D. J. B a r r a t t M. A. Sochocky
p a r t o f any proposed p l a n t . It i s i n
r e q u i r e d t o o b t a i n Bond work i n d i c e s
most c a s e s a primary g y r a t o r y l o c a t e d
f o r rod m i l l i n g and b a l l m i l l i n g and
on s u r f a c e o r , f o r underground mines,
lump samples c a p a b l e o f g e n e r a t i n g
u s u a l l y a jaw c r u s h e r . The s i z e o f
7.7 cm ( 3 i n . ) cubes a r e n e c e s s a r y
these crushers w i l l be d i c t a t e d n o t
o n l y by t h e mining r a t e and t h e t o p f o r c r u s h e r impact t e s t s . If a n
s i z e o f t h e mined r o c k which w i l l b e economic ore deposit has been
d e l i v e r e d , b u t a l s o by t h e p r o d u c t e s t a b l i s h e d and p r e l i m i n a r y bench
s c a l e work shows promising r e s u l t s ,
size required. For instance,
depending upon t h e s i z e o f the f u r t h e r sampling w i l l b e needed.
autogenous m i l l s b e i n g c o n t e m p l a t e d , A l s o , i f p r e l i m i n a r y media competency
a feed size parameter of t e s t s have i n d i c a t e d t h a t t h e o r e h a s
15.25-30.50 cm (6-12 i n . ) may be autogenous or semi-autogenous
desirable. potential, samples have to be
obtained t o t e s t t h i s further. For
Another i m p o r t a n t f a c t o r which e i t h e r a n open p i t o r underground
t h e comminution e n a i n e e r h a s t o know mining o p e r a t i o n , p r e l i m i n a r y mine
i n the early stages of circuit development work o f t e n c o n s i s t s of
p l a n n i n g i s t h e tonnage t h r o u g h p u t driving adits o r shafts i n t o the
deposit. Typically f o r autogenous
requirements. These a r e determined
i n due c o u r s e by economic f e a s i b i l i t y
m i l l t e s t i n g , 22,700 - 45,400 k g (25-
50 t o n s ) o f r e p r e s e n t a t i v e sample f o r
s t u d i e s which a s c e r t a i n t h e q u a l i t y
each o r e type a r e r e q u i r e d for
and q u a n t i t y o f t h e p r o d u c t which
p r o c e s s i n g t h r o u g h a 1.7-1.8 m (5-1/2
w i l l b e needed f o r p r o j e c t v i a b i l i t y .
o r 6 f t . ) diameter p i l o t m i l l . The
These numbers a r e a v a i l a b l e s o o n e r , samples should be run-of-mine
b u t perhaps w i t h less a c c u r a c y , from p r e p a r e d i n t h e normal manner by
t h e head a s s a y o f t h e o r e and from
d r i l l i n g and b l a s t i n g t o a b o u t a
e x p e r i e n c e which c a n p r e d i c t t h e 20.3 cm ( 8 i n . ) t o p s i z e .
p r o d u c t s p e c i f i c a t i o n and tonnage
requirements.
The r e l a t i v e c o s t s o f o b t a i n i n g
s a m p l e s , t e s t i n g them and t h e time
Review Of Requirements for taken a r e significant f a c t o r s i n t h e
Testing Various Circuits. The of c i r c u i t t o b e i n v e s t i g a t e d .
and q u a n t i t y o f sample may v a r y . It
cannot b e s t r e s s e d - o f t e n -enough t h a t Identification of Contiguous
any p r o c e s s f o r a n y g i v e n orebody i s
Processes, t h e i r Requirements and
o n l y a s r e l i a b l e a s t h e sample upon Inter-relationships with Identified
which i t i s based. A company would
Comminution S t e p s . Each p i e c e o f
be well advised t o i n v e s t t h e time comminution equipment has its
and money t o o b t a i n p r o p e r samples. inherent characteristics. Thus, o n e
The q u a n t i t y of sample required s a y s t h a t rod m i l l s p r o d u c e fewer
cannot be d e f i n e d . The t y p e o r fines than ball mills; closed-
d e p o s i t and t h e m i n e r a l i z a t i o n w i l l circuiting reduces overgrinding;
d i c t a t e t h e sampling programme needs. autogenous m i l l s break o r e a l o n g
g r a i n b o u n d a r i e s and c o n s e q u e n t l y c a n
A s h a s been a l r e a d y mentioned i n l i b e r a t e values a t coarser s i z e s .
a previous section, preliminary These b a s i c t e n e t s , t o g e t h e r w i t h t h e
samples a r e usually obtained as particular properties of the ore,
d r i l l i n g progresses t o d e l i n e a t e t h e i n f l u e n c e t h e comminution e n g i n e e r ' s
orebody. The c o r e s a r e s p l i t i n h a l f thinking when he is selecting
and one h a l f g o e s f o r m e t a l l u r g i c a l
equipment which must produce a
testing. Sometimes s u r f a c e g r a b
product that has characteristics
sampling o r t r e n c h i n g is a l s o used a t
compatible with those required i n t h e
t h i s point t o g e t material for
feed f o r t h e subsequent c o n c e n t r a t i o n
preliminary testwork. Generally,
process. If a n o r e h a s t h e t e n d e n c y
22.7 kg (50 lb.) o f sample is t o slime, t h e c i r c u i t may i n c o r p o r a t e
DESIGN, INSTALLATION OF COMMINUTION CIRCUITS
As o r e g r a d e s continued to m i n e r a l s was a f a c t o r i n t h e
d e c l i n e and u n i t o p e r a t i n g c o s t s t o c h o i c e o f autogenous g r i n d i n g
e s c a l a t e , a t t e n t i o n was turned t o t h e f o r the i n i t i a l operation i n
advantages o f e l i m i n a t i n g secondary- 1967 which processed underground
tertiary crushing and screening o r e (2,700 mtpd) and f o r t h e
p l a n t s through t h e u s e o f autogenous expansion (4,200 mtpd) i n 1973
o r semi-autogenous g r i n d i n g . which processed open p i t o r e .
The operation claimed that
Capital and operating cost autogenous g r i n d i n g produced a
s a v i n g s were s i g n i f i c a n t enough t o f i n e r product f o r f l o t a t i o n by
encourage some o p e r a t o r s t o t a k e t h e reducing t h e coarser f r a c t i o n s .
plunge. Their d e d i c a t i o n h a s ensured The optimum proportion of
that semi-autogenous grinding m a g n e t i t e i n t h e o r e was 20% f o r
circuits, at least in British smooth o p e r a t i o n .
Columbia, can a c h i e v e a v a i l a b i l i t i e s
o f 92% and i n one c a s e (Lornex) 94%. Utah Mines Ltd., Vancouver
In order of commissioning date I s l a n d , B.C. (231, i s l o c a t e d
commencing i n 1967, t h e f o l l o w i n g i n a n a r e a o f high r a i n f a l l , 80-
p l a n t s have been brought on stream: 100 i n c h e s p e r y e a r , which would
UV I n d u s t r i e s , New Mexico 2,700 mtpd make a fine crushing and
(3,000 s t p d ) , Utah Mines Ltd. I s l a n d screening plant difficult to
Copper 29,900 mtpd (33,000 s t p d ) , o p e r a t e on account of clay-
Newmont Mines Ltd
13,600 mtpd
.
(15,000 s t p d ) ,
Similkameen
Lornex
forming m i n e r a l s c o n t a i n e d i n
t h e ore. The s i m p l i c i t y o f
Mininu Corp. Ltd. 43,500 mtpd using primary crushing and
( 48,000 s t p d ) , Cyprus Pima expansion coarse o r e storage t o prepare
12,700 mtpd (14,000 s t p d ) , Climax feed t o t h e grinding c i r c u i t s
Henderson 27,200 mtpd ( 30,000 s t p d ) , was a prime f a c t o r in the
Afton Mines 6,350 mtpd (7,000 s t p d ) , choice. The p l a n t was d e s i g n e d
CYP~US Bagdad 36,300 mtpd for 29,900 mtpd (33,000 s t p d )
(40,000 s t p d ) , Highmont Mining Corp. using single-stage autogenous
22,700 mtpd (25,000 s t p d ) and grinding. I n i t i a l production
Quintana Minerals Corp. Hillsboro, achieved l e v e l s o f h a l f t o two-
N.M. 13,600 mtpd (15,000 s t p d ) . The t h i r d s o f designed c a p a c i t y . It
l a s t operation l i s t e d has t h e f i r s t was known t h a t t h e Bond work
i n s t a l l a t i o n o f a 5.5 m d i a . x 8.5 m index v a r i e d from 15.5 t o 25.0
(18 f t . d i a . x 28 f t . ) b a l l m i l l f o r depending upon o r e t y p e and t h a t
secondary g r i n d i n g o f a SAG m i l l the abrasion index for the
product. Cyprus Thompson Creek a t a n d e s i t e o r e t y p e was 0.4894,
22,700 mtpd (25,000 s t u d ) is hence t h e c h o i c e o f autogenous
scheduled f o r commissioning i n 1983. g r i n d i n g and t h e a v o i d a n c e o f
Bagdad and Highmont a r e o p e r a t i n g u s i n g s t e e l media. The c r u s h e d
autogenous-ball mill-crusher (ABC) run-of -mine ore contained on
circuits. a v e r a g e 75% a n d e s i t e and 10-15s
of p l u s four-inch m a t e r i a l . In
Other f a c t o r s which i n f l u e n c e d contrast, feed t o t h e p i l o t
t h e d e c i s i o n t o u s e autogenous o r plant over a period o f ten
semi-autogenous g r i n d i n g were, for months was 10,000 tons of
s e l e c t e d o p e r a t i o n s and a t t h e r i s k b r e c c i a , a l t e r e d porphyry w i t h
o f s i m p l i f i c a t i o n and omission: some c l a y , l e s s f r a c t u r i n g and
containing from 40-605 plus
- UV I n d u s t r i e s I n c . , F i e r r o , New four-inch rock. Consequently,
Mexico (221, processed a owing t o the deficiency of
s u l p h i d e copper o r e c o n t a i n i n g c o a r s e rock i n t h e m i l l f e e d ,
magnetite and g a r n e t . The high t h e change t o semi-autogenous
specific gravity of these grinding was authorized
DESIGN, INSTALLATION OF COMMINUTION CIRCUITS
accomplished by i n s t a l l i n g two on t h e e x t r a c a p i t a l c o s t f o r
b a l l m i l l s i n closed-circuit the crusher and associated
with cyclones t o regrind a conveyors was e s t i m a t e d t o be
c o a r s e r p r o d u c t from t h e semi- l e s s t h a n one y e a r . Additional
autogenous c i r c u i t s . cost benefits anticipated are
reduced maintenance c o s t f o r
The r e a s o n s f o r c o n v e r s i o n t o l i n e r s and pumps, etc. and
semi-autogenous g r i n d i n g l i e i n increased a v a i l a b i l i t y .
t h e f a c t t h a t c o a r s e r o c k , 20-
23 cm i n s i z e , d i d n o t s u r v i v e Successful operation of an
l o n g i n t h e p r i m a r y m i l l s and s o autogenous-crusher circuit is
accumulation o f mid-size and dependent upon consistent
c r i t i c a l s i z e m a t e r i a l occurred a v a i l a b i l i t y o f c o a r s e competent
which loaded the mill and r o c k t o a c t a s g r i n d i n g media.
reduced i t s c a p a c i t y r a t i n g . The inherent risks incurred
The s i z e o f t h e mine d i c t a t e d through the nature of the
t h a t p r o d u c t i o n came from one orebody and v a r i a t i o n s i n r o c k
s h o v e l and t h e r e f o r e b l e n d i n g o f t y p e , which c o u l d a f f e c t t h e
ore types t o ensure a c o n s i s t e n t a b i l i t y t o produce such media,
f e e d , which i s n e c e s s a r y f o r c a n be reduced by having t h e
e f f i c i e n t autogenous operation, capability to operate Semi-
could not be a t t a i n e d . In the autogenously. With two p a r a l l e l
last analysis, two-stage l i n e s a t Highmont, each c a p a b l e
grinding offers f l e x i b i l i t y f o r of processing 11,340 mtpd
ores of variable hardness i n (12,500 s t p d ) and designed t o
that distribution of mill o p e r a t e i n e i t h e r mode, t h e
loadings can be a d j u s t e d t o s u i t opportunity for comparative
conditions. testing exists. To d a t e ,
however, t h e p l a n t h a s been
- Highmont Mining Corporation, operating at the designed
Highland V a l l e y , B.C., c o n d u c t e d throughput following a s h o r t
p i i o t p l a n t t e s t s i n 1970 t o tune-up p e r i o d o f s i x months.
i n v e s t i g a t e a u t o g e n o u s and semi-
autogenous grinding with I n summary, t h e d e s i g n o f l a r g e
variations in ball loading, tonnage grinding circuits for
coupled with secondary ball p r o c e s s i n g porphyry copper-molybdenum
milling for preparation of o r e s should account f o r t h e t e s t i n g
f l o t a t i o n feed. o f d i f f e r e n t o r e types within an
orebody and t h e i r e f f e c t on power
The e f f e c t o f o p e r a t i n g t h e consumption, media consumption, l i n e r
primary m i l l a u t o g e n o u s l y i n m a t e r i a l wear r a t e s , throughput r a t e s
closed-circuit with a cone and p r o d u c t s i z i n g . The d e s i g n
c r u s h e r was a l s o s t u d i e d . In s h o u l d be s e l e c t e d s o t h a t t h e
these tests the critical a n t i c i p a t e d p l a n t tune-up h a s been
o v e r s i z e from t h e m i l l d i s c h a r g e w e l l planned i n o r d e r t o p r o c e s s o r e
was s c r e e n e d o u t and c r u s h e d t o o f known c h a r a c t e r i s t i c s and s o
p a s s 13 mm. From t h e s e s t u d i e s , minimize t h e p e r i o d and working
i t was e s t i m a t e d i n 1981 ( 2 8 ) capital required to attain the
t h a t an operating c o s t saving o f designed r a t e . Cash flow l o s t a t t h e
Can. $0.25/st was p o s s i b l e beginning o f a p r o j e c t ' s l i f e can
through elimination of the n e v e r b e r e c a p t u r e d i n terms of
p r i m a r y m i l l b a l l c h a r g e and a p r e s e n t v a l u e . Such p l a n t s should b e
r e d u c t i o n i n l i n e r wear compared d e s i g n e d w i t h some f l e x i b i l i t y where
to predictions for semi- i t i s known t h a t o r e c h a r a c t e r i s t i c s
a u togenous grinding. The c a n change. This is i n contrast t o
payback a r i s i n g from t h i s s a v i n g experience with taconite ores.
SELECTION OF COMMINUTION CIRCUITS 21
F l e x i b i l i t y i n l o a d s h a r i n g between and N a n i s i v i k ( l e a d ) h a v e u n i t c e l l s
primary and s e c o n d a r y s t a g e s o f i n t h e g r i n d i n g c i r c u i t which a c c e p t
g r i n d i n g and t h e u s e o f ABC o r SAG as f e e d t h e combined d i s c h a r g e from
options are examples. One an open-circuit rod m i l l and a
c o n s i d e r a t i o n , which t o d a t e h a s closed-circuit b a l l m i l l (29, 30).
a f f e c t e d p r o d u c e r s i n t h e United At Minera Real de Angeles,
S t a t e s more t h a n i n w e s t e r n Canada, S.A. d e C.V. in Mexico, two
h a s been t h e l i n k w i t h a d o m e s t i c 4.57 m d i a . x 6.1 m ( 1 5 f t . d i a . x
smelter. The fixed rate of 2 0 f t . ) r o d m i l l s were i n s t a l l e d f o r
concentrate production usually a 10,800 mtpd ( 11,900 s t p d ) p l a n t
r e q u i r e d by such s m e l t e r s and which t r e a t i n g l e a d - z i n c - s i l v e r o r e and a r e
i s s u p p l i e d by a n o p e r a t i n g u n i t believed t o be t h e l a r g e s t i n current
w i t h i n t h e same c o r p o r a t e s t r u c t u r e u s e on s u c h o r e s .
normally d i c t a t e s t h a t o r e p r o c e s s i n g
r a t e s be f i x e d . Canadian p r o d u c e r s A t t h e p r e s e n t time, it is
in British Columbia have more believed t h a t t h e r e a r e no operations
f l e x i b i l i t y i n t h a t , during periods in North America which employ
o f h i g h world demand, they can a u t o g e n o u s , semi-autogenous o r p e b b l e
maximize throughput and have t o b e mills. Research, however, h a s been
prepared f o r t h a t event a t s h o r t conducted for potential projects
notice. The u s e o f semi-autogenous (18).
grinding has demonstrated this
f l e x i b i l i t y t o a g r e a t e r degree than Gold, S i l v e r and Mercury
c o n v e n t i o n a l c r u s h i n g and g r i n d i n g ,
though s u c h a s t a t e m e n t s h o u l d t a k e The p r o c e s s i n g o f gold and
i n t o a c c o u n t t h e d i f f e r e n c e s beween s i l v e r o r e s i n North America h a s
hard and s o f t o r e s as e x p e r i e n c e d , traditionally made use of
for instance, a t Gibraltar. c o n v e n t i o n a l c r u s h i n g and g r i n d i n g
methods. Rod m i l l - b a l l m i l l , two-
Lead and Zinc stage b a l l m i l l o r single-stage b a l l
m i l l c i r c u i t s a r e t o b e found. Tube
Modern p r a c t i c e i n North America m i l l s are s t i l l used i n some o f t h e
f o r c r u s h i n g and g r i n d i n g l e a d - z i n c o l d e r mills, e. g. Pamour P o r c u p i n e
or copper-lead-zinc ores is and Dome Mines, O n t a r i o ( 3 1 ) . In
c o n v e n t i o n a l w i t h v a r i a t i o n s on a each c a s e where g o l d is formed e i t h e r
theme. Mineralogy and g r a i n s i z e as c o a r s e n a t i v e p i e c e s o r i n c o a r s e -
p l a y a l a r g e p a r t i n t h e development g r a i n e d s u l p h i d e s , i t i s r e c o v e r e d by
of flowsheets, p a r t i c u l a r l y with t h e gravity concentration i n t h e grinding
more complex o r e s . c i r c u i t i n a d d i t i o n t o recovery of
f i n e r v a l u e s by c y a n i d a t i o n . Jigs
S i n c e f l o t a t i o n is t h e a c c e p t e d are the most common types of
method of concentration, most equipment u s e d and are u s u a l l y p l a c e d
operations s t r i v e t o f l o a t lead t o intercept the b a l l m i l l discharge
m i n e r a l s from a s c o a r s e a f e e d a s prior to classification. One
p o s s i b l e t o a v o i d s l i m i n g and r e l y on exception t o t h i s p r a c t i c e is a t
regrind stages to upgrade Homestake, Lead, South Dakota, where
concentrates f o r e i t h e r lead, zinc o r r i f f l e d l a u n d e r g o l d t r a p s are used.
both. Some Canadian o p e r a t i o n s , e.g.
United Keno H i l l , Kidd Creek and Lime and sodium c y a n i d e a r e
Hudson Bay M i n i n ~ and S m e l t i n g a t almost universally used in the
F l i n Flon, f i n d i t n e c e s s a r y t o dissolution of precious metals.
conduct primary copper or lead There is c o n s i d e r a b l e a d v a n t a g e i n
f l o t a t i o n and r e g r i n d t h e t a i l i n g a d d i n g them t o t h e g r i n d i n g c i r c u i t
prior to secondary ( scavenger) s i n c e high d i s s o l u t i o n r a t e s usually
f l o t a t i o n followed by z i n c f l o t a t i o n . r e s u l t from a g i t a t i o n and o x y g e n a t i o n
Two o p e r a t i o n s , Lake D u f a u l t ( c o p p e r ) o f t h e pulp during t h e grinding
DESIGN, INSTALLATION OF COMMINUTION CIRCUITS
action. c r u s h i n g and s c r e e n i n g p l a n t .
The s t i c k y n a t u r e o f t h e o r e i s
t h e main c o n s i d e r a t i o n when d e s i g n i n g ACKNOWLEDGEMENT
crushing and s c r e e n i n g f a c i l i t i e s .
One p l a n t ( 3 5 ) u s e s w o b b l e r f e e d e r s The a u t h o r s wish t o t h a n k t h e
a n d a r u b b l e r , which is a t u m b l i n g respective managements of Dravo
autogenous mill fitted with E n g i n e e r s a n d C o n s t r u c t o r s a n d Wright
p e r i p h e r a l g r a t e d i s c h a r g e s a n d low E n g i n e e r s Limited f o r p e r m i s s i o n t o
lifters. This design avoids breaking p r e p a r e t h i s paper. The s t a f f
the boulders and cleans their assistance required for its
s u r f a c e s t o release h i g h e r g r a d e production is g r e a t l y appreciated.
fines for processing. Residual
boulders are d i s c a r d e d t o waste
through the open-ended discharge REFERENCES
trunnion.
1. F r o h l i n g , E.S. a n d Lewis, F.M.,
F a c t o r s which i n f l u e n c e g r i n d i n g F e a s i b i l i t y Study, Chapter 1,
plant design depend on product M i n e r a l P r o c e s s i n g P l a n t Design,
r e q u i r e m e n t s a n d are d i c t a t e d by 2nd Edition, Mular , Bhappu,
subsequent processing needs. Nickel- Editors.
bearing laterites, employing
p y r o m e t a l l u r g i c a l recovery methods, 2. Lewis, F.M., Coburn, J.L. and
d o n o t h a v e t o b e ground. For Bhappu, R.B., Comminution: A
hydrometallurgical processing, Guide t o S i z e - R e d u c t i o n System
g r i n d i n g is done d r y i n b a l l m i l l s . Design, Mining Engineering,
Drying o f t h e material t o w i t h i n 2 . 0 September 1976 and November
to 2.5% surface moisture is 1976.
necessary. Proper design f o r air
sweeping t h e m i l l , d u s t c o l l e c t i o n , 3. Coleman, R. L. , Metallurgical
m i l l a i r temperature c o n t r o l and c h a t Testing Procedures, Chapter 9,
removal have t o be g i v e n s p e c i a l M i n e r a l P r o c e s s i n g P l a n t Design,
consideration. Material which is t o o 2nd Edition, Mular , Bhappu,
dry (i.e. less t h a n 2.0% s u r f a c e Editors.
moisture) can be d i f f i c u l t t o control
when w i t h d r a w i n g from b i n s . 4. Sinclair, A.J., Sampling a
Mineral Deposit f o r F e a ~ i b i l J ~ t y
In the aluminum industry, Studies and eta-Mica1
b a u x i t e is f i r s t crushed and t h e n Testing, Chamr , Mineral
ground wet i n b a l l m i l l s u s i n g t h e P r o c e s s i n g ' P l a n t Design, 2nd
return caustic liquor from the E d i t i o n , Mular, Bhappu, E d i t o r s .
e v a p o r a t o r s as t h e l i q u i d medium.
5. Smith J r . , P.R. and B u t t s , G.E.,
Limonitic o r g o e t h i t i c i r o n o r e s Design o f M i n e r a l P r o c e s s i n g
a r e processed i n t o d i r e c t shipping Flowsheet, Case H i s t o r y , C h a p t e r
lump o r e o r s i n t e r f e e d fines. 42, Mineral Processing P l a n t
Proper selection of screens and Design, 2nd Edition, Mular,
c r u s h e r s and c a r e f u l design o f t h e Bhappu, E d i t o r s .
material h a n d l i n g components ( b i n s ,
transfer points) is of utmost 6. Rowland J r . , C.A., Pilot-Plant
i m p o r t a n c e . The o r e s o f V e n e z u e l a a t Data f o r t h e Design o f P r i m a r y
Ferro-Minera O r i n o c o are s c r e e n e d a n d Autogenous a n d Semi-Autogenous
crushed i n cone crushers. In the ~ i l l i , CIM B u l l e t i n , November
r a i n y season s c r e e n i n g and handling 1981.
SELECTION OF COMMINUTION CIRCUITS 25
27. C h r i s t i e , D. J . , Semi-Autogenous
Grinding at Simi lkameen
Concentrator, Proceedings of t h e
Auto~enous Grinding Seminar,
Volume 1 , Trondheim, Norway, May
1979.
28. Sibbald, C.V., The Highmont
Concentrator, CIM Bulletin,
March 1981.