24-08-2015
Commercial-in-Confidence
OTBL 2G Modernization & 3G Project
Contents
1 Introduction.....................................................................................................................................3
1.1 Site Information.................................................................................................................................................3
2 Test Details.......................................................................................................................................4
2.1 Tool & SIM Information....................................................................................................................................4
2.2 DT Check List....................................................................................................................................................4
2.3 Drive Test Plots............................................................................................................................................
2G Drive Test Plots
RxLevel Plot (Idle Mode)..................................................................................................................................5
RxQual Plot.......................................................................................................................................................6
3G Drive Test Plots
RSCP Plot (Idle Mode)......................................................................................................................................5
Ec/Io Plot...........................................................................................................................................................6
UE Tx power plot..............................................................................................................................................8
3 Summary..........................................................................................................................................9
3.1 DT KPI...............................................................................................................................................................9
3.2 Analysis............................................................................................................................................................10
3.3 Comments........................................................................................................................................................11
Number of cell 01
District Name Dhaka
Serving Area Suvastu Najar Valley, North Badda, Progoti Soroni,
Dhaka.
RNC Name RNDH01
Report Prepared: Ishaque Uddin
Drive Test Engineer: Habib
3G physical parameter:
Node B ID Cell name Azimuth Tilt (M) Tilt (E) Height(m) LONG LAT Comment
DHK_ V1415 DHK_V1415_4 90.42506 23.78991 ok
Comments: Overall serving pattern is under satisfactory level.One spot found serving macro cell due to DAS does not
work properly.
Basement 1 (Progoti Soroni End) Post_RxLevel Plot-(Idle Mode-MS1)
Recommendations: Rx level is fair due to DAS does not work properly.Need check the connectivity of All DAS in
this floor.
Recommendations: Rx level is fair due to DAS does not work properly.Need to check the connectivity of All DAS
in this floor. Also additional antenna required.
Recommendations: Rx level is fair due to DAS does not work properly.Need check the connectivity of All DAS in
this floor.Also additional antenna required.
Recommendations: Rx level is fair due to DAS does not work properly.Need check the connectivity of All DAS in
this floor.
Recommendations: Need to check the connectivity of L4O15 for improving 2G coverage value.
4th Floor Post_RxQual Plot-(Dedicate Mode-MS2)
Comments: Overall Tx power Poor. Poor Tx power will be improve after improving 3G coverage.
1st Floor PSC Plot-(Idle Mode-MS3)
Comments: Overall Tx power fair. Tx power will be improve after improving 3G coverage.
2nd Floor PSC Plot-(Idle Mode-MS3)
Comments: Overall Tx power fair. Tx power will be improve after improving 3G coverage.
Basement 1 -Ping test :
3.1.1 DT KPI
Measured value Measured value
CLASSES INDICATORS SERVICES Minimum accepted value
(MAX) (Average)
Basement 2= Basement 2=
Basement 3= Basement 3=
Basement 1=128 ms
Basement 2=129 ms
Basement 3=158 ms
3rd FL=26 ms
4th FL=45 ms
Basement 3=100%
G FL= 100%
1. No abnormalities found.
3.3 Comments
1. All the KPIs reflect good performance and show no abnormalities.