S.No. Description Unit Ref Rate MKT.Rate Rem

Binding Wire Kgs binding 60.00 60

Bitumen 10/20 (B.B) Kgs bb 0 0

Bitumen 80/100 (B.A) Kgs ba 0.00 0

Brick Ballast Cft ballast 20.00 20

Bricks No. bri 9.00 9

Brick's Tiles No. bt 0.00 0

Bond Tiles Kgs 0.00 0

Carriage Cemment Bag ccem 5 5

Carriage Crush 100 Cft ccru 2000 2000

Carriage Steel Ton csteel 2000 2000

Carriage Timber 100 Cft ctim 800 800

Cement Gray Bag cem 300.00 300

Cement White 40KG Bag wcem 510.00 510

Ceramic Tile Sq.m ct 450.00 450

Chips Cft chi 55.00 55

Crush Dina Cft cd 35.00 35

Crush Margalah Cft cm 45.00 45

Crush Sargodha Cft cs 45.00 45

Earth Cft earth 3.50 3.5

Felt Paper SFT felt 4.00 4

Hessain Cloth Rft cloth 3.50 3.5

Kassu Cft kas 5.00 5

Kerosene Oil Lit koil 37.00 37

Khaprale No. haprale 10.00 10

Labr. Bahishti Day lbh 250 250

Labr. Beldar Day lbd 300 300

Labr. Black Smith Day lbst 400 400

Labr. Carpenter Day lcarp 600 600

Labr. Coolie Day lcool 350 350

Labr. Mason 2nd. Class Day lmsc 500 500

Labr. Mason 1st. Class Day lmfc 600 600

Labr. Mate Day lmatt 650 650

Page No.1
Labr. Mistry Day lmist 700 700

M.Crush Cft mcru 30.00 30

Marble Strip Rft mstr 5.00 5

Over Head % oh 30.00 30

Over Head - II ( For special work) % ohh 35.00 35

Over Head @ Steel % ohsteel 20.00 20

Per-Cast Slab SFT precast 82.60 82.6

Pigments Kgs pigm 300.00 300

Polish Sft polish 4.00 4

Polytheen Sheet Kgs poly 125.00 125

Sand Ston 1/2" Thick Sft prem 104.00 104

Sand Chanab Cft san 25.00 25

Sand L.P. Cft lpsan 38.00 38

Sand Local Cft sanloc 8.00 8

Shuttering Sft sutt 13.00 13

Shuttering Rate for Beam And Lintel " sbl 17.85 17.85 Rs.17.85/Sft

Shuttering Rate for Columns " scol 17.85 17.85 Rs.17.85/Sft

Shuttering Rate for Foundation (Ordinary) " sof 9.28 9.28 Rs.9.28/Sft

Shuttering Rate for 1 F.Face " sff 17.85 17.85 Rs.17.85/Sft

Shuttering Required for 100 Cft F.Face (Slab,Projection) SFT shsb 0.00 0 200 Sft

Shuttering Required for 100 Cft For Beam And Lintel " shbl 345.00 345 300 Sft

Shuttering Required for 100 Cft For Columns " shcol 400.00 400 400 Sft

Shuttering Required for 100 Cft in Foundation " shf 100.00 100 100 Sft

Steel 40-G M.ton steel 35000.00 35000

Steel 60-G M.ton steeel 35000.00 35000

T&P. Concrete Mixer H.L Day conhl 4000 4000

T&P. Concrete Mixer S.L Day consl 6000 6000

T&P. Vibrator Day vibt 5000 5000

Thermopour Sq.M ther 206.00 206

Tile Ceramic Sft tcram 20 20

Tile Granite " tgran 600 600

Tile Porcelain " tporcl 450 450

Tile Tufe Pawer No. tuff 10.00 10

Turi "Wheat husk" Kgs turi 3.50 3.5

Wastage- A % wa 5.00 5

Wastage @ Steel % was 3.00 3

Page No.2
Wastage- B (For Cement Plaster only) % wb 5.00 5

Water Charges % wcharg 1.5 1.5

Wood For Heat Kgs wood 4.00 4

Wood Pertal Cft woodp 1500 1500