Vous êtes sur la page 1sur 31

Changes V 2.

2 for NISSAN
Introduction

Structure of ANPQP has changed: The categories


are broken down into 26 separate activities.

In Version 2.1 there were 27 activities.

2
Project Milestones Section

Project Milestones section was updated

Milestones de Renault Vehicle / Powertrain

3
Ground Rules

Important C and E-mail were added to all headers

4
Category 1 Contract Review

The name of Category 1 changed to Contract


Review
Added a description for each Category to explain its
purpose.
Moved one Activity Product Quality and Reliability
Management from Category 3 to Category 1

5
Contract Review

Category Purpose:
Prompt the study of the RFQ files received from Renault
or Nissan and identify the technical, quality and
reliability requirements.
Conduct a contract review as required in
ISO/TS16949.
Prepare a response to the RFQ files.

RFQ
File

Request For
Quotation 6
2.1 Sub-Supplier Management

Notes were added to Activity 2.1 to reinforce Sub-


supplier Management

7
Category 2 Sub-supplier Management

Additional detailed information was added to CSCC


format

8
3.1 Identification of Project Team

Notes were added to Activity 3.1


SAR was added to Supplier Contact Directory
format

9
4.2 Analysis of Design Potential Failures and
Effects

FTA was added to Activity 4.2

10
ANPQP Activities
4.5 Special Characteristics Management
(Control of Product and Process)
Important A Part / Area
A basic product/ part/ area necessary to maintain steering control,
braking system or fuel system integrity
A

Important B Product/ Part / Area


A basic part/ area which must conform to safety regulations relating to
occupant protection during and after a collision and the transmission of B
information necessary for safe driving. Important C was added

Important C Product/ Part / Area


A characteristics that is necessary for control of manufacturing variation to
C
achieve customer satisfaction.

OBD (On-Board Diagnostics)


A product/ part/ area where variance from design specification may affect OBD
compliance with emissions regulations.

Regulatory
A product/ part/ area that is restricted by laws and regulations for a
specific country or region.

11
12
5.5 Confirmation of Full Volume Conditions

The name of the Output document in the Activity


5.5 was changed

13
9.1 Design Change Management

Design Change Request Format was changed to


identify the source and the type of the change

14
9.2 Process/Facility Site Change Management

Process/Facility Site Change Request Format was


changed to identify the source and the type of the
change

15
9.2 Process/Facility Site Change Management

A list of Examples for Process/Facility Site Changes


was added to the Activity description

16
11.2 Identification and Traceability

Activity 11.2 is a New Activity combining V 2.1


activities 11.2 and 11.3

17
11.3 Enviromental Requirements

Output Documents and Submission Timing were


added in the Activity 11.3

18
Activity Timing Updates

Activity 2.1 Sub-supplier Management (ANPQP VER 2.2)


Tier 1
Supplier
Identifies
potential
sub-
Phase 1 Phase 2 Phase 3 Phase 4 Phase 5
suppliers
during RFQ
phase L M H L M H L M H L M H L M H
Component Supply Chain
3 2 2
Chart (CSCC)

Activity 2.1 Sub-supplier Management (ANPQP VER 2.1)

Phase 1 Phase 2 Phase 3 Phase 4 Phase 5

L M H L M H L M H L M H L M H
Component Supply Chain
3 2 2
Chart (CSCC)

19
Activity 3.1 Identification of Project Team (ANPQP VER 2.2)
Supplier
identifies
resources
early in the
Phase 1 Phase 2 Phase 3 Phase 4 Phase 5
Quote
process
L M H L M H L M H L M H L M H
Supplier Contact Directory
2 2 2
(N)

Activity 3.1 Identification of Project Team (ANPQP VER 2.1)

Phase 1 Phase 2 Phase 3 Phase 4 Phase 5

L M H L M H L M H L M H L M H
Supplier Contact Directory
2 2 2
(N)

20
Activity Timing Updates

Activity 3.2 Project Planning and Production Preparation


Monitoring (ANPQP VER 2.2)
Engineering
activities
and timing
are
identified in Phase 1 Phase 2 Phase 3 Phase 4 Phase 5
the contract
review
activity
L M H L M H L M H L M H L M H
Design Assurance Plan (N) 3 2 2

Activity 3.3 Project Planning and Production Preparation


Monitoring (ANPQP VER 2.1)

Phase 1 Phase 2 Phase 3 Phase 4 Phase 5

L M H L M H L M H L M H L M H
Design Assurance Plan (N) 3 2 2

21
Activity 3.3 Project Risk and Concern Management (ANPQP
VER 2.2)
Design /
Developmen
t concerns Phase 1 Phase 2 Phase 3 Phase 4 Phase 5
are tracked

L M H L M H L M H L M H L M H
Project Development
3 3 3 3 3 3
Record (N)
Concerns
during
Ramp-Up
and Mass
Production

Activity 3.4 Project Risk and Concern Management (ANPQP are


recorded

VER 2.1)
Phase 1 Phase 2 Phase 3 Phase 4 Phase 5
L M H L M H L M H L M H L M H
Project Development
3 3 3 3 3 3
Record (N)

22
Activity Timing Updates
Activity 4.1 Identification and Deployment of Special
Characteristics and Key Features (ANPQP VER 2.2)
Nissan
identifies
Special Phase 1 Phase 2 Phase 3 Phase 4 Phase 5
Characteristics
in the
Technical File
of the RFQ L M H L M H L M H L M H L M H
Special Characteristics and
3 3 3 3 2 2 2 2 2
Key Features Diagram (N)

Activity 4.1 Identification and Deployment of Special


Characteristics and Key Features (ANPQP VER 2.1)

Phase 1 Phase 2 Phase 3 Phase 4 Phase 5

L M H L M H L M H L M H L M H
Special Characteristics and
3 3 3 3 2 2 2 2 2
Key Features Diagram (N)

23
How to Find ANPQP
Nissan North America Supplier Portal Address:

https://www.supply.nissan-ix.com

25
26
27
V2.2

28
NMEX Supplier Portal Address:

https://www.supply.nissan-ix.com

NMEX Supplier Portal Address:

https://www.supply.nissan-ix.com
29
Step 6

Click on SQP
Option

NOTE: If you do not have these user and password, send


an e-mail to:
nmex-sqa@nissan.com.mx

Step 8

7. Click on View
Module

Click on ANPQP
Procedure
Option

30
Contact

Jerry Reeves
reevej3@nissan-usa.com

Dulce Alvarez
dulce.alvarez@nissan.com.mx

31

Vous aimerez peut-être aussi