Vous êtes sur la page 1sur 46

CALCULO DEL PRESUPUESTO ANALITICO

PROYECTO:

CONSTRUCCIN DE AULAS Y LABORATORIOS PARA LA ESCUELA PROFESIONAL DE INGENIERA TOPOGRFICA Y AGRIMENSURA DE LA UNA - PUNO

FECHA: ABRIL - 2007

ESPECIF
DESCRIPCION UND COEF. CANTIDAD P.U PARCIAL
. GASTO

6.5.11.10 RETRIBUCIONES Y COMPLEMENTOS A PLAZO FIJO

0147000024 OPERADOR DE EQUIPO hh 588.1900 3.36 1,977.76


0147000032 TOPOGRAFO hh 41.3300 4.13 170.52
0147010001 CAPATAZ hh 2,739.6300 4.13 11,302.88
0147010002 OPERARIO hh 24,660.3700 3.36 82,919.07
0147010003 OFICIAL hh 11,257.5800 2.99 33,672.88
0147010004 PEON hh 17,088.3800 2.71 46,295.96
TOTAL 176,339.07
Ingeniero Residente de Obra Mes 1.00 9.00 2,350.00 21,150.00
Ingeniero Supervisor Mes 1.00 9.00 2,700.00 24,300.00
TOTAL

6.5.11.11 OBLIGACIONES DEL EMPLEADOR


ESSALUD % 9.00 176,339.07 15,870.52
IES % 2.00 176,339.07 3,526.78
SCTR % 1.53 176,339.07 2,697.99
TOTAL

6.5.11.13 GASTOS VARIABLES Y OCASIONALES % 0.25 176,339.07 43,658.95

6.5.11.18 ESCOLARIDAD, AGUINALDOS Y GRATIFICACIONES % 4.96 176,339.07 8,750.00

6.5.11.20 VIATICOS Y ASIGNACIONES


Movilidad y Viaticos Mes 1.00 9.00 300.00 2,700.00

6.5.11.22 VESTUARIO % 5.00 176,339.07 8,816.95

6.5.11.23 COMBUSTIBLES Y LUBRICANTES


Costo de Equipos y Herramientas % 50.00 21,871.43 10,935.72

6.5.11.24 ALIMENTOS DE PERSONAS


% 4.13 176,339.07 7,290.00

6.5.11.29 MATERIALES DE CONSTRUCCION


0201000001 ACEITE PARA MOTOR GRADO 30 gln 11.6500 50.00 582.81
0202010000 CLAVOS PARA MADERA C/C 1 1/2 " kg 27.3800 3.90 109.52
0202010003 CLAVOS PARA MADERA C/C 2" kg 7.1000 3.90 28.02
0202010005 CLAVOS PARA MADERA C/C 3" kg 1,085.2700 3.90 4,253.19
0202010007 CLAVOS PARA MADERA C/C 4" kg 1.0000 3.90 3.90
0202040009 ALAMBRE NEGRO N16 kg 4,196.5500 4.00 16,786.20
0202040010 ALAMBRE NEGRO N8 kg 1,304.7900 4.00 5,219.15
0202110000 FIERRO LISO DE 1/4" kg 3.4400 3.00 10.30
0202970003 ACERO DE CONSTRUCCION LISO 1/4" kg 628.5200 2.85 1,791.28
0203000008 FIERRO CORRUGADO D=3/8" kg 1.7000 2.70 4.59
0203030020 FIERRO CORRUGADO GRADO 60 kg 70,574.5500 2.72 192,230.44
0204000000 ARENA FINA m3 182.1800 24.50 4,455.17
0204000006 ARENA GRUESA m3 134.2200 26.50 3,557.29
0204000007 AGREGADO FINO m3 339.9700 26.50 9,010.02
0204110013 TIERRA NEGRA DE CHACRA O TIERRA VEGETAL m3 2.0000 10.00 20.00
0205020020 PIEDRA MEDIANA m3 20.0100 26.00 520.21
0205020021 PIEDRA GRANDE m3 1.8100 26.00 47.14
0205350002 AGREGADO GRUESO m3 473.0200 25.00 11,830.99
0206030051 CONDUCTOR DE COBRE DESNUDO 25 mm2, TEMPLE BLANDO m 16.0000 5.70 91.20
0206500071 CONECTOR DE COBRE TIPO ANDERSON, PARA VARILLA 3/4" pza 1.0000 12.00 12.00
0207010019 CABLE 2.5 mm2 TW-70 m 2,735.5000 1.14 3,118.47
0207010021 CABLE 10 mm2 TW-70 m 300.0000 2.80 840.00
0207010035 CABLE 4 mm2 TW-70 m 1,650.0000 1.93 3,184.50

Pgina 1 de 46
CALCULO DEL PRESUPUESTO ANALITICO

PROYECTO:

CONSTRUCCIN DE AULAS Y LABORATORIOS PARA LA ESCUELA PROFESIONAL DE INGENIERA TOPOGRFICA Y AGRIMENSURA DE LA UNA - PUNO

FECHA: ABRIL - 2007

ESPECIF
DESCRIPCION UND COEF. CANTIDAD P.U PARCIAL
. GASTO
0207010036 CABLE 6 mm2 TW-70 m 180.0000 2.27 408.60
0207030092 CABLE THW 35 mm2 m 200.0000 14.00 2,800.00
0210010055 INODORO DE TANQUE BAJO und 24.0000 150.00 3,600.00
0210010067 LAVATORIO und 28.0000 130.00 3,640.00
0210010068 URINARIO DE LOSA VITRIFICADA pza 12.0000 139.00 1,668.00
0210510041 ACCESORIOS PARA INODORO und 24.0000 29.60 710.40
0210510042 ACCESORIOS PARA LAVATORIO und 28.0000 28.00 784.00
0211410023 SPOT LIGHT P/TECHO C/PROTECTOR, LAMP. AHORR. 20W pza 8.0000 45.50 364.00
0212000012 TABLERO TRIFASICO DE 12 POLOS und 4.0000 150.00 600.00
0212000014 TABLERO TRIFASICO DE 24 POLOS und 1.0000 220.00 220.00
0212010008 TOMACORRIENTE DOBLE PLANO BAKELITA C/TIERRA und 120.0000 10.50 1,260.00
0212020024 INTERRUPTOR TERMOMAGNETICO DE 2x15Ax240V und 8.0000 29.60 236.80
0212020025 INTERRUPTOR TERMOMAGNETICO DE 2x20Ax240V und 7.0000 30.00 210.00
0212020034 INTERRUPTOR TERMOMAGNETICO DE 3x30Ax240V und 3.0000 82.00 246.00
0212020035 INTERRUPTOR TERMOMAGNETICO DE 3x40Ax240V und 1.0000 83.00 83.00
0212020039 INTERRUPTOR TERMOMAGNETICO DE 3x100Ax240V und 1.0000 115.00 115.00
0212020088 INTERRUPTOR TERMOMAGNETICO DE 2x30Ax240 und 2.0000 32.00 64.00
0212090003 CAJA OCTOGONAL GALV. LIVIANA 4"x4"x2 1/2" und 270.0000 1.00 270.00
0212090030 CAJA RECTANG GALV PESADA 4"x2 1/8"x2 1/8" und 262.0000 1.00 262.00
0212090060 CAJA DE PASO GALV. 12"x12"x6" C/TAPA Y CHAPA und 9.0000 44.50 400.50
0212100083 TAPA CIEGA CIRCULAR pza 18.0000 1.50 27.00
0212130017 BRAQUET DE PARED GLOBO, D=20cm, LAMP.AHORR. 1x20 W Y ACCES. und 2.0000 60.00 120.00
0212140050 FLUORESCENTE DE 32 W C/EQUIPO Y PANTALLA und 88.0000 87.00 7,656.00
0212140060 FLUORESCENTE RECTO 2x40 W C/EQUIPO Y PANTALLA und 166.0000 95.00 15,770.00
0212310015 INTERRUPTOR SIMPLE pza 57.0000 7.00 399.00
0212310016 INTERRUPTOR DOBLE pza 17.0000 7.80 132.60
0212320002 INTERRUPTOR CONMUTADOR 3 VIAS pza 8.0000 6.30 50.40
0213510020 PEGAMENTO PARA PISO VINILICO gln 73.4000 25.00 1,835.00
0216040050 LOSETA VINILICA 2.5 MM m2 770.7000 26.96 20,779.54
0217000025 LADRILLO KING KONG MECANIZADO 8x14x24 cm und 60,350.0000 0.66 39,831.00
0217300005 LADRILLO HUECO 15 x 30 x 30 cm und 12,998.0000 1.60 20,796.80
0218010009 CABLE TELEFONICO # 22 DE 2 HILOS m 240.0000 1.00 240.00
0218010020 CABLE PAR TRENZADO UTP 8 HILOS (Categoria 5-E) m 1,483.0000 1.20 1,779.60
0221000000 CEMENTO PORTLAND TIPO I (42.5KG) BOL 9,791.0400 20.90 204,647.90
0221030005 CAJA DE REGISTRO DE CONCRETO I/TAPA GLB 1.0000 45.00 45.00
0224000017 CERAMICA RECTANGULAR 10cm x 20cm m2 27.1800 25.00 680.91
0224030030 MAYOLICA BLANCA 1ra 20cmX20cm m2 236.8000 22.00 5,209.53
0226080067 BISAGRA ALUMINIZADA CAPUCHINA 4"x4" pza 160.0000 5.00 800.00
0226090010 PICAPORTE DE ALUMINIO DE 6" und 32.0000 6.90 220.80
0226540003 CERRADURA PUERTA DE BAO pza 4.0000 38.00 152.00
0226540011 CERRADURA DOS GOLPES C/SEGURO Y LLAVE EXT. pza 24.0000 55.00 1,320.00
0226540071 CERRADURA TRES GOLPES C/SEGURO Y LLAVE EXT. pza 2.0000 69.50 139.00
0229030002 YESO EN BOLSAS DE 25 KG BOL 24.6000 7.00 172.20
0229030016 CARBON VEGETAL kg 50.0000 4.00 200.00
0229550097 SOLDADURA CELLOCORD PUNTO AZUL 1/8" kg 70.0700 11.00 773.72
0230000001 CEMENTO BLANCO BLS. 50 KG BOL 10.5800 85.00 899.47
0230100006 VARILLA DE COBRE D=5/8" x L=2.40m und 1.0000 200.00 200.00
0230150016 PORCELANA kg 51.7300 2.50 128.74
0230260002 PINTURA BARNIZ gln 8.3200 48.00 399.17
0230290025 TERMINAL PLSTICO P/ BORDE DE MAYOLICAS und 93.6200 2.50 234.58
0230450055 LAVADERO ACERO INOXIDABLE 18" x 35" DE UNA POZA und 1.0000 128.00 128.00
0230460019 PEGAMENTO PLASTICO P/PVC gln 6.7700 130.00 884.63
0230460032 SILICONA und 26.5400 6.70 180.44
0230480034 CINTA AISLANTE ELECTRICA 3M-1700 rll 15.3000 5.90 99.31
0230510045 FRAGUA kg 119.8800 4.60 550.81
0230520000 OCRE kg 29.5200 13.00 393.60
0230640049 TERM. RED DE COMPUTO DOBLE, P/ MINI JACK RJ-45 C/FASE PLATE und 11.0000 35.00 385.00
0230640050 TERM. RED DE COMPUTO SIMPLE, P/ MINI JACK RJ-45 C/FASE PLATE und 41.0000 30.00 1,230.00
0230640051 TERMINAL TELEFONICO SIMPLE und 9.0000 10.00 90.00
0230720001 THOR GEL (DOSIS DE 5 KG) DOS 1.0000 73.20 73.20
0230990007 CORDEL m 373.9200 0.20 78.72

Pgina 2 de 46
CALCULO DEL PRESUPUESTO ANALITICO

PROYECTO:

CONSTRUCCIN DE AULAS Y LABORATORIOS PARA LA ESCUELA PROFESIONAL DE INGENIERA TOPOGRFICA Y AGRIMENSURA DE LA UNA - PUNO

FECHA: ABRIL - 2007

ESPECIF
DESCRIPCION UND COEF. CANTIDAD P.U PARCIAL
. GASTO
0230990019 LIJA und 0.8600 1.80 1.55
0230990030 TUBERIA UPVC DE 6" UNION FLEXIBLE 5mt pza 10.6700 28.00 298.70
0230990056 CINTA TEFLON und 15.1900 1.40 22.79
0234000000 GASOLINA 84 OCTANOS gln 285.8900 12.20 3,497.04
0234020001 KEROSENE gln 14.6800 12.00 176.16
0238000000 HORMIGON m3 99.6200 24.00 2,390.88
0239000000 COLA SINTETICA FULLER gln 8.4000 27.80 233.48
0239010050 LIJA #16 M/ABRALIT m 9.6200 17.00 163.54
0239010051 LIJA #60 M/ABRALIT m 6.4500 16.00 102.93
0239010070 LIJAR # 50 ABRALIT m 126.3900 15.00 1,895.78
0239020075 LIJA PARA MADERA und 76.5800 1.80 138.39
0239050000 AGUA m3 340.7200 0.50 208.30
0239070002 GUANO DE OVINO m3 2.5000 15.00 37.50
0239150015 PRUEBAS DE CONTROL DE CALIDAD GLB 1.0000 500.00 500.00
0239300005 TECNOPORT 2.40m X 1.20m E=1" pln 89.1100 18.00 1,601.37
0239700007 BUZON TIPO "C", 1.0x1.0x0.70m, e=0.15m GLB 1.0000 85.00 85.00
0240130050 CERAMICO ANTIDESLIZANTE 30 x 30 cm (Mosaico) m2 126.1100 25.00 3,152.63
0240130051 CERAMICO ALTO TRANSITO T-4 40 x 40 cm m2 470.5100 25.00 11,762.63
0241110000 PARQUET HUAYACAN VETEADO m2 126.8400 24.90 3,158.92
0243020003 RODON DE MADERA 3/4" x 3/4" m 574.9800 1.80 1,034.96
0243020008 CONTRAZOCALO DE MADERA 4" x 3/4" m 564.0300 2.40 1,352.57
0243110015 MADERA AGUANO p2 30,570.0200 3.00 91,710.10
0243130071 MADERA CEDRO CEPILLADO p2 906.4700 6.60 5,982.67
0243160052 REGLA DE MADERA p2 380.0600 3.10 1,172.91
0244020014 TRIPLAY LUPUNA DE 4' x 8' x 4 mm pln 26.5700 23.00 611.00
0251010001 FIERRO ANGULAR 1" x 1" x 1/8" x 6m pza 81.1800 19.30 1,566.79
0251020001 FIERRO TEE 1" x 1" x 1/8" x 6m pza 18.7600 16.90 317.27
0251040000 PLATINA DE FIERRO 1/8" x 1/2" x 6m pza 286.1000 5.50 1,573.58
0251070010 TUBO ELECTROSOLDADO 2"x1", L=6m pza 227.9500 24.20 5,516.55
0252270009 PLATINA DE ALUMINIO 1" x 1/8" x 6m pza 48.1000 25.00 1,202.50
0252950010 CANTONERA DE ALUMINIO C/ ANCLAJE 2" 11/2" 6mts var 32.2000 30.00 965.95
0253010002 GRASA lb 11.4500 30.00 343.52
0253030027 THINER gln 18.6700 14.80 279.00
0253040002 BREA kg 79.3200 3.65 289.48
0253100003 PETROLEO gln 145.5900 11.50 1,676.81
0254010051 PINTURA LATEX gln 152.3500 37.00 5,627.46
0254030023 PINTURA LATEX VENCELATEX gln 109.8300 39.40 4,333.27
0254030027 PINTURA LATEX SUPERMATE gln 104.0600 57.50 5,984.38
0254060000 PINTURA ANTICORROSIVA gln 22.4700 37.00 831.04
0254080002 BARNIZ DD CPP gln 6.0400 67.00 404.68
0254110090 PINTURA ESMALTE gln 24.1800 40.00 967.20
0254610050 PINTURA SELLADOR gln 4.4800 40.00 179.31
0254830001 PINTURA IMPRIMANTE gln 333.3600 20.00 6,686.22
0254830002 PINTURA IMPRIMANTE PARA MUROS gln 119.6900 60.00 7,187.50
0256010097 CALAMINA GALVANIZADA ( 3mm) pln 27.0000 19.50 526.50
0257010008 PLANCHA DE ACERO LAF 1/27" x 4' x 8' pza 26.5700 69.00 1,832.99
0260040001 PLASTORMO m3 22.3700 180.00 4,025.70
0264040002 GRANALLA (Bolsa de 40 Kg) BOL 63.4900 11.50 730.16
0264040003 MARMOLINA (Bolsa de 40 Kg) BOL 21.1600 11.90 252.04
0265000046 TUBO FIERRO GALVANIZADO 1 1/2" x 6.40m und 72.7800 75.80 5,516.43
0265020027 CODO DE Fo. GALVANIZADO DE 1/2" x 90 und 168.0000 1.19 199.92
0265020028 CODO DE Fo. GALVANIZADO DE 3/4" x 90 und 42.0000 2.00 84.00
0265020029 CODO DE Fo. GALVANIZADO DE 1" x 90 und 4.0000 3.49 13.96
0265030012 TEE DE Fo. GALVANIZADO DE 3/4" und 29.0000 2.50 72.50
0265030013 TEE DE Fo. GALVANIZADO DE 1" und 7.0000 3.50 24.50
0265050011 UNION UNIVERSAL DE Fo. GALV. DE 1/2" und 16.0000 4.50 72.00
0265050012 UNION UNIVERSAL DE Fo. GALV. DE 3/4" und 16.0000 8.00 128.00
0265050013 UNION UNIVERSAL DE Fo. GALV. DE 1" und 2.0000 10.00 20.00
0265080032 REDUCCION DE PVC SAP C-10 DE 3/4" x 1/2" und 65.0000 2.70 175.50
0265080035 REDUCCION DE PVC SAP C-10 DE 1" x 3/4" und 9.0000 2.80 25.20
0265080037 REDUCCION DE PVC SAP C-10 DE 4" x 2" und 8.0000 4.80 38.40

Pgina 3 de 46
CALCULO DEL PRESUPUESTO ANALITICO

PROYECTO:

CONSTRUCCIN DE AULAS Y LABORATORIOS PARA LA ESCUELA PROFESIONAL DE INGENIERA TOPOGRFICA Y AGRIMENSURA DE LA UNA - PUNO

FECHA: ABRIL - 2007

ESPECIF
DESCRIPCION UND COEF. CANTIDAD P.U PARCIAL
. GASTO
0265330017 TEE DE F GALVANIZADO DE 1/2" pza 33.0000 1.50 49.50
0265370003 UNION SIMPLE DE F GALV. DE 1/2" und 28.0000 1.00 28.00
0265370005 UNION SIMPLE DE F GALV. DE 1" pza 9.0000 2.60 23.40
0265370007 UNION SIMPLE DE F GALV. DE 3/4" und 24.0000 1.80 43.20
0268040000 SUMIDERO DE BRONCE 2" und 14.0000 4.40 61.60
0268450002 TERMINAL DE COBRE A PRESION P/ COND. 25 mm2 pza 1.0000 3.00 3.00
0272000029 TUB. PVC SAP PRESION C-10 R 1/2" x 5m und 43.6800 12.00 524.18
0272000030 TUB. PVC SAP PRESION C-10 R 3/4" x 5m und 15.0600 17.50 263.86
0272000031 TUB. PVC SAP PRESION C-10 R 1" x 5m und 12.9200 24.50 316.73
0272130001 TUB. PVC SAL P/DESAGUE DE 2" x 3 m und 81.4800 10.00 814.80
0272130002 TUB. PVC SAL P/DESAGUE DE 3" x 3 m und 87.7800 13.70 1,203.84
0272130003 TUB. PVC SAL P/DESAGUE DE 4" x 3 m und 30.9800 16.70 517.73
0272130069 TEE PVC SAP C-10 DE 1/2" und 65.0000 0.70 45.50
0272140001 CODO DE 90 PVC SAL DE 2" und 161.0000 1.00 161.00
0272140003 CODO DE 90 PVC SAL DE 4" und 40.0000 4.20 168.00
0272140009 CODO DE 45 PVC SAL DE 2" und 12.0000 1.00 12.00
0272140010 CODO DE 45 PVC SAL DE 3" und 36.0000 3.80 136.80
0272140011 CODO DE 45 PVC SAL DE 4" und 15.0000 4.20 63.00
0272320001 YEE PVC SAL 4" und 24.0000 7.50 180.00
0272320002 YEE PVC SAL 2" und 53.0000 1.50 79.50
0272320003 YEE PVC SAL C/REDUCCION 4" a 2" und 4.0000 4.80 19.20
0272530067 CODO PVC SAP C-10 1/2" X 90 pza 130.0000 0.50 65.00
0273130023 TEE SANITARIA DE 4X4" PVC SAL und 16.0000 5.50 88.00
0273130024 TEE SANITARIA DE 2 x 2" PVC SAL und 11.0000 2.80 30.80
0273230001 SOMBRERO DE VENTILACION PVC SAL 2" pza 12.6000 3.00 37.80
0275010003 TUBO PVC SEL (E/C) 3/4" x 3.00 M pza 567.9400 2.70 1,533.60
0275010004 TUBO PVC SEL (E/C) 1" x 3.00 M pza 210.9800 6.00 1,266.00
0275010007 TUBO PVC SEL (E/C) 2" x 3.00 M pza 26.6600 14.20 378.40
0275130005 CURVAS PVC SEL D=3/4" pza 930.0400 0.35 323.76
0275130006 CURVAS PVC SEL D=1" pza 186.5500 0.95 175.89
0275130007 CURVAS PVC SEL D=2" pza 14.0000 3.50 48.80
0277000002 VALVULA COMPUERTA DE BRONCE DE 1/2" und 8.0000 20.00 160.00
0277000003 VALVULA COMPUERTA DE BRONCE DE 3/4" und 8.0000 25.00 200.00
0277000004 VALVULA COMPUERTA DE BRONCE DE 1" und 1.0000 30.00 30.00
0277080001 REGISTRO ROSCADO DE BRONCE DE 2" pza 17.0000 4.40 74.80
0277080003 REGISTRO ROSCADO DE BRONCE DE 4" pza 14.0000 9.80 137.20
0279000015 VIDRIO TRANSPARENTE DOBLE, e=4mm p2 1,033.8300 1.70 1,762.43
0279000038 VIDRIO CATEDRAL INCOLOR 4mm p2 80.6400 2.20 177.41
0279000057 VIDRIO SIST. MODUGLASS (INCLUYE ACCESORIOS) E=6mm p2 4,070.4300 6.50 26,477.18
0279010095 ESPEJO DE CRISTAL E=3 mm p2 72.3500 2.30 166.74

834,193.12
6.5.11.30 BIENES DE CONSUMO
Cuaderno de Obra UND 3.00 30.00 90.00
Mantenimiento de Fotocopiadora y Equipos de Computo GBL 1.00 2,500.00 2,500.00
Thoner UND 1.00 600.00 600.00
Tinta para impresora UND 2.00 500.00 1,000.00
Amoniaco para copiadora ozalit LTS 2.00 180.00 360.00
TOTAL

6.5.11.39 SERVICIOS DE TERCEROS


0337020049 MEGOMETRO (1000 VOLTIOS) DIA 1.0000 40.00 40.00
0337020050 TELUROMETRO (MEDIDOR DE PUESTA A TIERRA) DIA 1.0000 30.00 30.00
0339080044 PINZA AMPERIMETRICA DIA 1.0000 20.00 20.00
0348010004 MEZCLADORA CONCRETO TROMPO 8HP-9P3 hm 519.8700 12.00 6,239.78
0348010081 WINCHE ELECTRICO 3.6 HP DE DOS BALDES hm 141.8900 6.00 851.36
0348040023 CAMION VOLQUETE 4x2 140-210 HP 6 M3 hm 163.6500 35.00 5,726.05
0348210005 MOTOSOLDADORA DE 250 AMPERIOS hm 574.5400 6.00 3,447.21
0349030001 COMPACTADOR VIBR. TIPO PLANCHA 4 HP hm 49.0700 6.00 294.34
0349040008 CARGADOR S/LLANTAS 100-115 HP 2-2.25 YD3 hm 16.9800 65.00 1,105.14
0349070004 VIBRADOR DE CONCRETO 4 HP 2.40" hm 278.8700 10.00 2,789.27

Pgina 4 de 46
CALCULO DEL PRESUPUESTO ANALITICO

PROYECTO:

CONSTRUCCIN DE AULAS Y LABORATORIOS PARA LA ESCUELA PROFESIONAL DE INGENIERA TOPOGRFICA Y AGRIMENSURA DE LA UNA - PUNO

FECHA: ABRIL - 2007

ESPECIF
DESCRIPCION UND COEF. CANTIDAD P.U PARCIAL
. GASTO
0349190001 TEODOLITO hm 41.3300 6.00 255.84
0349880002 NIVEL TOPOGRAFICO hm 41.3300 4.00 157.44
0349880007 MIRA TOPOGRAFICA DE 4M hm 41.3300 0.50 24.60
0349900001 PULIDORA DE TERRAZOS hm 128.2600 6.00 769.60
0349900012 CEPILLADORA ELECTRICA hm 12.0800 10.00 120.80
Legalizacion de Cuaderno de Obra GBL 1.00 50.00 50.00
Encuadernados y Empastados GBL 1.00 100.00 100.00
Gastos menudos de rapida cancelacin GBL 1.00 7,950.00 7,950.00
Conservacin y reparacion de bienes GBL 1.00 8,000.00 8,000.00

6.5.11.49 MATERIALES DE ESCRITORIO


Utiles de Escritorio Mes 9.00 900.00 8,100.00

6.5.11.51 EQUIPAMIENTO Y BIENES DURADEROS


Herramientas Manuales GBL 1.00 8,556.15 8,556.15
Computadoras, Servidores y harware informtico GBL 1.00 25,321.05 25,321.05

Pgina 5 de 46
GRIMENSURA DE LA UNA - PUNO

TOTAL

176,339.07

45,450.00

22,095.29

43,658.95

8,750.00

2,700.00

8,816.95

10,935.72

7,290.00

Pgina 6 de 46
GRIMENSURA DE LA UNA - PUNO

TOTAL

Pgina 7 de 46
GRIMENSURA DE LA UNA - PUNO

TOTAL

Pgina 8 de 46
GRIMENSURA DE LA UNA - PUNO

TOTAL

834,193.1200

4,550.00

Pgina 9 de 46
GRIMENSURA DE LA UNA - PUNO

TOTAL

37,971.43

8,100.00

33,877.20

Pgina 10 de 46
RESUMEN DEL PRESUPUESTO ANALTICO

PROYECTO:

CONSTRUCCION Y EQUIPAMIENTO DE LABORATORIOS PARA LA FACULTAD DE CIENCIAS DE LA EDUCACION DE LA


UNIVERSIDAD NACIONAL DEL ALTIPLANO

Presupuesto : S/.

CODIGO CADENA DE GASTO

2.6.2.2.2. INSTALACIONES EDUCATIVAS


2.6.2.2.2.3 COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA - PERSONAL
2.6.2.2.2.4 COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA - BIENES
2.6.2.2.2.5 COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA -SERVICIOS
2.6.2.2.2.6 COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA -OTROS

TOTAL S/.
NALTICO

IENCIAS DE LA EDUCACION DE LA

1,163,803.53

COSTO
PARTIDA

388,110.67
733,508.03
28,164.62
14,020.22

1,163,803.53
PRESUPUESTO ANALTICO

MATERIALES, HERRAMIENTAS Y EQUIPOS DE OBRA

CONSTRUCCION Y EQUIPAMIENTO LABORATORIOS PARA LA FACULTAD DE CIENCIAS DE LA EDUCACION DE LA UNIVERSIDAD NACIONAL DEL
Proyecto
ALTIPLANO
Fecha 4/14/2009
Lugar PUNO

Part. Esp. Recurso Unidad Cantidad Precio


S/.
2.6.2.2.2.3MANO DE OBRA
2.6.2.2.2.3OPERADOR DE EQUIPO hh 532.04 6.87
2.6.2.2.2.3TOPOGRAFO hh 11.76 8.32
2.6.2.2.2.3CAPATAZ hh 1,848.37 8.32
2.6.2.2.2.3OPERARIO hh 16,754.83 6.87
2.6.2.2.2.3OFICIAL hh 7,540.84 6.39
2.6.2.2.2.3PEON hh 14,386.60 5.67

TOTAL

2.6.2.2.2.4MATERIALES
2.6.2.2.2.4ALAMBRE GALVANIZADO # 14 kg 4.22 4.90
2.6.2.2.2.4CLAVOS PARA MADERA C/C 1 1/2 " kg 10.76 4.80
2.6.2.2.2.4CLAVOS PARA MADERA C/C 2" kg 3.00 4.80
2.6.2.2.2.4CLAVOS PARA MADERA C/C 3" kg 869.53 4.80
2.6.2.2.2.4ALAMBRE NEGRO N16 kg 2,238.88 3.80
2.6.2.2.2.4ALAMBRE NEGRO N8 kg 785.41 3.80
2.6.2.2.2.4TARUGOS DE PLASTICO 3/8" x1/2" pza 26.00 0.40
2.6.2.2.2.4TARUGOS DE PVC 3/8" x1/2" INC/PERNO TIRAFON pza 24.00 0.60
2.6.2.2.2.4PERNO TRIFILADO PARA ANCLAJE ENTRE PISO E INODORO pza 26.00 1.40
2.6.2.2.2.4PERNO DE ANCLAJE TIPO MARIPOSA ENTRE TANQUE E INODORO pza 26.00 3.00
2.6.2.2.2.4CLAVO DE CALAMINA kg 4.00 7.50
2.6.2.2.2.4ACERO DE CONSTRUCCION LISO 1/4" kg 569.34 4.40
2.6.2.2.2.4FIERRO CORRUGADO GRADO 60 kg 37,500.91 3.40
2.6.2.2.2.4ARENA FINA m3 143.53 35.00
2.6.2.2.2.4ARENA GRUESA m3 47.40 35.00
2.6.2.2.2.4AGREGADO FINO m3 232.34 33.00
2.6.2.2.2.4THOR GEL kg 5.00 15.00
2.6.2.2.2.4TIERRA NEGRA DE CHACRA O TIERRA VEGETAL m3 2.00 11.00
2.6.2.2.2.4MATERIAL DE RELLENO (Cantera: Salcedo) m3 752.27 19.00
2.6.2.2.2.4PIEDRA MEDIANA m3 4.50 32.00
2.6.2.2.2.4PIEDRA GRANDE m3 59.70 32.00
2.6.2.2.2.4AGREGADO GRUESO m3 401.01 33.00
2.6.2.2.2.4CONDUCTOR DE COBRE DESNUDO 25 mm2, TEMPLE BLANDO m 15.00 9.90
2.6.2.2.2.4CLAVO CLIP + FULMINANTE pza 287.56 1.00
2.6.2.2.2.4CLAVO DE FIJACION + FULMINANTE pza 110.00 0.35
2.6.2.2.2.4CONECTOR DE COBRE TIPO ANDERSON, PARA VARILLA 3/4" pza 1.00 10.00
2.6.2.2.2.4CABLE CON AISLAMIENTO COLOR VERDE 2.5 mm2 TW-70 m 782.80 1.10
2.6.2.2.2.4CABLE CON AISLAMIENTO COLOR BLANCO 2.5 mm2 TW-70 m 782.80 1.10
2.6.2.2.2.4CABLE CON AISLAMIENTO COLOR ROJO 4.0 mm2 TW-70 m 357.00 1.70
2.6.2.2.2.4CABLE CON AISLAMIENTO COLOR AZUL 4.0 mm2 TW-70 m 357.00 1.70
2.6.2.2.2.4CABLE CON AISLAMIENTO COLOR AMARILLO 4.0 mm2 TW-70 m 357.00 1.70
2.6.2.2.2.4CABLE CON AISLAMIENTO COLOR BLANCO 1.5 mm2 TW-70 m 103.00 0.75
2.6.2.2.2.4CABLE CON AISLAMIENTO COLOR NEGRO 1.5 mm2 TW-70 m 103.00 0.75
PRESUPUESTO ANALTICO

MATERIALES, HERRAMIENTAS Y EQUIPOS DE OBRA

CONSTRUCCION Y EQUIPAMIENTO LABORATORIOS PARA LA FACULTAD DE CIENCIAS DE LA EDUCACION DE LA UNIVERSIDAD NACIONAL DEL
Proyecto
ALTIPLANO
Fecha 4/14/2009
Lugar PUNO

Part. Esp. Recurso Unidad Cantidad Precio


S/.
2.6.2.2.2.4CABLE CON AISLAMIENTO COLOR AZUL 1.5 mm2 TW-70 m 103.00 0.75
2.6.2.2.2.4CABLE CON AISLAMIENTO COLOR VERDE 1.5 mm2 TW-70 m 103.00 0.75
2.6.2.2.2.4CABLE CON AISLAMIENTO COLOR ROJO 1.5 mm2 TW-70 m 103.00 0.75
2.6.2.2.2.4CABLE CON AISLAMIENTO COLOR ROJO 6.0 mm2 TW-70 m 30.90 2.60
2.6.2.2.2.4CABLE CON AISLAMIENTO COLOR NEGRO 6.0 mm2 TW-70 m 30.90 2.60
2.6.2.2.2.4CABLE CON AISLAMIENTO COLOR AZUL 6.0 mm2 TW-70 m 30.90 2.60
2.6.2.2.2.4INODORO DE TANQUE BAJO SIFON JET und 13.00 164.00
2.6.2.2.2.4LAVATORIO SIN PEDESTAL MODELO MANANTIAL BLANCO und 13.00 70.00
2.6.2.2.2.4URINARIO DE PARED MODELO CADET MEDIANO BLANCO und 6.00 200.00
2.6.2.2.2.4JABONERA C/ASA P/BANO 15x15 BLANCA und 7.00 15.00
2.6.2.2.2.4TOALLERA C/BARRA DOBLE und 3.00 30.00
2.6.2.2.2.4PAPELERA C/EJE 15x15 BLANCA und 13.00 15.00
2.6.2.2.2.4TRAMPA "P" CROMADA P/LAVADERO 1/2" und 10.00 34.00
2.6.2.2.2.4TUBO DE ABASTO P/INODORO 1/2" x 5/8" CROMADO und 13.00 11.30
2.6.2.2.2.4CUELLO DE CERA P/ASENTAR INODORO und 13.00 7.00
2.6.2.2.2.4TUBO DE ABASTO P/LAVATORIO 1/2" x 1/2" CROMADO und 13.00 10.30
2.6.2.2.2.4TUBO DE ABASTO P/LAVADERO 1/2" x 1/2" CROMADO und 10.00 10.30
2.6.2.2.2.4ACCESORIOS PARA TANQUE DE POLIETILENO GLB 3.00 20.00
2.6.2.2.2.4ACCESORIOS PARA INODORO TANQUE BAJO ABS INDUVAL und 13.00 31.70
2.6.2.2.2.4TRAMPA PARA LAVATORIO TIPO BOTELLA CROMADO und 13.00 45.00
2.6.2.2.2.4UETAS DE FIERRO FDO. C/PERNOS TIRAFON 21/2"x1/4", C/TARUGOS DE PLASTICO jgo 26.00 4.80
2.6.2.2.2.4REFLECTOR SIMETR. TIPO MVF 415/070 C/LAMP. HALOGENUROS METALICOS 70W und 4.00 78.00
2.6.2.2.2.4TABLERO TRIFASICO DE 8 POLOS und 1.00 95.00
2.6.2.2.2.4TABLERO TRIFASICO DE 14 POLOS und 3.00 120.00
2.6.2.2.2.4TOMACORRIENTE DOBLE PLANO BAKELITA C/TIERRA und 83.00 9.20
2.6.2.2.2.4INTERRUPTOR TERMOMAGNETICO DE 2x20Ax220V und 6.00 38.00
2.6.2.2.2.4INTERRUPTOR TERMOMAGNETICO DE 3x30Ax220V und 2.00 70.00
2.6.2.2.2.4INTERRUPTOR TERMOMAGNETICO DE 3x60Ax220V und 1.00 70.00
2.6.2.2.2.4INTERRUPTOR TERMOMAGNETICO DE 2x10Ax220V und 6.00 38.00
2.6.2.2.2.4CAJA DE PASE GALVANIZADA DE 6" X 6" X 4" C/TAPA Y CHAPA pza 3.00 25.00
2.6.2.2.2.4SPOT DICROICO CIRCULAR GIRATORIO DIRIGIBLE C/LAMPARA 50W EQ 12.00 32.00
2.6.2.2.2.4CAJA OCTOGONAL GALV. LIVIANA 4"x4"x2 1/2" und 96.00 1.10
2.6.2.2.2.4CAJA RECTANG GALV PESADA 150X50X51 mm. und 161.00 1.10
2.6.2.2.2.4CAJA DE PASO GALV. 10"x10"x4" C/TAPA Y CHAPA und 3.00 37.00
2.6.2.2.2.4TAPA CIEGA RECTANGULAR pza 4.00 3.50
2.6.2.2.2.4LAMPARA P/ADOSAR C/FLUORESCENTE DE 32 W EQ 1.00 20.00
2.6.2.2.2.4FLUORESCENTE RECTO 2x40 W C/EQUIPO Y PANTALLA und 34.00 143.50
2.6.2.2.2.4FLUORESCENTE CIRCULAR TPR 1x32W C/EQUIPO Y PANTALLA und 42.00 104.00
2.6.2.2.2.4INTERRUPTOR SIMPLE pza 41.00 5.60
2.6.2.2.2.4INTERRUPTOR CONMUTADOR 3 VIAS pza 8.00 7.60
2.6.2.2.2.4PEGAMENTO PARA PISO VINILICO gln 44.95 28.00
2.6.2.2.2.4PEGAMENTO EN POLVO PARA CERAMICO kg 5,404.61 0.70
2.6.2.2.2.4LOSETA VINILICA 2.5 MM m2 472.01 28.50
2.6.2.2.2.4LADRILLO KING KONG MECANIZADO 10X14X24 cm und 43,884.00 1.10
PRESUPUESTO ANALTICO

MATERIALES, HERRAMIENTAS Y EQUIPOS DE OBRA

CONSTRUCCION Y EQUIPAMIENTO LABORATORIOS PARA LA FACULTAD DE CIENCIAS DE LA EDUCACION DE LA UNIVERSIDAD NACIONAL DEL
Proyecto
ALTIPLANO
Fecha 4/14/2009
Lugar PUNO

Part. Esp. Recurso Unidad Cantidad Precio


S/.
2.6.2.2.2.4LADRILLO HUECO 15 x 30 x 30 cm und 8,737.00 2.40
2.6.2.2.2.4CABLE ELECT NYY 3 X 16 MM2 m 25.75 20.00
2.6.2.2.2.4CEMENTO PORTLAND TIPO 1P (42.5KG) BOL 7,299.18 21.40
2.6.2.2.2.4CAJA DE REGISTRO DE CONCRETO I/TAPA 1.0X1.0X0.40M und 1.00 110.00
2.6.2.2.2.4TORNILLO AUTOPERFORANTE C/ARANDELA PARA POLICARBONATO E=8mm und 1,255.80 0.50
2.6.2.2.2.4BISAGRA VAIVEN BATIENTE 2 1/2" x 2 1/2" und 8.00 12.00
2.6.2.2.2.4BISAGRA ALUMINIZADA CAPUCHINA 4"x4" pza 77.00 8.00
2.6.2.2.2.4PICAPORTE DE ALUMINIO DE 6" und 4.00 18.00
2.6.2.2.2.4CERRADURA PUERTA DE BAO pza 1.00 33.90
2.6.2.2.2.4CERRADURA DOS GOLPES C/SEGURO Y LLAVE EXT. pza 23.00 52.90
2.6.2.2.2.4CERRADURA TRES GOLPES C/SEGURO Y LLAVE EXT. pza 1.00 73.00
2.6.2.2.2.4YESO EN BOLSAS DE 25 KG BOL 18.38 9.00
2.6.2.2.2.4CARBON VEGETAL kg 50.00 5.00
2.6.2.2.2.4CINTA VULCANIZADA O AUTOFUNDENTE und 1.00 35.00
2.6.2.2.2.4CINTA DE ALUMINIO PERFORADA CON FILTRO PARA POLICARBONATO DE 8 mm. m 31.40 3.65
2.6.2.2.2.4TERMINAL DE COBRE PARA CONDUCTOR 25 mm2 pza 1.00 10.50
2.6.2.2.2.4DISCO DE DESBASTE 1/4" X 7" pza 0.39 12.50
2.6.2.2.2.4SOLDADURA CELLOCORD PUNTO AZUL 1/8" kg 64.89 16.50
2.6.2.2.2.4BALDOSA ECONOBOARD WHITE STAR (EX-SPB TXT) 0.61mx0.61mx4mm und 424.55 4.80
2.6.2.2.2.4VARILLA DE COBRE D=3/4" x L=2.40m und 1.00 250.00
2.6.2.2.2.4MASILLA PLASTICA gln 7.03 192.00
2.6.2.2.2.4LACA SELLADORA gln 6.66 39.00
2.6.2.2.2.4ADITIVO INCORPORADOR DE AIRE gln 46.98 55.00
2.6.2.2.2.4TERMINAL PLSTICO P/ BORDE DE CERAMICOS und 52.59 3.90
2.6.2.2.2.4LAVADERO ACERO INOXIDABLE 14.2" x 15.7" DE UNA POZA und 10.00 150.00
2.6.2.2.2.4PEGAMENTO PLASTICO P/PVC gln 4.88 116.00
2.6.2.2.2.4SILICONA und 40.71 9.50
2.6.2.2.2.4CINTA AISLANTE ELECTRICA 3M-1700 rll 10.70 2.90
2.6.2.2.2.4FRAGUA kg 341.43 4.80
2.6.2.2.2.4OCRE kg 5.51 12.50
2.6.2.2.2.4ANDAMIO METALICO jgo 2.01 600.00
2.6.2.2.2.4CORDEL m 69.85 1.20
2.6.2.2.2.4CINTA TEFLON und 12.40 1.00
2.6.2.2.2.4CAJA DE CONCRETO CON TAPA DE REGISTRO 0.80x0.80x0.60 m. und 2.00 90.00
2.6.2.2.2.4GASOLINA 84 OCTANOS gln 35.96 8.80
2.6.2.2.2.4KEROSENE gln 8.99 11.20
2.6.2.2.2.4HORMIGON m3 173.75 32.00
2.6.2.2.2.4COLA SINTETICA FULLER gln 7.38 17.00
2.6.2.2.2.4LIJAR # 50 ABRALIT m 85.69 16.00
2.6.2.2.2.4LIJA DE AGUA PARA METAL # 80 hja 217.55 1.70
2.6.2.2.2.4LIJA PARA MADERA und 94.54 1.80
2.6.2.2.2.4AGUA m3 519.89 0.50
2.6.2.2.2.4SAL INDUSTRIAL kg 7.50 3.50
2.6.2.2.2.4GUANO DE OVINO m3 2.50 22.00
PRESUPUESTO ANALTICO

MATERIALES, HERRAMIENTAS Y EQUIPOS DE OBRA

CONSTRUCCION Y EQUIPAMIENTO LABORATORIOS PARA LA FACULTAD DE CIENCIAS DE LA EDUCACION DE LA UNIVERSIDAD NACIONAL DEL
Proyecto
ALTIPLANO
Fecha 4/14/2009
Lugar PUNO

Part. Esp. Recurso Unidad Cantidad Precio


S/.
2.6.2.2.2.4TANQUE DE AGUA POLIETILENO CAP. 1100L, C/ACCESORIOS und 3.00 440.00
2.6.2.2.2.4CARTEL DE OBRA INC. INSTALACION Y TRANSPORTE GLB 1.00 250.00
2.6.2.2.2.4DIVISION DE MELAMINE Y ACRILICO PARA SERVICIOS HIGIENICOS (Inc. bisagras, cerrojo tirador) m2 21.77 40.00
2.6.2.2.2.4CERAMICO ANTIDESLIZANTE CUPRITA 40 x 40 cm m2 483.41 25.10
2.6.2.2.2.4CERAMICO 30 x 30 cm LISO LINEA AMERICA BLANCA m2 54.92 20.00
2.6.2.2.2.4CERAMICO LINEA RUSTICO, SERIE RUSTICO ESTRUCTURADO HUESO 30x30 cm. m2 133.57 25.00
2.6.2.2.2.4CERAMICO LINEA PLAIN VERDE 30x30 CM. m2 5.64 24.00
2.6.2.2.2.4CERAMICO LINEA PLAIN NARANJA 30x30 CM. m2 6.63 24.00
2.6.2.2.2.4CERAMICO LINEA PLAIN BLANCO 30x30 CM. m2 110.36 24.00
2.6.2.2.2.4RODON DE MADERA 3/4" x 3/4" m 226.04 4.40
2.6.2.2.2.4CONTRAZOCALO DE MADERA CEDRO 4"X3/4" m 226.04 11.40
2.6.2.2.2.4MADERA AGUANO p2 23,636.93 4.90
2.6.2.2.2.4MADERA CEDRO CEPILLADO p2 215.28 13.60
2.6.2.2.2.4MADERA CEDRO CEPILLADO 2" x 2" x 10' pza 36.08 45.30
2.6.2.2.2.4REGLA DE MADERA p2 662.53 3.30
2.6.2.2.2.4TRIPLAY LUPUNA DE 4' x 8' x 4 mm pln 23.28 26.00
2.6.2.2.2.4FIERRO ANGULAR 1" x 1" x 1/8" x 6m pza 3.15 32.00
2.6.2.2.2.4PLATINA DE FIERRO 1/8" x 1/2" x 6m pza 146.03 12.50
2.6.2.2.2.4TUBO ELECTROSOLDADO 2"x1", L=6m pza 147.19 41.00
2.6.2.2.2.4TUBO ELECTROSOLDADO DE 4"X2", L=6m pza 4.46 72.00
2.6.2.2.2.4TUBO NEGRO A36 D= 1 1/2", L=6.40m, E= 1.8 mm pza 10.67 67.00
2.6.2.2.2.4TUBO CUADRADO DE ACERO LAC MECANICO 1 1/2"x1 1/2", L=6.0m, E=1.8mm pza 13.55 80.00
2.6.2.2.2.4SUSPENSION TEE PRINCIPAL DE 3.66 M. und 70.78 10.50
2.6.2.2.2.4SUSPENSION TEE SECUNDARIA DE 1.22 M. und 106.18 3.00
2.6.2.2.2.4SUSPENSION ANGULAR PERIMETRAL DE 3.0 M. und 36.50 6.00
2.6.2.2.2.4RIEL METALICO PARA SUJECION DE LAMPARAS EXTERNAS 3 VIAS m 4.00 24.00
2.6.2.2.2.4PUERTA DE MELAMINE CON MARCO DE ALUMINIO (Segun diseo inc. bisagras, cerrojo tirador) m2 15.21 45.00
2.6.2.2.2.4SEPARADORES E=5.0 mm pza 3,823.67 0.10
2.6.2.2.2.4PERFIL "U" TAPA CANTO DE ALUMINIO PARA POLICARBONATO DE 8 mm m 47.00 3.00
2.6.2.2.2.4PERFIL "H" CONECTOR DE ALUMINIO PARA POLICARBONATO DE 8 mm (TAPA Y CONTRATAPA) m 15.70 34.00
2.6.2.2.2.4CANTONERA DE ALUMINIO C/ ANCLAJE 2" 11/2" 6mts var 13.57 35.00
2.6.2.2.2.4ACONDICIONADOR P/METAL VENCEACRIL gln 13.63 34.00
2.6.2.2.2.4THINER gln 17.00 19.50
2.6.2.2.2.4PETROLEO gln 143.96 10.10
2.6.2.2.2.4PINTURA LATEX VENCELATEX gln 107.27 37.00
2.6.2.2.2.4PINTURA LATEX SUPERMATE gln 57.71 53.00
2.6.2.2.2.4BARNIZ MARINO gln 4.08 49.00
2.6.2.2.2.4PINTURA ESMALTE EPOXICA gln 30.52 41.00
2.6.2.2.2.4PINTURA ANTICORROSIVA EPOXICA gln 19.68 41.30
2.6.2.2.2.4PINTURA IMPRIMANTE PARA INTERIORES gln 148.93 18.00
2.6.2.2.2.4PINTURA IMPRIMANTE PARA MUROS EXTERIORES gln 80.12 70.00
2.6.2.2.2.4CALAMINA GALVANIZADA 0.83 x 1.80m x 0.25 mm pln 51.00 25.00
2.6.2.2.2.4POLICARBONATO ALVEOLAR GOLD E=8.0 mm, PLANCHA 8.85x2.10 m. m2 64.67 75.00
2.6.2.2.2.4TUBO FIERRO GALVANIZADO 1" x 6.40m und 2.40 120.00
PRESUPUESTO ANALTICO

MATERIALES, HERRAMIENTAS Y EQUIPOS DE OBRA

CONSTRUCCION Y EQUIPAMIENTO LABORATORIOS PARA LA FACULTAD DE CIENCIAS DE LA EDUCACION DE LA UNIVERSIDAD NACIONAL DEL
Proyecto
ALTIPLANO
Fecha 4/14/2009
Lugar PUNO

Part. Esp. Recurso Unidad Cantidad Precio


S/.
2.6.2.2.2.4TUBO Fo.GALV. DE 1/2" m 0.49 56.20
2.6.2.2.2.4TUBO FIERRO GALVANIZADO 2 1/2" x 6.40 m und 33.26 120.00
2.6.2.2.2.4CODO DE Fo. GALVANIZADO DE 1/2" x 90 und 84.00 1.40
2.6.2.2.2.4CODO DE Fo. GALVANIZADO DE 3/4" x 90 und 31.00 2.40
2.6.2.2.2.4CODO DE Fo. GALVANIZADO DE 1" x 90 und 12.00 3.50
2.6.2.2.2.4TEE DE Fo. GALVANIZADO DE 1/2" und 18.00 1.70
2.6.2.2.2.4TEE DE Fo. GALVANIZADO DE 3/4" und 27.00 3.30
2.6.2.2.2.4TEE DE Fo. GALVANIZADO DE 1" und 3.00 5.00
2.6.2.2.2.4UNION UNIVERSAL DE Fo. GALV. DE 1/2" und 20.00 7.70
2.6.2.2.2.4UNION UNIVERSAL DE Fo. GALV. DE 3/4" und 22.00 10.00
2.6.2.2.2.4UNION UNIVERSAL DE Fo. GALV. DE 1" und 4.00 12.40
2.6.2.2.2.4REDUCCION DE PVC SAP C-10 DE 3/4" x 1/2" und 26.00 1.80
2.6.2.2.2.4UNION SIMPLE DE F GALV. DE 1/2" und 26.00 1.50
2.6.2.2.2.4UNION SIMPLE DE F GALV. DE 1" pza 23.00 3.00
2.6.2.2.2.4UNION SIMPLE DE F GALV. DE 3/4" und 30.00 2.30
2.6.2.2.2.4SUMIDERO DE BRONCE 2" und 13.00 5.00
2.6.2.2.2.4TUB. PVC SAP PRESION C-10 R 1/2" x 5m und 31.71 12.00
2.6.2.2.2.4TUB. PVC SAP PRESION C-10 R 3/4" x 5m und 20.96 16.90
2.6.2.2.2.4TUB. PVC SAP PRESION C-10 R 1" x 5m und 8.82 24.00
2.6.2.2.2.4TUB. PVC SAL P/DESAGUE DE 2" x 3 m und 71.75 8.90
2.6.2.2.2.4TUB. PVC SAL P/DESAGUE DE 3" x 3 m und 52.68 14.50
2.6.2.2.2.4TUB. PVC SAL P/DESAGUE DE 4" x 3 m und 42.14 19.80
2.6.2.2.2.4TEE PVC SAP C-10 DE 1/2" und 42.00 0.70
2.6.2.2.2.4CODO DE 90 PVC SAL DE 2" und 123.00 0.90
2.6.2.2.2.4CODO DE 90 PVC SAL DE 4" und 23.00 3.60
2.6.2.2.2.4CODO DE 45 PVC SAL DE 2" und 15.00 1.00
2.6.2.2.2.4CODO DE 45 PVC SAL DE 3" und 14.00 2.70
2.6.2.2.2.4CODO DE 45 PVC SAL DE 4" und 3.00 3.50
2.6.2.2.2.4CODO DE 90 PVC SAL DE 3" und 11.00 2.80
2.6.2.2.2.4YEE PVC SAL 4" und 9.00 7.20
2.6.2.2.2.4YEE PVC SAL 2" und 45.00 1.60
2.6.2.2.2.4YEE PVC SAL C/REDUCCION 4" a 2" und 8.00 5.00
2.6.2.2.2.4CODO PVC SAP C-10 1/2" X 90 pza 84.00 0.50
2.6.2.2.2.4TEE SANITARIA DE 4X4" PVC SAL und 12.00 5.50
2.6.2.2.2.4TEE SANITARIA DE 2 x 2" PVC SAL und 13.00 1.50
2.6.2.2.2.4REDUCCION PVC SAL 4" X 2" pza 6.00 2.50
2.6.2.2.2.4SOMBRERO DE VENTILACION PVC SAL 2" pza 7.35 3.00
2.6.2.2.2.4TUBO PVC SEL (E/C) 3/4" x 3.00 M pza 275.97 2.90
2.6.2.2.2.4TUBO PVC SEL (E/C) 1" x 3.00 M pza 23.50 4.40
2.6.2.2.2.4TUBO PVC SEL (E/C) 1 1/4" X 3.00 M. pza 4.00 6.00
2.6.2.2.2.4TUBO PVC SEL (E/C) 2" x 3.00 M pza 34.00 12.90
2.6.2.2.2.4CURVAS PVC SEL D=3/4" pza 333.00 0.30
2.6.2.2.2.4CURVAS PVC SEL D=1" pza 32.00 0.90
2.6.2.2.2.4CURVAS PVC SEL D=11/4 " pza 5.00 1.20
PRESUPUESTO ANALTICO

MATERIALES, HERRAMIENTAS Y EQUIPOS DE OBRA

CONSTRUCCION Y EQUIPAMIENTO LABORATORIOS PARA LA FACULTAD DE CIENCIAS DE LA EDUCACION DE LA UNIVERSIDAD NACIONAL DEL
Proyecto
ALTIPLANO
Fecha 4/14/2009
Lugar PUNO

Part. Esp. Recurso Unidad Cantidad Precio


S/.
2.6.2.2.2.4VALVULA COMPUERTA DE BRONCE DE 1/2" und 10.00 20.00
2.6.2.2.2.4VALVULA COMPUERTA DE BRONCE DE 3/4" und 11.00 27.00
2.6.2.2.2.4VALVULA COMPUERTA DE BRONCE DE 1" und 2.00 37.00
2.6.2.2.2.4VALVULA CHECK DE BRONCE DE 1" und 1.00 43.50
2.6.2.2.2.4REGISTRO ROSCADO DE BRONCE DE 2" pza 11.00 4.50
2.6.2.2.2.4REGISTRO ROSCADO DE BRONCE DE 4" pza 10.00 12.10
2.6.2.2.2.4LLAVE DE BRONCE DE 1/2" pza 13.00 58.50
2.6.2.2.2.4LLAVE TEMPORIZADA DE BRONCE DE 1/2" PARA URINARIO pza 6.00 74.00
2.6.2.2.2.4LLAVE DE BRONCE DE 1/2" CON PERILLA METALICA, PICO GIRATORIO Y REGULADOR DE CHOR pza 10.00 170.00
2.6.2.2.2.4VIDRIO TRANSPARENTE DOBLE, e=4mm p2 140.89 1.90
2.6.2.2.2.4VIDRIO CATEDRAL INCOLOR 4mm p2 812.95 2.60
2.6.2.2.2.4VIDRIO TRANSPARENTE DOBLE, e=6mm p2 606.42 2.90
2.6.2.2.2.4VIDRIO SISTEMA MODUGLASS TRANSPARENTE (INCLUYE ACCESORIOS Y COLOCACION) E=6mm p2 150.96 7.20
2.6.2.2.2.4VIDRIO SISTEMA MODUGLASS TRANSPARENTE PARA PUERTAS (INCLUYE ACCESORIOS Y COLO p2 129.25 11.00
2.6.2.2.2.4VIDRIO SISTEMA MODUGLASS GRIS OSCURO (INCLUYE ACCESORIOS Y COLOCACION) E=4mm p2 4.30 2.90
2.6.2.2.2.4VIDRIO SISTEMA MODUGLASS GRIS OSCURO (INCLUYE ACCESORIOS Y COLOCACION) E=6mm p2 880.22 7.50
2.6.2.2.2.4VIDRIO SISTEMA MODUGLASS GRIS OSCURO (INCLUYE ACCESORIOS Y COLOCACION) E=8mm p2 545.48 13.00
2.6.2.2.2.4VIDRIO SISTEMA MODUGLASS GRIS OSCURO PARA PUERTAS (INCLUYE ACCESORIOS Y COLOCA p2 169.47 13.50
2.6.2.2.2.4SISTEMA ESTRUCTURAL MURO CORTINA E=6mm (Inc. accesorios y colocacion) p2 1,803.90 13.00
2.6.2.2.2.4ESPEJO DE CRISTAL E=3 mm p2 68.69 2.60

2.6.2.2.2.5SERVICIOS
2.6.2.2.2.5MEGOMETRO (1000 VOLTIOS) DIA 1.00 40.00
2.6.2.2.2.5TELUROMETRO (MEDIDOR DE PUESTA A TIERRA) DIA 1.00 30.00
2.6.2.2.2.5WINCHA DE LONA 50 MTRS. pza 45.96 38.00
2.6.2.2.2.5PINZA AMPERIMETRICA DIA 1.00 21.20
2.6.2.2.2.5MEZCLADORA DE CONCRETO DE 9 -11P3 hm 450.84 6.00
2.6.2.2.2.5WINCHE ELECTRICO hm 290.71 3.00
2.6.2.2.2.5CAMION VOLQUETE 4x2 140-210 HP 6 M3 hm 26.88 57.00
2.6.2.2.2.5MOTOBOMBA 12 HP 4" hm 4.80 8.00
2.6.2.2.2.5MOTOSOLDADORA DE 250 AMPERIOS hm 461.19 5.00
2.6.2.2.2.5SIERRA CIRCULAR hm 560.52 3.70
2.6.2.2.2.5CIZALLA hm 1,142.63 3.50
2.6.2.2.2.5COMPRESORA hm 33.18 6.00
2.6.2.2.2.5COMPACTADOR VIBR. TIPO PLANCHA 4 HP hm 450.03 5.50
2.6.2.2.2.5CARGADOR S/LLANTAS 100-115 HP 2-2.25 YD3 hm 26.88 55.00
2.6.2.2.2.5RETROEXCAVADOR S/LLANTAS 58 HP 1 YD3. hm 11.20 250.00
2.6.2.2.2.5TRACTOR DE ORUGAS DE 190-240 HP hm 2.35 150.00
2.6.2.2.2.5VIBRADOR DE CONCRETO 4 HP 2.40" hm 245.06 4.70
2.6.2.2.2.5TEODOLITO hm 11.76 4.00
2.6.2.2.2.5NIVEL TOPOGRAFICO hm 11.76 3.00
2.6.2.2.2.5MIRA TOPOGRAFICA DE 4M hm 11.76 0.50
PRESUPUESTO ANALTICO

MATERIALES, HERRAMIENTAS Y EQUIPOS DE OBRA

CONSTRUCCION Y EQUIPAMIENTO LABORATORIOS PARA LA FACULTAD DE CIENCIAS DE LA EDUCACION DE LA UNIVERSIDAD NACIONAL DEL
Proyecto
ALTIPLANO
Fecha 4/14/2009
Lugar PUNO

Part. Esp. Recurso Unidad Cantidad Precio


S/.
2.6.2.2.2.5VERIFICACION DE LA CAPACIDAD PORTANTE GLB 1.00 350.00
2.6.2.2.2.5DISEO DE MEZCLA PARA CONCRETO F'C=175 KG/CM2 und 1.00 300.00
2.6.2.2.2.5DISEO DE MEZCLA PARA CONCRETO F'C=210 KG/CM2 und 1.00 300.00
2.6.2.2.2.5ANLISIS GRANULOMTRICO und 4.00 30.00
2.6.2.2.2.5ENSAYO DE PROCTOR MODIFICADO und 3.00 65.00
2.6.2.2.2.5DENSIDAD DE CAMPO und 3.00 30.00
2.6.2.2.2.5ROTURA DE PROBETAS und 80.00 15.00
2.6.2.2.2.5ENSAYOS DE CONTROL DE CALIDAD DE MATERIALES DE CONSTRUCCION GLB 1.00 500.00

2.6.2.2.2.6OTROS
2.6.2.2.2.6HERRAMIENTAS MANUALES %MO

TOTAL
N DE LA UNIVERSIDAD NACIONAL DEL

Parcial
S/.

3,655.11
97.84
15,378.44
115,105.68
48,185.97
81,572.02

263,995.07

20.68
51.65
14.40
4,173.74
8,507.74
2,984.56
10.40
14.40
36.40
78.00
30.00
2,505.10
127,503.09
5,023.55
1,659.00
7,667.22
75.00
22.00
14,293.13
144.00
1,910.40
13,233.33
148.50
287.56
38.50
10.00
861.08
861.08
606.90
606.90
606.90
77.25
77.25
N DE LA UNIVERSIDAD NACIONAL DEL

Parcial
S/.
77.25
77.25
77.25
80.34
80.34
80.34
2,132.00
910.00
1,200.00
105.00
90.00
195.00
340.00
146.90
91.00
133.90
103.00
60.00
412.10
585.00
124.80
312.00
95.00
360.00
763.60
228.00
140.00
70.00
228.00
75.00
384.00
105.60
177.10
111.00
14.00
20.00
4,879.00
4,368.00
229.60
60.80
1,258.60
3,783.23
13,452.29
48,272.40
N DE LA UNIVERSIDAD NACIONAL DEL

Parcial
S/.
20,968.80
515.00
156,202.45
110.00
627.90
96.00
616.00
72.00
33.90
1,216.70
73.00
165.42
250.00
35.00
114.61
10.50
4.88
1,070.69
2,037.84
250.00
1,349.76
259.74
2,583.90
205.10
1,500.00
566.08
386.75
31.03
1,638.86
68.88
1,206.00
83.82
12.40
180.00
316.45
100.69
5,560.00
125.46
1,371.04
369.84
170.17
259.95
26.25
55.00
N DE LA UNIVERSIDAD NACIONAL DEL

Parcial
S/.
1,320.00
250.00
870.80
12,133.59
1,098.40
3,339.25
135.36
159.12
2,648.64
994.58
2,576.86
115,820.96
2,927.81
1,634.42
2,186.35
605.28
100.80
1,825.38
6,034.79
321.12
714.89
1,084.00
743.19
318.54
219.00
96.00
684.45
382.37
141.00
533.80
474.95
463.42
331.50
1,454.00
3,968.99
3,058.63
199.92
1,251.32
812.78
2,680.74
5,608.40
1,275.00
4,850.25
288.00
N DE LA UNIVERSIDAD NACIONAL DEL

Parcial
S/.
27.54
3,991.20
117.60
74.40
42.00
30.60
89.10
15.00
154.00
220.00
49.60
46.80
39.00
69.00
69.00
65.00
380.52
354.22
211.78
638.58
763.86
834.37
29.40
110.70
82.80
15.00
37.80
10.50
30.80
64.80
72.00
40.00
42.00
66.00
19.50
15.00
22.05
800.31
103.40
24.00
438.60
99.90
28.80
6.00
N DE LA UNIVERSIDAD NACIONAL DEL

Parcial
S/.
200.00
297.00
74.00
43.50
49.50
121.00
760.50
444.00
1,700.00
267.69
2,113.67
1,758.62
1,086.91
1,421.75
12.47
6,601.65
7,091.24
2,287.85
23,450.70
178.59
732,548.03

40.00
30.00
1,746.48
21.20
2,705.04
872.13
1,532.16
38.40
2,305.95
2,073.92
3,999.21
199.08
2,475.17
1,478.40
2,800.00
352.50
1,151.78
47.04
35.28
5.88
23,909.62
N DE LA UNIVERSIDAD NACIONAL DEL

Parcial
S/.
350.00
300.00
300.00
120.00
195.00
90.00
1,200.00
500.00
3,055.00

8,050.11

1031557.82
PRESUPUESTO ANALTICO

MATERIALES, HERRAMIENTAS Y EQUIPOS DE OBRA

Proyecto CONSTRUCCIN DE AULAS Y LABORATORIOS PARA LA E.P. DE INGENIERA TOPOGRFICA Y AGRIMENSURA


Fecha 01/09/2007
Lugar PUNO

Part. Esp. Recurso Unidad Cantidad Precio


S/.

MANO DE OBRA

651110 OPERADOR DE EQUIPO hh 573.3600 5.26


651110 TOPOGRAFO hh 44.8700 6.34
651110 CAPATAZ hh 2,417.1700 6.34
651110 OPERARIO hh 21,951.2300 5.26
651110 OFICIAL hh 9,251.4800 4.72
651110 PEON hh 17,726.8800 4.31

MATERIALES

651123.00
651123.01 GASOLINA 84 OCTANOS gln 58.3300 12.10
651123.02 KEROSENE gln 14.5800 11.90
651123.03 PETROLEO gln 143.6800 11.50

651129.00
651129.01 CLAVOS PARA MADERA C/C 2" kg 3.8100 4.00
651129.02 CLAVOS PARA MADERA C/C 3" kg 1,017.0100 4.00
651129.03 ALAMBRE NEGRO N16 kg 3,374.3700 4.00
651129.04 ALAMBRE NEGRO N8 kg 1,619.1200 4.20
651129.05 CLAVO DE CALAMINA kg 10.5400 6.00
651129.06 CLAVOS DE ACERO DE 1 1/2" und 807.8000 0.10
651129.07 ACERO DE CONSTRUCCION LISO 1/4" kg 472.6600 2.80
651129.08 FIERRO CORRUGADO D=3/8" kg 3.0000 2.80
651129.09 FIERRO CORRUGADO GRADO 60 kg 56,710.8300 2.80
651129.10 ARENA FINA m3 144.9900 27.00
651129.11 ARENA GRUESA m3 150.8300 27.00
651129.12 AGREGADO FINO m3 239.8400 27.00
651129.13 TIERRA NEGRA DE CHACRA O TIERRA VEGETAL m3 2.0000 10.00
651129.14 PIEDRA MEDIANA m3 7.8700 29.00
651129.15 PIEDRA GRANDE m3 3.7200 26.00
651129.16 AGREGADO GRUESO m3 330.5100 27.00
651129.17 CONDUCTOR DE COBRE DESNUDO 25 mm2, TEMPLE BLANDO m 20.0000 11.00
651129.18 CONECTOR DE COBRE TIPO ANDERSON, PARA VARILLA 3/4" pza 2.0000 12.00
651129.19 CABLE 2.5 mm2 TW-70 m 2,153.0000 1.20
651129.20 CABLE 10 mm2 TW-70 m 150.0000 4.40
651129.21 CABLE 4 mm2 TW-70 m 1,255.0000 1.80
PRESUPUESTO ANALTICO

MATERIALES, HERRAMIENTAS Y EQUIPOS DE OBRA

Proyecto CONSTRUCCIN DE AULAS Y LABORATORIOS PARA LA E.P. DE INGENIERA TOPOGRFICA Y AGRIMENSURA


Fecha 01/09/2007
Lugar PUNO

Part. Esp. Recurso Unidad Cantidad Precio


S/.
651129.22 CABLE 6 mm2 TW-70 m 180.0000 2.60
651129.23 CABLE THW 35 mm2 m 350.0000 20.00
651129.24 INODORO DE TANQUE BAJO SIFON JET und 18.0000 120.00
651129.25 LAVATORIO MODELO FONTANA COLOR BLANCO 20"x17" und 21.0000 75.00
651129.26 URINARIO DE PARED MODELO CADET MEDIANO und 9.0000 160.00
651129.27 ACCESORIOS PARA INODORO und 18.0000 60.00
651129.28 ACCESORIOS PARA LAVATORIO und 21.0000 40.00
651129.29 ACCESORIOS PARA URINARIO und 9.0000 75.00
651129.30 SPOT LIGHT P/TECHO C/PROTECTOR, LAMP. AHORR. 20W pza 8.0000 23.00
651129.31 TABLERO TRIFASICO DE 18 POLOS und 3.0000 205.00
651129.32 TABLERO TRIFASICO DE 24 POLOS und 1.0000 226.00
651129.33 TOMACORRIENTE DOBLE PLANO BAKELITA C/TIERRA und 91.0000 10.00
651129.34 INTERRUPTOR TERMOMAGNETICO DE 3x40Ax220V und 3.0000 75.00
651129.35 INTERRUPTOR TERMOMAGNETICO DE 2x30Ax220V und 2.0000 32.00
651129.36 INTERRUPTOR TERMOMAGNETICO DE 3x100Ax220V und 1.0000 90.00
651129.37 INTERRUPTOR TERMOMAGNETICO DE 2x20Ax220V und 5.0000 29.60
651129.38 INTERRUPTOR TERMOMAGNETICO DE 2x15Ax220V und 9.0000 28.60
651129.39 CAJA OCTOGONAL GALV. LIVIANA 4"x4"x2 1/2" und 200.0000 1.00
651129.40 CAJA RECTANG GALV PESADA 4"x2 1/8"x2 1/8" und 205.0000 1.00
651129.41 CAJA DE PASO GALV. 12"x12"x6" C/TAPA Y CHAPA und 7.0000 43.00
651129.42 TAPA CIEGA CIRCULAR pza 6.0000 1.50
651129.43 BRAQUET DE PARED GLOBO, D=20cm, LAMP.AHORR. 1x20 W Y ACCES. und 2.0000 60.00
651129.44 FLUORESCENTE DE 32 W C/EQUIPO Y PANTALLA und 71.0000 89.00
651129.45 FLUORESCENTE RECTO 2x36 W C/EQUIPO Y PANTALLA und 113.0000 116.00
651129.46 INTERRUPTOR SIMPLE pza 35.0000 4.20
651129.47 INTERRUPTOR DOBLE pza 27.0000 5.80
651129.48 INTERRUPTOR CONMUTADOR 3 VIAS pza 4.0000 6.40
651129.49 ASFALTO RC-250 gln 8.6500 17.80
651129.50 PEGAMENTO PARA PISO VINILICO gln 72.9100 25.00
651129.51 LOSETA VINILICA 2.5 MM m2 765.5600 28.60
651129.52 LADRILLO KING KONG MECANIZADO 10X14X24 cm und 38,113.4000 0.75
651129.53 LADRILLO HUECO 15 x 30 x 30 cm und 8,984.6000 1.60
651129.54 CABLE TELEFONICO # 22 DE 2 HILOS m 160.0000 1.00
651129.55 CABLE PAR TRENZADO UTP 8 HILOS (Categoria 5-E) m 1,208.0000 1.30
651129.56 CEMENTO PORTLAND TIPO 1P (42.5KG) BOL 7,414.0600 21.50
651129.57 CERAMICA RECTANGULAR 10cm x 20cm m2 14.3900 30.00
651129.58 CERAMICO LINEA RUSTICA-BLANCO 30x30 m2 183.8600 30.00
651129.59 BISAGRA ALUMINIZADA CAPUCHINA 4"x4" pza 246.0000 4.20
651129.60 PICAPORTE DE ALUMINIO DE 6" und 44.0000 18.00
651129.61 CERRADURA PUERTA DE BAO pza 3.0000 32.00
651129.62 CERRADURA DOS GOLPES C/SEGURO Y LLAVE EXT. pza 18.0000 59.00
651129.63 CERRADURA TRES GOLPES C/SEGURO Y LLAVE EXT. pza 2.0000 68.00
651129.64 MANIJA DE BRONCE PARA VENTANA pza 12.0000 6.00
651129.65 YESO EN BOLSAS DE 25 KG BOL 31.5200 7.50
651129.66 CARBON VEGETAL kg 50.0000 4.00
651129.67 CANASTILLA DE SUCCION DE 2" pza 1.0000 30.00
651129.68 TERMINAL DE COBRE A PRESION P/ COND. 25 mm2 pza 2.0000 3.00
651129.69 CEMENTO BLANCO BLS. 50 KG BOL 5.4300 98.50
651129.70 VALVULA FLOTADORA DE 3/4" und 1.0000 30.00
651129.71 VARILLA DE COBRE D=3/4" x L=2.40m und 1.0000 225.00
651129.72 IMPERMEABILIZANTE gln 10.5100 15.60
PRESUPUESTO ANALTICO

MATERIALES, HERRAMIENTAS Y EQUIPOS DE OBRA

Proyecto CONSTRUCCIN DE AULAS Y LABORATORIOS PARA LA E.P. DE INGENIERA TOPOGRFICA Y AGRIMENSURA


Fecha 01/09/2007
Lugar PUNO

Part. Esp. Recurso Unidad Cantidad Precio


S/.
651129.73 PORCELANA kg 39.4000 3.00
651129.74 ADITIVO INCORPORADOR DE AIRE gln 57.2500 35.00
651129.75 TERMINAL PLSTICO P/ BORDE DE MAYOLICAS und 104.3900 2.50
651129.76 PEGAMENTO PLASTICO P/PVC gln 5.7000 120.00
651129.77 SILICONA und 2.9400 9.00
651129.78 CINTA AISLANTE ELECTRICA 3M-1700 rll 11.8800 3.80
651129.79 FRAGUA kg 99.9900 5.50
651129.80 OCRE kg 22.5800 15.00
651129.81 TERM. RED DE COMPUTO DOBLE, P/ MINI JACK RJ-45 C/FASE PLATE und 11.0000 25.00
651129.82 TERM. RED DE COMPUTO SIMPLE, P/ MINI JACK RJ-45 C/FASE PLATE und 30.0000 22.00
651129.83 TERMINAL TELEFONICO SIMPLE und 7.0000 12.50
651129.84 THOR GEL (DOSIS DE 5 KG) DOS 1.0000 79.00
651129.84 TUBERIA UPVC DE 6" UNION FLEXIBLE 5mt pza 13.7600 30.00
651129.85 TUBERIA UPVC DE 8" UNION FLEXIBLE 5 mt pza 7.5200 40.00
651129.86 LUBRICANTE PARA TUBERIA gln 0.3700 39.30
651129.87 HORMIGON m3 97.1000 28.00
651129.88 TAPA METALICA DE 60 X 60 und 1.0000 11.50
65112989 CERAMICO ANTIDESLIZANTE 30 x 30 cm (Mosaico) m2 94.2900 33.00
651129.90 CERAMICO ALTO TRANSITO T-4 40 x 40 cm m2 293.3700 30.00
651129.90 PARQUET m2 142.0700 28.50
651129.91 CONTRAZOCALO DE MADERA CEDRO 4"X3/4" m 424.1000 2.40
651129.92 MADERA AGUANO p2 25,198.0000 3.30
651129.93 MADERA CEDRO p2 745.2000 7.50
651129.94 REGLA DE MADERA p2 346.0100 3.10
651129.95 ROLLIZO DE EUCALIPTO DE 3" X 2.80 M pza 65.0000 7.50
651129.96 TRIPLAY COPAIBA DE 4'x8'x 4 mm pln 22.4700 27.50
651129.97 TAPA Y MARCO DE FF PARA BUZON (D=0.60 M), 70KG pza 2.0000 350.00
651129.98 FIERRO ANGULAR 3/4" x 3/4" x 1/8" x 6m pza 2.1600 17.00
651129.99 FIERRO ANGULAR 1" x 1" x 1/8" x 6m pza 60.9200 23.00
651129.100 FIERRO TEE 1" x 1" x 1/8" x 6m pza 14.7000 21.90
651129.101 PLATINA DE FIERRO 1/8" x 1/2" x 6m pza 280.3200 6.50
651129.102 PLATINA DE FIERRO 1/8" x 3/4" x 6m pza 9.0400 10.80
651129.103 TUBO ELECTROSOLDADO 2"x1", L=6m pza 204.6000 24.20
651129.104 PLATINA DE ALUMINIO 1" x 1/8" x 6m pza 24.7000 25.00
651129.105 SEPARADORES E=3.0 mm pza 1,324.5000 0.10
651129.106 CANTONERA DE ALUMINIO C/ ANCLAJE 2" 11/2" 6mts var 16.1000 30.00
651129.107 PINTURA LATEX gln 115.4300 27.00
651129.108 PINTURA LATEX VENCELATEX gln 85.9600 40.00
651129.109 PINTURA LATEX SUPERMATE gln 82.5400 56.00
651129.110 PINTURA ANTICORROSIVA gln 16.8900 41.40
651129.111 BARNIZ DD CPP gln 6.7700 67.00
651129.112 PINTURA ESMALTE gln 18.2000 39.50
651129.113 LACA gln 8.3800 40.00
651129.114 PINTURA SELLADOR gln 3.5300 40.00
651129.115 PINTURA IMPRIMANTE gln 351.0200 66.90
651129.116 CALAMINA GALVANIZADA ( 3mm) pln 174.3000 24.00
651129.117 PLANCHA DE ACERO LAF 1/27" x 4' x 8' pza 25.0800 75.50
651129.118 PLASTORMO m3 6.0900 223.00
651129.119 GRANALLA (Bolsa de 40 Kg) BOL 32.6000 11.00
651129.200 MARMOLINA (Bolsa de 40 Kg) BOL 10.8700 11.80
651129.201 TUBO FIERRO GALVANIZADO 1" x 6.40m und 6.2300 98.00
PRESUPUESTO ANALTICO

MATERIALES, HERRAMIENTAS Y EQUIPOS DE OBRA

Proyecto CONSTRUCCIN DE AULAS Y LABORATORIOS PARA LA E.P. DE INGENIERA TOPOGRFICA Y AGRIMENSURA


Fecha 01/09/2007
Lugar PUNO

Part. Esp. Recurso Unidad Cantidad Precio


S/.
651129.202 TUBO FIERRO GALVANIZADO 1 1/2" x 6.40m und 36.1900 84.00
651129.203 TUBO FIERRO GALVANIZADO 2" x 6.40 m und 1.3200 114.00
651129.204 CODO DE Fo. GALVANIZADO DE 1/2" x 90 und 108.0000 1.20
651129.205 CODO DE Fo. GALVANIZADO DE 3/4" x 90 und 18.0000 1.90
651129.206 CODO DE Fo. GALVANIZADO DE 1" x 90 und 16.0000 6.00
651129.207 CODO DE Fo. GALVANIZADO DE 2" x 90 und 5.0000 10.10
651129.208 TEE DE Fo. GALVANIZADO DE 1/2" und 26.0000 1.60
651129.209 TEE DE Fo. GALVANIZADO DE 3/4" und 26.0000 2.50
651129.210 TEE DE Fo. GALVANIZADO DE 1" und 6.0000 3.00
651129.211 TEE DE Fo. GALVANIZADO DE 1 1/2" und 1.0000 8.50
651129.212 TEE DE Fo. GALVANIZADO DE 2" und 2.0000 7.00
651129.213 UNION SIMPLE DE Fo. GALV. DE 1" und 6.0000 4.50
651129.214 UNION SIMPLE DE Fo. GALV. DE 2" und 3.0000 6.00
651129.215 UNION UNIVERSAL DE Fo. GALV. DE 1/2" und 24.0000 4.50
651129.216 UNION UNIVERSAL DE Fo. GALV. DE 3/4" und 12.0000 7.50
651129.217 UNION UNIVERSAL DE Fo. GALV. DE 1" und 8.0000 10.50
651129.218 UNION UNIVERSAL DE Fo. GALV. DE 2" und 5.0000 24.00
651129.219 REDUCCION DE Fo. GALV. DE 1" x 1/2" und 1.0000 6.50
651129.220 REDUCCION DE PVC SAP C-10 DE 3/4" x 1/2" und 32.0000 2.70
651129.221 REDUCCION DE PVC SAP C-10 DE 1" x 3/4" und 6.0000 2.80
651129.222 REDUCCION DE PVC SAP C-10 DE 1 1/2" x 1" und 1.0000 3.50
651129.223 UNION SIMPLE DE F GALV. DE 1/2" und 17.0000 1.00
651129.224 UNION SIMPLE DE F GALV. DE 1" pza 20.0000 1.80
651129.225 UNION SIMPLE DE F GALV. DE 3/4" und 18.0000 1.20
651129.226 SUMIDERO DE BRONCE 2" und 15.0000 4.50
651129.227 TUB. PVC SAP PRESION C-10 R 1/2" x 5m und 34.7200 12.00
651129.228 TUB. PVC SAP PRESION C-10 R 3/4" x 5m und 4.3700 17.50
651129.229 TUB. PVC SAP PRESION C-10 R 1" x 5m und 12.1600 24.50
651129.230 TUB. PVC SAL P/DESAGUE DE 2" x 3 m und 62.0600 10.00
651129.231 TUB. PVC SAL P/DESAGUE DE 3" x 3 m und 86.8000 16.40
651129.232 TUB. PVC SAL P/DESAGUE DE 4" x 3 m und 22.6500 20.00
651129.233 TEE PVC SAP C-10 DE 1/2" und 48.0000 0.70
651129.234 CODO DE 90 PVC SAL DE 2" und 118.0000 1.10
651129.235 CODO DE 90 PVC SAL DE 4" und 26.0000 4.20
651129.236 CODO DE 45 PVC SAL DE 2" und 13.0000 1.10
651129.237 CODO DE 45 PVC SAL DE 3" und 42.0000 3.80
651129.238 CODO DE 45 PVC SAL DE 4" und 12.0000 3.60
651129.239 REDUCCION PVC SAP 2 A 1 1/2" pza 1.0000 5.00
651129.240 YEE PVC SAL 4" und 13.0000 7.50
651129.241 YEE PVC SAL 2" und 42.0000 2.50
651129.242 YEE PVC SAL C/REDUCCION 4" a 2" und 4.0000 5.00
651129.243 CODO PVC SAP C-10 1/2" X 90 pza 96.0000 0.50
651129.244 TEE SANITARIA DE 4X4" PVC SAL und 14.0000 5.50
651129.245 TEE SANITARIA DE 2 x 2" PVC SAL und 17.0000 1.60
651129.246 REDUCCION PVC SAL 4" X 2" pza 6.0000 6.00
651129.247 TUBO PVC SEL (E/C) 3/4" x 3.00 M pza 447.2900 0.30
651129.248 TUBO PVC SEL (E/C) 1" x 3.00 M pza 173.3200 4.50
651129.249 TUBO PVC SEL (E/C) 2" x 3.00 M pza 31.6600 13.80
651129.250 CURVAS PVC SEL D=3/4" pza 640.5400 0.30
651129.251 CURVAS PVC SEL D=1" pza 149.0800 0.90
651129.252 CURVAS PVC SEL D=2" pza 11.4000 6.00
PRESUPUESTO ANALTICO

MATERIALES, HERRAMIENTAS Y EQUIPOS DE OBRA

Proyecto CONSTRUCCIN DE AULAS Y LABORATORIOS PARA LA E.P. DE INGENIERA TOPOGRFICA Y AGRIMENSURA


Fecha 01/09/2007
Lugar PUNO

Part. Esp. Recurso Unidad Cantidad Precio


S/.
651129.253 VALVULA COMPUERTA DE BRONCE DE 1/2" und 12.0000 20.00
651129.254 VALVULA COMPUERTA DE BRONCE DE 3/4" und 6.0000 25.00
651129.255 VALVULA COMPUERTA DE BRONCE DE 1" und 2.0000 33.00
651129.256 VALVULA COMPUERTA DE BRONCE DE 2" und 1.0000 56.00
651129.257 REGISTRO ROSCADO DE BRONCE DE 2" pza 14.0000 3.50
651129.258 REGISTRO ROSCADO DE BRONCE DE 4" pza 6.0000 8.80
651129.259 VIDRIO TRANSPARENTE DOBLE, e=4mm p2 64.7900 1.70
651129.260 VIDRIO CATEDRAL INCOLOR 4mm p2 58.8000 2.80
651129.261 VIDRIO SIST. MODUGLASS (INCLUYE ACCESORIOS) E=6mm p2 4,224.2600 6.50
651129.262 ESPEJO DE CRISTAL E=3 mm p2 54.2900 2.30

651130.00
651130.01 PLANTAS DE TEMPORADA und 44.4070 4.00
651130.02 GRASS kg 26.2405 15.00
651130.03 FERTILIZANTE NATURAL kg 24.2220 8.00
651130.04 SOLDADURA CELLOCORD PUNTO AZUL 1/8" kg 55.3600 11.00
651130.05 CORDEL m 285.9500 0.30
651130.06 LIJA und 62.3400 1.90
651130.07 CINTA TEFLON und 11.6700 1.10
651130.08 RECIPIENTE PARA DEPOSICION DE BASURA Y DESECHOS und 2.0000 10.00
651130.07 COLA SINTETICA FULLER gln 6.9100 33.50
651130.08 LIJA #16 M/ABRALIT m 4.9400 17.00
651130.09 LIJA #60 M/ABRALIT m 3.3100 16.00
651130.10 LIJAR # 50 ABRALIT m 98.5500 15.00
651130.11 AGUA m3 512.4600 0.50
651130.12 SAL INDUSTRIAL kg 15.0000 3.00
651130.13 GUANO DE OVINO m3 2.5000 20.00
651130.14 VERIFICACION DE LA CAPACIDAD PORTANTE GLB 1.0000 350.00
651130.15 TECNOPORT 2.40m X 1.20m E=1" pln 79.2500 18.60
651130.16 THINER gln 21.5700 17.50
651130.17 BREA kg 3.7200 3.80

651139.00
651139.01 TRANSPORTE DE MATERIALES GLB 1.0000 4,000.00
651139.02 TRANSPORTE DE EQUIPOS Y HERRAMIENTAS GLB 1.0000 2,500.00
651139.03 TRANSPORTE GLB 1.0000 500.00
651139.04 CONECCION DE AGUA A LA RED DE LA CIUDAD UNIVERSITARIA GLB 1.0000 200.00
651139.05 CONECCION DE DESAGUE A LA RED DE LA CIUDAD UNIVERSITARIA GLB 1.0000 200.00
651139.06 DISEO DE MEZCLA PARA CONCRETO F'C=175 KG/CM2 und 1.0000 300.00
651139.07 DISEO DE MEZCLA PARA CONCRETO F'C=210 KG/CM2 und 1.0000 300.00
651139.08 ANLISIS GRANULOMTRICO und 4.0000 5.00
651139.09 ENSAYO DE PROCTOR MODIFICADO und 2.0000 65.00
651139.10 DENSIDAD DE CAMPO und 2.0000 25.00
651139.11 ROTURA DE PROBETAS und 80.0000 20.00
651139.12 ENSAYOS DE CONTROL DE CALIDAD DE MATERIALES DE CONSTRUCCION GLB 1.0000 500.00
651139.13 MANTENIMIENTO PERIDICO DE MOTORES DE EQUIPOS Y MAQUINARIAS GLB 1.0000 2,000.00

651151.00
PRESUPUESTO ANALTICO

MATERIALES, HERRAMIENTAS Y EQUIPOS DE OBRA

Proyecto CONSTRUCCIN DE AULAS Y LABORATORIOS PARA LA E.P. DE INGENIERA TOPOGRFICA Y AGRIMENSURA


Fecha 01/09/2007
Lugar PUNO

Part. Esp. Recurso Unidad Cantidad Precio


S/.
651151.01 HERRAMIENTAS MANUALES %MO
651151.02 MEGOMETRO (1000 VOLTIOS) DIA 1.0000 40.00
651151.03 TELUROMETRO (MEDIDOR DE PUESTA A TIERRA) DIA 1.0000 30.00
651151.04 MANGUERA D/JEBE 3/4" X 16 MTS pza 1.0000 50.00
651151.05 PINZA AMPERIMETRICA DIA 1.0000 20.00
651151.06 MEZCLADORA DE CONCRETO DE 9 -11P3 hm 526.3900 16.00
651151.07 WINCHE ELECTRICO hm 371.3000 15.90
651151.08 CAMION VOLQUETE 6x4 330 HP 10 M3. hm 26.1900 165.00
651151.09 MOLDE METALICO PARA BUZON hm 12.1600 8.00
651151.10 MOTOSOLDADORA DE 250 AMPERIOS hm 472.7900 6.50
651151.11 MOTOSIERRA hm 3.5200 10.00
651151.12 ANDAMIO METALICO hm 1,982.6200 4.50
651151.13 SIERRA CIRCULAR hm 1,414.0000 5.00
651151.14 CIZALLA hm 459.3900 5.00
651151.15 COMPRESORA hm 56.4200 7.00
651151.16 COMPACTADOR VIBR. TIPO PLANCHA 4 HP hm 449.5600 10.00
651151.17 CARGADOR S/LLANTAS 100-115 HP 2-2.25 YD3 hm 3.2500 135.00
651151.18 MARTILLO NEUMATICO 29 KG C/BARRENO-ACCS hm 1,446.3900 8.00
651151.19 RETROEXCAVADORA S/O 75-110 HP,.50-1.3Y3 hm 117.0900 130.00
651151.20 VIBRADOR DE CONCRETO 4 HP 2.40" hm 269.8800 8.00
651151.21 PUNTAL METALICO und 1,813.9000 14.00
651151.22 TEODOLITO hm 36.8700 8.50
651151.23 NIVEL TOPOGRAFICO hm 36.8700 7.00
651151.24 MIRA TOPOGRAFICA DE 4M hm 36.8700 0.50
651151.25 PULIDORA DE TERRAZOS hm 79.0400 6.50
651151.26 CEPILLADORA ELECTRICA hm 13.5300 10.00

TOTAL
Parcial
S/.

3,022.79
284.27
15,174.10
115,471.42
43,580.44
76,420.36

253,953.38

707.23
174.98
1,654.23
2,536.44

15.13
4,079.84
13,497.47
6,801.68
63.24
80.78
1,323.47
8.40
158,794.51
3,918.34
4,083.86
6,475.86
20.00
228.29
96.82
8,923.91
220.00
24.00
2,583.60
660.00
2,259.00
Parcial
S/.
468.00
7,000.00
2,160.00
1,575.00
1,440.00
1,080.00
840.00
675.00
184.00
615.00
226.00
910.00
225.00
64.00
90.00
148.00
257.40
200.00
205.00
301.00
9.00
120.00
6,319.00
13,108.00
147.00
156.60
25.60
154.05
1,822.75
21,894.87
28,585.05
14,375.36
160.00
1,570.40
159,421.55
431.55
5,515.65
1,033.20
792.00
96.00
1,062.00
136.00
72.00
239.51
200.00
30.00
6.00
535.50
30.00
225.00
164.04
Parcial
S/.
119.07
2,002.66
261.56
680.05
27.07
42.38
550.39
346.15
275.00
660.00
87.50
79.00
412.65
300.72
14.40
2,718.74
11.50
3,111.57
8,801.10
4,049.53
1,017.83
83,166.39
5,589.23
1,071.60
487.50
618.03
700.00
36.79
1,401.17
322.22
1,822.09
97.57
4,951.19
617.50
132.45
482.98
3,119.70
3,438.38
4,622.96
698.52
453.26
718.71
335.14
141.27
23,466.42
4,183.20
1,893.35
1,358.07
358.64
128.44
610.76
Parcial
S/.
3,041.25
149.96
129.60
34.20
96.00
50.50
41.60
65.00
18.00
8.50
14.00
27.00
18.00
108.00
90.00
84.00
120.00
6.50
86.40
16.80
3.50
17.00
36.00
21.60
67.50
416.63
76.54
298.19
620.55
1,423.52
452.90
33.60
129.80
109.20
14.30
159.60
43.20
5.00
97.50
105.00
20.00
48.00
77.00
27.20
36.00
134.20
780.00
437.00
187.88
132.40
68.40
Parcial
S/.
240.00
150.00
66.00
56.00
49.00
52.80
110.44
164.64
27,477.77
125.11
702,627.96

177.63
395.63
193.78
610.26
90.30
118.65
11.68
20.00
231.25
83.98
52.86
1,478.25
283.66
45.00
50.00
350.00
1,474.50
378.84
13.53
6,059.79

4,000.00
2,500.00
500.00
200.00
200.00
300.00
300.00
20.00
130.00
50.00
1,600.00
500.00
2,000.00
12,300.00
Parcial
S/.
7,646.72
40.00
30.00
50.00
20.00
8,422.15
5,903.68
4,321.61
97.28
3,073.12
35.20
8,939.15
7,075.33
2,416.17
394.84
4,496.94
438.35
11,572.10
15,221.08
2,159.60
25,394.60
319.51
254.90
21.35
513.76
135.30
108,992.74

1086470.32
PRESUPUESTO
ANALITICO
EJECUCIN DE OBRA

1.00 DESAGREGADO DE GASTOS GENERALES:

PROYECTO:
CONSTRUCCION Y EQUIPAMIENTO DE LABORATORIOS PARA LA FACULTAD DE CIENCIAS DE LA EDUCACION DE
UNIVERSIDAD NACIONAL DEL ALTIPLANO

COSTO DIRECTO S/. 1,031,557.82


PRESUPUESTO GASTOS GENERALES S/. 86,135.08 8.35%

PARTIDA COSTO
ESPECFICA DESCRIPCION UNIDAD CANTIDAD N DE MESES UNITARIO
2.6.2.2.2.3 1.- PERSONAL TCNICO, ADMINISTRATIVO Y AUXILIAR
2.6.2.2.2.3 Ingeniero Residente de Obra Meses 1.00 9.00 3,000.00
2.6.2.2.2.3 Asistente Tcnico Meses 1.00 9.00 1,597.00
2.6.2.2.2.3 Asistente Administrativo Meses 1.00 9.00 1,597.00
2.6.2.2.2.3 Maestro de Obra Meses 1.00 8.00 1,597.00
2.6.2.2.2.3 Almacenero de Obra Meses 1.00 8.00 1,319.36
2.6.2.2.2.3 Chofer Meses 0.25 8.00 1,319.36

2.6.2.2.2.5 3.- OPERACIN Y MANTENIMIENTO DE EQUIPOS


2.6.2.2.2.5 Mantenimiento de Camioneta Glb 0.50 8.00 300.00
2.6.2.2.2.4 Combustible de Camioneta Glb 0.50 8.00 200.00

2.6.2.2.2.6 4.- EQUIPAMIENTO Y MOBILIARIO.


2.6.2.2.2.6 Mobiliario de Oficina de Residente Glb 1.00 500.00
2.6.2.2.2.6 Mobiliario de Almacen y Guardiania Glb 1.00 200.00

2.6.2.2.2.6 5.- VARIOS


2.6.2.2.2.6 Papelera y Utiles de Escritorio
2.6.2.2.2.6 Papel Bond A4 Millar 10.00 30.00
2.6.2.2.2.6 Papel Bond color Amarillo, A4 Millar 5.00 30.00
2.6.2.2.2.6 Papel Bulky Millar 6.00 15.00
2.6.2.2.2.6 Rollo de Papel Bond para Ploter Rollo 2.30 55.00
2.6.2.2.2.6 Folderes Pza 50.00 0.50
2.6.2.2.2.6 Archivadores Pza 4.00 9.00
2.6.2.2.2.6 CDs Pza 18.00 1.00
2.6.2.2.2.6 Lapiceros Azul y Negro Punta Fina Pza 18.00 0.70
2.6.2.2.2.6 Borradores, Correctores, Clips, Etc. Glb 1.03 40.00
2.6.2.2.2.4 Casco de Seguridad para Personal Tcnico Pza 3.00 40.00
2.6.2.2.2.6 Servicio de Terceros Glb 1.00 500.00
2.6.2.2.2.6 Implementos de Sealizacion Glb 1.00 300.00
TOTAL
8.35%

E CIENCIAS DE LA EDUCACION DE LA
O

8.35%

SUB-TOTAL TOTAL
81,715.60
27,000.00
14,373.00
14,373.00
12,776.00
10,554.88
2,638.72

2,000.00
1,200.00
800.00

700.00
500.00
200.00

1,719.48

300.00
150.00
90.00
126.50
25.00
36.00
18.00
12.60
41.38
120.00
500.00
300.00
86,135.08
PRESUPUESTO
ANALITICO
SUPERVISIN DE OBRA

2.00 DESAGREGADO DE GASTOS DE SUPERVISIN:

PROYECTO:
CONSTRUCCION Y EQUIPAMIENTO DE LABORATORIOS PARA LA FACULTAD DE CIENCIAS DE LA EDUCACION D
LA UNIVERSIDAD NACIONAL DEL ALTIPLANO

COSTO DIRECTO S/. 1,031,557.82


PRESUPUESTO GASTOS DE SUPERVISION S/. 30,637.27 2.97%

-
PARTIDA N DE COSTO
ESPECFICA DESCRIPCION UNIDAD CANTIDAD MESES UNITARIO
2.6.2.2.2.3 1.- PERSONAL TCNICO, ADMINISTRATIVO Y AUXILIAR
2.6.2.2.2.3 Ingeniero Supervisor Meses 1.00 8.00 3,700.00

2.6.2.2.2.6. 2.- MOVILIDAD Y VITICOS


2.6.2.2.2.6 Movilidad Glb 1.00 8.00 55.00

2.6.2.2.2.6 3.- VARIOS


2.6.2.2.2.6 Papelera y Utiles de Escritorio
2.6.2.2.2.6 Papel Bond A4 Millar 6.00 30.00
2.6.2.2.2.6 Papel Bond color Amarillo, A4 Millar 2.00 30.00
2.6.2.2.2.6 Papel Bulky Millar 2.00 15.00
2.6.2.2.2.6 Folderes Pza 12.00 0.50
2.6.2.2.2.6 Archivadores Pza 3.00 9.00
2.6.2.2.2.6 CDs Pza 7.00 1.00
2.6.2.2.2.6 Lapiceros Azul y Negro Punta Fina Pza 10.00 0.70
2.6.2.2.2.6 Borradores, Correctores, Clips, Etc. Glb 1.01 40.00
2.6.2.2.2.4 Casco de Seguridad Pza 1.00 40.00
2.6.2.2.2.6 Imprevistos Glb 1.00 200.00

TOTAL
2.97%

DE CIENCIAS DE LA EDUCACION DE
ANO

2.97%

SUB-TOTAL TOTAL
29,600.00
29,600.00

440.00
440.00

597.27

180.00
60.00
30.00
6.00
27.00
7.00
7.00
40.27
40.00
200.00

30,637.27
PRESUPUESTO ANALITICO

LIQUIDACIN TCNICA- FINANCIERA DE OBRA

PROYECTO:

CONSTRUCCION Y EQUIPAMIENTO DE LABORATORIOS PARA LA FACULTAD DE CIENCIAS DE LA EDUCACION


DE LA UNIVERSIDAD NACIONAL DEL ALTIPLANO

COSTO DIRECTO S/. 1,031,557.82


PRESUPUESTO GASTOS DE LIQUIDACION S/. 15,473.37 1.50%

COSTOS DIRECTOS

COSTO DIRECTO DE LIQUIDACIN


PARTIDA N DE
ESPECFICA DESCRIPCION UNIDAD CANTIDAD MESES COSTO UNIT. PARCIAL
2.6.2.2.2.3 I.- EQUIPO TCNICO Y AUXILIAR:
2.6.2.2.2.3 Profesional Liquidacin Tcnica MESES 1.00 4.00 1,800.00 7,200.00
2.6.2.2.2.3 Profesional Liquidacin Financiera MESES 1.00 4.00 1,400.00 5,600.00

2.6.2.2.2.6 II.- INSUMOS Y MATERIALES


2.6.2.2.2.6 Papel Bond A4 Millar 8.00 30.00 240.00
2.6.2.2.2.6 Papel Bond color Amarillo, A4 Millar 4.00 30.00 120.00
2.6.2.2.2.6 Papel Bulky Millar 5.00 15.00 75.00
2.6.2.2.2.6 Anillos y Tapas Pza 18.00 6.00 108.00
2.6.2.2.2.6 Folderes Pza 25.00 0.50 12.50
2.6.2.2.2.6 Archivadores Pza 8.00 9.00 72.00
2.6.2.2.2.6 CDs Pza 12.00 1.00 12.00
2.6.2.2.2.6 Lapiceros Azul y Negro Punta Fina Pza 12.00 0.70 8.40
2.6.2.2.2.6 Borradores, Correctores, Clips, Etc. Glb 3.02 20.00 60.47
2.6.2.2.2.6 Ploteo de Planos - Liquidacin Tcnica Glb 6.00 100.00 600.00
2.6.2.2.2.6 Fotocopias Glb 3.10 150.00 465.00
III.- MOVILIDAD Y VIATICOS
2.6.2.2.2.6 Movilidad y Viaticos Glb 1.00 200.00 200.00
2.6.2.2.2.6 Imprevistos Glb 2.00 350.00 700.00

TOTAL DE COSTOS
CIAS DE LA EDUCACION

SUB-TOTAL
12,800.00

1,773.37

900.00

15,473.37
OFICINA DE ARQUITECTURA Y CONSTRUCCIONES
UNIDAD DE ESTUDIOS Y PROYECTOS

PROYECTO:
CONSTRUCCION Y EQUIPAMIENTO DE LABORATORIOS PARA LA FACULTAD DE
CIENCIAS DE LA EDUCACION DE LA UNIVERSIDAD NACIONAL DEL ALTIPLANO

CLCULO DE COSTO HORA HOMBRE


CONCEPTO MAESTRO OPERARIO OFICIAL PEON
DE OBRA INCIDENCIA (%)
Planillas 2 Quincenas
24 Dias 1092.81 887.89 819.59 717.15
Liquidaciones (Vacaciones)
(10%) + CTS (15%) 224.00 182.00 168.00 147.00
Obligaciones del Empleador
9% de la planilla 98.35 79.91 73.76 64.54
Beneficio de Escolaridad
S/. 300 25.00 25.00 25.00 25.00
Beneficio por 28 de Julio
S/. 200 16.67 16.67 16.67 16.67
Beneficio por Diciembre
S/. 200 16.67 16.67 16.67 16.67
Seguro Complem. De Trabajo
de Riesgo 1.53% 16.72 13.58 12.54 10.97
Feriados nacionales y locales
(15 feriados al ao) 48.79 39.64 36.59 32.02
Beneficios Adicionales
Gastos de Alimentacin 33.00 33.00 33.00 33.00
Equipo de Seguridad y Vestuario
S/. 150 x 2 Veces al Ao 25.00 25.00 25.00 25.00

TOTAL 24 Das Efectivo 1597.00 1319.36 1226.81 1088.01

Total Da Efectivo 66.54 54.97 51.12 45.33

TOTAL HORA HOMBRE 8.32 6.87 6.39 5.67


RA LA FACULTAD DE
NAL DEL ALTIPLANO

PORCENTAJE
INCIDENCIA (%)

68.43

14.03

6.16

1.57

1.04

1.04

1.05

3.05

2.07

1.57

100.00