Vous êtes sur la page 1sur 36

Faculty: Faculty of Civil and Environmental

Engineering
Department : Department of Infrastructure and
Geomatic Engineering
Title:
SIGNALISED INTERSECTION
CAPACITY AND LEVEL OF SERVICE
1.0
Page
1/19
Edition :
Checking no. :
Effective date :
Ammendment
date :
2
2
7/9/14
1/9/14
INTRODUCTION
The capacity of a street is related primarily to the signal timing and the geome
tric
characteristics of the facility as well as to the composition of traffic on the
facility.
Geometrics are a fixed characteristic of a facility. Thus, while traffic composi
tion may
vary somewhat over time, the capacity of a facility is generally a stable value
that can be
significantly improved only by initiating geometric improvements.
At signalised intersections, the additional element of time allocation is introd
uced
into the concept of capacity. A traffic signal essentially allocates time among
conflicting
traffic movements that seek to use the same space. The way in which time is allo
cated
significantly affects the operation and the capacity of the intersection and its
approaches.
In analysing a signalised intersection, the physical unit of analysis is the lan
e group.
A lane group consists of one or more lanes on an intersection approach. The outp
uts
from application of the method in this manual are reported on the basis of each
lane
group.
Capacity at intersections is defined for each lane group. The lane group capacit
y is
the maximum hourly rate at which vehicles can reasonably be expected to pass thr
ough
the intersection under prevailing traffic, roadway, and signalization conditions
. Capacity
is stated in vehicles per hour (veh/h).
The level of service (LOS) at signalised intersections is expressed in terms of
delay,
which relate to control, geometrics, traffic and incidents.
Stopped delay may be used to determine the LOS. It is defined as the time a vehi
cle waits
at a traffic light. Stopped delay stated in seconds per vehicle (sec/veh).
2.0
OBJECTIVE
The objective is to determine the capacity and level of service of the UTHM sign
alised
intersection using JKR Arahan Teknik (Jalan) 13/87 procedure.
Prepared by:
Name: Dr Basil David Daniel
Date: 1 September 2014
Faculty: Faculty of Civil and Environmental
Engineering
Department : Department of Infrastructure and
Geomatic Engineering
Title:
SIGNALISED INTERSECTION
CAPACITY AND LEVEL OF SERVICE
3.0
2/19
Edition :
Checking no. :
Effective date :
Ammendment
date :
2
2
7/9/14
1/9/14
APPARATUS / EQUIPMENT
1.
2.
3.
4.
5.
6.
4.0
Page
Odometer / Measuring Wheel
Stopwatch
Analog Counter
Safety Vest
Safety Cones (optional)
Flags (optional)
PROCEDURE
1. At the UTHM Signalised Intersection, conduct a traffic movement count on all
approaches (each lane separately) for one hour in four segments of 15 minutes.
Record the data in Tables 1 10.
2. Measure the lane widths, W (in meter) for all approaches and record the data
in
Table 11.
3. For each phase, measure the green time, g (sec) and cycle time, C (sec). Reco
rd
the data in Table 12.
4. Convert traffic volumes recorded in Tables 1 10 to passenger car unit (p.c.u.
).
This is taken as the design flow, q (pcu/hr) which will then be used in Table 11
.
5. Determine the adjusted saturation flow, S (pcu/hr) for each approach and trans
fer
the values to Table 11.
6. Using Table 11, compute y, which is the ratio of design flow to adjusted
saturation flow and determine the Y value, which is the total value of y for eac
h
approach.
7. Then, calculate the intergreen time, I (sec) and total lost time per cycle L
(sec),
8. Determine the practical capacity, Yprac and reserve capacity, RC of the
intersection.
9. Determine the average stopped delay per vehicle, d (sec) and level of service
for
each approach.
Faculty: Faculty of Civil and Environmental
Engineering
Department : Department of Infrastructure and
Geomatic Engineering
Title:
SIGNALISED INTERSECTION
CAPACITY AND LEVEL OF SERVICE
5.0
Page
3/19
Edition :
Checking no. :
Effective date :
Ammendment
date :
2
2
7/9/14
1/9/14
DATA ANALYSIS
Table 1
Approach (Movement): PARIT RAJA (RIGHT-TURN)
Day/Date: __________________ Time: _____________
Time
Lane: 1
Weather: ____________
Traffic Count
Vehicle Class
1
2
Vehicle Class
3
Traffic Volume
(veh/hour)
Class 1 (Motorcycles)
Class 2 (Cars)
Class 3 (Vans & Medium Trucks)
Class 4 (Heavy Trucks & Buses)
Total (PR1)
Note: p.c.u. = passenger car unit
4
p.c.u.
Factor
0.33
1.00
1.75
2.25
p.c.u.
Faculty: Faculty of Civil and Environmental
Engineering
Department : Department of Infrastructure and
Geomatic Engineering
Title:
SIGNALISED INTERSECTION
CAPACITY AND LEVEL OF SERVICE
Page
4/19
Edition :
Checking no. :
Effective date :
Ammendment
date :
2
2
7/9/14
1/9/14
Table 2
Approach (Movement): PARIT RAJA (THROUGH)
Day/Date: __________________ Time: _____________
Time
Lane: 2
Weather: ___________
Traffic Count
Vehicle Class
1
2
Vehicle Class
3
Traffic Volume
(veh/hour)
Class 1 (Motorcycles)
Class 2 (Cars)
Class 3 (Vans & Medium Trucks)
Class 4 (Heavy Trucks & Buses)
Total (PT2)
Note: p.c.u. = passenger car unit
4
p.c.u.
Factor
0.33
1.00
1.75
2.25
p.c.u.
Faculty: Faculty of Civil and Environmental
Engineering
Department : Department of Infrastructure and
Geomatic Engineering
Title:
SIGNALISED INTERSECTION
CAPACITY AND LEVEL OF SERVICE
Page
5/19
Edition :
Checking no. :
Effective date :
Ammendment
date :
2
2
7/9/14
1/9/14
Table 3
Approach (Movement): PARIT RAJA (THROUGH)
Day/Date: __________________ Time: _____________
Time
Lane: 3
Weather: ___________
Traffic Count
Vehicle Class
1
2
Vehicle Class
3
Traffic Volume
(veh/hour)
Class 1 (Motorcycles)
Class 2 (Cars)
Class 3 (Vans & Medium Trucks)
Class 4 (Heavy Trucks & Buses)
Total (PT3)
Note: p.c.u. = passenger car unit
4
p.c.u.
Factor
0.33
1.00
1.75
2.25
p.c.u.
Faculty: Faculty of Civil and Environmental
Engineering
Department : Department of Infrastructure and
Geomatic Engineering
Title:
SIGNALISED INTERSECTION
CAPACITY AND LEVEL OF SERVICE
Page
6/19
Edition :
Checking no. :
Effective date :
Ammendment
date :
2
2
7/9/14
1/9/14
Table 4
Approach (Movement): PARIT RAJA (THROUGH)
Day/Date: __________________ Time: _____________
Time
Lane: 4
Weather: ___________
Traffic Count
Vehicle Class
1
2
Vehicle Class
3
Traffic Volume
(veh/hour)
Class 1 (Motorcycles)
Class 2 (Cars)
Class 3 (Vans & Medium Trucks)
Class 4 (Heavy Trucks & Buses)
Total (PT4)
Note: p.c.u. = passenger car unit
4
p.c.u.
Factor
0.33
1.00
1.75
2.25
p.c.u.
Faculty: Faculty of Civil and Environmental
Engineering
Department : Department of Infrastructure and
Geomatic Engineering
Title:
SIGNALISED INTERSECTION
CAPACITY AND LEVEL OF SERVICE
Page
7/19
Edition :
Checking no. :
Effective date :
Ammendment
date :
2
2
7/9/14
1/9/14
Table 5
Approach (Movement): UTHM (RIGHT TURN)
Lane: 1
Day/Date: __________________ Time: _____________
Weather: ___________
Time
Traffic Count
Vehicle Class
1
2
Vehicle Class
3
Traffic Volume
(veh/hour)
Class 1 (Motorcycles)
Class 2 (Cars)
Class 3 (Vans & Medium Trucks)
Class 4 (Heavy Trucks & Buses)
Total (UR1)
Note: p.c.u. = passenger car unit
4
p.c.u.
Factor
0.33
1.00
1.75
2.25
p.c.u.
Faculty: Faculty of Civil and Environmental
Engineering
Department : Department of Infrastructure and
Geomatic Engineering
Title:
SIGNALISED INTERSECTION
CAPACITY AND LEVEL OF SERVICE
Page
8/19
Edition :
Checking no. :
Effective date :
Ammendment
date :
2
2
7/9/14
1/9/14
Table 6
Approach (Movement): UTHM (RIGHT / LEFT TURN)
Day/Date: __________________ Time: _____________
Time
Lane: 2
Weather: ___________
Traffic Count
Vehicle Class
1
2
Vehicle Class
3
Traffic Volume
(veh/hour)
Class 1 (Motorcycles)
Class 2 (Cars)
Class 3 (Vans & Medium Trucks)
Class 4 (Heavy Trucks & Buses)
Total (URL2)
Note: p.c.u. = passenger car unit
4
p.c.u.
Factor
0.33
1.00
1.75
2.25
p.c.u.
Faculty: Faculty of Civil and Environmental
Engineering
Department : Department of Infrastructure and
Geomatic Engineering
Title:
SIGNALISED INTERSECTION
CAPACITY AND LEVEL OF SERVICE
Page
9/19
Edition :
Checking no. :
Effective date :
Ammendment
date :
2
2
7/9/14
1/9/14
Table 7
Approach (Movement): BATU PAHAT (U-TURN)
Day/Date: __________________ Time: _____________
Time
Lane: 1
Weather: ___________
Traffic Count
Vehicle Class
1
2
Vehicle Class
3
Traffic Volume
(veh/hour)
Class 1 (Motorcycles)
Class 2 (Cars)
Class 3 (Vans & Medium Trucks)
Class 4 (Heavy Trucks & Buses)
Total (BU1)
Note: p.c.u. = passenger car unit
4
p.c.u.
Factor
0.33
1.00
1.75
2.25
p.c.u.
Faculty: Faculty of Civil and Environmental
Engineering
Department : Department of Infrastructure and
Geomatic Engineering
Title:
SIGNALISED INTERSECTION
CAPACITY AND LEVEL OF SERVICE
Page
10/19
Edition :
Checking no. :
Effective date :
Ammendment
date :
2
2
7/9/14
1/9/14
Table 8
Approach (Movement): BATU PAHAT (THROUGH)
Day/Date: __________________ Time: _____________
Time
Lane: 2
Weather: ___________
Traffic Count
Vehicle Class
1
2
Vehicle Class
3
Traffic Volume
(veh/hour)
Class 1 (Motorcycles)
Class 2 (Cars)
Class 3 (Vans & Medium Trucks)
Class 4 (Heavy Trucks & Buses)
Total (BT2)
Note: p.c.u. = passenger car unit
4
p.c.u.
Factor
0.33
1.00
1.75
2.25
p.c.u.
Faculty: Faculty of Civil and Environmental
Engineering
Department : Department of Infrastructure and
Geomatic Engineering
Title:
SIGNALISED INTERSECTION
CAPACITY AND LEVEL OF SERVICE
Page
11/19
Edition :
Checking no. :
Effective date :
Ammendment
date :
2
2
7/9/14
1/9/14
Table 9
Approach (Movement): BATU PAHAT (THROUGH)
Day/Date: __________________ Time: _____________
Time
Lane: 3
Weather: ___________
Traffic Count
Vehicle Class
1
2
Vehicle Class
3
Traffic Volume
(veh/hour)
Class 1 (Motorcycles)
Class 2 (Cars)
Class 3 (Vans & Medium Trucks)
Class 4 (Heavy Trucks & Buses)
Total (BT3)
Note: p.c.u. = passenger car unit
4
p.c.u.
Factor
0.33
1.00
1.75
2.25
p.c.u.
Faculty: Faculty of Civil and Environmental
Engineering
Department : Department of Infrastructure and
Geomatic Engineering
Title:
SIGNALISED INTERSECTION
CAPACITY AND LEVEL OF SERVICE
Page
12/19
Edition :
Checking no. :
Effective date :
Ammendment
date :
2
2
7/9/14
1/9/14
Table 10
Approach (Movement): BATU PAHAT (LEFT-TURN)
Day/Date: __________________ Time: _____________
Time
Lane: 4
Weather: ___________
Traffic Count
Vehicle Class
1
2
Vehicle Class
3
Traffic Volume
(veh/hour)
Class 1 (Motorcycles)
Class 2 (Cars)
Class 3 (Vans & Medium Trucks)
Class 4 (Heavy Trucks & Buses)
Total (BL4)
Note: p.c.u. = passenger car unit
4
p.c.u.
Factor
0.33
1.00
1.75
2.25
p.c.u.
Faculty: Faculty of Civil and Environmental
Engineering
Department : Department of Infrastructure and
Geomatic Engineering
Title:
SIGNALISED INTERSECTION
CAPACITY AND LEVEL OF SERVICE
Page
13/19
Edition :
Checking no. :
Effective date :
Ammendment
date :
2
2
7/9/14
1/9/14
Table 11
Phase
Movement
W (m)
S (pcu/hr)
q (pcu/hr)
y = q/S
y
I
PT2
PT3
PT4
II
BT2
BT3
PT2
PT3
III
PT4
PR1
PR1
IV
BU1
Key:
P = Parit Raja Approach; B = Batu Pahat Approach; U = UTHM Approach
T = Through; R = Right-turn; L = Left-turn
1 = Lane 1; 2 = Lane 2; 3 = Lane 3; 4 = Lane 4
Example Calculation of Adjusted Saturation Flow, S
Y = y1 + y2 + y3 + y4 =
Amber time, a =
All-red period, R = 2 sec
Intergreen time, I = a + R =
Drivers reaction time, l = 2 sec
Number of phases, n = 4
Total lost time, L = n(I a) + nl =
UR1
URL2
Faculty: Faculty of Civil and Environmental
Engineering
Department : Department of Infrastructure and
Geomatic Engineering
Title:
SIGNALISED INTERSECTION
CAPACITY AND LEVEL OF SERVICE
Page
14/19
Edition :
Checking no. :
Effective date :
Ammendment
date :
2
2
7/9/14
1/9/14
Practical capacity, Yprac = 0.9 0.0075L =
Reserve capacity, RC = 100% ( Yprac Y ) / Y =
Table 12
Phase
Movement
C (sec)
g (sec)
= g/C
S (pcu/hr)
q (pcu/hr)
qs(pcu/sec)
x = q/ S
d (sec)
LOS
I
PT2
PT3
PT4
II
BT2
BT3
PT2
PT3
III
PT4
PR1
PR1
IV
BU1
UR1
URL2
Faculty: Faculty of Civil and Environmental
Engineering
Department : Department of Infrastructure and
Geomatic Engineering
Title:
SIGNALISED INTERSECTION
CAPACITY AND LEVEL OF SERVICE
Page
15/19
Edition :
Checking no. :
Effective date :
Ammendment
date :
2
2
7/9/14
1/9/14
Example calculation for delay and determination of LOS
Sketch of UTHM Intersection
Sketch of Phase Diagram
Faculty: Faculty of Civil and Environmental
Engineering
Department : Department of Infrastructure and
Geomatic Engineering
Title:
SIGNALISED INTERSECTION
CAPACITY AND LEVEL OF SERVICE
6.0
DISCUSSION
Comment on the LOS of UTHM intersection.
Page
16/19
Edition :
Checking no. :
Effective date :
Ammendment
date :
2
2
7/9/14
1/9/14
Faculty: Faculty of Civil and Environmental
Engineering
Department : Department of Infrastructure and
Geomatic Engineering
Title:
SIGNALISED INTERSECTION
CAPACITY AND LEVEL OF SERVICE
7.0
CONCLUSION
Page
17/19
Edition :
Checking no. :
Effective date :
Ammendment
date :
2
2
7/9/14
1/9/14
Faculty: Faculty of Civil and Environmental
Engineering
Department : Department of Infrastructure and
Geomatic Engineering
Title:
SIGNALISED INTERSECTION
CAPACITY AND LEVEL OF SERVICE
8.0
Page
18/19
Edition :
Checking no. :
Effective date :
Ammendment
date :
2
2
7/9/14
1/9/14
APPENDICES
(A) Saturation Flow Estimation
If W < 5.5 m, use the following table:
W (m)
S (pcu/hr)
3.0
1845
3.25
1860
3.5
1885
3.75
1915
4.0
1965
4.25
2075
4.5
2210
4.75
2375
5.0
2560
If W 5.5 m, use the equation S = 525W
(B) Saturation Flow Adjustment
S = S Fg Fr Fl Ft
Correction factor for the effect of gradient, Fg is taken as 1.00 for 0% gradien
t.
Correction factor for the effect of turning radius, Ft
Correction Factor, Ft
0.85
0.90
0.96
Description
for turning radius R < 10 m
for turning radius where 10 m < R < 15 m
for turning radius where 15 m < R < 30 m
Correction factors for turning traffic, Fr and Fl
% Turning Traffic
5
10
15
20
25
30
35
40
45
50
55
60
Factor for right-turn, Fr
0.96
0.93
0.90
0.87
0.84
0.82
0.79
0.77
0.75
0.73
0.71
0.69
Factor for left-turn, Fl
1.00
1.00
0.99
0.98
0.97
0.95
0.94
0.93
0.92
0.91
0.90
0.89
5.25
2760
Faculty: Faculty of Civil and Environmental
Engineering
Department : Department of Infrastructure and
Geomatic Engineering
Title:
SIGNALISED INTERSECTION
CAPACITY AND LEVEL OF SERVICE
Page
19/19
Edition :
Checking no. :
Effective date :
Ammendment
date :
2
2
7/9/14
1/9/14
(C) Average Stopped Delay per Vehicle
Average delay per vehicle, d on a particular intersection arm is given by the fo
rmula:

9 C (1 )2
x2
d

10 2(1 x ) 2qs (1 x )
where
C = cycle time (sec)
= proportion of the cycle that is effectively green for the phase = g/C
qs = flow in pcu/sec
x = degree of saturation = q/ S
(D) Level of Service Criteria for Signalised Intersection
LEVEL OF SERVICE
A
B
C
D
E
F
DELAY PER VEHICLE
< 5.0 seconds
5.1 to 15.0 seconds
15.1 to 25.0 seconds
25.1 to 40.0 seconds
40.1 to 60.0 seconds
> 60.0 seconds
Source: JKR ATJ 13/87