INVERSION
0.00
SUBTOTAL
TOTALES
CAPITAL DE TRABAJO
COSTOS PRODUCCIN
SUBTOTAL
COSTOS VARIABLES
MATERIA PRIMA
0 42.00
0 8.00
FLETES 0 0.00
SUB TOTAL $
TOTALES $
FUENTE
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
109,500.00 109,500.00
0.00 0.00
- 0.00
3,600.00 3,600.00
0.00 0.00
0.00 0.00
0.00 0.00
9,000.00 9,000.00
329,242.02
0% 0% 0%
DATOS DE PRODUCCIN
SUP POTREROS(HAS)
CAP.CARGA ANIMAL U.A.A.
MORTANDAD ADULTOS(%)
VENTA
VENTA
INICIAN
FINALIZAN
PRECIO DE VENTA
GASTOS
SUPLEMENTACION
SUELDOS Y SALARIOS
SEGURO GANADERO
MEDICINAS Y VACUNAS
UTILES Y EQUIPO
COMBUSTIBLES Y LUBRICANTES
FLETES
MANTENIMIENTO CONST.E INST
QUINCENA NUMERO DE PESO GR. C/U BIOMASA (KG) ALIMENTO % RACION
ORGANISMOS DIARIA
15 22.6
15 42.6
15 50.3
15 79.5
15 80.4
15 127.4
13 132.4
13 161.1
13 163.1
13 195.7
13 209.2
13 239.1
13 229.0
13 271.9
13 276.6
13 342.1
13 391.8
13 426.3
13 455.9
3,897.04 KG
CONSTRUCCION DE ESTANQUES PARA CRIA DE PECES
No DE ESTANQUES A COTIZAR
3
CANTIDAD EN CONVERSION
OBRA ESPECIFICACIONES UNIDAD
UNIDADES MATERIAL/UN
CEMENTO PARA
.5 PROF X 20 X 2 M3 20.3 4.5
CIMIENTOS
CEMENTO PARA
.15 X 2.5 X 20.5 M3 12.0 4.5
PISOS
CEMENTO PARA
2 DE 30 X 1.30 X 20.6 M3 48.2 4.5
PAREDES
2 DE 30 X 1.30 X 2.0 M3 4.68 4.5
MALLA
ROLLO DE 1.25 X 20 MTS M2 153.8 20
ELECTROSOLDADA
CONECCIONES PVC-
CONECTORES 6" UNIDAD 3 1
METALICO
CODOS DE PVC CODO 90 UNIDAD 3.0 1
REVUELTO 7 M3 POR VIAJE M3 154.0 7
51 X 4 VARILLAS X 2.5
CASTILLOS M LINEAL 75.6 6
MTS
12 X 4 VARILLAS X 20.5
C. DALAS M LINEAL 278.4 6
MTS
MANO DE OBRA CONSTRUCCION UNIDAD 3.0 1
CEMENTO PISO
21L X .30A X .15 PROF. UNIDAD 1.89 4.5
CANAL COND
CEMENTO PARED
21L X .15H X 2 UNIDAD 3.2 4.5
CANAL CONDUCC
REVUELTO P/CANAL
7 M3 POR VIAJE M3 5.4 7
DE PROD
MALLA
ELECTROSOLDADA ROLLO DE 1.25 X 20 MTS M2 31.5 20
CANAL COND
RIA DE PECES
DE 21 X .30 X .15
TOTAL DE COSTO
COSTO TOTAL
MATERIAL MATERIAL/UN
145,554.00