
15268 Control Valves .
15268 Bidder's Name
15511 Heat Recovery Steam Generator .
15511 Bidder's Name
15511 General Technical Data .
15511 Total weight empty, lb
15511 Water to fill HRSG to operating level for hydrostatic
test, gal.
15511 Time required to bring HRSG from cold condition to
design output condition, min.
15511 Seismic design
15511 Average far field sound emissions with combustion
turbine operating at rated megawatt load when
measured at a distance of 400 ft (122 m) from base of
HRSG, dBA/dBC
15511 Heating Surface Summary High Pressure Economizer(s)/Evaporator(s)/Superh
eater(s)
15511 Total surface area, sq ft / /
15511 Pinch points, F / /
15511 Approach temperatures, F / /
15511 Total internal volume, gal / /
15511 Tube diameter, in. / /
15511 Wall thickness, in. / /
15511 Corrosion allowance, in. / /
15511 Design pressure, psia / /
15511 Design temperature, F / /

Section A
Heat Recovery Steam Generator
Source: 00300, 2009, v1.2 Page 46 of 60
Quotation Fill-In Information
Bid Issue
GRDA Unit 3 Combined Cycle Project Heat Recovery Steam Generator
March 2014
178592.67.6130

Technical input to 00300.7 Technical Fill-In Data Required with Quotation


15511 Material (ASTM/ASME Standard and grade) / /
15511 No. of rows / /
15511 No. tubes per row / /
15511 Tube Pitch (square or triangular) / /
15511 Direction of flow / /
15511 Fins .
15511 Type / /
15511 Density, fins/in. / /
15511 Height, in. / /
15511 Thickness, in. / /
15511 Material / /
15511 Method of attachment / /
15511 Pressure drop at full load steam flow, psi / /
15511 Time required to completely drain, min. / /
15511 Heating Surface Summary Intermediate Pressure Economizer(s)/Evaporator(s)/Superh
eater(s)
15511 Total surface area, sq ft / /
15511 Pinch points, F / /
15511 Approach temperatures, F / /
15511 Total internal volume, gal / /
15511 Tube diameter, in. / /
15511 Wall thickness, in. / /
15511 Corrosion allowance, in. / /
15511 Design pressure, psia / /
15511 Design temperature, F / /
15511 Material (ASTM/ASME Standard and grade) / /
15511 No. of rows / /
15511 No. tubes per row / /
15511 Tube Pitch (square or triangular) / /
15511 Direction of flow / /
15511 Fins .
15511 Type / /
15511 Density, fins/in. / /
15511 Height, in. / /
15511 Thickness, in. / /
15511 Material / /
15511 Method of attachment / /
15511 Pressure drop at full load steam flow, psi / /
15511 Time required to completely drain, min. / /
15511 Heating Surface Summary Low Pressure Economizer(s)/Evaporator(s)/Superh
eater(s)
15511 Total surface area, sq ft / /
15511 Pinch points, F / /
15511 Approach temperatures, F / /
15511 Total internal volume, gal / /
15511 Tube diameter, in. / /
15511 Wall thickness, in. / /
15511 Corrosion allowance, in. / /
15511 Design pressure, psia / /

Section A
Heat Recovery Steam Generator
Source: 00300, 2009, v1.2 Page 47 of 60
Quotation Fill-In Information
Bid Issue
GRDA Unit 3 Combined Cycle Project Heat Recovery Steam Generator
March 2014
178592.67.6130

Technical input to 00300.7 Technical Fill-In Data Required with Quotation


15511 Design temperature, F / /
15511 Material (ASTM/ASME Standard and grade) / /
15511 No. of rows / /
15511 No. tubes per row / /
15511 Tube pitch (square or triangular) / /
15511 Direction of flow / /
15511 Fins .
15511 Type / /
15511 Density, fins/in. / /
15511 Height, in. / /
15511 Thickness, in. / /
15511 Material / /
15511 Method of attachment / /
15511 Pressure drop at full load steam flow, psi / /
15511 Time required to completely drain, min. / /
15511 Operating Conditions (indicate Load Case) .
15511 Conditions at high-pressure superheater outlet .
15511 Steam flow, lb/h
15511 Steam temperature, F
15511 Steam pressure, psia
15511 Conditions at intermediate-pressure superheater outlet
.
15511 Steam flow, lb/h
15511 Steam temperature, F
15511 Steam pressure, psia
15511 Conditions at low-pressure superheater outlet .
15511 Steam flow, lb/h
15511 Steam temperature, F
15511 Steam pressure, psia
15511 Conditions at reheater outlet .
15511 Steam flow, lb/h
15511 Steam temperature, F
15511 Steam pressure, psia
15511 Conditions at LP drum water outlet .
15511 Feedwater flow, gpm
15511 Feedwater temperature, F
15511 Feedwater pressure, psig
15511 Conditions at high-pressure economizer inlet .
15511 Feedwater flow, gpm
15511 Feedwater temperature, F
15511 Feedwater pressure, psig
15511 Conditions at intermediate-pressure economizer inlet .
15511 Feedwater flow, gpm
15511 Feedwater temperature, F
15511 Feedwater pressure, psig
15511 Conditions at low-pressure economizer inlet .
15511 Condensate flow, gpm
15511 Condensate temperature, F
15511 Condensate pressure, psig

Section A
Heat Recovery Steam Generator
Source: 00300, 2009, v1.2 Page 48 of 60
Quotation Fill-In Information
Bid Issue
GRDA Unit 3 Combined Cycle Project Heat Recovery Steam Generator
March 2014
178592.67.6130

Technical input to 00300.7 Technical Fill-In Data Required with Quotation


15511 HP Attemperator spray water flow, gpm
15511 IP Attemperator spray water flow, gpm
15511 Minimum stack temperature, F
15511 Maximum gas pressure drop turbine exhaust to stack
inlet, in. w(g)
15511 Maximum gas pressure drop, in. w(g), through: .
15511 SCR Catalyst
15511 HP boiler blowdown, percent
15511 IP boiler blowdown, percent
15511 Steam drums .
15511 High-pressure
15511 Inside diameter, in.
15511 Overall length, in.
15511 Wall thickness, in.
15511 Material (ASME Standard and grade)
15511 Steam separator type .
15511 Primary
15511 Secondary
15511 Capacity .
15511 To midpoint of normal water level range, gal
15511 For hydrotest, gal
15511 Minimum drum holding capacity at full load steam
flow, min.
15511 Water surge volume, gal
15511 Dimensions, in., distance from centerline to: .
15511 High level trip
15511 High level alarm
15511 Low level alarm
15511 Low level trip
15511 Intermediate-pressure .
15511 Inside diameter, in.
15511 Overall length, in.
15511 Wall thickness, in.
15511 Material (ASME Standard and grade)
15511 Steam separator type .
15511 Primary
15511 Secondary
15511 Capacity .
15511 To midpoint of normal water level range, gal
15511 For hydrotest, gal
15511 Minimum drum holding capacity at full load steam
flow, min.
15511 Water surge volume, gal
15511 Dimensions, in., distance from centerline to: .
15511 High level trip
15511 High level alarm
15511 Low level alarm
15511 Low level trip
15511 Low-pressure .

Section A
Heat Recovery Steam Generator
Source: 00300, 2009, v1.2 Page 49 of 60
Quotation Fill-In Information
Bid Issue
GRDA Unit 3 Combined Cycle Project Heat Recovery Steam Generator
March 2014
178592.67.6130

Technical input to 00300.7 Technical Fill-In Data Required with Quotation


15511 Inside diameter, in.
15511 Overall length, in.
15511 Wall thickness, in.
15511 Material (ASME Standard and grade)
15511 Steam separator type .
15511 Primary
15511 Secondary
15511 Capacity .
15511 To midpoint of normal water level range, gal
15511 For hydrotest, gal
15511 Minimum drum holding capacity at full load steam
flow, min.
15511 Water surge volume, gal
15511 Dimensions, in., distance from centerline to: .
15511 High level trip
15511 High level alarm
15511 Low level alarm
15511 Low level trip
15511 Duct burners .
15511 Manufacturer
15511 Design heat input, Btu/h
15511 Maximum heat input, Btu/h
15511 Distance from burner flame tip to next heat transfer
surface (at maximum duct burner firing rate), ft (m)
15511 Ignitor type
15511 Burner turndown ratio
15511 Minimum firing capability, percent of design
15511 Number of burner elements
15511 Fuel train .
15511 Pressure regulating valve .
15511 Manufacturer
15511 Size
15511 Type No.
15511 Fuel block and bleed valves .
15511 Manufacturer
15511 Size
15511 Type No.
15511 Required inlet fuel pressure, psig
15511 Fuel gas flow rate (maximum), lb/h
15511 Casing .
15511 Casing material (referenced standard and grade)
15511 Casing thickness, in.
15511 Internal insulation .
15511 Material (referenced standard and grade)
15511 Thickness, in.
15511 Internal liner .
15511 Material (referenced standard and grade)
15511 Thickness, in.
15511 Casing design pressure, in w(g)

Section A
Heat Recovery Steam Generator
Source: 00300, 2009, v1.2 Page 50 of 60
Quotation Fill-In Information
Bid Issue
GRDA Unit 3 Combined Cycle Project Heat Recovery Steam Generator
March 2014
178592.67.6130

Technical input to 00300.7 Technical Fill-In Data Required with Quotation


15511 Expansion joints .
15511 Manufacturer
15511 Location
15511 Length, ft-in.
15511 Width, ft-in.
15511 Height, ft-in.
15511 Installed weight, lb
15511 Design pressure, in. w(g)
15511 Design temperature, F
15511 Materials (ASTM Standard and grade) .
15511 Belt
15511 Insulation pillow
15511 Insulation fill
15511 Frame
15511 Liner
15511 Safety shroud
15511 Bolting
15511 Stack Data /
15511 Stack height, ft-in. /
15511 Stack type (round or rectangular) /
15511 Cross-sectional dimensions, L x W, ft-in. /
15511 Wall design, single or dual /
15511 Primary wall material /
15511 Primary wall thickness, in. /
15511 Inner wall material (dual wall only) /
15511 Inner wall thickness (dual wall only), in. .
15511 Internal insulation material /
15511 Internal insulation thickness, in. /
15511 Internal liner material /
15511 Internal liner thickness, in. /
15511 External insulation material /
15511 External insulation thickness, in. /
15511 External lagging material /
15511 External lagging thickness, in. /
15511 Dead load, lb /
15511 Design wind shear at base, lbf-ft /
15511 Design wind moment at base, lbf-ft .
15511 Design seismic shear at base, lbf-ft /
15511 Design seismic moment at base, lbf-ft /
15511 Foundation anchor bolts requirements
15511 Number .
15511 Type .
15511 Diameter, in.
15511 Required projection above foundation, in.
15511 Quantity of test ports provided
15511 Diameter of test ports provided, in. .
15511 Location of platforms provided
15511 Size of platforms provided, width, ft-in
15511 Design minimum exhaust gas temperature, F

Section A
Heat Recovery Steam Generator
Source: 00300, 2009, v1.2 Page 51 of 60
Quotation Fill-In Information
Bid Issue
GRDA Unit 3 Combined Cycle Project Heat Recovery Steam Generator
March 2014
178592.67.6130

Technical input to 00300.7 Technical Fill-In Data Required with Quotation


15511 Design maximum exhaust gas temperature, F .
15511 Exhaust stack emissions limits (see 15511.1.4)
15511 NOx, ppmvd at 15 percent O2
15511 CO, ppmvd at 15 percent O2
15511 Ammonia, ppmvd at 15 percent O2
15511 VOC, lb/h .
15511 Particulate, PM10 lb/hr
15511 Trim .
15511 Safety valves .
15511 Manufacturer
15511 Size, in.
15511 Type No.
15511 Power relief valves .
15511 Manufacturer
15511 Size, in.
15511 Type No.
15511 Feedwater control valves .
15511 Manufacturer
15511 Size, in.
15511 Type No.
15511 Blowdown valves .
15511 Manufacturer
15511 Size, in.
15511 Type No.
15511 Main steam stop valves .
15511 Manufacturer
15511 Size, in.
15511 Type No.
15511 Spray water control valves .
15511 Manufacturer
15511 Size, in.
15511 Type No.
15511 Feedwater check valves .
15511 Manufacturer
15511 Size, in.
15511 Type No.
15511 Feedwater stop valves .
15511 Manufacturer
15511 Size, in.
15511 Type No.
15511 Circulating pumps high-pressure (if required) .
15511 Manufacturer
15511 Model
15511 Quantity furnished
15511 Design .
15511 Flow, lb/h
15511 Head, psi
15511 Efficiency, percent
15511 Circulating pumps low-pressure (if required) .

Section A
Heat Recovery Steam Generator
Source: 00300, 2009, v1.2 Page 52 of 60
Quotation Fill-In Information
Bid Issue
GRDA Unit 3 Combined Cycle Project Heat Recovery Steam Generator
March 2014
178592.67.6130

Technical input to 00300.7 Technical Fill-In Data Required with Quotation


15511 Manufacturer
15511 Model
15511 Quantity furnished
15511 Design .
15511 Flow, lb/h
15511 Head, psi
15511 Efficiency, percent
15511 Supplier furnished materials and associated
installation quantities .
15511 Large Bore (>=2 in diameter) Alloy Pipe, lf
15511 Large Bore Alloy Pipe Spools, each
15511 Large Bore Alloy Field Welds, each
15511 Large Bore Alloy Field Welds (average dia.), inches .
15511 ASME P - 1 Welds, each
15511 ASME P - 4 Welds, each
15511 ASME P 5A Welds, each
15511 ASME P 5B Welds, each
15511 Large Bore (>= 2 in diameter) Carbon Steel Pipe, lf

15511 Large Bore Carbon Steel Pipe Spools, each


15511 Large Bore Carbon Steel Field Welds, each
15511 Large Bore Carbon Steel Field Welds (average dia.),
inches (Note 1)
15511 Total Large Bore Carbon Steel Field Welds that require
PWHT, each .
15511 ASME P - 1 Welds, each
15511 ASME P - 4 Welds, each
15511 ASME P 5A Welds, each
15511 ASME P 5B Welds, each
15511 Small Bore Alloy Pipe, lf
15511 Small Bore Alloy Pipe Spools, each
15511 Small Bore Alloy Field Welds, each
15511 Total Small Bore Alloy Field Welds that require PWHT,
each .
15511 ASME P - 1 Welds, each
15511 ASME P - 4 Welds, each
15511 ASME P 5A Welds, each
15511 ASME P 5B Welds, each
15511 Small Bore Carbon Steel Pipe, lf
15511 Small Bore Carbon Steel Pipe Spools, each
15511 Small Bore Carbon Steel Field Welds, each
15511 Total Small Bore Carbon Steel Field Welds that require
PWHT, each .
15511 ASME P - 1 Welds, each
15511 ASME P - 4 Welds, each
15511 ASME P 5A Welds, each
15511 ASME P 5B Welds, each
15511 Structural Steel, tons (Note 2)
15511 Structural Steel, pieces

Section A
Heat Recovery Steam Generator
Source: 00300, 2009, v1.2 Page 53 of 60
Quotation Fill-In Information
Bid Issue
GRDA Unit 3 Combined Cycle Project Heat Recovery Steam Generator
March 2014
178592.67.6130

Technical input to 00300.7 Technical Fill-In Data Required with Quotation


15511 Casing, tons
15511 Casing, pieces
15511 Ductwork, tons (Note 3)
15511 Ductwork, pieces
15511 Casing/Ductwork Field Seal Welding, lf (Note 4)
15511 Platform and Stairs, tons
15511 Platform and Stairs, pieces
15511 Modules/Tube Bundles, each
15511 Modules/Tube Bundles (maximum weight), tons
15511 Boiler Internals/Baffles, pieces
15511 Boiler Internals/Baffles Welding, lf
15511 Drum Enclosures, pieces
15511 Drum Enclosures, sf
15511 Drums & Internals, pieces
15511 Drums & Internals (maximum weight), tons
15511 Duct Firing & Control Systems, each
15511 Off Base Skids & Miscellaneous Equipment, each
15511 SCR Catalyst, pieces
15511 Technical Assistance Time, hours
15511 Notes .
15511 1. Average Diameter for large bore pipe welds is the
sum of the diameters for each individual large bore
welds divided by the total number of large bore
welds. .
15511 2. Structural Steel includes structural members, only,
not fasteners, shims, gussets, etc. .
15511 3. Ductwork includes expansion joints, but not
fasteners, shims, & gussets. .
15511 4. Casing/Ductwork Field Seal Welding includes
expansion joints. .
15511 Seal welding is defined as the number of lineal feet
of weld placed multiplied by the number of sides
from which the weld must be placed. Thus, a seal
weld that must be placed from both the inside and
outside is equal to the length of the weld multiplied
by two (2).
.
15511 PWHT = post weld heat treatment .
15511 Exhaust Gas Silencers
15511 Manufacturer
15511 Perforated metal sheet material
15511 Frame material
15511 Pressure drop at design flue gas flow, psi
15551 Damper .
15551 Bidder's name
15551 Type of dampers
15551 Damper frame inside diameters
15551 Parallel to blade shaft (blade) (width), in. (mm)
15551 Perpendicular to blade shaft (height), in. (mm)

Section A
Heat Recovery Steam Generator
Source: 00300, 2009, v1.2 Page 54 of 60
Quotation Fill-In Information
Bid Issue
GRDA Unit 3 Combined Cycle Project Heat Recovery Steam Generator
March 2014
178592.67.6130

Technical input to 00300.7 Technical Fill-In Data Required with Quotation


15551 Perpendicular to blade shaft (blade) (length - diverter
only, in. (mm)
15551 Damper net flow area when open
15551 Weight, total, lb (kg)
15551 Materials of construction
15551 ASTM A588 or ASTM A36 or UNS
S31725 or UNS NO6625 or UNS
Frame N10276 or UNS S31603
15551 ASTM A588 or ASTM A36 or UNS
S31725 or UNS NO6625 or UNS
Blade skin N10276 or UNS S31604
15551 ASTM A588 or ASTM A36 or UNS
S31725 or UNS NO6625 or UNS
Blade stiffeners N10276 or UNS S31605
15551 ASTM A588 or ASTM A36 or UNS
S31725 or UNS NO6625 or UNS
Axles N10276 or UNS S31606
15551 ASTM A588 or ASTM A36 or UNS
S31725 or UNS NO6625 or UNS
Axle stub ends N10276 or UNS S31607
15551 ASTM A588 or ASTM A36 or UNS
S31725 or UNS NO6625 or UNS
Seals N10276 or UNS S31608
15551 Frame
15551 Flange-to-flange length
15551 Number of stay bars
15551 Blade - louver
15551 Number of blades
15551 Blade width, in. (mm)
15551 Blade skin thickness, in. (mm)
15551 Blade axle diameter, in. (mm)
15551 Deflection at center of blades with damper closed
and at maximum design temperature and pressure
15551 Method of attachment of blade skin to axle
15551 Percent of stack area blocked when damper is in open
position
15551 Linkages
15551 Linkage safety factor
15551 ASTM A588 or ASTM A36 or UNS
S31725 or UNS NO6625 or UNS
Linkage material N10276 or UNS S31608
15551 ASTM A588 or ASTM A36 or UNS
S31725 or UNS NO6625 or UNS
Linkage pin material N10276 or UNS S31608
15551 ASTM A588 or ASTM A36 or UNS
S31725 or UNS NO6625 or UNS
Linkage bolt material N10276 or UNS S31608

Section A
Heat Recovery Steam Generator
Source: 00300, 2009, v1.2 Page 55 of 60
Quotation Fill-In Information
Bid Issue
GRDA Unit 3 Combined Cycle Project Heat Recovery Steam Generator
March 2014
178592.67.6130

Technical input to 00300.7 Technical Fill-In Data Required with Quotation


15551 ASTM A588 or ASTM A36 or UNS
S31725 or UNS NO6625 or UNS
Linkage pivot bearing type and material N10276 or UNS S31608
15551 Method of adjusting linkage
15551 Mechanical seal system
15551 Seal type
15551 Seal section length, in. (mm)
15551 Top
15551 Bottom
15551 Sides
15551 Seal supports/retainer thickness
15551 ASTM A588 or ASTM A36 or UNS
S31725 or UNS NO6625 or UNS
Packing box material N10276 or UNS S31608
15551 Packing
15551 ASTM A588 or ASTM A36 or UNS
S31725 or UNS NO6625 or UNS
Material N10276 or UNS S31608
15551 Manufacturer and type
15551 Maximum temperature rating, F (C)
15551 Packing depth
15551 Maximum permissible deflection of packing
recommended by packing manufacturer
15551 Describe blade edge to frame seal
15551 Describe blade edge to blade edge seal
15551 Damper Drive
15551 Chain and sprocket or Rack and pinion
Type of drive system or Pneumatic/hydraulic
15551 Drive shaft
15551 ASTM A588 or ASTM A36 or UNS
S31725 or UNS NO6625 or UNS
Material N10276 or UNS S31608
15551 Diameter, in. (mm)
15551 Drive shaft bearings
15551 Manufacturer
15551 Type
15551 Size
15551 Idler shaft bearings
15551 Manufacturer
15551 Type
15551 Size
15551 Drive operator design torque, maximum
15551 Damper opening torque - normal opening
15551 Starting
15551 Running
15551 Damper closing torque - normal closing
15551 Starting
15551 Running
15551 Sprocket or pinion

Section A
Heat Recovery Steam Generator
Source: 00300, 2009, v1.2 Page 56 of 60
Quotation Fill-In Information
Bid Issue
GRDA Unit 3 Combined Cycle Project Heat Recovery Steam Generator
March 2014
178592.67.6130

Technical input to 00300.7 Technical Fill-In Data Required with Quotation


15551 Manufacturer
15551 Type
15551 Size
15551 Chains
15551 Manufacturer
15551 Type
15551 Size
15551 Guarantees
15551 Guaranteed opening time - maximum
15551 Guaranteed closing time - maximum
15551 Guaranteed maximum pressure drop at design flow
rate with damper wide open
17052 Bidder's Name
17052 Panel size (L by W by H), in. (mm)
17052 Panel approximate weight, lb (kg)
17052 Summary of Major Components
17052 Item
17052 Manufacturer
17052 Quality
17052 Model
17053
Subsystem - Programmable Logic Control System .
17053 Bidder's Name
17053 Manufacturer
17053 Model No.
17053 Redundant (yes/no)
17053 Quantity (count redundant pairs one)
17053 Memory size, per processor, kbytes
17053 ROM
17053 EPROM
17053 Others
17053 Inputs and Outputs - The bidder shall complete the
following items for each type of card proposed. Copy
this section as needed. Change type numbers
appropriately.)
17053 Digital inputs
17053 Card type
17053 Electrical signal range
17053 Quantity of cards proposed
17053 Points per card
17053 Pulse inputs
17053 Card type
17053 Electrical signal range
17053 Quantity of cards proposed
17053 Points per card
17053 Digital outputs
17053 Card type
17053 Electrical signal range
17053 Quantity of cards proposed

Section A
Heat Recovery Steam Generator
Source: 00300, 2009, v1.2 Page 57 of 60
Quotation Fill-In Information
Bid Issue
GRDA Unit 3 Combined Cycle Project Heat Recovery Steam Generator
March 2014
178592.67.6130

Technical input to 00300.7 Technical Fill-In Data Required with Quotation


17053 Points per card
17053 Analog inputs
17053 Card type
17053 Electrical signal range
17053 Quantity of cards proposed
17053 Points per card
17053 Thermocouple inputs
17053 Card type
17053 Electrical signal range
17053 Quantity of cards proposed
17053 Points per card
17053 RTD inputs
17053 Card type
17053 Electrical signal range
17053 Quantity of cards proposed
17053 Points per card
17053 Analog outputs
17053 Card type
17053 Electrical signal range
17053 Quantity of cards proposed
17053 Points per card
17053 Is the failure state of individual digital output (the state
of the contact upon processor or I/O module failure)
user selectable (yes/no)
17053 If no, what is the failure state
17053 Operator Work Stations
17053 Manufacturer
17053 Model No.
17053 Display processor type
17053 Quantity
17053 Are the display programs resident in the display
processor's memory (yes/no)
17053 Describe the proposed HMI software (manufacturer,
model, version, and features)
17053 Maximum number of addressable points (tags) Per
operator Work station
17053 Supporting electronic hardware located in
systemcabinets (yes/no)
17053 Number of monitors supported by one operator
interface package (keyboard, mouse)
17053 Maximum
17053 Proposed
17053 Number of windows supported by one display
processor
17053 Maximum
17053 Proposed
17053 Number of monitors supported by one display
processor (if only one window is open per monitor)
17053 Maximum

Section A
Heat Recovery Steam Generator
Source: 00300, 2009, v1.2 Page 58 of 60
Quotation Fill-In Information
Bid Issue
GRDA Unit 3 Combined Cycle Project Heat Recovery Steam Generator
March 2014
178592.67.6130

Technical input to 00300.7 Technical Fill-In Data Required with Quotation


17053 Proposed
17053 Programming Stations
17053 Describe the components of the programming
stations (monitor, processor, memory types/ sizes, disk
drive types/sizes, manufacturers, model numbers,
etc.).
17053 Describe the proposed programming software
(manufacturer, model number, hardware requirements,
features, etc.)
17053 Is the programming software compliant with the
requirements of IEC 1131-3 (yes/no)
17053 Monitors
17053 Manufacturer
17053 Model No.
17053 Dimensions, in. (mm)
17053 Diagonally
17053 Depth by height by width
17053 Weight, lb (kg)
17053 Maximum wiring distance from display processor, ft
(m)
17053 Printers
17053 Type
17053 Quantity
17053 Manufacturer
17053 Model No.
17053 Communications Network
17053 Is the network masterless (yes/no)
17053
Networking type (broadcasting, token passing, Etc.)
17053 Transmission rate, MHz
17053 Maximum overall length, ft (m)
17053 Maximum distance between nodes, ft (m)
17053 Number of nodes
17053 Maximum
17053 Proposed
17053 Cable Type 1
17053 Cable Type 2
17053 PLC System Cabinets
17053 Number of sections
17053 Dimensions (each section, L x W x H), in. (mm)
17053 Weight (each section), lb (kg)
17053 Remote I/O Equipment Cabinets
17053 Number of sections
17053 Dimensions (each section, L x W x H), in. (mm)
17053 Weight (each section), lb (kg)
E640 Low Voltage Induction Motors .
E640 Bidder's Name
E640 Motor manufacturer
E640 Model number

Section A
Heat Recovery Steam Generator
Source: 00300, 2009, v1.2 Page 59 of 60
Quotation Fill-In Information
Bid Issue
GRDA Unit 3 Combined Cycle Project Heat Recovery Steam Generator
March 2014
178592.67.6130

Technical input to 00300.7 Technical Fill-In Data Required with Quotation


E640 Driven Equipment
E640 Design standards (e.g., NEMA/IEEE, IEC)
E640 Driven equipment maximum brake horsepower, hp (kW)
E640 Motor nameplate, hp (kW)
E640 Service factor (NEMA/IEEE motors only)
E640 Motor bearing type
E640 Motor efficiency at nameplate, hp (kW), percent
E640 Bearing lubrication system
E640 Space heater rating (watts / voltage / phase)
E645 Electric Actuators .
E645 Driven Equipment Name
E645 ID Number
E645 Application: General usage, nonmodulating or
Extremely wet or submersible or Locations by
specified engineer or Valve listing specified engineer
or DC actuated valves
E645 Electric actuator manufacturer
E645 Size and Model No.
E645 Nameplate voltage, volts
E645 Motor full load current, amperes
E645 Motor time rating, seconds
E645 Rated actuator torque, lbf-ft or lbf-in (NM or KIP-ft)
E645 Speed of operation, open-to-closed or closed-to-open,
seconds
E645 Weight of actuator, lb (kg)
E645 Maximum differential pressure which actuator is
capable of operating against, psi (kPa)
E645 Valve stem diameter, in. (mm)
E645 Thrust allowance for valve packing friction, lb (kg)
E645 Housing material
E645 Integral control package with network communications
Model No.
E645 Manufacturer's electric actuator wiring diagram
E645 Drawing No.
E645 Drawing title
E645 Revision

Section A
Heat Recovery Steam Generator
Source: 00300, 2009, v1.2 Page 60 of 60