Académique Documents
Professionnel Documents
Culture Documents
--- \-
'L
CONCESSlON AGREEMENT
between
and
Volume-11
(SC'I-IEDI 1
I ,I:$)
/
MAICII,2017,
! . ,-
. I,.
% 7
National liiehwavs Authoritv of India Concession Aareernent
-? LIST OF VOLUMES
'7
VOLUME -1 : CONCESSION AGREEMENT
.A
VOLUME - 2 : SCHEDULES
-?
-r\
VOLUME - 3 : ANNEXURES
.,-.
Four laning of Rohlok JitrdSecrionfbnn ( . n ~1117.flIlfJ ro kin 3 J 7.800oj3'li-iI nnrl connrc~inglinkjiatrr I,II J47.800 oj.\"H-71
lo (.m 9.300 oj'fill. 71A lo he r.recirrrd os ROT fi~l/)l'rojec~or1 DBI-0 Pntlrrn under .\.IfDl' I'hure 111in 11reSlale u{
Iforyoso
Nat~onalHishwevs Aulhorily of hdia Schedules
SCHEDULE A -
(See Clause 10. I) SITE OF THE PROJECT
1 The Site
1.1 Site of the Four-Lane Project Highway shall include the land, buildings, structures
and road works as described in Annex-l of this Schedule-A.
1.2 An inventory of the Site including the land, buildings, structures, road works, trees
and any other immovable property on, or attached to, the Site shall be prepared
jointly by the Authority Representative and the Concessionaire, and such inventory
shalt form part of the memorandum referred to in Clause 10.3.1 of the Agreement.
1.3 Additional land required for Toll Plazas, Traffic Aid Posts, Medical Aid Posts and
vehicle rescue posts or for construction of works specified in the Change of Scope
" Order issued under Clause 16 2.3 of this Agreement shall be acquired in accordance
with the provisions of Clause 10.3.6 of this Agreement. Upon acquisition, such land
shall form part of the Site and vest in the Authority.
4 Laning of Rohtak Jind Section from km 307.000 ti km 347.800 of NH-71 and connec~inglink from km
347.800 of NH.71 to km 9.400 of NH-71A to be execurcd as BOT (Toll) project on DBFO Perlem under NHDP
Phase I l l in the Slate ofHaryana Page A - I
Nalional Hiohways Aulhori/v of India ~chedules
Annex - I
(Schedule-A)
I. The Site
The National Highway No-71 start from NH-1 at Jalandhar passing through, district
l.urlhiana(~agrao'hon NH-95), Barnala, Sangrur in the state of a Punjab and Jind,
. .
Rohtak, Jhajjar and Rewari at Bawal City joining NH-8. 'The Project road takes 'off
from existing chainage Km 307.000 of NH-71 at the junction of Proposed Bypassat
Jind City and passing through Shadipur, Julana, Lakhan Majra (Krn.347+800) joining
at NH-71A (Km. 9+400)with Rohtak bypass desigmhainage Km. 355+600-ofNH-71
*
on .the basis of existing and design chainage. The proposed road will bypass the
towns of Julana, Lakhan ~ a j r aand Rohtak and will.join at Chainage 9+400 of the '
NH-71A Rohtak - Panipat just outside Rohtak city. The project road, so located,
covers-40.800 Krn as per existing chairiage and 48.600 Km between originating and
terminating points as per proposed chainage. The entire lengths of the project road
fall in the State of Haryana under Rohtak and Jind District.
2. Land
The site of the project Highway comprises the land (Existing Right of Way, ROW) as
described in Appendix A-1
3. . Cariiageway
The present carriageway of the Project Highway is two-lane with Earthen Shoulder
on both sides at most of the stretch of the road. An inventory of existing carriageway
is presented at Appendix A- 2.
Major Bridges
4 Laning of Rohtak Jind Section from krn 307.0i0'10 km 347.800 of NH-71 and connecting link from km
347:800 of NH-71 to km 9.400 ofNH-7 lA to be,executed as BOT (Toll) project on DBFO Pattern under NHDP
Phase 111 in the Stare of Haryana. Page A - 2
National H~ohwaysAuthorily of lndia Schedules
- -\
6. Grade Separators
7. Minor...Bridges .
8. Culverts
There are no bus byes and truck lay byes on the Project Highway.
154
4 Lanirtg of Rahtak Jind
347.800 of NH-71 to km 9.400 ofNH-7IA to be executed as BOT (Toll) project on DBFO Pattern under NHDP
Phase 111 in the Stale of Haryana Pag8A - 3
i
National Hiqhwavs Authority of India Schedules ,,
Appendix -.A1
Existing ROW
. .
4 Laning of Rohtzk J~ndSecrion from km 307 000 to km 347.800 of NH-71 and connecting link from km
347 800 of NH-71 to km 9.400 of NH.7IA to be executed as BOT (Toll) project on DBFO Pattern under NHDP
Phase 111 in the Slate of Haryana Page A - 4
Nafional H~qhwaysAulhorily of India Schedules
Appendrx - A 2
4 Laning of Rohtak Jind Section from km 3b7.0~0ro krn 347:80~ of NH-71 and connecting link from
347.800 of NH-71 to km 9.400 of NH-7IAfo be cxecuted as BOT [Toll) project on DBFO Pattern under
Phase 111 in the State of Haryana
Nabonal Hiohways Aulhorilv of India Schedl~iss
Appendix - A3
157
4 Laning of Rohtak Jind Section from km 307.000 to km 347.800 of NH-71 and connecting
I
347.800 of NH-71 to km 9 400 of NH-71A to be execured as BOT (Toll) project on DBFO Pattern
Phase Ill in rhe Srate of Haryana Page A - 6
!
National Hiohwavs Authqritv of India Schedul~
Appendix A-4
DETAILS OF EXISTING SLAB CULVERTS
1 308+293
-1 x 8.31 1x10
Slab
2 313715 Slab 1 x 9.03 1x10
3 319566 Slab 1x747
4 316+013 Slab 1 x 4 329 1x10
5 1 319+416 Slab
------ 1 x 2.85 1x10
4 L a n ~ n gof Rohrak J ~ n dSecr~onfrom km 307 000 a *m 347 800 of NH-71 and connecting l ~ n kfrom h
347 800 of N H - 7 1 10 km 3 400 of NH-71A lo be executed 8 s B I) projec~on DBFO Pattern under NHDP
Phase III In rhe Srate of Haryana
4 . .
Page A 7 -
~ a l i o n aHiqhwavs
l Aulhorilv of India Schedules
4 Laning of Rohrak Jind Secrion from km 307.00b t i km 347.800 of NH-71 and connecting link from
347.800 of NH-7 I co km 9.400 ofNH-71A to be executed as BOT (Toll) proiecton
. . DBFO Pattern under
Phase 111 in the State of Haryana Page A - 8
National Hiqhways Authority of India Schedules
,
SCHEDULE - B
(See Clause 2. I )
2 Four-Laning
..
3 Laning of Rohfak lind Section born krn 307.000 to km j47.800 of NH-71 and c o ~ e c t i n elink Fro
347.800 of NH-7 I to krn 9.400 ofNH-7 l A to be executed as BOT (Toll) prole:ct on DBFO ~ a t t e under
k
Phase 111 in the State of Haryana Page B - 1
2..
L W
.
. ..
. .,
-
National Hiahwavs Authority of India Schedules
i. ..
.. -.
, .,
\ L*
$.'.' ., A
Annex - l cry .
,!.. - ?
(Schedule-6)
d, .;..;-;. -
-
LC-
Description of 4-laning
fb..,'.'' :
1 Width o f carriageway
-.
'U
1.I The carriageway shall be 2 x 8.75 meters (7.0 + 1.5 + 0.25) wide. -'..
. ., h
Fi..-,
$C.;
) -
Project facilities shall be constructed in conformity with Annex-l of Schedule-C.
..
3 Specifications and standards
;..-fi 1,
,
&.
kd
The Project Highway shall be constructed in conformity with the Specifications and
Standards specified in Annex-l of Schedule-0.
The Project Highway shall be improved to 4-lane contlguration with paved shoulder
with or without Service Roads. The entire road portion shall be 4-lane including the
bridges and other structures. 'The typical cross sect~onsalong with different types of
cross section required to be developed in different segments of the project highway
are indicated in Appendix B-I.
. . -
The details of the proposed bypasses are given in Appendix 8-5.
161
4 ianing o f Rohtzk Jind Section from krn 307.000'to'km 347.800 of NH-71 and connecting link fro
347.800 of ~ ~ : ro7 krn 1 9.400 of NH-7LA ro be executed as BOT (To10 project on DBFO Pattern under N
Phase I l l in the State of H q a n a Page'B - 2
, !
National Hjghways Authonty of lndia Schedules
4.8 Underpasses
Vehicular and Cattle underpass shall be provided at location given at Appendix 8-8.
4.11 Culverts
4 Lanlng o f Rohrak lmd Sect~onfrom kk 307.000 to km 347 800 of NH.71 and connecting llnk t?
347 800 ofNH-71 to krn 9 400 of NH-71A to be executed as BOT (Toll) project on DBFO Pattern under
Phase Ill ~nrhe State of Haryana Page 6 - 3
Nalional Hiqhways Aufhorilv of Indie Schedules
Appendix B-I
TYPICAL CROSS-SECTIONS
Proposed Chainage
C/S : . Length (~rn'.)
1 4 301
/
1 1 11
2.
1
I
307.000
308.450
315.800
(
I
, ,
'
308.450
309.200
315.800
316.550
1
I
Type - 2
-
Type 4
Type - 2
Type - 4
,
I
I
' .
1.450
0.750
6..60?
0.750
1
.
'
I I I I
13 329.050 329.850 -
Type 4 0.800
4 Laning of Rohtak Jind Section born krn 307000 to krn 347.800 of NH-71 and connecting link fro
347.800 of NH-7 1 to km 9.400 of NH-7 l A to be executed as BOT (Toll) project
Phase 111 in the State of Haryana' Page 6 - 4
'
National Hi~hwaysAuthority of India Schedule$
-
Ty'pe 3 New Construction
'1 6 4
4 Laning of Rohtak 1 i n d ' ~ e c t i o nfrom krn 307:000 to km 347.800 of NH-71 and connecting link fi
347.800 of NH-71 to km 9.400 of NH-7 IA to be executed as BOT (Toll) . . ~. r o.i e c on
t DBFO Pattenn u n d e ~
Phase 111 in the State of Haryana Psge 8 5 - y v
National Hiqhwavs Authoritv of lndia Schedules
Appendix 6.2
Plan B Profile L.
.
i .
.
.
F
4 LaningofRohtak Jind Section from km 307 000 to krn 347.800 ofNH.71 and connecting link from km 347.800 ofNH- I
I
71 to km 9.400 ofNH-71A to bc executed as BOT (Toll) projccl on DBFO Pattern under NHDP Phase I l l in the State of
Haryana Page 6- 6
1
'
"
A
,
National H;~hwavsAuthoritv of India Schedules
'i
Appendix 8-3
-7 DETAILS OF SERVICE ROADS
Proposed Chainage
SI. ~ e & h of service Road Width Side-
No. (in Km) (m)
From To
1 308+450 309+200 0.750 7+00 Both Side
, -! The aggregate length of Service Road on both side of project highway Is 18.710 krn.
--.
?
ofRohtbc
4 Lan~ng Jlnd Sect~onfrom km 307 000 to am 347 SO0 ofNH-71 and connecllng link from km 347.800 ofNH- !
71 to km 9.400 ofNH-71A to he executed as DOT (Toll) prolect on DBFO Panern under NHDP Phase Ill in [he Stare of I
Haryana Page B- 7 I
- I
National H;uhwavs Aulhorilv of India Schedules
Appendix 8-4
Sr.
Existing Chainage (km) Design Chalnage (km) Proposed ROW (m)
No. .
From To From To
-.
4 Laning o f Rohtak Jind Section horn krn 307.000 to k n 347.800 ofNH-7 I and conneciing link from km 347.800 of N H -
7 1 to krn 9.400 ofNH-71A to be executed as DOT (Toll) project on DBFO Palten under NHDP Phase I11 in the Staic of
Haryana Page B- 8
Nalional Hiqhways Authorily oilndia Schedules
Appendix 5-5
Bypass wide
3 Rohtak 347t800 348t775 9+400 of 355+600 6,825
bypass NH-71A
Total Bypass length , 15.300
Appendix B-6
A) AT GRADE MAJOR INTERSECTIONS
Start of Julana
1 320t600 . ' 320+600 NH-71. Junction
. . Bypass
End of Julana
2 329700 326+375 NH-71 Junctlan
Bypass
Start of ~ a k h a n
3 3344070 334+?51) NH-71 Junction MaIra Rypass'
Start of Rohtak
5 347+800 . 348+775 NH-71 . . Y Junction
Bypass.. .
4 Laning of Rohrak Jind Sec~ionfrom k m 307.000 to km 347.800 ofNH.71 and connecting link from km 347.800 of NH-
71 to km 9.400 of NH-71.4 to be executed as BOT (Toll) project on DBFO Pauern under NHDP Phase 111 in the State of
Hzryana Page 8-10
r-
National Hicrhways Aolhorilv of India ~chedies
I l9
I
/ 3261430
I
1 327i045
I
1 l efl
I
4:O
I
I Village Road
327t400 328+010 Rtght 7.O V~llageRoad
Haryana
Page El- 1 I
!
Nalional Hiohways Authorily of India ~chedules
4 Laning o f Rohtak Jind Section from km 307.000 to km 347.800 of N H - i l and connecting link from km 3 4
71 to km 9.400 o f NH-71A to be executed as ROT (Toll]I project on DBFO Partern under NHDP Phase 111 in the S~a\eo f
Haryana
Nalional Hiqhwavs Authorily of lndia Schedules
Appendix 8-7
C
-s 0
Y
0
z .-0
U
m
i
0" m
_I
- 0 u
B w
4 Laning ofRohtak Jind Section from krn 307.000 to krn 347.800 ofNH-71 and connecting link from km 347 800 of NH- I
7 ) to km 9.400 ofNH-7lA to be execured as BOT(Tol1) project on DBFO Pattern under NHDP Phase I l l in the State of
Haryana Page 0- 13
Nationel Hiohwsys Aulhoritv of India Schedules
Appendfx B-8
DETAILS OF PROPOSED VEHICULAR UNDERPASSES
- d) cn
P)
Cn m 2 ' C
P)
a
u;s
(II '
.m
C .-'I7 .-m
d
i; .c
%a $ 2 ~ 31-"
UI
0 f
-
Z uI
u E .;; :a 5 P
,-
c
,-01 2 :2 ?St., e a
6
U) U) a m 0 a .2
0-
X
0 CI
c4
W a Y
-C .
New RCC 'Ox
ixl0.5m 24 m 5.5m
1 308t818 308+823 Road to Village Kinana '
Lane Structures
2X2 RCC Box 5.5m
2 316+180 316+180 Road to Jaijaiwanli Village 1x10.5m 24 rn
Structures
New2X2 RCCBox 5.5m
3 322+495 Road to Julana 1x10.5in 24m
Julana Lane Structures
Bypass New RCCBox
4 324t300 Road to Gohana Village 24 m
1~10.51~1 5.5m
Lane Strudures
5 328t750 329+440
New 2 X
Road to ~ a i h w a l a . ~ ~ l l a ~ e
~"':'RccBox IxlO.jm
24 5.5m
. . .-
Lane str,,dures
6
Lakhan Maira 336+123 ,
New 2 X
R ~ ~ ~ ~ S H - I G A
* RCC Box 1x10.5m 24 m 5.5m
--..Bypass
. . -. <.
. . 1 ane
New
St~clurec
RCC so'
7 338t045 339t000 Road to indorgarh Village 1~10.5m' 24; 5.5m
Lane Strucl,,res
-- ... .-.
New RCC 'Ox
8 343+100 344+050 Road to ~ h a ~ w a t i pVillage
ur 1x10.5m 24 m 5.5m
Lane Structures
... ,
DETAlLSOF PROPOSEDCATTLEUNDERPASSES
-
I
V1
0)
m
.-mC
m
m rn
m
.-cm
0
0
c d)
P :- 0 *
r
d L zz 3 2 :5 5 .CE
G J .D
a
X
E: 8 T;J =c
f
0 0
g "-52
.-.
.
C
C)
C
.-a 2 :P Em$ P
5
Lz ao ec 9;;
2
.9
W
X
0
0
--
c
k * 0
0 U) ae < :
Julana
324t746 Road lo Surakhera V~llage
New 2 X 2 RCC Box
~ypass lx7m 24 m 4.5m
Lane Structures
Road to Nas~rpurand Ne
353t285 lx7m 24m 45m
Charnaaa villepr
.
4 Laning of Rohtak llnd Secrlcn ficm k n 307 000 l o krn 34
7 1 to km 9 400 of NI1.7 lA ro be executed as DOT (Toll) pi
-
Q National Highways Authority of India - Schedules
Appendix 6-9
'7
0)
al m P, C
ol m
m .- - 8 P m e 0 2
=V.- .-m u h
$5 =a
0
C
O 9e.s g:
to
0
5o .c e mae eJ % g
-z g u o gO tZ ;~ ~" o 7,g
Tb
WI:
m .,-
,-
X
W
.-Em
V)
6
0
P
X
I-
a'z:u E'Z
a 2 C
V)
E m
0 =
am
ea 5
5:
~5
5
g
I
-:
N
m
313.766 313+766 Rlght
:: 1 S1abiOpen
Foundat~on
3 r 95 2 4 rn
Reconstruction
of ex~sllng
Bridge to New 4
lane
Reconstruction
7
2X2 RCC Slab 8 Open of existlng
2 5
m
332t473 333+163 Right Lane Foundallon
l2 24
Br~dgeto New 4
lane
-. -
3
-
7
4 )
ROhtak
Bypass
350+490 - Lane
RCC 'lab
Foundat~on
'
Open
3 x 12.5 24 rn
Construction of
New 4 lane
Bridge
z
2
x
'ON 3901t18 I
I
LlOlE I
I I
'ON'S r- N m
National Hiohways Aulhorify of India Schedules
Appendix 5-70
IMPROVEMENT PROPOSALS FOR CULVERT$
A. Reconstruction I Widening and New Construction Scheme for Slab Culverts
-. ' ,
:
4 Laning of Rohrak Jind Section 6.om km 307.000 to km 347.8
71 ro km 9.400 of NH-71A to be executed as BOT (Toll) proje f
Haryana
National Hiqhwavs Authority of India Schedules '
d., . a '
--
\ ' ,'
\.y
. .. ' r - ,
,
8
'ad
'--
* -'
. .
.. e
d-:- . .
'.Li
.--.
(-. ,:' -
t2,
) -\
.!F-:..;
a.
,.,-.&
L+,,i'
j-
- .
d
9 .-,
'-..- I. . .
;. -3.
A'; )
,
-,
%
-..
1 x 1200 Reconslruclion
53 347+623 348+547 Pipe Culvert HP Culvert 1 x 800 Proposed 32.0m
4 .
54 349+450 HP Culvert 1 x 1200 New Conslruction 32.0m
55 351+129 HP Culvert 1 X 1200 New Conslruction 32.0m
- ' 0
SCHEDULE - C
(See Clause 2.1)
PROJECT FACILITIES
I Project Facilities
The Concessionaire shall construct the Project Facilit~esin accordance with the provisions of
this Agreement. Such Project Facilities shall include:
(a) Toll Plaza; : 1 No.
(b) Roadside Furniture: : Yes
Street Lighting; : Yes
Pedestrian Facilities; : Yes
Landscaping and Tree Piantation, . Yes
Rest Areas; : 1 No.
Truck Lay-byes; : No.
Bus-bays and Bus Shelters; : Yes
Cattle Crossings; i:YP
Development of site for wayside amenities; : Yes
Traffic Aid Posts; : Yes
Medical Aid Posts; . Yes
Vehicle Rescue Posts; and :Yes'
Telecom System. : Yes
4 Laning ofRohtak Jind Section from km 307.000 to km 347.800 ofNH-71 and connecting link From km 347.800 of
NH-71 to km 9.400 of NH-71A to be executed as BOT (Toll) project on DBFO Pattern under NHDP Phase Ill in thc !
State of Haryana Page C - 1
I
P..:
W .
-
Annex I -
(Schedule-C)
Project Facilities for Four-Laning
1. Project ~ a c i l i t i e s
The Concessionaire shall construct the project Facilities described in this Annex-l to
form part of the Four-Lane Project Highway. The Project Facilities shall include:
@
4 Laning of Rohtak lind Section from km 307.000 to km 347.800 ofNH.71 and connecting link from km 347.800 o
NH-71 to krn 9.400 ofNH-71A to be executed as BOT (Toll) projec~on DBFO Pattern under NI-IDP Phase I l [ in the
, State of Haryana Page C - 2
I '-,
National Hiohways AvfhoriV of India Schedules
The provision of road side furniture shall be finalized as per NHAl Manual of
Specifications and in consultation with the Independent Consultant.
(ii) Metal Beam Crash Barrier, Concrete Crash Barriers, Separators (M. S.
Railings)
d) Pedestrian Facilities
Pedestrian facilities in the form of guard rails, footpath, lighting, etc shall be provided
as per required.
4
Landscaping of Highway shall be.done on, but
.. 102
Laning of Rohtak Jind Secrion from km 307.000 to lan 347.800 ofNH-
@
(&
g link from km 347.800 of
NH-71 to km 9.400 ofNH-71A to be executed as BOT (Toll) projecl on DBFO Pattern under NHDP Phase 111 in the
'
* .o't' .
i
'
j
I
Median
The concessionaire shall provide minimum of 44 nos. of Bus Bays along the project
highway and the Incations are given in Appendix C-1. The design of Bus Bays should
be aesthetically pleased with surrounding. The locations of these bus bays shal! be
finalized by the concessionaire in consultation w ~ t hthe IC.
g) Others
C
The following facilities shall be provided as per Concession Agreement .
1) Highway Lighting
The truck laybyes and 50 m length (minimum) of the Project Highway on its
either side shall be illuminated at night to provide a minimum illumination of
' 4DLux.
2) Highway Patro!
3) Ambulances
4) Cranes
Note: In case of any discrepancy in number or location of any of the project facility
mentioned in this Annex I, the Independent ~ngineershall finalize the number1location of
these facilities as per site requirement.
,-
.q ~ \ g hi..
3
183
4 Laning of Rohtak Jind Section From krn 307.060 to km 347.800 of NH-
#
# @#:,:
NH-71to krn 9.400 ofNH-71A to be executed as BOT (Toll) project on DBFO Pattern under NHDP Phase 111 in the
State of Haryana
+
cting link from krn 347.800 of
Page C - 4
:c... . "
National Hiqhways Aulhority of India Schedules
Appendix C - i
LOCATION OF PROPOSED BUS BAYS
------ -- --
St. Left Right
No' Existing Chainage Proposed Chainage
Existing Chainage Proposed Chainage
- - .
1 307+450 307+450 307+600 307+600
2 308+450 308+350 309+200 309+350
3 310t650 31 0+650 310+850 310+850
4 312+100 312*100 312+300 312+300
5 313+6CO 313+600 313+600 313+60C
6 315+700 315+700 316+750 316+750
7 317t450 31 7+450 317+650 317+650
8 320+350 320t350 320+500 320+500
9 325+760 326+435 325+760 326+435
10 328+100 328+790 328+370 328+060
11 330+020 330+720 330+270 330+970
12 330+950 331+640 331+090 331 +775
13 334+000 334+685 334+050 334+735 .
14 336+600 337+570 336+600 337+570
15 337+550 338+515 338+550 339+575
- -
.., .....L -
4
..
Laning of Rohtak Jind Section from km 307.000 to km 347.800 ofNH-71 and connecting link From km 347.800 of
NH-71 ro km 9.400 of NH-71A to be execuLed as BOT (Toll) project on DBFO Panem under NHDP Phase 111 in h e
Stare of Haryana Page C - 5
Nationil Hiqhwavs ~"fhorifyof India Schedules
SCHEDULE - D
SPECIJ?ICATIONSAND STANDARDS
1 Four-Laning
The Concessionaire shall comply with the Specifications and Standards set forth in Annex-I of
this Schedule-D for constructioll of the Four Lane Project Highway.
p i -
-.
. ,
,I'
\."
.
'
. -
":. -.
- .
.,..
..,
- _
-.\
.. 185 ..
.-
. 9
4 Laning of Rohtak Jind Section from km 307.000 to km 347.800 of NH-71 and connecting link from km
NH-7 I to krn 9.400 of NH-71A 10be executed as BOT (Toll) projecL on DBFO Panern under NHDP Phase Ill in the
State of Haryana Page D - 1 ....
..... .
-
National Hiahwavs Aufhorilv of India Schedules
Annex - I
(Schedzrle-D)
Notwithstanding anything to the contrary contained in the aforesaid Manual, the following
Specifications and Standards shall apply 'to the Four Lane Project Highway, and for purposes of
this Agreement, the aforesaid Manual shall be deemed to be amende&to the extent set.forth
below:
I I I I I I
1 1 1 I ( Clause Reference I
Location Item ~ e s c r i ~ t i oofnDeviation
No.
Para of 4 lane Manual
Nil
I-
.?
-?
.?
- , .
4 Laning of Rohtak Jind Section from km 307.000 to km 347.800 ofNH-71 and connecting link from km 347.800 of
NH-71 10 km 9.400 ofNH-7iA to be executed as BOT (Toll) project on DBFO Pattern under NHDP Phase 111 in the
Page D - 2 1
-~
-
\
State of Haryana
!
.-
!
1
. '
i MANUAL. OF
j '
I
/
;
. . SPECIFICATIONS & STANDARDS
. ... . FORFOUR LANING . .
i ..
. O F HIGHWAYS THROUGH'
, f
..I1::;;::::* ..
.
.
I.. . . . .
, .' . . . . . . .
. .
.. . . .
I: '.:., : .
~
. .
.. . . .
..
. :. . . . . .. , . . .
I .:.
. . . . Published by
i . :'.
; INDIAN ROADS CONGRESS
..
1. ' '.. , .:
. .
1': . ' .
. .
Sector 6, R.K.'Puram,,
New Delhi-110022
i'
i
.. .. .
. .
,2009
. .
.-
. .
I
; >, jr?acking and Postage chargss ex!!a)
....
. ,
. . . . .
.
.. .
.
lE.7.:.
;. . . . . . .
. ,
.
;.
. .
. .
. . . . . ..:%:I. -
..... . .
IRC:SP:84-2009
. . .. ' . .
. . .
.....
'
. . . '.. .
' I . .
.
. .
. .. . :.. . . . . .
: ?'
. . .
. .
. ...%..
. . .
... :'. . . '
. . . ....
. .. .
'
:. . . . .'.. '1 .
i
. , .. . . .. . . . .
.. . . .. . ... . . .. ..
. . . .
. -
:. .
. .
. .
...: .. . . . . . ,
. . . . . . . . . .. . . . , :
. _ . . . . . . .
!. . . . . .. . .. . . . . . . . .
..
. . ..: .
. .
.. . , . I
4.
: . ?. General
. .
.. .
; ... . . .
,. 3 Intersections and Grade Separators .
I:.;.'. -
,
I"' , ,..
..
' 4. . Embankment and Cut Sections
. . . .
: ..
A?-,
, 6 ,Highway Drainage . ' 55
7 Design of Slructures 63
":i 1: . .:.. ,
8 , ater rials 81
. . ~raffic
control DeviceslRbad ~ a f e t i ~ e v i c e s j ~ Side
o a dFurniture. , . '89
. ,
. .
, ' 10 . Toll Plazas
. . I . '
.i , 11 ~ a n d s c a ~and
i n ~~ i e Plantation
e .. . :. ' ,
, , . .
. . 12 Project Facilities.
. .
. .
. .
Appendix :2
i
1. . I ~ ~ ~ ; ~ ~ : ~ ~ - ~
PERSOMHEL.O~THE.GEWERAL SPECIFICATIONS
AND STANDARDS COMMIT'TEE (GSS)
(I
0,lh-June, 200'3)
. -
1 :'.'
I ...
.
. ..,. (Member-Secretary) . ; Shipping, Road Transportand Highways, . .
.
~ r i New Delhi 210001, -
'. ~ r $ n s ~BhaGan, -
.. , .
. '.
~. ? . . ,. . ., ~ i n i t i e r s :.. .
. .
4. Shri R.D. Ram .~ngi~e~i;in-~hief-cum-Addl. Comm. -cum-$1.
secretary, Rural Construclion Deptt., . .
.. ' . . . - . - . .
. .
6.
, . .
Shri H.s; Chahal 1 -.,':.. Vice chancellor; Deenbandhu Chotturam
Universi!~of Science &Technology,
. .
i!: . .
b , . ~uithal,Sonipat
. i!
. :7. prof. S.S. chakrab&ily ' Managing ~irector,Consulting Engp Sewices (1)
1 . . . . . Itd., 57,'~ehruPlace, New Delhi ;110 019
PV~.
[ ,
1 9: Shri P. K. Oatta
. .
' ~ x & t i v i Director. Consulting Engg. Sepices (I)
. ,Pvt. Ltd.., 57,,Nehru Place, 5th . Floor
. .
, . , . ,
I
i . . . . New'~.elhi I10
. 016 -
j . .
1i 10. . ~ h o d a ~ k a r ,:'.
s ~ & A N. ' chief Engineer, Ministry of Shipping. Road .
1 : . . . Transport'& Highways, Transporl Bhavan, . '., .
i
' ,.
11. Shri 0. P. ~ u p t a DG (RD) &AS, MOST.(Reld.)
i
1i '
I
1
I ...
!
- .
-
i
!
i . ..
.12. Shri Vishl,\/as Jaiil Managing Director, Cons1.1ltingEngineersGroup
iI LtlJ., E-I2, Moji Colony,'~\~lal\/iya
hlagar, ,laipur
.. .
1 .13. Shii A. C. Bortlr~lci c h i d Engineer (N. H.VJorks?,Assam. Cbsndmari,
1. -Guwahati 731 013
1 . '
~ h rc~.'G.
1 . .
l4. i blarathe"
,
Chief Engineer, Nasik Public Works Region,
Trimbak Roatl, Nasik - 422 002
I. .
!'
I.. I Shri Pitlahi Roy Managing Director, Lea Associates (SA) Pvt. LIC.
I . ' , Choudhu~f 8-li~27,.bdohyan Co-op. lndi~strialEstate,
1.. .
fvlathurd Roacl New Delhi. 110 044
i< s'
.
i
i-
'1 6. Shri A. 0. I\larain : DG (RU)&AS,F/IOST(Retd.), B-'186, Sector-26,
I
I
-'
. . Noida.- 203 30.1 ? .
! '
.: 'NebvDelhi--110075 . .
, ,
. .
. ! . ,
20. Shri K. 8. Rajoria
. : EncjinCkr-in-Chief, Delhi PWD (~etd:),;~-25, ..
I . .
. . . . :
26. Shri K. B Lal Singhal E-in-C Havana PWD (Retd.), House No. 684,
Sector 16, Panchkula - 134 109 (Halyana)
11 . .
- 27. ' Dr.&I. G. Tarnhankar Diri-ctor - ~ r a i j eScientist (SERC;-5) (3etd.j 8
1.. Former Errlaritws$r,isniis? (CSIR),8H-1/44..
'-
'
.. .. . . . . .
. .
~ d :
..Fl,d ~;201,\lasundra !!,allay ~ b a f r n e n tGI-1.3,
~
1''. . .
Sector VI, \/asundra, Dis!t. ~hazia'barl-19 .
. .
. .
1:.'.,;' . 29. . M4. V. C. Verma . Executive Qirecior-mil ark stir^$ Grienlal S:ructn!.al
/;
. . .
.
. Engis. ~."t.Ltcl., 2.1,Cornrcercial C~~icplex,
* : ;.
1
I1 :. 1
'{ ~ a l c h klarg,
a Oiploinatic End.
New Delhi - 1'10 02'1
. . , .. ... . . . . ..
. _ . .
. 30. Shri Ghasi Ram pe,puty Director General (03S). HQ DGBR,. . . . .
I.I - 1:.
... .
31. . P. ~hrivastavi
C O ~0. Director (Design), E.-in-CBranch. Kastimir H r ~ u s e ,
'P. 0.AHQ, Rajaji Marg. New Delhi - 110 011 -
I.
1. . . 32.. ShriKrishna Kumar : .'Chief Engineer, UP PWD. 96. M. G. Mary.
I,::.-'..
I '
.
1:.
I
: ..:'.
Limited. Leela Business Park. 3rd Floor,
Opp. Hotel ~eela,~ndheri ~urla~oad,
Andheri (East) ~ u r n b a-i4.00 059
. II - 371 Co1.A. K. Bhasin Senior Joinl President, MISJaypee Ganga .
I. - ,
i lnfristrucl~~re
Corpn. Ltd., Seclor-128,
I Noida-201 304
i
I 38. Shri Asholc Kumar
i
i :,
-. '
... h
1 .
Ex-OHicio Members
'I. Shri D.E. Deshpande . (Presidenl, IRC).Secrelary to the Govt, of
klaharashtra,Sachivalaya, ivlumbai
....
2. The Director General I\/linislryofShipping, RoadTransporlS. Highways,
.(Road Development) 8. ' .Transport Bhawan; New Delhi 110 00!
Special Secretarjt to the
.Govt. of India
3. Shri R. P, lndoria ' '~ecietatyGeneial, Indian ~ o a d ~s o n ~ r e.s.s. , .
Kama Koti ivlarg, Seclor-6, R. K. Puram, .
.
1. Shri.N. V. ?vierani
. .
j
. .
... Former ~ r i n c i ~secretary
ai to Govt:of Mahara'shtra ' . . .. . .
' . . .,PWD, Flat No. 1344, ~uildincj~-47,~darsh'~agar,
. . . .. , Worli., Mumbai :;400025 .. . .
_-~ . .. . .
. .
. '
.
I
. . .. . .
__ .. '
.___ .
..
. . . . .
. 193
viii
..-,
'-?
. .
"?
"'9
I
i
i
I
.. IRC:SPjM2009
Ex-Officio Memb,ers
. . . . .
??
1. Shri D.B:.Deshpancle (President, 1RC)Secretary lo the GO\/~.
of
....
"'7 'Maha!ashtra,Sachivalaya, Eil\lrnbai . . .
i . . . .... . . . , . _ . . . : .- .
t 2. of$hippifig,
?he Wrector ~ e n e r ~ l . ~ i ? i & Road rianiporl & Higl~ways,
, : ~ e- w11.0.001
I ' ' ' .
--?
I (Road Development)& ~ r , a ? s ~ q ~ ,. ~ h. a i v a. n.Delhi ( _
-
. . .. . .
, :
' GO^. of lndia . . . ... .. . . .
' ,,
F~
, . . 3. : . . R:P. Indona
Shri : secretary ~ i n a i e llidian
, ~ o s d ~r b n ~ t s s s .
, '
. . .
:'- .
1 , .
t
d. .
ShriN. V. Meranj ':.- . . ' Former.Principal.Secretaryto ~ o v t of. Maharashtra
PWD, Flat No. 1344, ~uilding~-47, Adarsh Nagar.
! ..
CA 1 Worli. ~ u m b a- i400 025 ,
- .
. .
!?* i
. .
, . .
,...
.n
'
i
:
. .
. .
;
: i .. . . . . . . . .
.
. .
i .
.
. . . .: .
!,--
. . . .
. . . ..'
b
. . .
, r-.
.
,
.. . >.: . . .I . . . . . . .. . .
.
. I
! *.
. . .
. . . . .....: ...
? . . . .
_ . . / .
. .. . .
. .
4 : . ' _ .... ,
. .
. .
4 t .
. . . . .:
.
. .
-.
\ II .. . .., . <
. .
.: . .
. . . . . . . . . .
I
4 I - . .
. .
.?' if . . .
. .
.
I
. . . .
~ I
I . .
i . .
-
n-. I
!I
, I
^
I
I
?>
-
?, !
,
:v , . . 144.
, . .
v~ii
1'
-1
7
, .
i The Manual of Speciflcation~~ Standards for Four laning of )-lighWays through Public ,
: .
Private qarlricrship has been irnder the consid~rationof Project Preparation, Contract
1'
!. F~lanagement& Qualityty.Assurancecommittee (GI) since ~anua$20.09.~i~e'draftwas
1 . ... . . ..
disci~ssedby G-1' Committee in a number ofmeetihgs.
1. . .
i, .
I
- '
.
.
The Project preparation, contract Management & Qua~it~~ssurarlce ~om&ttee(per-
,, soilnel giver1 below) in its meeting held on 25.05.2009 has finalized the ~ V ~ Iand
J ~rec-
I
. ; cmrnencled its si~bn~ission to the General Specifications 8 Standards Committee(GSS) '
i. .
s
.
.
. for their consideration. . '
. .
. .
Puri, S.K. - Convenor
Datta. P.K.' - ' ~c-convenor
Ramana, K. Venkata -. .. Member:Secretary .
. .
.. Members. . .
Ex-Officio ~ernb'er
DG(RD), MOSRT~H
' (D.B. Deshpan'de)
. ,~ecreiary~eneral,IRC
f (R.P. Indoria) . ..
I
I
The draft Manual was approved by lhe General Specifications and Standards
I Committee(GSS)in its meeting held on 10.06.2009 and the Executive Committee in ils
the Secretary General, IRC to place thesame
n1ee:ing held on 16.06 2009 and'auli.~i!i~zed
. .
before Council. Thedocument was approyed by [he IRC Council in its 1881h meeling I.~eld
on 19.06.2009and !he Secretary General ~\/as'authorized to incorporate the comments
I
! offered by the Council inembers and [hereafterhave it printed.
j
I
!
. . .
195
i
*
SECTION 1
.i . ,
* ...
a GENERAL ..
j ....
$ ...
a:... ,
. .
1r::.-: :
5':;.
. ::. .I.I This Manual is applicable for Four Laning of Highways through Public Private
'., . . ' ,Partnership (PPP) mode. The scope of the work shall be as defined, in the Concession
..
. .. . .. Agreement. This Manual shall be read harmoniously with the intent of the Concession
. '.Agreement.
1.2 The project Highway and the project facilities shall conform to the requiremerits ..
. .of design-aridsuecifications set out in this
Manual, which arc the minimum prcscribed.
T h e project repqrl and other information provided by theAuthorilyl shall be used.by the
Concession.direonly for its own reference and fol carrying out further investigations. The
Concessionaire shall be solely respondible for undertaking all the.necessary surveys,
:.investigations arid detailed designs in accordante with good industry practice and due
diligence, and:shall have no cl.aim against the Authority for any loss, damage, risk, costs,
liabilities or oblj'gations arising out of or in .iel.ation to the project report and other
information provided by tl~eAuthority.. . . I .
.
! . . . -draw up a ~ c ~ a l i t y ~ s s u r a Manual
n c e (QAM).covering'tbeQuality System (QS), Quality
! . , '
Assurance Plan (QAP! and documentation for all aspects of the bridge and road works .:
. !
. .
and send three copies each to the Independent Engineer (IE) for review. The class of
quality assurance shall not be less than.Q-3.(Refer'lRC:SP;47 and lRC:SP:57).
!!; '
i
i
.1:4 The codes, Standards and Pchnicai .Specificationsapplicable for the design
and construction of project components are: .. .
i . .
; . .
i) . Indian Roads Congress (IRC) Codes and Standards; ( ~ e f e r
1I
"
' ' Appendix-2).
j ii) Specificationsfor Road and Bridge Wol ks issued by the Ministry of Road
I
Transport & Highways(M0RTH) hereinafter referred 10 as MORTH or
Ministry's Specifications.
I
iii) kn3 other standards referred to in the Manual and any supplement issued
with the bid document.
- ..;consistent w.ith the provisigns of the Concession Agreement and thls Manual. The role of
., 1he.IndependegtEngineer shall be as definedin the concession Agreement. I
....
.. 1.8 ln case of any conflict or incoosistencjl in the provisions of the applicable IKC
. . Codes, Standards . or.MORTH
. Specifications, the provisions contained in this Manual
shall apply,.. ..
.'.'
. . . . .
..: 1.9 In the absence of any specific provision on any,particular issue in the aforesaid
.. ' - i
Codes or specifications read in conjunctiorl with the Specifications and Standards
contained in this Manual, the following standards shall apply in order of priority.
. . .
i) 0ure'au of lndian Standards (01s) ,'
. . . . .
.
I/)
.
~rneiicao~bsociationof State ~ i ~ h w and
a b Transportalion Officials . .
. . .,. , . ':(AASHTO) Standards or Arnerican.Society for Testing and Materials.
. . . . . .. .. (ASTM) Standards or Euro Codes 'or. Blitish
. Standards or Australian : . .
.. .
.. .. .. Standards
.
p iii) Any other specificationslstandards by the ~oncessionaii-eand
. .
.
. . .r reviewed by the I.
'
I '.
.All items of building works shall conform to Central Public Works Department .
1,'l.O
.(CPWD) Specifications for Class Ibuilding works2and stapdards given in the National
..BuildingCode (NBC)); For the Project Highway through the state entity, to the extent ;
> .
:s'pecific provisionsfor building works are made in IRClMORTHSpecifications;the'same
... shall prevail:o&r the CPWDINBC provlsions Forthis purpose, building works shal! be .
: .deemed .to include .ioll.plaza compiek, road furniture, roadside facilities, landscape "
. .1.12 . . Alternative.Stacdards a n d ~ ~ e c i f i c a t i o n s . .
. . ... , . . . .
:The 'requirements stated in the Manual are the minimum. The Concessionaire will,
however, be. free to adopt international practices,
and standards to bring In innovatio
. .
. .
. - better or comparable with the standards prescribed In the Manual. The specifications and '
,
., :
with.authentic standards and specifications mentioned in Para 1.9. Such a proposalshall
be submitted by the Concessionaire to the lndependent Engineer. In case, the
. . Independent Engineer is of the opinion that the' proposal submitted by the pi ":, . : ' . ?
I;.
Concessionaire is not in conformity with any of the international standards or codesithen
'. . . he will record .his reasons and. convey the same to the Concessionaire for compliance.
. . A record ,shall be kept by the Independent Engineer, of the non-compliance by the
. .. Concessionaire of the minimum Specifications and Standards specified in the Manual.
Adverse consequences, if any, arising from any such nor)-compliance,shall be treated as.
- "Concessionaire Default" and shall be dealf in accordance with the piovisions of the'
,
::. ConcessionAgreeinent.
',
. .. . .
. .
.
. .
'
..
I
.
s i ~ a i in the existing highway are in the form of limitation
' ., .~ h e , ~ h ~cb~lstraints
/ . ,
.. or'l'iglit-of wov, un-regulated access, inadequate service roads and,
.
'
1,
4 .;
_:-
to the traffic shall be duly c0nsidered.h design and construction to make
the Project ~ i ~ h wdurable,
ay
1:.. . .
. d) ' Mitigating disruptive effectsof construction
. .
... . .:.
,
. , . The plann,ing, dgrign~nd.m~struction of thshi~hwayshallbe such that . .
.,..... b, ''.theconstructionof Project ~ i ~ h 8oes w a not
~ have.adverseImpact on the
. . ... . .. .
.::...; . . . . . .. . , .:envlromrnent and does notdlsrypt the lives and business activities of the
.-.
. :. . people livlng close to the ?rojq$t ,~icjhway.'.
.'<
9.
. . . . . . . .....
1. . , I . sbety during ~ ~ n s t r u e t ~i c tdnOperatian &@lntenance
I
!. -
.! 1.14.1 .T?e Concessionaireshall devel&. implement and administer a surveillance
and safety pjpgrame forproviding a safe environment on'or about the Project Highway,
e .
.I.
'
:.
. . . . .
' 114.2 'Befiret a r k g up any construictiotj 6rmdinte"ance operation/work, the
' ----
, , ~.Concessionaire'skallprepare a Traffic Manage.hent Plan for each work zone and furnish
1i - '
. ' .
.it to the independent ~ n ~ i n efor e rcommentsduly incorporating the following:
I... ::. .
. , . :
,. I) . '. Desi,gbats a site ~ a f e t ~ ~ e i i h e a by
d eadgalified Safety Officer.
.. . . .
. . ' ....
II) . .,' ~rafilcsafety devices
. . as p e i l ~ ~ : ~ with
~ : 5the5 following specifications:
.... . .
.&, . . a) Signages of retro-ref!ective sheet of high'intensity grade.
. . . .
. . . . . . . . . '
Delineators in the form of cones/drums (300to 500 mm dia and
' : b) '-
. i' .
.
.. .
1000 m m high) made.of plasticlrubber having retro reflective red
. . .
. . . and white bond, at a spacing.of maximum 5 m along with a reflective'
' .
. .
tape(red and whiteband) to be tied in between the gaps of cones1
. . . . . . .
drums. A bulblflasherusing solar energy is to be placed on the top of '
. , ' ) Barricades using iron shad (plain) with adequate iron railingifrarne
. .
, . painted with retro-reflective paint in alternate black and white (or
.. . yellow and black) stripes. Warning lights at 5.0 m spacing shall be
. mounted on the barricades and kept lit in the dark hours and night.
. .
iii) he arrangement of traffjCduring construction and maintenance shall
. . . . . -..conform to-the requirements.of Clause 112 of MORl-H Specifications.
. . ' Ensure availability of 7 rn paved carriageway for traffic without potholes
' or other defects. At.locations.where available.carriagewayis less than .
' 7 rn, provide round the clock traffic signals '
%. ..."
... . . .
P
\~".
. ..
, .
. .
-
_,.I
'. ,-
6.' .;.
I.I .: . . h* ' . -
1,;
'
1.'
, .:.
1 :..
.......
. ..
-
.
. p.
%
:
'
.r
i: : .
.. :: : .
i
c: ,-
-
f , '
1,. . .
?1 . . . .. . . . . . .
iv) Sprinkling of water for dust control at work zones, haul roads and plant/ A , j
.
,
. . &-):;
rc;i.'
- -
ix) . . training/awaikness~~rog'iammes.
Safety
1;;
;,...,.'...::,
;.
. ..
;.
X)
,
. .
l'..
4.q-
. . . . .. . .
1 ,::;,. '. :
"
xi) A penalty scherne'f~rvioiations iii bf ad&ate traffic control
.:.\!. . . . . . .
devices: and proper'traffic m@agement should 'be proposed by the k.
, i . . . . .,
'.,
. ~rct5&ionaife. lncaseddefault; the amount of penalty shali. he
. paid-by e-
1I;.:. .::
I' -
. . the Concqscionaire tathe Authqrity, '.
ensati at ion
. . . .
.. *;*
LLl
xii) A scheme including insurance cover.-for thkd partyfar
workers, road useis and r o d side residents in case of d6athlinjuryldamage
to ihe vehicl.elproperiy resulting.from accidents on the Project Highway,
-
c..
. .
.&.*
h..
. .
@ -
.
. . 4;@ .A
I.i, :
I . .
.
. -'..1.14.3 The Concessionaire shall a1s.o be responsibleforensurihg compliance of all
'
:. labour laws and regulations i'ncluding those relating to the welfare.of.workers engaged
'
.:both directlyand indirectlyon the Project Highway, besides their occupationalsafety and
\+
,-w
L.
'
"
-
I .
! health.
.. . . '
f!
@
., .>
: . .
i . . . .
...
....
1::
j
.
.
.
IRC:SP:84-2009
r
i
I . 1.7 Utilities
I:.. , ..
The details of the new utilities which are tobe constructed or provided for along or
.
1.
.
... .
.:
. ; acros's the Project Highway shall be as spicified in Schedule 'B' of the Concession
Agreement. . ..
j . .
..,.
...
.... . ,' .1.18 Review and comments by the independent Englneer
...,_....
#;
. .. . .. . .
. . . .
s b ihe Coneesslonaire is requheij to send any diawings or documents tothe
...:;:,i. . ~ n t a ~ wh&
.;.-:.:. . i :lnQpendent Engineer for review and comments, and in the event such comments are
,. . : . received by the Concessionaire, it shall duly consider such comments in accordance with
.. ..
. .... . the Concession Agreement and Good Industry Practice ior taking appropiiate action
. .. . ... .
,. . ' .thereon, The correspondence between.'the Concessionaire and the independent
. .
... .
:.. . .. . 'Engineer shall be deemed valid only if a copy thereof is endorsed to and received by
.: .'the~uthorit~.
.
1 : .; :. , , ;' . . . . .
. .
,120 This Manual is for 4-laning of the Project ~ i ~ h w aHowever,
y. in some stretches,
. . . . . a s indicated in Schedule '%'of the Concesslon Agreement, 6-lane divided carriageway
, .' shall be provided as part of 4-ianing of the Project Highway (Refer para 2.18). This shall
not be construed as 6-laning of the Project Highway.
1-:::..... .
.
I.: $
::
.
. . .
." ,
. . . . I)
. ..
. This-sectionlays d'own.thestandards for geome\ric design and general
features for.fout-lanedivided cacriageway.
. . .
.
&:
. ,.
': . 'iii) heg geometric design oft he project Highway shall conform tothe standards
. . . ..
set out in.this sectibn as a miqirnurn. %
I
. . . . .. .. .
.
. .
. . . . .
. .
.., .. . . .
.. .. .. . . . .. .
, . iv) As far as
possible, uniformity of design standards shalibe maintained
throughout the length of the Project Highw.ay, In case of any change,.it
.... shall be effected in a gradual manner. . .
... . .
.. . ... .. .. . . . . . . . .
....
. ...
.. . . . .v) Where the existin$ road geometries ate deficient with respect to minimum
requirements and its improvements tothe prescribed standards is not
. .
. . . . :..feasible.due to any constraint in acquisition af'additiqnal .land, such
',
.... .Agreement. ..
I:...
1': .
.
.
.
.
vi) Existing horizontal wrves, which are found diflcient in radius. laya~t,
transition lengthsoa.super-eley$ion.shallbe corrected to the standards
s~ecified
. . In this.sec'tion. .
. . .
'
I'
I -
.
classification (Terrain is classifie
a~bnment).
I
!
I
i
:
I
:.. .
._
Table 2.1 Design Speed
.. i.-
' In general, Ihe nlin$ deslgn-ipsd shill be adop!?d foi the V ~ ~ ~ O
2.23 gaometric
US . . .
I . . design fe,btures of the road. Mlnimurn de'sjgn Speed shall be @opted anly where slte '
. ;. .. .
: .
.
.I1 . .
i '
.
,
conilitiqs are restrictive and adequate land width'is not available. Such stretches shall
.. .be asindicaled in $chedulc?'B'.of the
..
. .
Concesiion ~greement.:: . . . .
. . .
'
-. . . ...
.
. . 'l"he,minimum Right of.Way for non-urban and urba? areas should bpas prescribed'in
. -i I ~ ~ : 7 3 ' aIRC:86
nd respectively. . . .. . .; . .
. I : . . . .
. . 2.4 . - . ' . .l a n e Width. of Carriageway ' .. . . .. . .. . . .
i . . . , . . . . . . . . . . .. . . . .
. .
.
.
.
! ..
1 1. b. e. .. 3.. ; .
The standerdlane width of t h e 6 r o j e ~ t ~ ~ i ~ h w a ~ ~ h ~ :
. i
i . . . .
. . .
\ . 2.5 Median . . . . _. . . . .. . .
, '
... , :
.. . . . -.
. i !
1
. .
. '
'. ! . ,2.5.1 The medisn.ahall be either ralssil or depressed. The'width of rnedlan is the
I
distance between Inside edges of carriageway, The type 6f rnedlan shall depend upon
i
i . the availability of Right of Way. The minimumwidth of median,.subjecttoavailabllity of
I
! Right of Way, for various be as in Table 2.2.
. . locations~shall
.
. .
. . . .
. .
% . .
I . able 2.2'Width of ~.e d .i a n. . "
.
. .-
. . . . . .
: The type and widths of median in various itiitches of .project ~ i ~ h wsheit
& be as
.. indicated in Schedule 'B'. . .
, . . . . . . ... . .. . . ... ... .. . . ..
.2.5.2 he median shall have ju'it.gblydesigned drainage systPksothatwater does
,
-
..? . . . . . '. . . . .. ! . ....
...... . . .
. . .
.: ' . .
' , 2 5 4 , As far aspossible; the median-shallbeof unifoimwldth in'a particular sec6an
,
'. '
..-'. . . ,. .provided. . . (.
. .
.:2.5.5 . . In the.ca$e'-6f &.depiessed median, metal .beam type (double beam) crash
~ . . . . . . . .barriers
. shall be provided,at eit'her side of the median. Suitable shrubs as.per Section 11 .
..:. ':-. of this Manualshall beprovlded. . . . . . .
. . .
. .
.I.: : . . : . . . . . . . . . .
!
: . . : 2.5.6
Suitable antiglare measures such as metallplastic screens shall be provided . ,. .
, . . : in flat stretches or on horizontalcurves to reduce headlight glare from opposite traffic. The
I. .
1 : . .total height of screen including the height of the barrier shall be 1.5 m.
1 . ,
.
;.:
.
. .
.... :2.6 .
Shoulders '. - .
. , . .. . . . -
. . .
. . . . . . . . . .
. . . .
.1 .. ..2.6.1 .Width 0'fshouldei.s . . . .
. . . .
.
I ,;. ;
'
.
The shoulder width onthe outer.side (left side of cairiageway) shall be as given in
Tables2.3. and 2.4.
, . . . . ..
.
. .
I
I
'Type of Section
--.----.
' . ,
. 1
Mountainous. . and
.
.
--I---.
Steep Terrain (Hllly
,
. . Area).
Earthenshoulder
. . . .
.
;
. .
...
, ,I
Built up area and 1.5 (on hill side) ~ a i s e dFootpath along with
approache's to . 2.0 (on valley side) :. provision-ofadequate drainage
grade separated , along and.across thefoo!path a .
. .
structures/bridges .
C
!
I Thc type of shoulder shall be as below:
i) in the,buill-up section and approaches,to the grade separated structures, .
- .
the sKoultlel. sl?allbe paved in full width. " ,
i
ii) ~arthenshoulder6 ghall'bc covered.viith 150 mm thiqli layc~.o I yrar~ular
. .
''
. .. . . . . .
. . . . . . .
2.7'. ~ o a d w Width
a~ .
!
. .
2.7.1 he width of roadway shall dependupon the width of carriageway, shoulders
and the median: . . . .. .
. . . .
. .
. . 73-100 m 0.9 m . .
iiji-3bo m. 0.6 m
.. : . . .. .. . . . . . .
2;8 . Crossfall , ',. . .' . . ,.:..
. . ...
. . . . .:. ... . .
2.8.1 The crossfall on straight section$b f road carriageway, paved shouldkrs and, . '
paved portion of.medianshall be 2.5 percentfqr bituminous surface and. 2.0 percent for , .
. . .. . .2.8.2, . The crossfgll shall be unjdiregional.for eitherside carriageway sloping towards ...
. . . . the shoulder in straight leaches and toward? the'lbwkr bdge-onhorizontal curves. The , .,
I,
... . .. camber on the existing h a d shall be modified to uriidirectiorialcrossfall.
. .
. .
. . . . . .
'
. ' 2.8.3
, The ixosifail for $ranular.shouldern on .straighipollions shall be i t leasi . . . .
.
. .. 0.5 percent'steeper than t h slope.of the pavement and p,aved shoulder subject to a . . .
'
~
: . . . . '.minimum of 3.0 percent. On super elevated sections, the eaithen portion of the shoulder .....
'
. . ' on thaouter side ofthe curve would be provided withreverse crossfall of 0.5percentso . :, . . :
. . .that the earth does not drain on. the sarriageway.and the storm water: drains out with . . ,,
.:
. ,' minimum travel path. . . .
. .
. .
. .....:.2.9 .. . . ~. .e. o. r .n e. t r i.c~. ..e . s.. l .~ .n ,.'. . .. . . .
, . .
. . .
. .12.9.1 ~eornetric.desl~n shall conform to IRC:73, exceptas oiherwlse indicated In ',. .
.:. ..
'
3 ..
. . '.The
. . . radius of horizontal curves for various terrain conditions shall not be less'than the
I ..-. .. . .desirable minimum values given in Table 2.6 except for Sections as indicaied in
1 ;. '. , . : Schedule 'B'. For such Sections, the radius shall not be less than absolute minimum.
. .
..
i "
safe stopping'sight distance and desiiable rtiinimurn sight diStance for divlded
carriageway for various design speeds are given in Table 2,7. The desirable values of
.sib.ht distance shall be adopted unless -there.hre site constraints. A minlmurn of safe .
:1 : .
' '
., . . .
:stopping sight.diitanoe shall be available . . .
. . throughout:. . . . .
. !. . - . . . . .. . . , . . . . , .. ' . . . .
1.::*, ., . . . ';.;.
,..:: Table 2.7 Safe Sight Distance -
. . . . .
.- .
. .
. . .
180
.
.
' :.
I
I
.
- ' . . . . . . . .
! . . , 40 .'. , ' 4-5 . ' : 80 ', ' '
1 ' ........
: .. . . . .
,.I. ,. 2.9.6 , Vertical alignment. . . ..>.
i'.. . . . . . . . . . .
''
'
..: : .2.9..6.1 The venical alignment should provide for a smooth longitudinalprofile. Grade .
1.' : ' .
'
; .I.&anges shall not be too frequent as to cause kinks and visual discontinuities.in the :. . ,
'
1 . .. . .:2.9.6.2 ~ i a d i e n t s ' ' . ; .
..
1
r:.
. . .
\i
. . . .y ~ h e
ruing and limiting gradients are given in Table 2.8. .. . ;?, .
Table 2.8Gradients
. .
'. 2.9..6.3 ~ o n sweepin$~erti&l
g curves shall be provided a1 all grade changes. ~ h e s e . '
i. :. shall be.de~igned.
. . .as square parabolas. .. ..
I
i 2.9.6.4 Design of vertical curdes and its cool shall be in
: accordance with IRC:SP 23.
1 ..:. IRC:SP:84-2009
[:. ,: '
.Wherever cross road is proposed to be taken below the Pioject Highway. .minimum
1 clearances at underpasses shall be asfollows:
. . . . . . . .
, .. ' Vertical clearanci.' at. underpassesshall not be leis than the values give" below:
. .
1I .
.. :2 m,these can. be used in dry seasoi, for pedestrian and cattle crossing by providing
neceasaty1oorihg:~hiswiIl'nOt be'a substitute for n o r r n a l ~ e u i r e r nof
.r . . . cattle crossings asper para 2;13;3.
' .. . :'> . . . .
t pedestrian and,
, : . .
1 .
I
:
. . . .. .. . . . .
'
. .
. . . .. .. .. . . . . ... :
,
; r
2.11 . . . Lateral and Veffical clearance at overpasses ..
. . .
'
. wherever any stiucture is providedwer the project ~ i ~ h wthe
a ~minimum
; clearance, at.
. ' . overpasses'shall be as follows: :
. . . . .. .
.' 2.11 .I Lateral clearance
.
''
.
..
- Full roadway width shall be car~ledthfough the overpass structure unless otherwise
. '
specified in Schedule 'B'. Provisionshall also be made for future widening of the Project
. ' Highway'tg.6-lane with saalce roads. The abutments and plers shall be provided with . ,
i
1
2.12 Access Control
i
i
! 2.12.1 Access
..
. ,4cce& fo the Project Highway shall be pa~iallycontrolled.In genera!, a&esf lo \he project
..
:
1:-
.
.... . Highvday st~allbe provided at tho following localions:
i:..,. .. , . ,
. . . .... . . .
. : . .
.. . . 2.12.2;2 :,For thk stretchapwhere total length of a bridge is less than 60 m.and the
'
...,.. . ., service road isrequired 10 be provided on both.sides of the stream; then the service road,
.:: ' . ,shall continue across the stream,and suitably designed 2-lane bridge structure'shall be
. . .
.. : . . :. .- .provided. In. cases involving bridges of.60 rn length .or more, s.eparate.bridge sfructures
.'.:: . . .. .:.. '... niay not be provided and service road shall be merged with ttie Project Highwayat 50 m . .
... .. . distance before the bridge structure, unless otherwise specified in Schedule:'B1 of the
. . . .. .. :Concession
.
" Agreement. .. .
.I...... .... . 2.12.2.3 Wherever service roads.are provided, provisionshall be made for proper'entry
",::
1. . . - ., :and exit ramps between the main highway and the service roads, duly keeping in vlew
,, '
/: .'.:. . .'future widening of main hlghbvay to six-lanes. The layout shall be as per Fig. 2.1A
: . . 'to2.11-1. "
2.13.1 The type, location, length, number and the openings required and approach
gradients for various grade separated structures shall be as specified in Schedule 'B' of
I the Concession Agreement. The approach gradient to the grade separated structure shall
not be steeper than 2.5 percent (1 in 40).
t
I
2.1 3.2 Vehicular underpassloverpass
II '
I
1
1.
1... . " .'
. . .
.
. .
, .
I ' -
I...
1 :.
.
1.. :
I
1 ":.
I ' ..
i . .
i.
1.
I .
.
I
1 .
1.: .
!.
- .!i.i'. . '
..
\ .:
t
1. .:
1' ;
I . ..
Y
1
I
P ' . . ,-
'k.>,
1.Sm WIDE SEPARATOR
. .
.. . . . . . . . . . . .
. ..
.
.
. . . . .. . ._ . ..
. . . .. .
FIG. -2.1GSuggestive Layout of service Road h t i o u i h g at intersection . . . .
. . . . . . . . -. . . .. . .. . . _ re
I..- ""."'-'.." . ..-,, ' ,,...
I . '
.. ,
i .!.
.t
.shallalso be provided across other categoriesof roads-carryingan average daily traffic
I .. of more than 5000 ~ a s s e i g ecar
:. r ~ n i t(PCUS)
i on thedate of inviting bids.The s l r u c t ~ r i
:_ may be either an underpass oranoverpass depending upon the nature of terrain, vertical ,
1. , .
.
profile of road, availability of adequate right of way, etc. Unless otherwise specified in
schedule '0'of the"~oncession ~y reement, the~rojecl~ i ~ h w shall
a y be carried at the.
- .existing level in rural areas and the cross road would be either an underpass or overpass
.. and the. entire cost.involved in-lowering or raising the existing cross road.would be
1.. . ,
. . .' included as part of the cost of the Project .Highway. .However,. in urban areas, the cross
mad shall b e carried atthe existing level. .unless:o!h:erwise,specified in Schedule 'B' of
1 .. - . . the. ~oncesrlqn
. . . . .
~greernen1:~ecisionwhelher thecros road orme ~rojeqtHighway will
. . be carried at the existing level willbe taken at the time of preparing the feasibilily report
' . and would be based on considerations of drainage, land acquisition, provision of ramps
,
. .. . . .
1:
,
. . . . . .for the grade separatedfacility, height of embankment agd projed economy etc.
. . . . . <
, , . .,.
': These rhallbe provided& spedfied in Schedule '8' ofthe Cancession Agreement.
i .:
. . -. -
. . 1)'. ; An ~nder~asslover~ass'for crossing of cattleand pedestrians may not ,
11 . .. , .
... .
.
.'* . . .
.
: , V) n &hall?lso be
~ e d e s t r i i "nder~asrl6verp~ss within a distance
of.200 mfrom a school orhospital or factorylindustrial area.
,:'.
' . ' . . .
1i"
, .
' 2.13.4 Road over ridges ( R O B S Y R Ounder
' ~ ~ ~ r i d ~(RUBS)
es shall be provided as'
per Section-7 of this Manual;
!
1 2.14 Median Openings
1
1 2,14.1 Median.0pening.sshall not be spaced closer than 2 km. Additional controlled
! '
.'openibgs shall also be provided for igspectioh, and diversionof traffic during repair a"d
i .
:,rehabilitation.. .. . . . .
I ...
' ,
2.14.2 . Medlan'opening shall not be provided in front of the s,ervice road entry. The .
'
. distance betwoen the service road entry and the median qpching shall be at least equalto .
the sum of length of accelerationlane, d deceleration length. Location
. of opening shall be so decided as to istance shall however be
. . .
not less than 150 m.
3 .
220
I ...:: ..---.TT-z,..... :.. . . . . . .. .. . .. .. .. . .. .. . .. .. .. . . . . . . . . . . . . . . . . . . . . : . .-,,!. b........l.r;r-.3,ri..7n\~
. . . . . . .
. . . . . ....
? j
.
..
..
.
..
:
!7ijr@
. -+
.,,......1:
1
2.14.3 All median openings shall be providedwith additional 3.5 m wide shelter lane
j by the side of median in both directions for waiting of vehicles to take U turn. Wherever
t
required, horizontal geometricsof the road shall besuitably adjusted.
i.I . . .
2.14.4 Length of median ~peningshallnqtbe less tha.n.20 m.
iI
' '
:
i,:;:: -
,
'
. . 2.15 Fencing
. .
'
. . .
1/-.. . : . Fencing shall be provided between the service road'and tho Project Highwayto prevent
I .. . . .
1 the pedestrians, local vehiclesand animals entering the highway. ~he.fencingshallbe ....
,
:., . either of rnetal.double beamcrash barrier or pedestrian guar'dtail'given In Para 9.10 of
.
i ..
2.16 Typical Crb'ss-sections . .. . . . . . .. ..
., . . . . .. . . '
. :
. .
;...
1' .... ~ y ~ i ccrass-sectioni
il of Project Highway are gjvve$ InFlg. 2.210 2.10 for variou& .
Ii ' .: .* lpcations as below: . . .
. . . .
..
. .
i
!
Fig.2.2 shows typical c~osssection Type-A1 for 4-lane divided highway in op.en . . .
1 .
.
.
.
. country'wilh iaolat6d built-up area in ~lai~lrolling
. . . . terraid;
. without seriice. roads
.
and with " .
j. :. : . . . depressed median
j' .
.
'
I ... , . Fig. 2.3 gives tipicat cross section 'fype:~2for 4.-lane divlded highway in ope" , '
,
Fig.2.4 slio\vs typical cross section Qpe-A3 for 4-lane d~videdhighway in opin
1 . . . country with isolated built-up area in plainirollingterrain, without service roads andwith
. . . ' . . .
i .
. .
raised median.
. .
[ ' ,
. .. . Fig. 2.5 gives typical cross section Type44 for 4-lane divided hlghway in. open
country i n plainlrolling terrain with service roads on both sides and with raised median '.
. .
I, -.
Fig. 2.6 shows typical cross section.Type-B for 4+lane divided highway in built-up
..section in plain and rolling terrain with. service roads on both sides' and with. raised
! median
. .
! ::
1. F'ig. 2,7 shows typical crosS section Type-Cl for4-lane divided highway on different
i .
\ ; '. contours in open country with isolated built-up area in mountainous terrain. . : :. ' ' -
t . .
I Fig. 2.8 shows typical cross section Type-C2 for 4-lanedivided highway ondifferent
i .
! ';. contours in built up section in mountainous terrain:
20
,
<
!pB.
................ ........ -. :a
' . . . .:-)-.
. I
,..' . :,!
_ h
-6
., .
:.
b..
ar
. .. .
,. '
-
n
@ .. ; -) _
-
I . . ,
b
,
fl . ,
G.
/
- .,:
--
-
\*p: .-
,.:.
I . ' . '
. i .: : F. @
:!.,y: . , L.: ..
I-!,
..
.'.' , . , .p-
:q;
-
be-
! . '
I
!: .
;.:;
;.
,
'
' . .
@- L.
. i.I..:,.
!
,'
.
,
:.
.
.. .
4- "2.
-
: . ;.
p-
6 ' ' .
.. -
; '. .
-i'. . . . --..
-2
: - .
i.' .
.
+>
,&3
.e
&..
i ... . - . .
. .-@ -
i. .
,a(zzzz,
7
'V
. ..,
I
:
.
1
... . .
:i-@
\d
I
i .
I; ' . .
5
! '
. . .
I
t
el-
\^.?.
-
:"
' I
-
'".. ' . . ~
r
e.. .
.....,.*
r
": ... . .
r
<,i
.........
yS
-
...:.f .
,*. .
-
'.,.i
i ..
'! :
: IRC:SP:84-2009
I... .
! ,..
Fig. 2.1 0 shows typical cross section Type-C4 for 4-lane divided,highwayat same level
1, ;..
.. in built up section in mountainous terrain.
I ' . .
1: . ' . 2 : Capacity of Four-lane highway
.
/
I .
: . .
.....
. .
...
1 .,..-. ;.
,
For the purpose of augmentation of the.facilitiesand upgradationof the Project Highway,
thedesign service volume for different terrain c9nditions a level of seylce shall be as
.specified in Table 2.9;
# ' .:,
. .
, .,
1.. .. '
' I
I. . . . . . . .
1 Table 2.9.Desfgn Service Volume for Foui-lane Highways in PCUsper day .
i, ..... . . . . .
. .
. . . . .
!. ... . . .
., . Terrain . ; Desig~lSe.wice ~ o l u m ein ?Cbs per day
(. . ...
.
1': '
.
evil of ~ e -$. c e 'Bt Level of Service 'C'
I,;. '.: - Plain and R~lling..~
.:...
,.
: 20,0($
....
. .
. . 40,0$ :, .. 6'0,000 . . ..
:.
1I . . :. .
.
~
M;ountainous and Steep
.
'3o;ooo
..
.
" ,. . -
.
.
:
*I.
-,
I! i.
:.-y
i.. iI :
c- i
. ,
."'
. .
Qh
I,'.',
I
I . . .
, .
.
.
.
. . , . . . . . . .
. .. . . . .
. .
. .. . , .
. . : .. .. .. . ... ... . . .. . * : .. . .. .. .. . .. . .. .. . . .
.
. . ....
. .
..
.
. .. . .
.
'
.
.. . . .... .
..
1:. ..
i ... . . .
1.. ,.: ,
. ' .
. . .' . .: . ._ .. . . . .. .. . . . , .
..
. .. . . . . . . . . .
. . .
, , . . .. . .... . .. .. .. . . ......
_
.
. . .... . . . . . . . . . . . . .-
. ..I . :
. . _ .: ;._. . '-
.
. , ..
. .. , . . . . .
. ' .' . . .
. ..:
. . . . ... . . . . . . . ( . : .. . . . . . .. i:. . . . . . . . . . . . , . . . . .
. .. .. . .. . . . .
. . . . . . . . :s.ECT10~~",,:3,
1.. ..... ",:. . . . . . .. .
:
. . :... . . . . . . .. . . .. . . . .. . .. . . . .. . ..
. .
.
INTERSECTIONS AND GRADE SEPARATORS
'
\ ' :. . ' ..
1. :.;.;
.
.
.
. ' . ..
. . .. ., .
' . .
., . .:.. .
. .. . . .
. . . .
. . . . .. . .. . .
. . . . ... . . . .. .: . .
...
, .. ,
. . . . .
.. . . .
. .
. . :.
!i ...
' . . . . . .
. . . . ...
. ..
.
. .
!.. ..
I.
. . . . ' . ,. .. . . .., . ._.. _. . . . .
I
.
. .
. . . . . .. . . .. . .
. .
. . . .. . . . . . . . . . . . .
. .. .. . . . . . . . . . . . . . . . . .. . . . . . . . . .
. . . 3.1 .Introduction
. . .
:.. . . . 3.1.I The intersections to be provided shall,beone of the followiqg types: . .
1.. .
I. '
. . .
i) At-grade Intersections
1
1:':
3 :' .
.. ii) Grade separated Intersectionswithoutramps
1,1 . ; .:
.'
.
. iii) interchanges. . . .
. .
.. :... .:. '.'fhe types a'nd toca.tions d.lntersections, ~ n t e r c h a n ~ eand
.:. s Grade-separated
. . .
:.... Intersections witho1.1tramps shall be based on requirements stipulated in IRC:SP:41,
. . . . .lRC:5, lRC:92, MOR'TH. Specifications for Road and Bridge works.. These shall.be
. . . . ' . specified in Schedule '~'.of'the'~oncession ~~reement.
. . .- ...
. .. : 3.1.2
_ . The existing intersections, which are deficient with respect to the minimum
.' . requirements ~ h 3 lbe
' l irnpr~vedto tho ircbbriticd:$f~hdards.Additional land, if any,
. , . :required for improving the existing intersections shall be provided by the~uthority.
.
1
,
, ' ' 3.2.1 The type ofi&rgictions to be abopted shall bedecidedon the basis of
!. . .' parameters4ike numberof-intersecting legs, traffic volume/spe~id,type of traffic control
.
i ' . . etc. Properly designed intersictions shall be provided at all at-grade crossings. Rotary
I : shall not be provided. . . ? .
i .
. .3.2.2 i) 'The intersections shall be designed baing regard to. flow, speed,
composition, distribution and future growth of traffic. Design shall be
specific to each site with due regard to physical conditions of the site p?....
b.. J
.._ ....._........ . . . . . . . . . .
~~>\,,V>S.,.\,?.? ; 7 . r :
&:;-::.:. .:. : . . . . . . . . . . . . . . . . . / . ' . ......>....
. .
,, . . . . . ... .. ... .. .. .. . <.A..'k.,
.YIP.
,I.::.. ,. iii) The channelising islands shall start from the edge of the paved shoulder.
. .
This principle shall also apply in case of MORTH - Type Designs for
f :' . lntersectionson National t-lighways.
I
: .. . . .
I
;. ;
'3.2.3 . Cross roads sttalljoin directly on to seivice roads and Ihe entry to and exit Iron?
the qroject Highway shall be through end connectjons as shdwn inWfig. 2.lAtI-i. .
[ :.
i ..
i ' . 3.3 Gyade separated Intersections and interchanges
\I*'.:. .
1 . '.- . ?.#%I .
Grade separated intersections, without ramps, shall be provided at locations
1. .. .
where traffic on cross roads is moderate to heavy. Under this type, two cross roads
'separate.at different grades (as Road Under Bridge or Road Ouer Bridge). The access
. from Project Highway to the cross roads in case of such grade separated intersections
.. . .without ramps, shall be through otherexisting roads1service roads:. :
..
'
. . - . .
. I 3.3;2 An inteichange is justifiid'at locatio"~where trafficon cioss road is heavy and
'
3.3.3 ~ ~ o m e t r i c s t a n d a r dfor
s design.
-.
, .
~~-
. .
.
. ..~ -
i - :.
1 - : '
I
.. The geometric.desQn standards for various gleqents of-grad! separatol.s shaii be as
i ...
given in IRC:92. Gradient for approaches shall nol be steeper than 2.5 percent ( I in 40).
i6
. .
~ l ~ h trequir&nerif
i"~ shall be as her
section 12 of this ~ a n u a l The
. top and underside of . '
. -
the grade separated structures and interchange area at the ground level upto 50 m
.
beyond the point'from where flaring of the main carriageway takes place shall be
I . provided with lighting.
!
I
i
3.4 . .. Detailed Design and Data for Review by the IE
i
1
The ~o'ncessionaireshall submit the details of the ground surveys, .traffic data, traffic
forecast, design and drawings of the inlerseclions and interchanges showing all safety
[
1 fealures to the Independent Engineer for review and comments, if any.
i
i
i .
!
fie
LJ
,-
I .
!.
!...
' .
I
SECTION - A
'.
j ..
1 ';.
1 ;..
EMBANKMENT & CUT SECTIONS
I
. . . . . _ . 4.1.1
'
Tha design and constyctlon of the Load in embankment and in cuttings shall
,
:'*. ' be carried out in ac&ordance .with section 3b0 o f MORTH Specifications and the
. '.
I
-... . . . .- requirements, and standards and specifications given in this Section. This Section also
.... . . . . cdvers spesificatlons fopsub-yrade afid ezrthen shoulders. ' ..
....
* 11
. . . . . . . . . . 4.1.2
.
:Efforts should be made to remove the inherent deficiencies in plan and profile
::..: ; . of the existing road:-Thefinalcentre line of the roadand the road levels shall be fixed duly
. . .
. considering ali therplevant f$ctori iovkring 3trurtural soundnesssafety and f~~ndional
. . . . .
.
. I.!. -:
i .. . .
1.2 . En~ba,rne"t
-;I : . . :.
1
,
4.2.1 The height bf the embankrnerlt shall be measured with respect to the finished
.
.. .. .., . . .:road levels. The f o l l o ~ i Principl~s
~g shall be kept in viewwhilefixing tlie road level: . , ,,
. .
i) No section of the road is overtopped. The finished road level shall be at
.. .
. .. . :.
. .
.. :
least 0.6 m above ground level (excepl in cutting and transition length)... . .
. .
. . ii) . The bottom of.sub-gade is generally 1:O rn above the high flood levell
high water: table. However, in tlie case of existing old roads where i t may . . . .
.'
.
be difficult to fulfill this criteriodwithout needing reconstruction or raising
in substantial length, the criteria may be relaxed depending on site
. . '
conditions, ensuring that the bottom of sub-grade is 0.6 m above High
Flood Level (HFL). The HFL shoald be decided by inteiligsn! inspections;
. . . . . local'obsetiations, enquiries and studying the past records. lf raising of
. . . . : any section(s) of.the existing road is required, the same shall be specified
. . . .in schedule 'B'of the Concession Agreement.
. .
. . . . . . . . . .
. .
0.2.2, Materials and physical' requirements . .
. . .
. 4.'2.2.1 souring of materials forembantnl~ntand s~bgradecon~tr~ruction, as well as
compliance with environmental requirements in respect of excavation ahd borrow areas
under the applicable laws shall be the sole responsi
..,232
. .. . .. . .
... . . . . . . . . . . . . . ,. . . .,,
.
..
.
;
.. ,
..... .<....: .:.:.....a....s?<.
$ :,. ':, . j.'.::.,':s.':,;;<:,
.:
. .
IHC:SP~~~-~OO~
1
1
4:2.2.3 The embankment and subgrade shall be compacted to satisfy the minimum
compaction requirements glven in Clause 305 of MORTH Specifications.
!
j :
'
; ' ;
'I IRC:75 taking into account slope stability, bearing capacity, consolidation, settleinent and
i. safety consideratlons based on geotechnical.and'~investigationdata, Where the
embankment is to be supported on a weak stratum, appropriate remediallground
'
i
j . .. improvement meas,ures shall be taken.
i
; 4.2.3.2 l ~ soil is retnined by suitable
Side slopes shall rlcibe s!eepcr thra 2 ~ :vn!&rs
t
. .
1 soil retaining structures. . .
i. '4.2.3.3 The .side slopes shall be protected against erosion by providing a suitable .
Ii ' vegetative cover, kerkhannel, chute, stonelcement iQncreteblock pitching or any Other
. .
4.3 ~ o a d w a ) i nCutting . .
..
. .
.,
. .
4.4 soif lnvestig'a'tions and Deslgn Report .'
.
>
4.4.1 General . .
i . . he Concessionaire shall carry out necessary soil surveys, and field and laboratory , ,!;.
. . inve'stigations for selecting appropriate borrow pits, identifying and treating problematic
'
j .ground locations, if any, and for finalizing structural featuces and design of the
r
;
!
.
.
'
embankment and cut sections and establishing improved ground properties. Areport on
the soil investigation shall be furnished along with the design. .. ..
. . ..
I '
';
..
4.4.2 Soillnvestigations for embankment
. .
I ,
Soil investigations shall cover the following:
'
42
233
*
. ,..
. . .,-.,.I. /.>.'....?-:LI..,
. :...\57
i
I-: .
. .
lRC:SP:19;In addition ta this, all tests.as per the requirements of MORTH
!:.'
i'.; . Specificationsshall be reported.
' b) In respect. Qf embankments 'with height more. than 6 rn, additional
I.,.f..,
1 ...
' ' .
'
s :. inundation, If any.
'
1 I . -' .: ..
I.
'
. . . ".d)
. ]
. ~ h e i h a i ~ i t e i i s tof
i ~embankment
s foundation including the presence of. ..
I -. . . .
! . . . .. . .. any un:suit&le~weak st~~a;;inaish;/'areas;water
. . . . . logged areas., etc. .
... . .. .
8 ,
. ... . . . .
Soil investigations,and tests shall be carried out in accordance with the requirements
specified in IRC:SP:19 and information regarding depth of water table, seepage flow,
presence of any weak, unstable or problematicstrata.
43 '
. . 234
F
La-
---
c. -
.
)
. . .
. . . '.
. .
. . PAVEMENT
. . DESIGN
. - . . . . . . . . . .
. .: . ' .. ' '
. . .
. . . .. . . . . . .. .. . . .. . . ... : . .
. .
. . . . . . .
. . .. . . . . .
. . ....
. . .
SECTION 5 -
j :.
4 ;. PAVEMENT DESIGN
1I . . . .
1' .: . , "
,?.. .. . .
i , :
> ..
;
. . 5.1 ~eneral
.:1. .
. . . . .
.
..~;~'..'. ;
.
'
'
.
5.1.1. The design and conslruction of new pavement sections, and of strengthening
,. .: . . . . measures (overlay) lor the existing pavement shall be carried out in.iccordaico with the
.c:I:' .
.. ;:.:. .:..:
'.
. , . 'criteria, standards and spe'cificatians.given In this .section; Where .alternative
. . : - specificati~ns01.materials are proposed to bring in innovation in design etc:,provisions
....
1:; .;, ': :... . .of Para
. . .,.......
.
,
1. I 2 of this Manual shall apply.
'
..
...:'. . .. .
'\.
t .
.
. I.-. . .,..,,'.:, .,:.
. . . . ... . . . .. 5.1.2
.' ..t .. . .. >..
... . ..*::..
.
The design of new pavement sections or ttrengthenjng of exiskg pavements
.. , . ..shall taka into accbrlnt allrslev~ntfactorsfbr assurlng reliable pdrformance and shall also
. :I:!...
.. . . . . . . _ . satisfy the specified'minimum performancerequirements:
* . . . . .....:.:. . . . . .
. .~
,. i.: -:. -
I..:.; :.-
:
1 . .:. . . . . . .5.1.3 The Concessionaire shall undertake the necessary soil, material and pave-
: ' . :
!. .. ,: ment investigations and trafficvolume and axle load studies in accordance with the good
I'....
I , ......... industry practice for preparing detailed designs. . : ..
I \ . . ;.. .
I . . .
. .. ; ;.
1,,.,....
,:, ,:
.
5.1.4 The materials, mix.& and c;clnstr~ctionpractieeshall meet the requirements . .
. .. flooding, poor drainage, frost susceptible areas etc. are found to exist, adequate ..
I, ,.-., . measures shall be adopted to deal with such site conditlons. :
is:;:,:',.. ... . .....
.
,
I . .
' 1 . .. ;
I :.'
'
.; . ..5.2 Type of Pavement
.. ' .: . .5.2.1 unless otherwise specified in Schedule 'B', the Concessionalie may adopt
. . . . . . any type (flexiblelrigid) of pavement structure for new construction.
. .
' i
i
I .. .5.2.2 Strengtheningof the'existing flexible pavement will be carried out by providing
[ . .
. appropriate
. bituminous overlay, unless specified otherwise in Schedule 'B' of the
:, . .
;. . . . . . 'Concession Agreement. . . . .
! '.
. .
!
. 5.2.3 The Authority may require provision of cement concrete.pavernen1on the new
'
1 ' : '
I
i . . ' carriageway andlor replacement of existing pavement depending upon specific site
'
! ' .
conditions. Such requirements shall be as specified in Schedule 'B' of the Concession
,
j ..
Agreement. The minimum design, construction, performance and maintenance
1' . . requirements for cement concrete
... pavements will be specified by the Aulhority and
I ' . lRC:SP:84-2W9
I' 1
1
i ' 5.3 Method of Design New Pavements' -
. . . Design of .Flexible,
.
Pavements.
... . .
[,,, 4 rigid pa&rne"t
. . .
j . , '
.. . .
, ,
.
5.3.2
-
M ~ ~of ~design
C I
. .
Rigid pave.rnen1s&ll be designed iti accoidaniei with the inell~bdpiesdrlbed irl IRC:5D
'.. . . . . .
/ 1:;
. . . . .
. . .
. . .
'.) 5.4.1 Flexiblk pavement- design period and strategy - . : ' ,
I... .
i) Flexible pavement shall be designed for a mininlrrm d e ~ i ~ n . ~ e rofi o15
d
I ,
.' .. .
-years or operation period, whichever is more. Stage construction will be.
pernlissible subject to the requirements specified in para (ii) below.
: ..
. . : '
. , ii) . Allernative strategies o r combinationof inilial design, strenglhening and
... lnaintenance can be developed. by the on cession ail-e to provide Ihe.
. .
. . . ; .: specified lev'el of pavement performanceover theoperation period subject
.. ..to satisfyingthe)ollowing m i n i i y i d.esign.requilemenis,
. I
* .. .. .
. . . .
. .. . .
. . ..
' , . a) :.The thitknes; d f sdp-b.as@'iindbase of pave~ent$eclion is designed
. .. .. . . .. .I
. .for.a minimum design period of. 15 year$ or the operation period,
. . . . . ' 'whicheveris more.and the initial bilyminousiurfacing for a minimum
:desigiperiod o j 10 years. . . . . .- . .
1 . . .
j .
I . i) Rigid pavement shall be des~gnedfor a minimum 'design period of.30 '
i iil) The DLC will rneel the rn~nirnctnicemenl and compressive slrength
requirement as prescribed in IRC:SP: end beyondthePQC . .
i
48
j
'
. . . 238
1..
, s,,.;~>'.*P
iv) Below DLC layer, a properly designed drainage layer Granular Sub Base
(GSB) of 150 mni thickness shall be provided throughout the road width.
It shall be designed to obtain a drainage coefficient of not less than20 m
: :
per day.
. . .. . .
. .
. .
5.4.3 pavement performance requirements ,
. .
i) he pavement structure shall be cbpable of giving the specified
performance over the entire.operation period. ..
ii) The new pavelnen't surface shall savsly Ihe following standards, .'
a) : Surface ~ i n i s h. . - . -As per reqcirements of
Clauses 902 and 903 of
i -.- . .MORTH Specifications .
1
. . .
.
: . I ., ,
,
. . b) Ro~lghnessin e ~ c lpne
h . . . . Not more than 2000.~~imlk!nfor ..
I I
' each lane in a km Iq?'gth
...
i . . .. ...
I . . . . . . . ..c) Rullirlg . '
. . . . ..
. . . .
:.
.
.
1I . . .. . 3 m Straight
... . by . . ' Edge. . .. .. . ... ,.
1 . . d) . Cracking.or'ariyotherdistress . Nil . ,
.:
'
. .
-; j . ' ' ' .
iii)
" . .~ u r i n btiie'ipi;atibngperiod, the.paVeme'nt iurfick rough"ess or any
1
a .
. .
.. . .
.
. '
structural dr ftinctional distiess shall'not exceed the values specified in
.Schedule-K of the Concession Agreement. Generally the. pavemenl
[ con$tion in termsof roughness, cracking and rutting should not deteriorate
I . .
i . . to the maximum values specified in Schedble-K for rectification, earlier :
. . than 5 years from the original.levell from the year of rectification. Any
! . . . treatment in the form of renewallovetlay.carriedout,orrequiredto restorel '. .'
j . . correcll improve the riding quality or any distress shall beof such thickness
. . and specifica!ion that will restore the riding quality to roughness not
. . . .
I exceeding 2000 mm/km. ..
. .
iv) ~ L ~ rthe i noperation
~ and rr,aintcnance period, the,pauementstrenglh shall
be evaluated periodically through defleclion measurements (Refer to para
5.8 (ii) of this Section) and the stretches exhibiting any structural deueiency
....
shall be rectified.
. .
5.5 Design Traffic . . . . . .
.
55.1 The design traffic shall be estimated.interms of cuniulative number of standard
axles (8160 kg) to be carried by the pavement during the design period.
!
,-
5.5.2 . Estimate of the initial daily average traffic flow shall be -based on at least
-
...
7 days, 24 hr classified trafi ic counts,.lRC:9 may beused as guidance for carrying out the - ..
. .
traffic census. . .
:
5.5.3 Any. likely change in lraffic due to proposed four laning oi the facility andlor
.:. - . future development
. . plans, land use; shall .be duly considered in estimating the design
.......
. . traffic. . . . .
. . ..
j >, . .
-. Traffic growth' rate shall be.established tor each category Of commercial
.'5.5.4
I vehicles to be considered for design of pavement. For traffic projestionqhe procedure.
- I . . . outlined in IRC:108 may-befollowed..The Concessionaire shall adopt a realisticva!ue of
I'.. .
- j .; .the rate of traffic growth, provided.that annual rate of growth of commercial vehicles shall :
I .,;., n o t be adopledless than 5 percent.
. . .
.
..
. . .
. . ,
!. . .
I '
5.5.5
:>
. . .
The design traffic in case o; service road.shal1be five million standard axles.
' . .
1
) .
. 5.6, syb.$sda
..
. . '
. .
. 1 .': . ..: . . . . . . .
.....
. The subgrid; h h e t h e i in cut or fill, $h.&l meet thc' ~equir8ments'~stipulat8din Clause 305 . , . ;. . :. .
of MORTH SpecificaBons,The thickness.of subgrade shall not be less than 500 mm
I.; .
; : . .. 5.7 . Pavement Components and .
. Materials
. . . , , ..
... i ) ,The k v a m i n t con.st~uclionrniteiiib for nub-base, h e and biluminoua
. , ,
. . .
i.'
I . , ', i) .~. u g h i i & sineach lane for fulllength~hall
, be measured bi-annually using
i appropriate .approved
. method and equipment.
ii) Thestrudumlevaluati~nof the
shall bemade by taking deflection ,
1 .
5.9.1 Before strengthening treatment is prescribed, a detailed pavement condiiion '
!I s u ~ e and
y evaluation shall be carried out in accordance with IRC:81 to determine
i The extent of distress and nature
I' i) -
structure, and
I:
/ . 50
!
i 240
I
I
ii) Whether any special treatments e.g. provision for remedying reflection
cracking, pavement internal drainage, sub-grade improvement1
reconstruction, or rectificationof any other deficienciesaig warranted.
1.
, :. '
5.9.2 .Necessary corrective measures to.treat the identified deficiency shall be talton
I. :.. :.,..: . alongwith strengthening
. . of.the pavement.
1':'
J ....
5.9.3
.. .. .
In itrekhei where {he paverne"t Is damagedldeterlor+ed to such i n extent .
that the use of Benkelman Beam method may not result in a realisb assessment of the .'
, strengthening treatm'ent, pavement shall be designed as new pavempnt.
I: .. . ,
. . . .
'
)
. : 1,..
':. .. . 5.0.4 Where 8n'exi31irly pavement Is bullt over an untreated expansivelb!ackcottor: .
,. - . soil subgrade, its improvementlstrengtheningshall be treated separately. Such stretches
'
',
.
! 1'. . - shall require re.construction.withprovision of necessary measures such as replacemenu
I . .
. ' treatment of eipansive subgrade, drainage, etc. as per the prescribed specificatjons and . ..
'
. . course)
. over ..thegranular
. layer shall cqnform to IRC:37. .. . .
. .-
: : . . 5.9.6 Design of Overlay'
. . . . .
i! . . . . '
I . ' i) The tI.,ickness of the bltumlnous overlay shall be determined on the basis
,
iii)- 'The design traffic will be estimated as per the proceliure described for
. new pavement.
'
51
" 241
... . ... . .
qs$..:
*,,.,..,..: ;...,; . ,
c . , ..
.. . . . . . .
... .,
b
r;-*
I . '
iv) The thickness of bituminous overlayfor pavement strengthening shall not
] :. be less, than 50 mrn bituminous'concrete, after attending to the
- 1. , - ' .
requirementsof profile corrective course. .
. f'
,(- . I
, . Ii . 5.9.7 B i t u m i n o ~ ~mix
s for overlay
i) The specifications for the bituminous mixes for the overlay shall be as
specified for biturninoils surfacing for new pavement sections.
,
...
-~ i
1 .
.
i:..,
:
;
,
..
.i )
.
.
Design@!recycled mix where provided shall conform to the requirements
of.~lause51 7 of MOR'TH Specifications.
. . . .
n 1 '
:/
. .I . 5.9.8 Pavement
. . performarice iequikmentsiand evalyation
?
, .
(' . ; '
: .
. .i) The strengthened pavementshal~satisfy. fhe.minimum standard and
. . nialntenan.ce.r.equir~mentipecifigd foi,.6&w pavement sections in this
.. .. - . Manual and ~bhedule&.bfthe Cqjckssilon~greernent.
.. ..
.: . .
.'. .. . .
. . ii) Th6 performance measurement and evbl"6tion will be done as given in ..
. . this Manual. . . . .
...
. . .. . . .. .. . .
. . . . .5..10 ' ': . PavedShoulders
, . . '.
. .
Paved shoulders shall be provided ;as:specified in t h i s ~ a n u a l
.. .. . . i)
. . . . ..
ii) . . If the ihickness of the existing p d e d shoulder, if any,, is less than the:
.
.
.
. . ..
:.
..
.
.
. . . '
thickneis of the existing ~dvement,the paved shoulders shall b e :
reconstructedto the:pavementthickness,
. . in the adjoining carriageway. ,.
..
. . 5.11 ' Construction, Workmanship and
. ,. . . I .
. .Qyality
. .
ofworks ' .
I . .
1 ~olwithstandinithe minimum design, specifications and slandards specified in the
'1 preceding paras for n e w and strengthening of existing pavements, if the
Ii pavement stiows premature distress in the form of cracking, rulting, patching, loss of ,:
! camber or ariy other structural or functional distress, necessary remedial measures by. ' .
I strengtheninglresurfacinglrecycling shall be nforrning to the rninimum
j . l'equirements prescribed in Schedule 'K' Agreement. In case of
I repetition of the distress, reconstruction sh
!
1 . ...
1'I . ,
- .
! . . . ... .....
<
i
. Er~gineeralongwith Data collection; Data Evaluation and Design Reports. : .
i
1
6 5.1 3.2 Data collection
I
z . Following details shall be included in the report:
. .
i ) . Soil investigation data fornew paven~en'tsasperl'able 13.2 of IRC:SP:19. ' .. '
. . .,
. ..
,.. .
I "iii) pavement deflection Data measured by ~enkelrnanBeam as perthe
1 . . ... . procedure detailedin I R C : ~Pavement
~. deflection data shall be recorded
in the prescribed Proforma videTable 3 of IRC:81. The deflection data '
I
shall be accompanied with the characieristics of the cub-gmdo 30il
I . .
oovering typeof sub-grade soil, field rnoislure content (at the time of
. . .
deflectiori survey), average annual rainfall in the area, and pavement
temperature at the tirne of deflection survey.'
!
53
; .'
243
1:.. ... ,
,..,. -.. .. .. . .. ,, , .. .
,@q;.y,i;.::. . ..; .. . . .
*,.,% ,..... . . .
. .
.
. .. . . . .
. . .
, .
I.
I ii) Pavement deficiencies, drainage and constraints.
ii . ',
iii). Any other relevant details.
11 ..
' 5.13.4 . Detailed design
1:;.
1 ..
The Report shall contain the detailed design of the preferred solution along with any
specid treatment proposed for adoption: Any daparlurgs from the specifications stated
herein shall be supported wlth authentic standards and specifications
. and accepted:
. 1: .practice. . , .
. .
' '
. . . . . .
. . . .
1 :. .
.
. ..
.
.
.
. .
.' , .
. .
. .
. .
HIGHWAY DRAINAGE
p .
r? O ' .
1.
c-' I .
1
.
.
:---, ; ' .
-1RC:SP:84-2009
i
;
<,.-' 1;
.:- 1 ..... SECTION 6. - '
'-'f
(7 .
1;:.
1 .
....
.
. . . . ..
Y
.
HIGHWAY DRAINAGE.
I I-.
. . .
P 1: . . 6.1 General . . . . . . .
1 '
6.1.1 The design and c*'nstructioti of euriace and subsurface drains f i r highway . . .
1.. ',
.
!. . ' . . . . . . .....
I
6.1.3 In io'dsectionsin bullin& and ~tund6r~assesihereit
'
1. . may not be posuble to . ' '
T
1'!. :: . . drain out the water using gravity flow, necessary arrangement for pumping shall be'made. .
. . .. . .
. . 6.1.4 ~ ~ t a i l e d : s u & efor. ~levels aloig..th& proposed longitudinal drains shall be ,
.
.. : . . . . carried outon both sides of the'prokct Highway; The bottom levels of these drai?s shal!
. . ... .. . . meet the culverts and bridges.
. -
I
f .
'.. .6.2:2
. embankment, pavement,oy stru5tures.-.
, . ,.
..
. . . . .
The road-sidedrains shall not pose any danger.t6.traffic, slopes.of cuttings, ..
._ . . . . . .
. . . . I _ .
. . .
I,. ' .... 6.2.3 ' , A s fatas possible, lonsil'lidinalslope shall,"ot be'leis m5percent fOr lined ..
drains and '110 p~rcerit.f'orunlined drains. Permissible lion-erodible flow velocily for ' ' '
! .
i 'corresponding .earthsurface as mentioned in Clause 9.4 of IRC:SP:42 shall be kept, . . '
i in view
[ ,
6.2,s The drains shall be provided with CC lining inthe following situations:
ii .I)
. . .
-". When due-tospace constraint the drains are located near the toe of the
embankment or near structures.
57 '
- 94 6
i
i.. 6.2.6 In built-up areas; covered or piped drains, with manholes at suitable intervals
;. ' . , to desilt the pipes, shall be provided.
- .
. .
i . 6.3 . Median Drainage
!!. . . . . .
6'.3.1 Pl.opcr arrangement for drainage of median Bhall be provided. The median
1i
! .
drain shouid have adequate longiludinal dope to the neared culvert to drain off
:transversely. . . .
!.. .. 6.3.2 ln case the car;/ageway is sloping towards unkerbed median (wider than 5 m), , . .
i '
'provision of a central swale shallbe made for draiGage of the'mediari: Theswale.shall
'
.
i slope ~'cjngitudinal!yforarainige, water intercepted by inlets .at intervatsdnd discharged
.' ,
I .: .
. . .. . . . . . .
!.'
!. . . throug'h trahsverse drains into outlet channel. . . . . .. . . .
[I
. . . . .
ii . .:... 6.3.3 . . be turfed or paved and could becroined for
Median of width 7 m or less shall , .. . .
. . . . .
j . ' ;" drainage acrobs'the pavement. . , , .. . .. . .
; . .
. .
, .
,1
!,
:.
. . .. .. . . .6.3.4
. ' .
. In superelevated sections, proper'arrangement,for drainage of.rais'ed. .
i ...carriageway and, median shall be made without .allowing water. to. drain on the other .....
. . .
!I .: caniacjeway . . . --
. .. .
I .: ..
/ . 6.4
, '
. . .
' Diainage o i Embankment with Helght Above 3 m. . .
. . .
3
i .
. .,:
! $4.1. . in embankments, with: height more than.3 m anci,approaches,to bridges;
1 ...... .. .;.. .special arra.ngem.entfor protection of embinkrnent'S'lbj5es spll'tje esseritiel in order to, ' '.'
! . .' . . . .ensure that emba"krnent sldpeirniintain their shape durin$ the rnonsobnseasen: In thls. , . ,
. .
.. respect, directions contained In Clause 7 of IRC;SP:42 may be follow~das'tlppropriate , .
. . '.for the cli.matic confitlops of the area
. . of. the Project,Highway. , . . , . .
I ...... .. . .
1 .
. . . .
(. . .': 6.4.2 orinage arrangement Shall include provision i f k t r b c h i h e l a t the edges of '. . ..
', the roadway.to channelise ths water, and Cement Concrete (CC) lined chutes along the
. slope< a! .designed .intervals to discharge the water into side channels at the bottom
i alongwith'appropriate pro'tectionof the slope. The slope protection mat'ecial and chu'tes
i shall be'kep! well maintained at all tinies.
! .
I
I 6.4.3, The chute drains and drains at toe of theembankment
. .
. . shall
. be.of. Plain
. .
Cement .
:Concrete (M 15 grade), over proper bedding. . . .
Tho catch water drains shall be designed to carry the intercepted waterto the
lvert or natural drainage channel.
58
, . 247
,. . . . . :. . .
6.5.3 It shall be ensured that the catch water drains are provided$Gable hill slopes
outside the periphery of slidelunstable areas. ,/
! . .
!
6-54 Where required, lined'chutes shall'be pi-ovldedto lead the discharge to the
8
catch pit of culvert or to a natural drainage channe!,
ii . 6.6
. .
Sub-surface Drains
.. '
1. . . . .
' . 6.6.1.. . be pr.ovided
The sub-surface drainage. shall
. ! r .' . .
1 ...... i) . for lowering the levelof watertable for drainage of sub-grade; -
! . - . . . . .. . . . . . . . . . . ,
-
.
' .
..
1 . 6.6.2 Sub-surface drains shill npl be used for surfacedralnage.
I
'- .
. . .
. . 5.6.3 . :. thesub-surface
. . . . . dralnf shdll be:.. ' , ,, . .
. .
f . . . i).:
,Close jointed: p e r f ~ r a t e d . ~ i or
.: ~ copen
s jointed unperforated pipes in
1
! . . . . : . : trenches with backfill rnato!al aroundpipss.
/ .. . . .. .
-:
.. . . . . . . .
. : i i ) Aggregate drainqconsiiiing of free draining material in the trench without ,.
I::
- .
. .
. .
.
. .
any pipe. .
:
, . . : . . . . : . .. , .
. 1. , .,
.'
.
6.6.4
3 0 0 :of
. . . .. .
,
~ the M o ~ ~pecificitidns.
H
. ..
'. .
Perforated pipes and $perforated pipes shall meet.therequirements of Clause
. .
I ,:.
. . .
designed on inverted filtercriteria for filtration and permeability,or of an .
... 'appropriategrading conforming to the requirementiof Table 300.3 of the
I . . . . . . . MORTHSpecIfications.,
.
. . (
11 ' . .
.
. . ,
.
. : ii) ~hick'&& of bi~ckillrnateiial'ar&nd the pipe shall ;lot 68 lass than 150
. . mm. The minimum thickgess of material atjove the top of the pipe shall be
f 300mm. . . . .
i .- u s e of Geo-textile
4 "
.' . .
!'..
The sub-surface drains may be deslgried using appropriategeotextile to
'
/........ . . . . i)
: ..... - , serve the funclions of filtration and separation. ' . -
'1 ; :. . . . . . . . - .
J. :. ... -
i. ;;:;.
.: ,' ',
. ,
ii) She sub-surface drains can be provided with geotextile either along.the
trench or around the pipe or both.
.I..'.... .
L .: .
. . .
1 :.:.. iii) The geotextile shall satisfy the requirements of Clause 702 of the MORTH
b'"., . .
,
Specifications.
.
q::
I:;'. . ;..".
I... _ . ". .. . . .
j . .
.6,G.10 ~rsnch.axca~,stibn,laying 6t pipe;~sckfilling, snd us' of gaosynthetics shall
.: : conform to the requirements of ~ l d u s e
...... 309.3 of the MORTH Specifications. '
.
..
-. .. . . . . . . .
'
.
- . ..shall
he drain ~ " t l e ts h i l l b e a .free. butlet and _ . 'b.eprovided
. . . as per
309.3 of the ~ ~ ~ f ~ ~ p e c i f i c a t i o n s .
I.,;:'.........
. . .
: .. . .. . . . - . .. ,.. . . . .
ii . :..'. . .. :6.6.12 ' . Aggregate drains :
! . .
i .:. :
! . ) f he trench for aggregate drain shall be of minimum 3~ mm width and cut
1'. .
i:'..
. . . . , to a depth to expose the gra~ula'r.pavement courses to be drained.
,.
: ..
. . . .: . . .
1:. .:. .
, . .
.
:
.
i )
.
~ g g r e ~ afor
t e the drain shel'be gravel, stone aggregate or slag of grading
83 perToble 8 of IRC:SP:J2. . . .. . . . . . .
".
f
..,
;. . . . . .. .I
. .
I .:
I .
1. '..
:. 6.6.13 ~ e s i j d
.
n si!hsoil drainageshall be
be made to IRC:SP:42. .
bas@ on a rational bask: deference.may
. . . . .
. .
. . . - . . ... \
,
- .
! ....... >
I ' 6.7 . Internal Dralnage of Pavement Structure . . :
1'. ..
I..'
.
I . .
. ' i) Boxed type construction in which pavoment is housed h earthen shoulders
. . ' shall not be provided.. .. . .
! ' . .
, . . ii) The sub-base shall be extended acrossthe shoulders for efficient drainage
I
'of pavement:' . . .
. . . .
iii) The granular sub-bas'e shall be.of proper design and grading to perform
5 .
. .
satisfactorily as a &ainage layer. The drainage layer shall not have material
i . finerlhan 75 micron'size. . . . .
I
"
1 ,
The ~oncesslonaireshall carry out proper s u r ~ and
~ ~investigations
s for delailed design
of the drainage system. The proposal for drainage system supp'orted with survey
investigalion,yport and detailed design report shall be submitted lo the Independent
1. ,
1 . ::... . ~
. h e i u t v e akdi~vestlgati~n
y and drainage studlos slrall ioo~do: '
. .
.. . . ..
.,I , - . ;
.
..'. . . . '
. '.6.8.2 Deslgn details
' . The report shall include: '
, 'k "
]
i
I
.'
iv)
v)
Drainage arrangement plan along with cross section of drains with
longitudinal levels, cross drainage works and a strip chart.
Specificationsoj drains. .
. >I . .
vi) ~n~ additional inforrnatlon as req;lired by the IE for review of the drainage
i system. . ,
i
i 6.8.3 ~ e s ~ o n s i b i lfor
i t ~design and adequacy
The Concessionaire shall'be fully r'esponsible for design and adequacy of the drainage
period as per the requirements of the Concession . .
DESIGN O F STRUCTURES: . :.
1 . . '
. .
t.. . . : .
. . . . . : SECTION ;.'I
1 i
I .
. .
. .. . . .
! ,:
.. DE.SIG.N:,OFSTR~JCTURES
. . . . . .
/ :,
. . . " '
. .
1. '
1:;
! -I
....,..
. .
. :
..
I) .All .bridgesshall be des'igned in accoidance with the relevant Codes,
Standards and ~pecificationsand Speclal Publications and Guidelines
. of the IRC. ,All construction of bridges shall,conform t o MORTH
;Specifications for Road-andBridge Works. ., .,
'..
I:,.
. .
I
ii) All bridge.^ shall have independent.super$ructure for each direcllon of
. . . . travel unless specRed otheiwise i i i Schedule 'B'; Culvertsrnay'havesingle
or independent supeistructure. . . . .
I ...
. . . - .
I: . .
. .
shall be high level .bridges unless specified otherwise in
.~.. . . :iii.) . ~ll.:hrid.~es.
!.t . : '
. . . . . . Schedule.Y3~oftheConcessio~Agreement.:
. .
iv) ~ i a d u bspans
l shaO be pr&ided if the height. of solid embankment in .,
. .
' '
...
built-up sectionsis more than 3.m. "
/ . , . . .
. .. . ... . . .. . .
i) .~hP&ldthof rnedlan in theculvert and bridge pdrtion shall, as far as
.possible,be kepl same as that In the approache.s.'ln case width of median
. . ', . .' ' is differeptfrgm that of approach section due to slte constraints, sult'able
. . I
. . .
. . . . . , . : transition shall be provided near approaches for.guidingvehicular traffic.
.
. . ,
'
i vii) Suitable provision shall be made for relaining the earth in the median
I portion either by extending the abulment wall or constructing a now
I ....
retaining wall. The abutment wall shall have.provision for taking the
I discharge from'the median;Care shall also betaken to merge the wing
. . .. . .
.
I . : ,
,
wall Ireturn .. knd flooringof the old bridge with those of the
. .wall . .new bridge.
1 ... ,
. viii).
.
.Any utility .service to be carried by the structures shall be specified in . '
i
'i .
!.. ii) All. new struclures sl~allbe designed for the condition when footpath is
j.' , used as carriageway. The footpath portion may be provided at the same
!* .. ..
level as the bridge carriageway and separated by crash barrier in non
11 : . . . - : . . bu'ilt-upareas. In b~iilt-upareas, raised footpaths shall be provided.
i .:
iii) All the components of structures sllall be designed for'a service life of
i'..
f . . .
100 years except appurtenances like crash barriers, wearing surface and
rubberized components in expansion joints and elastomeric bearings. All
3 -
? ,: .
. .
. . the requirements to achieve durability and serviceability shall be . .
1: ' . .
. implemented.
. . , . . . . . d
i.,. . . : . ..
. . . .
d '
,,
.
. 7.3' Width o t ~ t t u c t u r & :' ..,
, .. .
I!. ::.:. Width of the culie,rtsan.d bridges shallbe adopted as b&w:
.
.
. . .
i - .
1 '.. . .
I: : i) New culverts
! .. , .
.
,i . .. ' . . .
. I
I . 0v&ali ividthbf all new culverts shall b e Cquol toroadway width of the" ,
,'. ..
approaches. The outer most face of raitlnglparapot shall Be in line with :
I,..
I
. .
. . . . the outer most edgeof shoulder, Typical:cross section of the new culverts .
for a 4-lane project highway is given in Fig. 7.1.
,
. .
'
.. .. .. . , . .
i
!*
. a) . ~he.overall.byidth of new bridges shail be: same as the roadway width ,
'
.
.
' .of the appro ache,^. AII. new bridges shall. have a footpath on left side
.
I ..
. . of the traffic. Typical cross section of such type of new br/dge with
. . .
i .'. . footpath for a.4-lane project highwa$:is given inFig. 7.2.
j
b) Where the daily traffic in PCUs exceeds 30,000'at the time of
i.
.
feasibility study1 bidding, the width of new bridge shall be as per
Six-lane standards vide details given in Fig. 7.3 with footpath. Sucll
bridges shall be indicated in Schedule '0'..
i ..
I .r . '
. . . .
. . . . .
I
:. . Fig: 7.2. cross section of Bridge at Deck Level - withFootpath
1.. . .
. .. .:. .. . . . ., . . . . .
4-Lane Divided Highway
. . .. .
. . .
. .
. . . .
. :j., :..- . . . . . . . .
. . . . . . . . .
. : . . ..
,
Fig. 7.3 cross section of Brldge at beck Level - with Footpath
4-Lane Divided ~ighway(Bolh sides new Bridges for 6-Lane Standards)
. .
67 - '
- .
.........:...
. . .
. . . ....... ., . , . : ..! . :.:,+:.
...I
c) The culverts and Hume pipe structures shall be widened so as to
make the deck width same as specified in.Sub Para 7.3 (i) of this
Secfion. If the width of additional widening is less than 0.5 m on
either side, the widening of the structure maybe dispensed withand .
. . traffic shall be guided with the help of crash barriers in a transition of
-
, .
1in 20 on either side approaches,
List of eulvert&o be reconsl~uctedandior *idened ~ha~lbes~ecified
.. . . . . d) in Schedhle 'B' 6fth.e ~oncession~grdem:ent.
. . .
. . .
. .iv) xis sting bridges. .
. . .
'
.
.replaced.
. .
Minor non-structuralworks shall be suitably-repaired, '. .
. . 9 . .
. . 4,'
7.4 . StructureTypes. , 'Id
] ..
i i) . The bridge structure should aesthetically blend with the environment.
ii) The type and span arrangement may be flxed so as to provide rid~ng
comfort.
I iii) Wherever box girders are proposed for superstructure, the minimum clear
j . . . .
depth inside the box shall be 1.50 m with suilable openings in the
6b i
- . 255 I
. . I
f
. . . . . .. . . . . .. . . .i, . . 1
Fig. 7.4A cross Section of Bridge al Deck Level- With Footpath
(T-BeamlBox Girder Type 1 Well1 Pile Foundation)
. .
4-Lane Dixided Highway (One side new Bridge and othersides'Existing for 2-Lane Briae),
.. . .. . . . . . . . .. . . . .. . . . .. ..:.
. . . . : . .. .. . . .
. .
: ... . .. . . : . . . .
. . .
... , ,
. .
' 8
". . 256
i. .. -...................
,
. . .. . . . . . . . . . ;.
. . . . I . . .
. . . . .. . .
. .
. . . .
. ! :;
. !!. ' . ..
. . .
I '.
I:'." ' '
I -.: . 1RC:SP:84-2009
. . -..
'
i .
.
1.
f.5 Hydrology
I '
i1, . . . . At1 the s'tructures shall have adequatewaterway,which shall in any care be not less than . .
! .' '
that of existing bridge (ex'cept when such walerways can be .reduced in cases like
.clogging'or silting of spans; etc.). The.design discharge shall be evaluated for flootl ol
'
i ..
1'I..:. , .
.,
. 1OO-year. return'period.
. .
. .
'. I. .
i..'.
, .
. .
' 7.6 ~ub~o
~ ni i le s t i ~ a t i o n s . .
- .
i ~ n d e ~ e n d esub-soil
nt .invistigations>hall be carried out to,establish the soil
-
. . . . . . . '
:, .
'required for detailed design of foundations in accordance with relevant provisions of
. . .
I. :
I .
,IRC:78. and. IJIORTH Spscifications,
.
,
, . ,
,
i...
1 :..'.. ..
. 7;7 ::. . Culverp and,sridger using Pipes . . . .
1; ;
; .
: . .
. , .. ..i) Reinforced concrete pipesforculverts and bridge'structures shali'be of
18 . :..
I , .
. . . ,
' Non Pressure (NP) - 4 type conformi?g to the requirements of IS: 458:
f.
i . . .. .. . . . .' . . . Mlnlmurn diameter of pipes for new pipe culverts shall be 1200 mml . . .
.
I.. :....
- ii). ~ x i s ~ b ~ c u ~ of
.
1, . .
I.', .
,
.
.
' v ediameter
ns 90_0mm afidabgv_e,,which are in sound
. .. conditionand functioning satisfactorily, may be extended, using pipes of
I .'.' ..
i . . '
, ' same diameter. All culverts having.pipe diameter.lessthan 900 mmshall
:.
I: .
..:. .-, ..be.replgce.d.withpipes of minirnum 1200 mm diameter under both the ,
8
i
i.
.
.
..
.
' . : 'carriqgeways. Minin~l~m depth of eatfh cushion,ove~:glpeinc1.udin.groad .
i .,. . . . ,' crust shall not be less than 1000 mnl for newlrecoristructed culveds. In
I.-
i . . . case of existing sound and safeculverk, a minimum cushion of 600 rnm
!.. , .. ' .
r
., .. . .
8
may be'acceptable. In case the cushion is insufficient, encasing of pipe in
:I, 1; , .
. ., . .
.
' concrete shall be ensured. Floor protbction shall be as specified in the
1 .. '
- . ' 'The ~~"cessioriaire
shall be respopsiblc for.the .&ife,workabl.e design and methodology
(' '
for all temporary or: permanent forins, staging-and.centeri'ng.requlredfor supportingand. L
-formingthe-concreteof shape, dlmensions and surface finish as shown on the drawings
I ,
! '
. . .
1. .: (Refer IRC:87). Adequate foundati0.n for the staging shall be ensured, ~edundancyin
? support system shall also be ensured by providing.diagonals and actddiiional members. ' . .la
i
i The following guidelines shall be adopted:
: .
i) Formwork shall be of steel, marine ply or laminated plywood.
! '
ii) Only such shuttering oil (release agent)shallbe used, which permits easy
removal ci shutlers wilhout leaving stains o~.othermarks on.the surface of
the concrete. Reqair-eme:itsgiven under Clause 3.5 of IRC:87 shall also
be com~liedwith.
. . iii) In case' of tubular staging of heights more than 10 m, special attention
shall be paid to the structc~raladequacy of the system, efficacy of the
Connections (clamps etc), and foundations. Foundationblocks of adequate
e t ~be provided'under tho hase plates
thicknessin ~ 1 5 t e f i a n ~ . c o n c rShill
to provent differential 'setuemants. All bent tu6u1ar props shall be
straightened belore re.-use. and .the member wlth deviation from
straightness more than 1 in 600 ofits length shall not be re-used. For . .
re-used props, suitable.;edvdion in the permissible loads shall be made
depending upon their conditi~nin'accordancewith recommendations of .
thernanufacturerand as reviewed .. b j the IE. .'
. ...: . I
. . . ..
In case of prestressed 'Concrete members, the side forms shall be
r&
ori~
' ed as early a~'~os$ib!e ah@thesoffitforms shall.&r,mit movement
of member without rest<a..intf:wtienprestress is applied, Form supports
a n d forms for cast-in-situ.~membersshall.riot'beremoved until sufficient
\ . prestrep has been applied to car[$ all inticipatedloads during '
i' I . construction stage.
. .
1. ,. - '
.I - , . .
. . : .
. . .v) , ,Ade,quatefoundations for formkock shall be ensured.. .
. . : . .. . . . . .
7.8.2 .,. : Speclal tokporary'and
.
enabilng works
, . . .
..
.
,
: ,
2
.
.
., ' . ,. ,
. '.:I . ,. . . . . . . . ' , ( .
' ~ e s i ~ n s , ~ d r a . wand
l n ~ smethodology~p~oposed
by tho Concessionaire In the use of '. '
-The design.of open 'foundations shall conform to IRC:78. Floor. prote,ction shall be
provlded as.per Section 2500 of MORTH Specifications.
.. .
. . . . .
71
258
. ... . .. , .. . .
f .
1
%
-.
IRC:SP:84-2009
r, ......
I
.-
a) Bore-log details for each foundation; . .
I
I .
I I
. ' ' .' :b) Design assumptions;
5 '
i .: 2 . . . . . . .
1 ..
1: .:.. . . c) Design calculations both:for single pile or group
. .of piles and for pile "
, type;. . . .. .
I .; :
f ::. . . d) ~ ~ p e .piles-~ored
of castiin-situ piles and driven,piles; . .
1 .:-;.'. . ..;, . .
e)':' procedure adopted for installationaf jjiles;
. .
.
poi.
'w . '
-; ?
<.
I
.
.
. . . .
, ..
. .
1, . y : . ' . f) Arrangements for load testing of piles;. . '. . .
. .
g) Formit $0; reporting of test results.
.
'
, . . .
I . . ... . .
1".
,.
1'.
L< .:...
. . . . .:. . ii) he ,66ii;s,sioniire shill submit the following information. .regarding +
'proposed.'proprieta
. . system of pillng: . . . . . .
I:, . . . . . . ... , . . . .
',
f ,:. '
. .
. a) ~ e n e r a ~ f e a t u i ~ sprocesslsystem
~ttie al~ngwithspe~if~ations
and
1.
... . , ,
i
1. . :
.
. . .
. .
...
.
'
d)
.
e)
Details of projects where the processlsystern hasbeen successfully
.used;.
Limitations,
:
.
if any;
. ..
. . ,,. . . . . . . . . ..
. ..
.
. . . . . . . . . . . . .. .. . .. . :.. . .. . .. .. .. . . . . . . . .
. . . .
.. . . .. .. .
.
i1 '" ' .
.
..
,
...
"'
. . . . . %. .. ., . .. . : ....
1 .. . . . . . f) . Acceptance testsand criteria.;
.
' , ........'
.
i , .
. .
ij For conventional method of well sinlting, the Concessionaire shall submit
'a method'slatement includit~gthe following: ,
a). Design calculations and drawings,
b) . Procedure for sinking andplugging o'f well, ...
. .
. .
. . . . .. ..
.
.
.
.
i,. . . . . . . : . . . . g) .lnsia~ation
a,nd maintenanceprocedure and schedule; and
. .
.. ..i i. i. ) ~ ~ h e ~ o n c e s s l o ninahis
l r ~~ e t h o t ~tat6ment
k shall include the procedure .. .
. . . . . ..fsr sinklng hy speclal methods, carrylng,outtests, if any,'of wells including
. .. . design criteria/calculati.onS, drawings and formats for reporting test results.
1:. ' . . . . . . .... ..... . . . . .. . . s
. .
I. . . . . . .
[i .. . :. ..: s ~
c h shall be provided as per clause 2i7 of IRC:6 and ~eclion2700 of MORTH
~ f l ~ r i a slabs
~ ~ . B ~ ~ ~ ~ ~ .~ .~ ; . : . . . . :
. '
, .' ;. . .
. folloiing:.
, .. . . .
. . . .
, . ' . .
.". . '
. . . .
.. . .. . .. i),. . . ..Sources of materials;
1 . .
ii) Design, erection'and removal of formwork,
: . iii) ... ~ a ~ oofucasting
t yard togeiher with necessary details; . . . .
. . . . . .
I
I '
i
I
- . 73 260.
I* . ,-
w
/
t
W
c"
,-
1i P.
b.'
/
-
i
i
lRC.SP:84-2009 ..".
A.
'
1i La- .
!I. vii) Prestressing systern, if required,
viii) fvlethodology and equipment f~r'sideshifting and
. . . . ..
launching of pre-cast
girders, . . . . .
1. :' ..
I....
1: ix) Key personnel for execution andsupervision,
i ';:: .'..
..,.
, .
1.1.'. .'
'.. 7.12 Bearings
1 :.. . . .
. . . 7.2.
'All bearings shali be easily accessible for inspection, maintenance and
.. .
replacement. Suitable permanent airangements shall be made fqr inspection of bearings
: . hon bridge deck. Drsiyi, a i d s y r r i i r i ~ i o of
~ ~bearings
s a as per IRC:83 /Pan I, I1
s t ~ be
! . . . .. and Ill). Spherical bearings shall~onformto the require?erits of BS:54OO0Thimaprials .
" ' ,
i; ; .. . . . of bearings may however conform to the relevant BIS codes nearest to the,specifications
. . .. given in 'BS:5400. ?he drawing of bearings shall include the layout plan showing exact.
/,i 1.. .. . loca!inn on.topof pity and abl-ltmentcap and.the type qf bearingsi,e: fixedlfreelrntational
'
'
-
:; . . . .at each location along with notes for proper installatlon. The bearing should cater for
? '
' 1; '
';,
.
',
:7.42.3 The Concessionaire. 6ha11submit detailed speciflcstiono, deiiOns and
drawings including installailan. drawings
replacement procedure,.
. .
...
and maintenance manual lnooiporating the .
. .
,
.
! .. ;. '.*l
8
3% -
[ . :_' 7.12.4 The ~oncessioniireshall obtain and submit a complete Quality Assurance PI,
m)
. -
. , Programn~e(QAP) from t h i manufacturer. The QAP shall give the full details of the
i process ofquality control, raw material testing, various stages of manufacture, testing of
i1 . . bearing components as well as testing of complete bearing in conformity with relevant .
! . . part of IRC:83, prior to the commencement of manufacture of the bearings.
I
7.12.5 In addition to the routine testing of the materials and bearings at the P-
-
Lj
1
manufacturer's premises, the Concess~onarreshall arrange testing of random samples
! T
of one percent (minimum one number of each lype) of bearings from independent agency .-
PA.
I
I approved by the IE. r
*.,
.6 The Concnss~ona~re shall subn~lta certlflcate of conftrmalion regarding quallty ,-
,>>.
rol measures taken durlny manufacture of the bearlngs and the materlal conforming
74-
i
I - r
. . 261 1I ,..
7
1 F
,
8
F
' to the prescribed standards andspecifications. Full lot of bearings oithe sample found to
1 have inferior sgecificalions to those certifiedby the manufacturer or to have major
discrepancy in material specificationsorwhich fail to meetthe acceptance criteria, shall
be rejected.
I . ... .
. .
ii) ' For existing bridges all expansion joints., which areolder than I S years
. . shall bereplaced. . . . . . .
. . . .
iii)
.. hec concessionaire shall procure expansionjoints oolj flom maiufacturers
:. . approved by MORTH. : . . : .. . . .. . .
. wearing
. . Coat ...
. 'retained..
'. . . . . . . . I .
. .
I ' .
1.); .. Wearing coat:older
. shall be replaced..
than 15,year$or In damag%dldlitr~ssed
condition . .
f
I ' . .: . .. .,
7.15.1 ' ' ~ ~ i n f & c eearth
d ret~iningstructuresshall not be provided for height more than
i 6 m unless othelwise specified, and nearwater bodies. Such structures should be given
i! special attention in design, construction, ground improvement where necessary,
maintenance and seleclion.,of System/System design. Loca1.and global~stabilityof the
'I structure'~hal1be ensured. : ...
7.15.2 ~ e s i ~ccreditation
~ n andwarranty for life of the structure from the approved
I
supplierlmanwfactuier shail be obtained and furnished. A qualified and experienced
I
technical representative of the approved si~pplierlmanufacturershall be present on site
! throughout during the ca n phases to ensure that the quality of the works
i
executed by the Conce rdance with good indi~strypraclice.
i .
I
5 -
- . 26.2.
!
I
I . _ .................
. . .. . . . . . :
I ....
: .... IRC:SP:84-2009
I.' '
1 -.: ..
1.. : . 7.15.3 'rhe.Concessionaire shall submit relevant informationon the system covering
1: I '.
inter-alia the following;
. .
1. ., . . lii) Details gf plant and equipment to be used along with the names of
I ..
. i'.: manufacturers and name of proceSslsystem; . .
'r
1. ::., . . .
.
. . . . . . . .
-I .:. . . . .i ) Details ~f projects where the pcocesslsyste,mhas.beensuccessfully used;
': . ..
.],:.; ' ... ...
.
.
.
.
. . . .
"1 . . ~imitatid?s';if
,. any; . . .
: ' .
,.
.'
1
1
I.:*.:. ;
:..;, . . .
.
. . .. .. . .
.. vi) Acceptance tests and criteria;
. .
..
.
a
. 1 . . .
1: . . . . .
:
:I[
. . . .
. ' 7.1 5.4 ' TheConcrs.ionaire ;hall &brnit method ststernktit inclidiiig'the f0110wiq:
.. , . .
;,
......
. .:.,,
. . . ' . i) Design assumptions calculationsand drawings,
. .
: .
.
. . .
. . . . ii) Construction ~.rocedure, ' . , . , ,
v... :
I,!.; :, . : ,
. 'I..: iii)
Tests tobe conducted including frequency and-lheformats f ~ r t e ' ~ o r t i n ~
,
, . :
: . . . . . .'7.15.5.
i
$ .
.. .1 . ..
I.
.
.- rnanufacturerlsupplier and brand name, date of production, expiry, if any and batch
, . . ' . ' identification
% '
.
number along with the manufacturers test certificates. . .
i - .
.
1
I '
.
.
.
'., .TI6 River Training and Protective Works
i . .. .
i ..River training and protective works shall be providedwherever required for ensuring the
i, . . . .. 'safety of bridges and their approaches on either side. The special features and design of
i . .various types. of. river
i
;. ' .. . .trainilng
, and
. protectiveworks shall be. in.eccordance
. . .
,
. .
with IRC:89.
i : . . . . . . . . . . .
I . . .. . .. 7.17 . ~ a f e. tBdrriers
..~ . . . . . .:'. .
. . . . . . .
:[ :
:
; '
i) Foc.bridgeswithout foot paths, concrete crash barriers shall beprovided
I
. .
.!
I . .
at the edge of the carriageway.onall new brldges. ..
. . . .
1
I
! ii) The type design for the crash barriers may be adopted as per IRC:5. The
design loading for the crash barriers shall be as per Clause 209.7 of
IRC:6.
For bridges with foot paths, pedestrian railirtg shall be provided on the
e fooipath
outer s ~ d of
1
I:.. .
I . liv) Therailings of existing.bridgesshall be replaced by crash barriers,where
specified in Schedule 'B'of the Concession Agreement.
I '
i
V) ~arapetslfiailingsof the existing bridgeslculverts to be repairedlreplaced
shall be specified irr Schedule 'U'ol the ConcessionAg~.eement.
1.'.
I' . . 7.1 8;1 ~ n l o s otherdie
s speclfied'in ~chedule'~'otthe
~ ~ n c e s s i a n ~ ~ r e e r nROB1
RUB to be.provided shsl1.k as specified in this Manva1,yiih particular refeience lothe,
provjsions~ofPara 7.'3 of this Section; .. . .
. .
ent,
. 1.'! ;. - '.
.
. , . .
i! . .
i) In case a 2-lane bridge exists over the railway tracks, another two-lane
.I.,.: bridg.eshsll be constructed for one side traffic. The treatment to existing
. . .
i
; .
.. . . . .
structure..shallbe given as in-Sub-para7.3(iv) of this section.
. . . .. .. .. .. . .. .
! .
. . . 4) In case the bridge is to be piovididover an existing level crossing, twin '.
1..
'
' . 2-lane brid.ges shall be.constructed with overall width as given in Sub; .
Para 7.3 (ii) of this Section. If the aiignme(1tof road at the existing railway ,
I. :,.
. ' ,
I 'he'c.&~tyubtion of k ~ ~ w i t hthe
' i nrailway'boundary shall be under the
i : . i .
1.
.
'
Theservice roadswhere providedshall be continued in the bridge portion
: also., :
. . . . I., . .
1 ii) The vertical and lateral clearances shall be as per guidelines given in
1
,
Section 2 of thls Manual.
.. :
. .
'ii) . ~ h e s estructures shall be designed to carry railway loads. The
Concessionaire shall be required to obtain approvals of all designs and
drawings from the concernad Railway authorities. The design of struclure
shall be in accoidance with relevant Railway codes.
- .
.77. 264
. .
. ... ..
, ..
. ...,.
. .
1 ' . . .
ii:.:. ;. IRC;SP:84-2009.
1;:'.
,
I"..
. . .
,:,: ::.... . . .
I:,,;.
:.:. . .
(iv) 'the construction of RUB and its approaches *hall be carried out in
conformitywith the terms specified in thea'pproval granted by the Railway
-..
. authorities. . .
. .
. . -
. 7.19 Grade Separated koed ~trui;ti~.res . .
I .
I.:::-.'. . . . . .
. .
,,7.20 ,
-
Drainage . .
!.... . . . .
!..
I... . . :: . . . ' .__ . .
f:,:;:,:. . '1 An effecliye draindgesystPrn for the bridge decli'sha~~be planned, designed and
,I
a
......... insta!led so as to edsure that water frorn'the deckis taken dqwn to ground levelldrainage '
I ............... -courses,byadaquate size of drainage spouts and pipes. The type of such arrangement ...
i -
shall b.e.~pe8fi8d'ln,Sche.dule : .:
. . . @'df the Concession Agbe~iient.
' ' '
1.:. ..... .
I.. . . : ~ .. . .
. . . : ,,
., . . a
:
.
. . . .
. .
I.::.:.. . . . . . ,..2, ~ t r u c ' t .~ rin.Mafih
.i s . ~nvlronment.. .:.. .
j i , . . . : ..
f . .'. . :
i ' . . . . .,
. . . . . . .
. .
. ... . .
;. '. . Necessary rn~asuresltrea!ments,for.p~~~tecting.st~uctures
it1marine environment shall be '
;. ., .,
.as specified in Schedule '8' of thc Concession
. . kgre'ement.
. . . . .
i: ..
!,. . . . . . .. .
, ...
;
I
d) Replacement of bearings,
I '
.. . . .
f,
~
..
265 . .
ii) The ~oncessionaireshall-submit repairs-and strengthening plan for
. . structures.in p.ara:(i) above !o. the 1nd.ep.endent Engineer.for.reviewand
, . comments, .if any.:far all.othq~struci'ures.withminor deficiencies,.nd
affecting structural inadequacies and jn.te.grity, appropriate reljair.
rneasures may bb proposedand subrnilted to the Independent ~ n ~ i n e e:r
for review and comments, if any.
iii) Strengthenipglrehabilitation work shall becarried out in accordance with
1 ..;;
1
' . relevant IRC Codes and G~~idelines. . .
1. . . iv) The Concessionaire shall take up repair andwideriing of existing bridge .
1 .. ;
= .
at a particular site only after the new bridge a\ that site is constructed and
,
?I . . '
the same can be used by Ihe traffic. Before taking up the worksof repair '. '.
. .
I
I . '.
and widening of the existing bridge, the concessionaire shall make all ,..
!. . 'arrangementsto ensure that both way traffic can use the new bridge and .. . ,"
1
,I, .
.. .
. .foundation, and abutment etc., which will r,ot affect or disturb the flow of .. .
: .traffic over t11e:existing bridges, rnay,.however, be taken up befoie
: completion of the new bridge. In such cases where new 2-lane bridges is. . .
'
.
.'
. ...
f.
' '
not required to be constructed before COD; the existing bridge shall be.
.!i -. repairedlstrengthenedby suiiably regulating the traffic on the bridge or by "
. i, .
>
' ! "tempora.rydiversion.
! 1
i 4
er informatior)relevant to lh~!design report.
79
266.
--- _ .....
._.__ . . . . ... ..
7.24 Responsibility for Design and Structural Adequacy
1
:.
j The Concessionaire shall be fullyrespon'sible for the design,structural .adequacy and
i' - . . - , detailing of tiridge .and culve.rt siructures. .Review. by IE 'shall not relieve the
Concessionaireof this responsibility. . .
!> . .. .' . .. . .
35 ' " .> . .
. .
. . .
. . . . . . . . .: . . .. . . .
I.'.' , . . . . .
. . . ..
!:' . . . . . . . . .. .. . . .
I .
. . .. . .. . . . . .
I
. . . . . . . . . . . .
II...': ' . . ..
.
.. . . .
...
. ..
. . . .
.
. .. . .
. .
. .
.. i .
. . . . . ., C
i . :. ... . . . .
! . .
SECTION * 8
. .
SECTION 6
. .
MATERIALS
. .
General
. . i) Ail materials to be used.inworks shail be in conformitywih the requireinents. . . .
laid down for relevant item in IRCIMORTH Specifications unless othetwise
specified in this Section. If. the Concessionaire proposes to use any
material, which is not covered in IRCIMORTH Specifications, It'shall
conform to relevant IndianStandards, if there ere any, or to the International
Standards. Proprietary products proposed to be used shall be proven by
use'in comparable international road and bridge projects, and:shall be
supported with authenticatedlicensingarrangementwith the manufacturer. .
f) kcceptanbi
. . tests and criteria;
. .
2s'
. . 269 :
. .
i
. . . .
.. .; Any type of cement specifiedin 1RC:21 may be usedfor the works subject to limitations,
. .
if
,any, spgclfied therein. . . . . . . . . . . . . .. . . '
. _ . . . . . .
. .. . .. . . . . . _ . . :
. . .:. . 8.4 1.. Coarse Abgregates . . . .. /
. .
.
..
.
' ~efo.rec.ommencern6ntof the workb, at least thke samples, in iccord.anco with the .
...
: procedure laid down in IS;2430, shall be taken Jor.each quarry source to ascertah the
.
. . . .quality;..suitabilityand fi!ness.of ttie available material for use,in the works. ~ r e s test's
' h
a
. shall be..conducted in case there is any change In the sourceior the type of rock.being
. . The proposal, along with acopy of t'estrepo&,,
. . . quarried:
.. . , . shall.be
. .
submitted..
. .
. . . . . . . .
1
I ? . .
. i) . All fine aggregates shall confor~nto1~:383and tests for confdrmity sllall
. .
'
... be carried out &.per 18:2306 (Part 1 to ~ l l l ) .he fineness modulus of fhe . .
.. , . . . .
. % .
. . . . . . . .ii) . ~ e f b r et h e commencement of the works, at least'three.samplesps per
. 1632430 shall be taken for each quarry source to ascertain t,he quauty,
. . .. . '
. suitability and fitness of ttie available materlalfor use in the works aid the . '
. . ' , iii) Fine aggregates h a v i n k i t i " ? itkali-silica reaction shall not b6 usid.
I
I , . . i) ., Water for use in the works for mixing and curlng of concrete shall be in
i conformity with Clause 302.4 of 1RC:Zl.
I - . .'
, ..
ii) ',Water fr.om each source shall. be tested before the start of works and'
...
: ''. . 'thereafter every three mdnths and afler:each monsoontill the completion
. . .
1 'of the:works and the proposal along with a copy o.ftest reports shall be
1 : . . submitted to the IE for r9vii.y and comments, if a.ny
. . . .
i . .
. .
iv) Admixtures shall not impair the durability of concrete. They shall not
combine with the ingredients to form harmful compounds or endanger the
protection of reinforcement against corrosion.
, .:
j ..:. . ,.
'.
..
tI :' . . ..: v) T h e packaging .of admixtures shall clearly indicate the name of the.
j .....
i:: ':',
: m,anufacturer/supplier, brand name (name of the product), date. of
.. ... .. . .
1
1::
{I.'
. .
. . . . . 8.7.i... .
..; . . . . . . Specifications, following informationshall'also be furnished:
in a d d i t i o i i g the delailg
itlpulated in c 2 u g e 1012.1 of M~RTH
...
. .,
.<:: .. ., .' . . .
. . '
. .
. . . .
. . _ .. ' i) pH value and colour. : . - .
.;'.-.
.,:
. . . '
. - . . .
..
; . . 8.81' Steel farprestresslng .' :. ..
, . . . '. ..", .
. .
.
I' '1 ' ..
:.,' , .In additidn t o the reguirement,men~9nedin~ i a ~ ~ e . 1 0i ~f MORTH
9.2 Spedficatiiohs.the
. I"
i : .
'. . ' :
'
steel for prestressing shall satisfy follawlng condiiionsi
.i,,_./,
1 . : . . . . .. . . .
1'. .: .' i) Uncoated stress relieved low relaxation steel.conforniing'to:IS:14268.
. . . . ii) Prestressing steel shall be subjected toacceptance tests in respect o f '
. .
modulus of elasticity, relaxation loss at 1.000 hrs., minimum ~ltimat~tensile
I',: ."' ' . '. . strength., stress-strain,curve etc. prior to actual ,use on works as per
. ..
I....
:" ' ..'.'. .
. . . .
gciidelines contained'ln 8814447. The modulus of ela'slicityvalue, as per
I....:.' . . . . - . : "acc&ptanck testg, shalf@nform to the design value, which shallbe within
. I..'.. . . a range hot more than 5percent between the maximum andthe minimum.
I . . . . .
.
1'.
. .
.
, .
..
-..
~ ~ ~ ~ ~ ~ u ~ ~ - t ~ , ~ t e l t ~ ,Steel
i)
~ n t e n s' i o n e d
Only Fe 500 grade of steel shall be used on works and all reinforcing
I., . . . .
steel for use in works-shall be procured from mainlmajor producers. Fe
41 5 grade of steel can also be-usedwhere permissible as per IRCCodes
...
... .. , ,
8 5'
.. 271 . .
,'
. .
j ;.,
. .
) only fresh steel shall be brought to.the.site. Every bar shall be inspected
I ...: before assembling on the wdrk; and 8efective;briltle orzburnt bars shall
1:
1.1:
.. . :.
iii)
be discarded. Cracked ends of bars'shall be cut before use..
0nlyThermo.MechanicallyTreated(TMT) bars conformingto 1831786 shall
be used .
..
. as rei.nforcingsteel.
'
(.... . .. . . :
. . .. .. . . . , .
II.'.:';, '.
. .' :
,
~ i l steel,
d high terisile steel, cast steel,.steel forgings, and stainless sfeel shall conform to
the provisionsmntained in Clause 925.1 of IRC:83(Pail Ill). .,. . ..
1 . . .
. . . . .
..
. .
8.8.4 : ~tnlcturil . . tee;'..
. . .
, - . . , . All structuralsteel, castings and forgings; tisteners (bolts,nuts, washers'and rivets),welding .
.
'. :. 'j consurnables'and wireropes and cables shall conform to the provisionsof Clause 505.1.2,
.. 505.2,505.3,505.4and 505.6 respectivelyof I R C : ~ ~ .
1.. . . . . .
I.'' ..
.
.
.
.
' 8.9
Bitumen shall be
~ithrnen-
. . . ' . . Specifications for "Paving bitumen: 18;73:2006 of grade appropriate for the traffic and
' . .
': cllrnatic conditions of the Project Highway. The heavily trafficked roads in hot.areas may . .
.flnd harder grade bltumen more appropriate whlle pavements in mountalnous regions
. . . subject to sub-zero temperatures duringwinter months carrying relatively lo,werfrafflcloads
. . and subject to the phenomenonof "Frost Heave" may Hnd less viscous bitumen resistant
to fatigue a.nd cold cracking more'appropriate.
1.: 8.10 Storage of Materials
86
212
. . . . . ........ ..
.
r .!
-
'.J
(-+
.-"
.
?b;
, '
. -
... .
fl. ., . "
-
b.#'
-
!' . .'
b';
a
1
.,.. ,-
IRC:SP:84-2009
L
i ? : .'
{.
i
. . . . . . .
.*i
." . . . -
1.:.
' considered defective after review by the Independent Engineer shall not be used in the
worksand shall be removed from site by the Concessionaire at his cost. Such materials
I*.;
L;~:
. ..
.-.'
.. -
-
. . .
p . . . . . :.
! .... shall not be made acceptableb y any modifications. hd
i... . . :.,
,I:.
-
- . . :
, ,. ::
M )
. ' . 8.11 Report to: be .submitted . . *d'
,. ,.,,.,
'
. . .
.
. .
. .'
...;.
...
. ._. :.
_ _.
'The Concessionaire shall prepare and.submit report'containing test results of all
. -
.:- ..
:..A. and finished products proposed to be used in theproject Highway. . . .
... !.. ........materials . . -
;-...
.. _ . ., . . . . . . . . . . .. . f' .:
. . . . . . . . .: .
-
. . . '
.... . W'
..',..
.a .
:>'.. .. . .
. .
. . . . . .
. . . . . . . :>.
.; . fl ._ .
'
..:
>. . . . . . . . . . . . . .. . . . .. . . . , . . . : . . . . . r":/
<"........
.,-.... . W
. .. .
. . . . . . . . . .. .- . . e.1.
*-,
,j, . ; . .' ... .: . . . . . .. . . . . .. . . . . . . ..
..:... ... . .. . . .
I
. ..
/*-
:"; . ........
. . . ' . . . . ,
. , ... .
. . .
r" -2-.
...-.. ) ,--
.:.:..
. . .. .. . ...
.. .. . . . . 46.
:_.. . . . . ':' . .. .. . .. . .
.. . ._.
:. . . .. . .. . . . . . . . , _ I . .
. .
, . . . .. L.7
. . . . . ..
..
i
......
:. . :
. : .. . . . , ..: :; .
. . .
.
. . . .
..a
+ T ..*
'A
-
.. .. . . .
; . , ..
%Ld
I,.;,;
I:.: . . . . .
.'.
.. . . .. .. . ,
.
.. . . .
. .
. .
. . . ...
A'..
'e
..:3
J,
.. .. .. . . . . . . .
.. . . ... . . ... . . . . . . . . .. .. . . . .. ,
\ .
4
... . . . . ". . .-f
.,. . .:
.
.: . . '
, . . . ..
.....:.. ... ... ..'
.
. , l r\
.. . . .
, . - f@J
.......:. . . .' :. . . .. .. .
- .
....I
i
.
. .
. . . . .
w.
-7
.. .. .. . . . . . . . . . . . . . .
. . . .. . . .. . .. ,
. .. .. . . . .. .. . . . . . . . .. .
. .. . . ."7
'!. . . . . . , I
..
..:. . . .
:..
.. . , . . .
S' . a
, . . . .. ,.
.... . . . . . .. . . . . .j .. .
. > rP., ?
. .. . . . . .. . . . . . . . . . . . . . . . .. .. I
;3"
1'. '. . . . . . . ''
1
-
I.. .. .: ... r.7?:.! . .?
I
1
I.
. . . .
. . . . . . . .. . .
'+. .J
I .. . .
. .
F..: , .
I
t . .
-6
1 ' ' . , . . . . . .
. . . . . , . .. , .:
. .
. ..
.' r--.
I
3 .
- ' . .
. , .
. . .. . . . .
. . . .. . -
.'.."
A'
! :. . . . . .. . .. . . . . . .....
!
. .
. . . . .
. . .
. . . . *.: ' ?
. . . . . , . . .
.
. . . . ' .,!. . .
. . .
. . ' 4
8. . . .... F , ,
I
I : . . . . . k'?
I
r
. . . .. . . . .
. . . .
. .
il.. . . . . . . f:
?
I . ' ,
. . . . . . ....
! - n
I :. . . . P
t;;.
I
-
. .
! ..
,;
--
\+
- 7
SECTION - 9
. .
1.: .....
1.. :. :.
!. ... ~ h g t h r e types
e of road signs vir., manda~ovlregulatorvsig& ca~tlonaty~wainin~
signs
! ... . . ' and informatory signs shall he provided as given in IRC67 and Section 802 of MORTH
. .. . -. - " ' Specifications.'Proper signs shall be provided for left in and left out at service roads for
. . . . safe guidance of traffic. Clustering and proliferation of road sign's shall be avoided for
. .
enhancing their effectiveness.
i.. .
. 9.2.1 The material and specifications for Road ~ i ~ n s : s h abe
i l governed by the
!. Specifications for.Road andBridge Works issued by the MORTH.',.: ., . . . .. . ..
, . . . . . . . . . . . \. '..
j .
' 9.2.2 i n ~ m a r k i n g ~ : . ~ i t k . ~ t ~ p ' ~ i Qwaj!
TRF~IF?C~~IIb e . ~ n r r e s ~ b n droad h ~ ;signs,
.gi~s
.. ;..
.
:%.. . merging or diverging traffic signs, Inno clnscd <igns; ria$ ,narrowing ilgni, slip rosdsl
I diversion signs, compulsory:k&ep leftlright signs, or any other signsas per lRC:67.
. . ...
. .
:, - ' .. 9.2.3 Wherever the project ~ i g h w a alignment
y is oh a cu'we,there shall be advance
. . ,
. .; cautlanary signs for sharp curves (dependingon whether it is on leftor right) and dicvron,
signs (rectangular in shape with traffic yellow background and.black arrow) at theouter
'
.
'.. . . ' eqge of the curvo. The 3ign for thc curvc ahead particuldrly in mountainous and steep
'
- . . . . . tertain shall always be accompaniedwith chevrsil signs at Ihe outer edge of the curve and
'.. appropriate delineation. '.,
. .
. . 4.2.4 The Specifications and standards of roads signs such as chevron, overhead,
etc.; whicti are not covered by IRC:67 would be as per InternationalSiandards.. . . .
. .
! , : 9.2.5 All road signs shall be with reiio-reflective sheeting of hig; intensity grade with
; . . encapsulated lens fixed over aluminium sub-strata asper Clause 801 of MORTH
1
I Sp~cifications.
?'.
. . . . . . .
.. 275
I .: . . \ . . . . .
+ . . . . . . . .,.
1 ;.,,>* L%.,..
I ' .
! lateral clearance and installation shall be as per MORTH Sp.ecifications. The
i
i ... ..
I
!
. pedestal supporting the gantry or cantilever structure of the overhead signs shall be flushed
j ::, at the ground level and in no case shall protrude
. .
more than I50 mrn above ground level.
. . .
...
!.
i s size of overhead traffic signs sl~alibe specified in Schedule 'R'
: ~ o c a l i ~and9.2.7
.:. . . of the ~onc$ssioh~ ~ r e e m e nThe t . following .conditions'may be. consi@red while
. . . . .
. . . . . .. .... . deciding'about the locations of over'head slgns:
. . .
' I .
. . ... . . I . I ) ~ r a f i volume
c atoinearcapacity, . . . . .
. . . . . . . .. . , . , . ..
. .. . . . . . ... .
. . . . a
..
ti:,.-..
.I:;,.
. .
....
'..&. ....
Built-up
. . .
+etches,
..........
. . .. 1
.
<
.
,111)
. .
'
. . . . , . _. .. .
1;
:-
9.2.8 . NOsign, signal or any other device ereded for traffic contiol, &fic guidance
' -. .I .
.. , , andlor tra~cinfoimationshall obscure any other traficsign. Further, Re signs and siinals
. . . . . . .
' "all not carry any advertisement. . . . .
.. . . .
.
. . . ... . ' . .
.
,
..:, . .- . .99.9'-
. ~ i c &I\ :,
h ramp $tiail haye si9'is.mduntid P n n ~ ~ ~ t s i n. dhi &. name
..
t i ~ of the , . . ., , '. .
..
. . . place. and
. . .t~~itiiporltaritio~ds
. .
.,,,.
. ,. . - . . it weul ! lead to..
..........
'1;-
. . ."- : . . . . . . . . , . .. . . . . _ .
.....* . . . . . . . . . . . ... . . . . . . . . . . . . .. . .
.>:* .' , 9.3 ............. ..i k.:,i.i r. .g. a. . ....
. ' .. ~ o i t I ' ' ~ a '" '
. .
.: . . . .:. .. .. .. . ...
.
. . . . . . . :' ..
. .
...... -.. .
. . .:. ,
'. .
.
. . . merging with traffic is safe. The markings shallbe done by means of a self propelled
"
machine whlch.has a sa-tisfactory.cut-off.value capable .of applying 'broken line .
. .
automatically.
. .
1 -ii) Road markings may also be in the formof prefabricated sheet material,
I
i
e.g. plastic sheets, which may beset into Ihe pavement wilh upper surface
i flush with the pavement surface.
i 9.4 Road Delineators '
..
rs. hazard markers and object markers as given
. ' "
92 .
, 2:16
. .
. .
...>.... -.
. . . . . . . . . ....,.
. .
.,.
.I. . .
, t
I
.
.
. .
. . . .. . . . .
.. ...
t;. Atlenwator,s'~hall.'b i provided at'hazard mar$rs locations given in I R C ; ~ ~&uct"ral
.,'
; . . columns of'la~ge-direction signs, illumination Iimp,,po.ststsand, at.appioachin6 Iraffii : :
i islands of toll piazd:' I!' shall take repeated iinpacts withbut'any additidnal recovery ....
! . . . . . . shall
'.procedures and with 'minimal or no repairs. The' atlenuators .modules . . be . . . .
j
moulded from HDPE plastic. The design, size, number of modules, etc. of atlenuators ' "
.'
.:
i
'. i sliall be as perlnternational
. . . Standards.
. . . and. location,
. . specific duly considering,
. . . the . . .
liltcly. impact. , ,
. . . .
! . .
. . .
' : , . . .
fi 9.7 ' Road ~ i ahd:,~edi
i i &i safety Barriers
. . . . . . . .
. . .
, .
j . ,There are two typesof safety barriers viz., roadside safety barriers, and median safety
i barri'ers.
, .
i. . .
5 rn '
. . ~en!re..ofthocarrlageway
' '
and rnedlan openlngs - . . Ihe junclion/madian .
. . . opening (approachingside)
I . . . . -1
I.).;
'
.'
a spacing of 0.15.m carrlageway and.the
cross roads (approaching
.--; ,
side 50 rn before !lie
junclionlmedianopening)
1: :
I :.
.
. .
4 All buill-upareas . .
5 i~ncontrolled ~edesfria~
Lenglhof built-uparea
- .
I . . .:,
..
crossings . . . . . .
. ,
. . . .
.. .
J
. . . .
.' Note : . . .: . . . ..
. . . . . . .
;.. 1:' solar ~tudssha'llbe providedfor lbcatiok at ki. No. 3 (i) and 5 in ?able 9.1.
. . 2.. White. colour road studs.shall be-used at locations where lane marking in white
, . 'colour Is prescribed i? , . . . .
. . . . . .
I ' 'i;'
. . ... IRC:35,- Amber oolour shall be used a! locafions wheie lane marking iK amber
1. ; . ::
. . .
' .
.. '
colour is prescribed in ,
. IRC:~~; R L cblour
' .
~ may be used to indicate no entry (gke conlrafiow side).
I. ,.' .
i '"
" ' 9.7.1 . Road side safety barriers .
.
. .,
.
.
:: ;i) ; Warrants: The Idngituainal roadside'barriers.arebasically meant to shield
'
. .r .twotype's.of roadside.hazards I;e.embanRm'ents and roadside obstacles
! and also for preventing the vehicles~v~ering.off the sharp curves. The
warrants for a fill se~ti6n
in terms of the height and slope needing protection
. . . '
. with roadside ba&rs;are. st~owr!inFig.'S.l. The barrier is not warranted .
for en?bankment,having a fill slope of 3H:l.V or flatter;The warrants for
roadside objects are mainly dependent upon theiype of obstacle and the
'
. ' vehicle striklng the bariier Is llkely to be less severe than the severity of
. ' . . accldent resulting frgm the vehicle lrnpactingthe ilnshielded obstacle.
. .
I ' Some ofthecommonly encountered roadside obstacles are bridge piers,
. . headwalls cut slopes, retainlng walls, lighting supports, traffic signs and'
',
" .. signal Gpports, trees and uti1ity;pole.s. . . . .
,
. . . ,.
. . .
I ii) ~ y p e sof Roadside Safety Barriers
I1 : .
The.ce are three types of longitudinal roadside safety barriers vi.z:. - . -
I .
. . . .. . . . .
. a) Flexible type (like wire r .. .. . . .
.
- ' '
. .
. .
I
I.! . .
278 i
I
. . . . . . . . ..
. . . . . . . . . ......
. . . ..,;-A,:
.. !
?
. .. . .
>
1. ;,;, '. . '. . .
1i .:?. -;. . . . .
. . .
.
, . TIIAVELLE
FILL SECTION -
EMBANKMENT
, ..
I ':.
. .
. . .
. . HEIGHT
. . . . . . . .
. .
' C
. L
. . . I
. .
. . ..
..
1 .
. .
D .
' . . 0.1 . . ,
. . . . . . . .
. . . . . . .
.
.
.
. . . . ..
1, - .
,
.
. . . .
. .
. .
.
. . A', . !
.-
......
0.0
' '
. .
?-
o 3 - 6 9 . 12 . . 15 ' 18 .
i .FILL SECTION HEIGHT (m) .
j
'
. .
. '\--
r
-
L..
..
95 . .
I . .
.. 279
.,. :.; . :
' b) Semi-rigid type like
1 ... "W' beam type steel barrier
i Thrie beam type steel barrier
These stael barriers are of strong post type and usually remain
functional afler moderate ~ollisionsthereby eliminating the need for
imrnediate repair.
. . ;c ) : Rigid type(like cbncrete crash barrkrs). . . . " . ' '
.
. . '. . . away from the posts. The spacer minimizesvehicular snagglng and ',
. . . . . . . . ,reduces the likelihood of a vehicle'vaultlngover the barrier.The steel . . . .
. .. . . .. . posts and the blocking 0u.t spacer shall both be channel section.of . .
. . . . 75 rnm x.150 rnm Slze and 5 mm thick. The rail shall be 700 rnm '. .
,
. . . . .
aboveground le?el.and postsshall be spaced 2 m center-io-center.
.. Typical details.areshownin Fig. 9.2. . .
. . 2
..
.
The thrie beam safel) barrier shall have posts and spacers similar . ,
'. .to .the ones mentionsd qbove for "W beam type. The rail shall be
I ..:. . .. .
.initial.coslthar! the "W" beam type but Is less prone to damages to
i vehicle collisions especially for shallow angle impacts. Typical details
i ' ..:.' . .
.. . . . of Tbrie beam barrierare shown in Fig. 9.3. .
. . . he "W'! beam, the Thrie beam and the posts spacers and fasteners . ' .
. : . .Turneddown guardrails have the " W or Thrie sections reduced from . '
:.
,
to minimizedrivers'reaction to a hazard near the road by gradually . -'
. introducinga parallel barrier installation or to transition a roadside
1 . . barrier nearer the roadway such as a bridge parapet or a railing, the
d down rail shall be flared away from the roadway. Suggested
rates depending upon the design speed and type of barrier are
Table 9.2.
96.
280
. I :c..: ., ..I . . , ... ...-.:,, ...:..... . . . . . .
. . .
.,
. . .
.. . . ....
. . . .
. .
THRlE BEAM BACK-UP
.. : ., I
. . . .
. . . I . _. .
. . '. : . . .
. . .
.. . . .Fig. 9.3Typical ~etails.of~ h r i eBeam Section
. . .. . . .. .
. .
I
. .. .. .
. .
. .
i . . . :-All dimensions are in mm
'Note
. .
. . . .
.
. ,
1 :;.,..
). ..:
:..... . .
: . .
. .
. .
j:!;',.. ..
. .
,
IRC:SP:84-2009
1.: -:.,
. .
.: Table 9.2 Flare Rates
I:.;.
1:;. . . . . . .. . Design speed in Flare Rates
i..;~..,
. . .. .. ..
.....
,,.
..... - . . .
. . .
. . . .
km per hour
l(10
Rigid barriers Seml-rlgld barrlers
17:l 13:l
-
80 . 14:l . . - .11:1
.. ..
6.0". ' 11:l . . .' . . . 9:l' '..
-
. . 40 8:l 7: 1
The posts in Be end treatment shou!d have?hesame c:o~s.szc:ionn
as provided in t'ke main barrier. . ,
.
portion should develop a tensile stren,gh in the rat1elementcto prevent
. . , . the rail from pulling'out of the anchorabe. Tha barrier can also be
.-_.....
. . ... . .: . . anchored in an earth berm specially oonstruct~dfethia purpbae
. 2'. :'. . . . . . . . .
,
. . . . ... . . .
' . I '
. prnvid~~d the new berm itself is not a ha-r.ard,tothe traffic.Tha earth'
:.:.. ........
; ,
:.. .. .. .. .i.
... . ... . .. . . . .
"
, .
,. ,% c). .~lackment: Placement recoinmendalions determine :the, exact
. . . . layout of the barrier and shall: be made.by the design'sngineer
. 1:'
keeping in view' the lateral offset of the barrier and flare.rate. The
'
! . . .::. ...
j . . .. . .. . ... , . .
. . . final layout shall be asite-specific combinationof th8'se factors; The
*i . ' .
! ,. .
. :. '. '
barriers shall be as far away from the traffic as possible 'and shall
., . .
,i . .
, ,
:.
, . . preferably have uniformclear&ncebetweenthe traficand the hazard.
i! : :. , . .
.! . ..:. As far as possible the safetibaker shall be placed beyond 2.5 m of
! . . ' . .. the traveled way, For long and continuous stretches, this offset is not
j : ;.. . . critical. The distance between the barrier and the hazard shall not
i .
. . .: be less than the dnflection cf the barrier by an impact of a full sized
1:':
I . .
. ' .
.
. - vehicle.ln case of embankments, a minimum distance of 600 mm
I . . . . .
.. . .
I. .
. ' shall be maintained between the barrieiandthe start of embankment
.
Ii
.
. . slope of a:hazardlto prevent the wheelsf~omdropping over the edge.
. .
. . Typical details are shown in Fig, 9.4. . . . . .
I . . . .
1 . . .
: '
. . . . Flatter flare rates may be used particularly where extensive grading
1; would be required to ensure a flat approach from the traveled.way
j .. subject to Ihe availability of right of way.
I
. I. iv) Road Side Concrete Barriers
zj Design Aspects : Roadside Concrete safety barriers are rlglo
barriers having a sloped front face and a vertical back face. The
, . . .
9%
283
600 mm MINIMUtvI
.. . DESIRABLE
. .
. ..
.
. .
. . . The @ncre@.barriermay be precast in lengthsof upto 6 rn depending . ' '
%. . .' upon the feasibility of transport and lifting arrangements. Concrete
,
. . .
' gradcfor ths'ba~iersshall not be leaner than M30; The minimum
.
.. thickness of foundafiuns shall be 25 mm thick cement concrete or
' ,
I
i
'.'q) Placement : Placemerit recorn~endationsf i r roadslde steel
barriers, mentioned in para'9.7.1 (ili) (c) above are applicable to
, ' .,
284
. ,.&.:.. - .'..
. . . . . -
L..
..
. . . .. . ,--
4 . .
'w
. -
t - ..
W
..:
.< -
4: . ,
,w' .
.
. .
&..--;:'
- ~
v
.:
...>
!
-
C:' r-.
t-:.
. -.
.
e . .
:.
. .' . .-
@. .i
La'
' .-
..c
?:.I
- '
'4
,,:3 .-
s;')
hi.-
,a ,-
7#,;
f.
id
..Q
.)
-
"3
A. ....I
-
.n
P
7b
""p)
. . -
I' .-
s' 3- -
M
,.GI,--.
'*.-J
J
.-
f<")
_w /--
3
&(/
. . . . .8
-..
',.; -
.*."'
*., :;
L
' a,.;
,-
,'.+.
,-
-
+?
i-'
a; " , .
\.J .
.-
.
++--
- ..Y
.<.. -
lilr
, s.0
.-.-. .
-
.-.
I.,,..'
-
.
-
I:.
\. ....
..,,
.... ,-
are a major source of accidents. Fixed objects on mediaris also require
shielding from the trafficflow. Provision of median safety barrier in such
conditions is an important requirement.
Wanants :The requirement bf a median barrier is ifunction of the width
of the.rnedian and the traffic volurne on.the wad. Fig. 9.7 indicalus the
warrants for provision of median barriers in terms of the combination of
median wid!h and ~verage.Daily~raffic(ADT) in PCUs. At ADT less~than . .
20,000 PC,Us and with medians wider than 9 m, the probabilityof avehi'cle
crossing aGoss the median is iela\ively low and medlanbarriers in such ,
.alignmGf, sight distance, design speed, traffic volume and median width !.
shall be.made prior.to taking a decision to install a median barrier. . .
. . . .
a) !&ee!j~edlanBarriers . . .
t s "W' beam barricr shall be similar to the
. . ~ e s l ~ n ' ~ s p e :cThe
.roadside barrier described In Para 9.7..1 (lii) (a) above exceptthat
the "W beam shall be provided on both sldes ofthe post withsimilar.
. . . dalails are indicatedin Fig, 9.8. . .
spacers. Typical
?he T h r l ~beam barrier b hail be similar to the roadside barrier .
'described.ln'~ara9;7.1 (iil) above except that the Thrie beam shall
;be provided on bolh sides of the'post with similar spacers. Typical
:details:areshown in Fig. 9.9. . . .
. '. . . ..
OPTIONAL
. . . .
. . ..
. . . :. ' 6
. .
.fig.9.8 Typical 0etaiI.s of!^: Beam ~ e d i a n ~ a r r i e r
_. . *
pi-.'..,'
u.6' ,
. .
4 ' .
.: Median barriershallbe terminatedsuffrci~ntlya\niayfromthe median. . .. ...
.. .
.. . opening with the twin objectives of preventingimpact by the turning
.
. 1.;. .
-'.
- -
.
, , . .... . .
2 '. : ' o f 8 t o 9 m ;
..
..
. . ,
Placement :Placement ~ecommendationbforiteetmedian.barriers
. mentioned in Para 9.72 .(lil)'(a) above apply to concrete median - .
,
.
.
.
.
. . barriers also.
,
. ..
- ' iv) 'General .. . . .
. . . .
- : Raised kerbs or drains shall not be provided between ths'ttavejed way
,
. . .. _: . . and the barriers. These destabilize the vehicle balance. and disturb its . .
. .. .
. . .. , . e~ullibrlumbefore i t strikss the: barrier, thus defeating the essential
..
. . . ' '., purpose of safetyand.redirectior~of the Impacting vehicle. Steel barriers.' , ; '.
! : . , .. ' shall be: provided iti rural seGions.whereas @ncrete.barriers.shall be .
..
1"''
':
I :. .. . ' '
provided in'b~iltiubsections; In addition to the warrants given in Para. ; . .
. . .
.
. ..
' , . . . .; 9:7;1 (i) and 9,'7.2 (iijabqve, the safety barriers shall also be provided at . :. '
, . .. . . .
.. . . -thefollowing locatio~s.~. ., . . . . , . . .. . .
, , ,
.. . . . . .
. .
i . a) Where embankment is retained by a retaining struclure. - .
1 . .
on valley side of highway arid steep terrain.
,I . .
b) . . .in .mountainous
, . .
audit.' . . . . .
' b
' '
. .
The iequirementsGfsafety Barriers for structures are given in Para 7.17
. .
:.
of this Manual. . . . .
I
9.8 Road Boundary Stones (RBS)
II :
, .
i 106
29 0.
(
I
i
I
WlDT H OF MEDIAN
. W .
w12 w12 I
. .. .
. . . ,
ILLUSTRATION 3
I. 1 SECTION 11 :. j '
ILLUSTRATION
.. . .
!
1 . . .
Fig. 9..10 Recommended Medlan ~ a r r l e Placement
r
ii
in Non-level Median
107
291
,. . ,... j
1
L,
d
L. -,
6
;--,
;-,
{.'>
I-,,
I?
.-
. .
. . . .
.. 6000
. '
. .8
, -= . :
. . . :
. .
i .
: -/(-
-
150 (TYFI ,.
;,
A . ITYP
1
1 . '
Is00 . 2400 I 1800 .
- . . .
50 3 0 280 30 50 '.
. . .
SEE DETAIL B
4O DRAFT
o
"w
'm
8
-0
. ,-.
a
m
END'KEYWAY DETAIL "a-
. . . .
,w' . . .
'33 N3TES :-
W ..
1. Concrete M 30
2. Placs on 25 mm g r ~ d lbed
3.'Iiigh strength deformed
(HYSD) reinforcement
4 . .Ul'dimensions are in mm
. . . .
' . .
. Fig. 9-12 Median Barrier Prkkast ~ e s i ~ n
. . . . . . . . . . . - - .. . .-
i
i . Way. Theseshall be sRacedat 200 rn. he boundary stones shall be of cement concrete
1 . as per Type Design given in IRC:25, The boundary stones.shall be painted with cement
1
I .
. primerand enamel paint and marked !RBS' by paint.
-
ii)' Hectornetre (200 rn) Stones sha~l'be~rovided
.
at every 200 rn distance on
.both sides of the Project Highway. The design and specification of 200 m
,
stones shall conform to 1&~':26. The matter to be written on the 200 m ' .
. .
., stones
' shall be as spe.cifiid in IRC:26;
. .
: :
. I .
. , 3.10
.
, Pedestrian k a i ~ l n ~ s l ~ u aails
rd : . .
:
: . . .
..
. ,
. . .. . . . .
! . .
' . . , . .....
, ' 9 .'Sotar Based Beacons or Flashing Signals
.. . .
. .. .. . .
.
.
. -: . These shdll be provlded at'uticontrolled pedesirian crossings; near the public gathering
.;.... places like'educational institutions, worship piaces, hospitals, etc. cross roads; and . .
. ' :median opening
. locations; .
: . .
. . . . .
. .
. .
. ' 9.12' . design Report
t '." .. . . . .
. 1.
i
,7he ~oncesslonsireshall submit the proposals for traffic controIIr3ad &ifetydevices and
',
.
i :road furniture together with drawings and details to the Independent Engineer for review '
!
and comments, if any. The proposals shall' include type, location, material
j' .:specifications, installation detailsand the, requisite warranties for satisfactory fiel,d . .
1:
I
: . perfoknance (as applicable).
.1 ,:..:,-
.
.,
'
j
,:...
. . . .. .
! .,. ,:. '
! .:.
[ ' . , . , (. '
!:
, . '
:. .. ..
I "
I
.
j.:
. . .
. .
Ij
I RC:SP:84-2009
j
t :
,' :..
SECTION 10 -
. .
. .
.. . .
1 . .. . .
t '
TO.LL PLAZAS
j . .
. .
. . . . .. .
.. 10.4 .
.. . General .
. .
. .. . . .
.. .: The ~oncessiondreshall provide t h 6 ' ~ o l Plazas
< at the locations. specified in
. . .... -Schedule 'C'. for collection of tollffee as :per the Concession,Agreement. The fee
. .
. .:. collection system shall bespeedy, &ficie_nt and user friendly. The design oftheToll Plazas . :
1 ,;
. should be such that they akaesih~ticaily~pleasin~ an.d.efr'lc'knt,aridthafee:coilsctionstaff . '
if .. .. ' '. '.' .should be quick, courteous and adequately trained.beforedeptoyrnbnt. . .
...
'
I- -
.
.
.
'10.2
. . . .
'Location of Toll Plaza
. .
/
,
i
. . .. .
. . .
.
, 1: :!he location df loll para rhallPe.indicated'i/ S c h 6 d u l ~ ' C ~ fCoicession*&eernent.
th~ . '
. .
...
: i) Land availability
. .
.. ..
ii) Stream of traffic o n ~ o lPlaza
l . . . . . .
. . . , .
... . .
. ,. ... . . iii). visibility for the:aiproaching traffic . . . .
. .
. . . .
. . . ::. . . . . ;. iv), ~easonably.
away from road ioter~ectionsafi:dlorail crossings. . :
: . . . . . . . .
,. ' .
.
. ,.. ... ..
,
.
. . .:
.
V) . Free from dsk offlooding and subrnergenca;
. .
etc. ., ' . .. ' . . .
. .. . .
. .. .. '. . ?
,
. . . . .
i
. . . .
;
1
I
.
-'
.
.'..10.3.
. . .
' Land for Toll Plaza
.Adequate land for Toll Plaza shall be acquired to permlt the provision of toll lanes for a
"
. projected peak. hour traffic of 20 years subject to a minimum number of 16 toll lanes
including all other buildings and structures to be accommodatedat the Toll Plaza location.
'Land shall be acquired as per provisions of the concession ~greement..
1 . . ..
1 .
. .
10.9 .:
. . . . .
~ a out
y and Design ofioll Plaza . .
. . .
. .
.
1 . .
.
~ y ~ i clayout
.10.4.1 a l O~S+S tpll is &en in Fig. 1O:I. The layo"i shall provide for .
, '
.
.. .future,expansion of toll lane's. Stage construction ofToll Plaza in respect of number of toll '
113- .
246
. . . . .
. . . . . . .
IRC:SP:84-2009
Between each toll lane of the toll plaza, traffic islands are required lo accommodate toll
booth. These islands shali be of minimum 25 rn length and 1,8.'m width. Pratective
' . . . . . barriers of reinforced concrete and trafficimpact attenuaiors shall be'plased at the front of
-' .
each island to prevent out of control approaching vehicles crashinglint0 the toll booth.
! . . :. .They would be . painted
. with reflective chevron markings.,
i.
1 .
10.4.4 Tall booths
i
3i: .
1 . . . ..: Toll booths may be provided bf prefabricated materials oi of mascnrj.The loll Sooths
1, . , shall have adequate space for seating of toll collector. computer. printer, cash box. ctc, II
' ..
. . . . should have:provision for light, fan and air conditionjng. The typical details of traffic island
. . . . . ... .with toll booth are given in Fig.. 10.2. . . . . .. . . ....
'. . *
. . . . .
. . .. .
. . . .: Toll bpoth.stial1be placed at,the centie bfeach iraffic Island.The toll booth shall'have large
. . . :. . . . .. glass windd.w to provlde the'toll collector with good vidbility of approachjng vehicles. The
. .. ... .: '.bottom,ofthetoll window should be' placed at such a height (0.9 in)above ground level so
. . . '.. . as to provide convenience of operation.The toll booths shall be ergonbmicailydesigned
*.. . '::.. and vandal. proof.
'
. - There shall be GCTV camera.installed at each booth: . . . . .
. . .... .. . , . . .
. . . .
10.4.5 Tunnels . . . .. . .
. . .. .. . .. . ..
. .
... -,.
...... . . . . .
: Foi the movement bet&& toll'6kcs and toll Mhbf eac?h.tolllane;akunderground
i
, I:
- tunnel aGoss all toll lanes shail:be provided, Its dimension would be sufficient t o
,
I.'j. ' . -',:: .:;. . accommodate.the required wiringlcable system and for convenient mavement of
1 . . personnel. It sh.oulij also be provided with lighting and. ventilat.ion system so that the
-,
1
. .:
'. / . ;A I I the toll lanesand toll booths shall be covered with a canopy ha canopy ;hall be wide .'
! . 'enough to provide weather protection to toll operators, drivers and facilities. The canopy
.I. . ., .
.
.. shall be of aesthetically pleasing design with cylindrical suppoitcolumns located at traffic
/1.
. island so that there is no reslririion on visibility and lreffic rnovernenl Thevertical . .
298
I,'.
i . .
!. . .
. . . ..
......
. .
.
!
the storm water is 'drained o f efficiently and. no
place at any area of the toll plaza.
. .ponding or stagnation
. . . .
. . of water
. .
takes
..
. . .
. :.. . ' . . butlon'on a touch panel-andentry lane controller for controlling.the.equlpm~~t,of-the entry .
',.: lane and for $ending the data to the daiaprocessing equipment at Toll plaza oPlce. Each
. . . . . toll lane.shal1 have elsctro,nically operated boom barrier along with synchr~nised system
. : fpr traffic lights.
,
. . . .
. .
I '. ;.'
1 .: .; .The ~lectrotiic Toll ~oliektib; (ETC) system shall konslst of. an 06 B'oirdUnit (with a
{::~rnadCard) fitted on a vehicle and a roadside antenna (Road Side Unit) to receive
. . .: . communication for.identification of its code and.other stored data .and.a system.for
'
.. '.
. ..
.
, . . . .. :. transmitting
. data to and from the'on board unit to the customer information management
1 . . . .. system through the road side unit.'
:
i .. - .. . . ... ,.
. '. . .. . ,
1 ; . :
. . . . . . . . . . .. .
~
. . . . . .
. .
. . . . . . . . . .. .
1 ... .
'
' 10.4.11 '~reventibnofdv&loading 8
; . .
. . . .. . . .
.
.' . ':..:~ollplaza ~dcatiorishall.also-beprovided with system'for checking and preventing over-. .
.. . .. . , ,
' '
I;.. - .. . - ..loadingof
. :. yehicles i t ~oll.~laza.
For this purpose, weigh in motion systems at approaches . ., ,,
:.... . . . . .to each toll lane are to'be IostaUed. Separate space for staticlveigh bridge and area to .;.. .-
..';. . ... .. .holdoff-loadedgoods from overloaded uehlcies shall.be.provided
,
after the.tolI bartiers for ......
. . . . . ,each direction of travel. .. .: . . . . . . .. . . ... . ., . . . . . . . . . . . . . . . . . . .. . . . .
.
. . . . . . _. . _.;
. ... . . . . . . : .. .. ..
. . . . . -
L
. .
' . . . . I
..
he total number of toll booths and lanes shill be such as to ensure the service time oi not .. .:
: more than 10 seconds per vehicle at peak flow regardless of methodology adopted for
'. .
. . ' fe~collection.For purpose of guidance following parameters are suggestedas capacity : . . :
I .
.
.
...
.
. .
.........
..
. .
At least two toll lanes in each direction of travel shall be provided with the system of
paymentthrough ETC. Not less than 2 middle toll lanes shall be capable of being used as
reversible lanes to meet the demand of tidal flow.
. .
I1 '
Toll plazas shall be designed for projected peakhour traffic of 20 years. As mentioned in
Para 10.41, the ~!agekonsiruction of t011.pIazain respect of number oftdl I ? - ~ e s , ~be
h~~il. :
allowed. If atany time, the queue of vehicles becomes so large that the waitingtime of the .
'
--
i
i
I user exceeds three minutes, the number of toil lanes sha!l be incieased so t'hatt'he
. .
i . . .
rilaxiti-turn waiting timeis brought down to less thanthree minutes.' . . . .
. . . . .. .. .. .
1! "
. For smooth arid.efficienl fuoctioning of toll collection, the following arrn&men~ :. .
facilities shall be provided: . ._. .. . -
, , '.
I . .
I
i
, ' ::. . .
i). The staff posted at the counters in the-semi-~uto,matic~sys.lem:of
,
toll
collectian 'shall be provided with sufficient electronic equipment for the .
., .collectionof toll and recording data, a?d:small denominationnoteslcoins'
. . . . . ...
..
.
?
1.
.
i ...
/ iii) If the booth is dosed for any reason, incominbtraffic shall be' guided into ;
i the adjoining working booth with the help of appropriate signs. . . . . . .
!
i : . .
. .
I .. iv) The eniire.fe! collectinn complex
. . . . . . . .
. . .shgll
. be-adequafelyguarded.
, .
. .
. ..
. .
. .
L '~,oncrete shall b&prbvided intheToll ~laza.&ealfltl"ding tapering zane.hom ': ?
..
'
!
i .. 'durability and long time serviceability consideration arid .to permit the p~vlsionof toll i
lanes'initiallyfor a projected peak hour traffic of 10 years. 'The concrete pavement maybe
I-
i widened to provide.for future toll lanes required as per stage construction. The rigid . , ..
I . pavement shall be designed as per IRC:58. For this work, use of paver shall not be
. .. . . . . . . . . . . . .: : .
: insisted. . .
t: '10.4.15
. . . . ... .
Traffic signs.
. . . .
. '
. .
. . . . . . .
;.. . . .
.
....
.
. .
.. i
I
,'
. , ..
. .
, . ,. . .
. . .
i
I
1i :r A well thoughi outstrategy should be evolved for provldin$iraffi&lg"sand load rriarkinei '. i
In and around tbeToII P l a i in accordance with IRC:67,anB IRC:35. The Concesslonalre
{would design the configurationlplacement of signsfor toll plaza which are,not g1ven.i".
: i!
i1 lRC:67 and furnish to I for review so as to ensure uniformity of signs i.n use
I
'
. on all the
, . .
-.highwaysacross the country.
!
I . . i
Signs should be placed along the Project Highway, roadway of.TollPlaza to guide and
ssistance to the drivers approaching the Toll Plaza. It is necessaty to aleri the ,
i
.... I
1I
,@. 1.18 i
. ,
1 . O v. , .
3C1
-4;
1
a
<
.........;..p.$......
&,5&?i, ...... .,-. ... . . .
: . . . : . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
8 :
. . . . . . .
. .
. . .
I
, . . 'driver about the existence of Toll Plaza one km ahead with arepeater sign 500 m ahead.
. .
Stop sign shall always be used in combination with certain road markings such a's stop
; line and the word 'STOP'. marked
. on the pavement.
. .
,. .
% ,
The Toll Plaza sign should besupplelnentedby the sign adviginb the users of the notified
.. . .. :toll rates (fees) for various types of vehicles and exempt~dcategories of vehicles.
. '. . . . .
. :. . .~ppropriate.~igns
-. and Signals shall.als:o be pro\iided on the Canopy of till plaza to
. . :. . ;prope'rlyguide the approaching vehicles abo.ut the lane'in operation, lane applicable to
, . . . ,. . .specific category
. of. vehicle, lane with ElectronieToll System, reversible lane, etc:
.. . .- . . .
. .. .. .... . .
10.4.1 6 Road markings
. . . '.. . .'
. ;The road rnarkings.shal1be used in accordance with section.9 of this Manual. The road
, ',
. . .'markings for the Toll Plaza area shall consist of lane markings, diagonals, chevron
.
.,- '. liarkings. single centre 1ine.i~ provided at the'centre of carriageway at toll gate to
. .
. demarcate.each'service lane; Diagonal markings for central traffic island and chevron
. :. .... ...mafkiAgsat side-trafficisland shall be providedto guide,the dpkoaching:and separating
i .' .. ,traMc. .- . . . . ... .
. .
'
;,;ji,tiorder to coktrol overspeeding of the vehicle approadhirib to11 booihi transverse bar
.
!' . , <',
. . markings, as: per typical details
.. given in Fig:,lO..3 shali be provldsd. ......
....
. . . .. .... .. . . . . . . .. .. . ..:.;!:.,,~,'
, . .
. .
:..10.4..17 ~ l g h t i n. g .' . ;
.
.... . . . .
.
.
.
.
.
.
.
. . . . .
. . . ......
.....:. : . . . .
. . . . .....': \
:. . The toll phi& shall have lighti"$$$tem to provide vidbilily to drivarsfgr.:the use of facility
.: . -especiallyto access the correct service lane and also to the toll collector~:'lndian Standard
:
. . .
'
.'Code o f practice for ~ i ~ .f.i.t.i.n. .$. a f - ~ ~
~horoughfare'
b l i
g c IS:^ 944 shall@, followed. This
would be done by interior and.&xterior lighting as indicated below. ~ow@supplyshall be
.- f r o m public power supplysyst?m! but.stand by generatingsef of the c$acity .. to supply the
. .
.required power shall be providedai toll ?laza. . . . . .
. . . . . . .
. .. .Interior
. ' Llghting : ~ h e t o i l & o t h s and facilily building office shall beilluminated
. 'adequately. Indoor lighting shall be with fluorescent lamps. Lighting should be provided in
,
...
. . : such a manner that glare isavoid&j,or minirnised. The level of illumination shall be 200 to
.....
'.. '.300Lux as per 1833646 part II. . '; . . .
. .
. .
. .. .. . . . .
. . . . -
' . x t e r i o i , ~ i ~ h t:l Lighting
, n~ of t h e ~ o l l ~ lisimportanifor
~ra enhanting~le . . . . night visibility. : . ,
IS to the.Toll Plaza
,
lip,I: -I
I " 6..
I
m a . "
. , , .. . . .
High Mast Lighting : Normal low light poles are not able to give the .requiredlighting
conditions. It is, therefore, necessary to install high mast. Aheight of 30 m for the rnast is
considered suitable to have uniform spread of de$ired:levelofillumination~ln.the Toll Plaza
.area for.safe
. movement of vehicles..
. . .. . . .. . . . . .
.
- '. .. '. .
. . .
. . i , _ . . . . . . . :
. .
. . . . .. . . .
. . .
. . .., . . .
. . . .
. :.'..:. . 10.4.18-
. . .
~ a t e .iupply
r . . . . . . . .
. . .. . - . . .
.> 1':. ... .,; ..
. : -.Adequatewater supply shall be provided. For woiking out wa!er rhuirement and internal
, . .
;-, drainage system. reference may bemade to IS:1172, IS5339 and IS:1742..
. .
I :. .
: ...
. Toll &za shall have fire fighting kquipment, in~ludin~smoke'detectors
and auto visual
1 . .,alarm system as per Section 4.17;l ~f Natio"al Building Code, so that the personnel .
working In the ~omplex
.. and the'office and the. road
. .users
. are protected .against
. fire
. .
/ ;,. ::..haiards,
: . . . .. . .
. .
.. ,. .
. . .. .... ' :10.4,.20 ~ d lplaza
l complex
. .
.. ...:.. Toll plaza shall have a separate office bullding so as to provide comfortable offlce space .. '
,. . ; .for manager, cashler and other Staff. There shall be separate rooms for TVmonitors,
. meetlngs,:toilets, and for the sale .ofpasses; smart cards, on board units and public
, .... . . .
::,
interaction. The building shal! have a strong room for keeping the cash and a garage to : .
accommodate the security van (during operation of loading the collected revenue). There .
. .
.'shall be parking space in thk s a m e campus for vehicles for the staff and workers'and . '
..
. . : . other vehicles engaged in the operation of the Project Highway. . . . .
. .
I
I The size of the office complex depends on the rnrnlmum requirement of above facilities.
'121
. .
?C4
C,
... .. .. .. ; ; ,> . . .. / . .
. . . .
. . . . . I - I
IRC:SP:84-2009
.. . -
,
.. . ' .
. ~ h e d e s iand'layout
~i of 7011Plaza bornplei including all facilities shall be owbiitted. to. !he
. .. . . .' '
.i. '
.
. lndependent Engineerfor revie.waqdcomments,'ifany..
.. . . . . . . . .. . . . .. . .. .'!.. . ..'.,:.. . . .
. . . . .. . _ . . ,. . . . . . :. .,
. . ,
....
:;>:.,':.'1: '.
:,:. . . . .
. . . . .!'..,
:.
. ..
.';,
....
. . ,.....
. ...,(..
...... I
. . . . . .
, . , ..:
I.:.
,,
. ':.'.:,
1 .....
i. ..... - '
;'i" :
:.. '
..;.;. .;:..:
.:,
.
. .
I... ..:.
:. ...
.
.:
. .;.
.; I .....
SECTION 11
.II,I General
,.;:.. ..":
i'. . .
. , ! ;',:.:..". The Concessionaire shall plant trees a'nd shrubs of cequired number and type at the
. . ..: .. -appropriate locations within the Right of Way and in the land earmarked by the Authority
i: . . . . . . .
. .
.
i-'.:
1 ......
.....-.- for afforestation keeping in view the.IRC Guidelines onLandscaping and Tree Pkntation.
1 -.-.: ..
.. The Authority will specify the number of trees which are required to be plantediby the
:
j . . . . .:;.. . Corlcessionairs as compensato~yafforestationor: olhe&ise. The Concessionaireshall
. -.. I'
:. ;:,;
also maintain the trees and shrubs in good coridition.during the ConcessionPeriodas
....:.... . ..' , per the maintenance schedule. The guid.elinesgiven in this Section shall be followed, in
. :1
I..'
:.: ':. ..':'.
;,:.,. . . . .
." ..
plantation of trees and shrubs.
, . .
..-. .
.. . .
..
.
:.
.
.
,. . 11.2 ,' Design Considerations in Various Locations . .
....
. . 1 .:.. ..:' . .
6 .. . ,; : '
i . . . . .11.2.1 Set-back distance of trees and other plantation .
, I . ' . : ..:' .
1 . . .:.
.. '.: Trees.on thc roadside
shall be sufficiently away.lrorn the'roadway so that they are not a
. . hazaid lu road trafllc or restrict the visibility. Most vulrierable locations in this regatd are . .:
'. ,.
L
lhe'inside of r:trrves, median's, junctiohcorners and cut slopes. Trees shall be placed al s
. . ' . . minimum distance:of 14 m from the.centre.'line o'f.ttie extreme.traffic lane to provide
[, .. .:.-. . ... ': recovery area for the vehicle that rlrn's off the road: Asecond row of trees 6-m.furiheraway
i
..:. will also be planted wherever possitjle. Preferably the first row of trees shall consist of . i
I - .
: - / .: -Specieswith thick shade and other rows of vertical type providing thin shade. Expinsion
;'
. . .. .
I . . . . . . .of the Project Highway to G-lanes sllall be taken-intoconsideration while locatingthe trees .
f ' . -. A:.': 'so that land is free of trees when furtherwidening takes place. The distanies for . . .
.. . >
,
I
'
.
: . . . . .:(.. . alternative rows of trees shall be reckoned from the nearest edge of the unidirectional
1 . ; . . . ' . . . .carriageway. IVo plantation shall be allowedon theembankmentslopes.
. >; .
j 1; ........
. . .<'
. . . .
.:.. 11.2.2
;.:..
. .;. Experierice has been that
Set-back of frees on curves
growth of thick vegetation close to the formation on inside of
i.
?
, 11 .....
.:
'
: , ::,
..:,::-,horizontal curve Leads to serious .reduction of sight distance and causes avoidable
accidegts withcatkleichidren sucidenly~prnbrgingfrom the side Uncontrolled treaY
vegetation, may also affect visibility of trafficcontrol devices and road slgns.'Therefore,
in plain terrain a stopplng sight distance bf 180 rn corresponding to'the design speed of
, ;
. . ., jI
i
i
! ;. . .;.. ... 100 km per hour may.be ensured on all curved sections of the Project Highway along the. , . .
/ . -:innerrnpst lane. However, where there are siterestrictions their requirement may be
! . . .: , 'reduced to 130 m corresponding to the design speed of80 km per hour as a special . .
case. The existing treesand vegetation on the sides have to be suitably thinnedltrjmmed, i
1 . .
.
'
1 . or even removed if necessary and a regular programme of pruning of the offending trees
n as part of the maintenance operations. ', . . - ,
I . I .
, ,
125-' .
. -
. . . .. .~~!:7.::7Pr.$F&%m!1mmm~wm
;
1I ' .IRC:SP:84-2009 . .
I
I. . .
j . . In all cases, location of trees shall be checked to ensure.~that clear . vision of all highway
1I ' '
.
signslsignals is availableat all times to t h ~ ' r n ~ t o i i s t s . ~ l ~ ofoliage
: come: in the way of roadway lighting.. . . . . . .
, t h e or trees shall not
I . .
1 -. .
...
.
. . . . . . . . . ....
. .
. 1 2 3 .' Vsrticgl clearance
. . :of. trees .and other
. . plantations'
. . . . : . .
. .
. , . . ....... : . . .... . . . . .
-. . .
. For safe traffic operation. the vertica! clearanceawailableaiross the madwayshall be
. .
1 a
minimum.5 m. From 3his angle, the; probable . . . 9ize.of
. ..all. plants
.. . . . shall.bs
. . . .
anticipated jn
. .
. ,. .: . advance,'at
.. . . . ..the time of initial planting.
.. . . .. ... . . . .. .. . . . . .
. . i :... ..\ . . .... .
'
. ,.
. - ..
:
. .
.
-..
-
To all& for the effects of gow!h, $ind:acd
, .
trimmed td 6 m and 6.5 m ..
. . - . ... - be planted 2nd maintainedto cut off headlight glare from.traffic in the opposite direction. . ' '
. . Flowering plants and shrubs are eminently suited foi the purpose. ~hese'shallbe planted. . . . .
. . .
. . :; either Incontinuous iows or inthe form of baffles. The height of shrubs shall be maintained . , ]
. ..:. . .' . .at. 115 in to cut off the effect oftraffic liglitscoming from theopposite direction.. .
.r .*. . .%,
. .
. . .
..... - ':
' In ihe sect lo"^, where thewidth of rnediari is less than 3 m, shrubs or flowery $ants may
,:. . : be planted.In between crash barrlers:or other means like. metallplastic strips to cut off
'
-,.'
: . . .
, I . glare shall be brovided.. . .
. . . .
. .
, -. . . . .
... . :.- The shape of shrubs and plants shall be suitably regulafedso thattheig'is no overgrowth . . .
.. ..: either vertically.or horizontally beyond:the edge of the paved median:
..
. , . '
, .
. " .: . '
In the vicinity of road intersactioni and median openings, median plantation +hill be
. . . . ,avoided or restricted to low-growing varieties to ensureadequatevisibility.
i '
. . The following guidelines shall be kept in view whileselecting the species of trees to be
, . planted:
i , :, . . .
....
1: . . :
. , . 126
. .
I
I
. . 308
a ... ._ jl . .. . .. .. . . . .. .. . . . .. . ,.. .. . . . . .: . :. . . . . . . .
....... <..; :,
. , . . ... _.. .......... ... .. .. . .. ..
'
.
ii ) 'Trees which become very wide shall be avoided as their maintenance
. .
would cause interfeience with traffic flow.. .. . .
iii) The species must be capable i f developing a svaight and clean bde . . .. .
. .. ..
iv) The selected trees shall, preferably, be fast growing and wind-firm.'~hese . .
shall not be thorny or droptoo many leaies~.. . ' . .. .. ... .. . .
he t'rees shall be deeb rooted, ai shallow [oats injurebafe,$ekts..
. . ':. . . . .
. . . .
In urban areas, the species selected shall be of,iess spreading type.!$ ' . :
thai these do n6t interfere with overhead services, clear,vie.wsof signs1
..
'
. .. . .
signals, and efficiency of roadwaylightirig. . ' . . . . . . . . .
. .
I . .
. . 12.514,
. .. .Pavement-
.
i . ,. I
1, . . .-. . The pavement in the bus bays shall have adequate crust'with respect to the wheel loads
i.
:
1 ... . , , expected. Also, the surfacing shall be strong enough to withstand forces due to frequent
...
. braking andacceleiatior~bythe buses. The colbur and 1extbl.e of the bus bay surfacing
. .. .shall
. ; . . . of!he main
bepieferablyilistinctive from that . c.arriageway.
. .
. . . . . . . . . .
12.5.5.''. . Drainage . .
. .
The bus bays shall have prqp$rcro$s slope to drain off theexcess water. . .
...........i .
..: . . . ...
. . . .: No water, which is like(y to .sp!a$h:.o( the,w$itirig passengers; sha'll be .'
:. :.
. . .
. '
,
.allowed,to collect
.
. . " . . . . ... .. . . . : . . .
" '
. . . . . . . . . . I . . ... . . ... . . . . . . . . . .. .. . . . . . . . . .
. . . " . . . . 12.5.6 . . Road maikings
-....
. . ... ....
* . . . I
. . . . . . .. . . . ..
.. : - . . pavement markings as specified in Section 9 of this ~anualkhallbe broiiided aithe'bos . . ' . .. '
. . . .. .. . . stops as shown in Fig. 12.1and 12.2.with the word 'BUS'.written prominently on:!he
.. -
.. ... . .:... . . pavement. Pedest.riancrossings shall be marked slightly behind the standing position of . . . .. . . .
. . . .. the %uses'In at'd4r"to...reduce pedestrian c0nflicts. :The kerbs shall be marked with.
,
...
12.6 'Rest Areas ! ' . _ ..
. . . . .
,. . . .
F,.
.-
.
.
1 , '1
.
.Localion and Layout of -the rest areas shall 'be as indicated in,Schedule !B' of the .
: ...
~ ~ n c ~ s r i o h ~ ~ r e e r nRest
; n tareas
. shall be provided by the Mdeksionaira d i the
~ lands '
. .
/ . . . included in the Site and procured by the ~uthority.Within the areas so provided, the
. . ,. Concessionaire shall construct and operate, orcause.to be.conslructed and operated,
.
.*y 1
I '
. paid fadlities such as toilets; telephones.cafeteria. parking. eft
. . . . . . . . . ,
. .
. . , ,
. . . . .. .. .. . . . . . . . . .
-J I ' . : ~a~lityf~~.$itilewoss[.~g~.shaI~be~r~~.idk~
. .
. .
a s r p i c i ~ini Para 2.13.3 of ! h i s , ~ a n ~ a'i .
..... .
. !
i
.
.
,
. 12.8.1 ~raffid~id.bosts shall be establi~heda t ~ o lPlaza l locations in accordancewith
Shepmviiianr oilhe~ n C ~ S S I o n ~ A 9 r e e r n e. ~.; t .. . . . . . . . . . . . .
.
' - ., 12,8.2 . The Concessionaire shall establish and operate Highway patrol unit(s)manned ,
.
1' by-atleast two.persons apart from the driver for every unit which shall continuously patrol
ceeding 50 km and shall remain in contact with the Control
The patrol shall render assistance to users in distress and
intervention or by calling for assislance.from Control Room,
..
3 18'
. .......7.;.
. . ........--..
. . . . .
. . . *><... . :
..vz-.<....*.....-......$....... .
. . > . . . .. .
.......................<. ..>v;.;!!.';?,:~.Y.~~.
1.: .
, . Crane operat'orsor ambulance as required. The patrol shall.promptly clear the road of any
. . .
.
[:;,.. . ...
obstruction. Where the obstructions take time to be cleared, the section shall be
I;.;;.: . . .. .. cordoned off by placing traffic cones, which shall be illuminatedduf.ing night. The patrol
.: ;, .
l.':. .. . . , vehicle shall be large'enough forseating at least four.personnel besides the driver and '
.
."-
.....
. .. . .
:...:..:. ... :$pace.to carry essential trgffic gnd incidence management and safetytools. Itshall also .
1..
.....
..'I
:
............ . have a light on its top and a.siren on board. It.shall be equipped with tr'afficcones and
.... ... . .. .. . other accessories for traffic controlwhich are fully visible during night time.
... ...... . .. . .. . ..
1.'1i:,.
.-'..i. ,.'. .
.... : : 12,9 .
...:
Medical Aid Posts . . .
. . .
. . ..
-1.:') ., ..."..... . . . .
L . 129.1
.
. ~ ~ d i c a l ~ 6 s t ~ ' $beh estibiished
a l l . . . a.l ~ o lPlaza
l . . in. accordancewith
l~.cations ',
,'
.., . . . .- . . . .
i::!.:
: . :. . , . ihe provisions of the Concession Agreement. . ' ... . . . . . .
'
],.".'..> . . . .
;,.:.:....;....; ,
:. : ..
.. '.'I2.9.2
Thft.Cqnc~ssb~~'iirsl~ellprovide~rnbulqnce(s)manned by at leas1lklralned
'
. . ..
:.and certified paramedics so that the res.pon% t/me is not more than 20 minutes of call.
i4.i air~bular\b& shall be.equlpped wlth fir61aid, life'a8ving meditdl sewicbs and supporl .. ' ' '
ystem implements for transportingthe victims to the nearest traumacare hospitals, and .
roviding.emergency medical aid during transportation of victims'from accident slte to
. .
e nearesttrauma . . care.hospital, . . , . . . . . . . ., . .
.
..... . :. .
; . .... . . . : . . . . .
.
... . ,...: : .. .. . . . ;--
. .......
>,
:.:. .. -12.1-0' 'Vehl.de ~ e s c u ePosts . . . . . . . . .
. . . .. . . . .. . . . . .
. '- ' ' '
....
. . ..',I' . . . ... . ... .. . . . . . . . . . ... . : ' . . ....
. : . . . . .:...: ..
,
. . ::.
.. ... ......
').' ..: .. .12.10.1' Tho ~oticc.ssionair~shell provide a vehicle i e ~ c & : ~ d satTollplaia
t location . . . .
, . . with all necessary equipment as specified in.the ConcessionAgreement, .: . . . .,:
1: .... ..; ..; .. . . . ..
:,
i .' i.:..' :.:.'.' :12.10.2 Crane(s) shall be available at the site of theincident withiri 3O,minut&sofcall to
1, ;., ....... '
1: . . . . . . .
I..;.. .,::.,,:. .
:..TelecamSystem
. . ... . .
1-, . .. .. . ...... . .. .. :j2.11
. . . . . .
..
. . . . .
. .
. .
. .
7
.. . . . . . . . . .
; . ' ... . '
.:;;... Tho Cbncessloriaire shall provide a TelecomSystern at' Toll piaia loca06n with all .
;
. . '... .. necessary equipment as s'pecified.in Schedule 'B'.of th,e ConcessionAgreement: . . . :
I . .:'. .
a,...
. . . . .
. . .. . . . .
-.. ,
I . '
.
. ' ..''
the daily traffic exdeeds 40,OOQPCVs; foimaking ihiarvs"tioni i s required for smobth, , .
. '
:"
/
\ ' .."' '
.
_. . . .
. . .. L-d
.
. .:
..
maintenance and operation patrol;the ambulance, and !he intervention
i
.
' . .:.
team
. .
,
. , .
:.
ii) three way communicalion between the data source and a Central Control
!
.Room, the Control Room and the data sources and display units, and
between the maintenance and operation teams, through a transmission
1 .; svstem, and
I:. .. . . . . .
... . . . . .
...
. .
I. ....
I . . . . . . . . .hi): A Centra! Control Room to process all data and control the highway
i::. . . operation. . . . . .
I.:,':.:
1.'.
. . . .! . 12;12,2 he systems,and e q u i p r n e n t i f , shall:meet'fhe.following
'
~~~~
and environmen'talrequiremenlas specified in IS:Q000
main'climatic
1.:
I n . :.
'
. . . . . , ...
,
'
.
.
. a
. . ... . .. , .
Temperature Range of Operation
. 60C.(i ZC)'. .
'
-.Low of 0,OC (2 3OC) to high of
,.. , . - .
. .. - . .
1: . . . . . . . . .:. .. .. .. .... .b) ' .~el&iveHumidity of 95 percent
....
.. .. . . .
. . . . . . ;, . , 4 vibration ~ r e ~ & n~a&e'of')
c~ 0 Hz- 55 H i . . ...
. .. . . . . .......... . .
1 , ,: . ::!2;12.3 Dataac.qufsitlon system! Rlis shall consistof (a)AutomaticTrafficCounter
and Classifier (ATCC),:with an in.-roadloop detectors and treadles. (b) Video cameras
.
I1.I: : -'. .
. .
,, lit$$tqled.bn:rood wiL such pa~.qndtilts~ata~e~gthof:2.km
~moaitdriiiggflraftic.(c) ~ f i e r g e n c y ~ kBoxer
road is captured for video
i l insldlled at every2 km to enable any user
. . . .: .tobe Instantly in contact wi*,the Cgn.trol Room, (d) Mateorologicalsensors for capturing . . .
1.. : . '' -.dataon temperature,weather, wind, (e) Mobile radios for patrol vehicles and ambulances
. . . .
to bein communication with Central Control Room and among themselves. .. -- - .
.
-#
. 1.I .. . .. . 12.1
.
2.4 . Em6rg)ncy.calj boxes (EC8) with loud speaker, m i h o n e activation button
.;:
.
with LED indicating conversatian;shall he hoosedin a vandal proof casing and operate in
. . .
. . ,full.to play mode in noise level of upto.95 decibels with In-built diagnostic features for
.
- .. . . automaiic detection in case of d&age
' ':. .by,'any object. Mobile communication system
':. . ' :. :.. shall domprjse. the mpblle'radio basg stati'0.n~and control centce equipments. It shall have .
: .?. ... . ,giovi'slon for mo.~nted,mobile set an.ambulances, cranes and ,patrqlling.vehicles. The
. . .
. .
. . .
. . . . '. . ~.'sy'stem shall have the facility to canned mobile to mobile, mobile to controller, and
... . .... -
. .controllerto mobile along with the systeins for waiting, holding, and transfer of calls. The . '
. : .; syste,m shall use .a palr of frequencies to.be allotted to the Concessionalro with the
. . . .. . .'. apgtoval.of wlfless planning and coordination . (WPC),
. Deptt. ofTelecommunlcatlons
, ' . . '. and.shall.6perateforfullduplex
. . mode, . ...
I:. . : . . . . . .
m. For this . .
. . . . 1.8 m depth. The .
. .
shall be.more than
. .
angleof ? 70' to the '; . '
140 3'30
I.
1.
' :
, . .
1.
,
- '.
I L;r .-..\
...,.,...:.
aW~+,",;<,:'-..-
:. .. ..,
,.,.. . +. .;......... .:,.,- . . . .,
. . . . . . .... ., 1......... .,. . : . ,. .. . . :. . .. .. . . . . . . - .. . . . C'. .
' '
. \ . .:,
2 ' "
'
. .
i
i IRC:SP:134-2009
3
i
i '12.12.6 The meteorologicalsensors shall comprise thermocouplelpyrometer, humidity
1:.
jf
meter; anemometer, visibility meter and sensor for. measuring pavement surface
temperature, They shall be installedona single polewith a specificattachment and power
supply fed from the integrator. They shall have the facility to communicate on Polythene
Insulated Jelly Filled copper cables (PIJF)lOptical Fibre Cable. ..
. .
I.
I
' , .
' .
12.12.7 The ~dtomaticTraffic Counte6cum-Classifier (ATCC) shall be capable of
:detecting and recording all'categories of vehicles plyingon the Project Highwaybasedon
their length and number of axles. The systerrishall be robust and capable of operating
1 ... . with minimum maintenance and.m.aybe-either piezb-electricor infrared. It should have
. . minimum accuiicy level of 99 percent. .The logic units sllall be mlcropro~es$~r based.
j:
I The system should be able io -recordarid store vehicle data for.:a period of at least two
! : weeks with a Daily ~ r a f f i cVolume of up to 1,00,000 vehicles. The system shall have
I ' . compatibility to transfer the dataon PJJFlOptical Fibre Cabklby using any of the
1 . : . available'communicatio~mode like.GSM (Global System for Mobile~Communications)l
I
1;
. . .
. I;
. .
. .
. :
. . gPRS(Ge"eral Packet ~ a d i S&i o n;ice), landline modem; C D M (code
~
1
1 . . .12.12.8 he ~ l d s e dCircuit ~elevidon(CCW)Surveillan~eshallcomprise ddeo
i . . ,
*
. ,camera, its housing and pan, and Tilt Meads. The video.ddmera shall tie mounted st a
i! . . height so as to cover the ta,rg?t length of highway and the,.housing shall be able tn
. withstand,adverse weather conditions. It shall have a 360angular travel In the horizontal
i .
plane and a tilt of 90" down fl-om @ hbrlzunlal. It 6Rall have zoom.lens with mlnlmurn power
I
uT 30 XI auto lrls and lllf~'al.cdri~tdr,Infraredcompatlbillty for nlght'operatlon~andremotely ' .
i. . :. . selectable operating
. . modes. It shall. . have .compatibility with co:ax!al cableloptical
. . . .fibre cable. ... . . . .
I
!.
1 .
.~ransmissionsystem,cable system, interface system, network management system,
Ii .
repeaterlamplification system, and power supply 'system. There shall be 3 or 4
.
ntres (as appropriate) housing all the interface equipment apart from the Control
rovided with, asapproprlate, cables, Interface,terminals (such as optical line
and in!erfbce, network management system equipment, optical fiber cable ..
3 2 1,
141 (%3
0 .;:, - :I.
, c
r -
.i,
-*y
..........
interface eqbiprnent and control centre. interfdce equipment; data acquisition system
'. . ' ., interface, etc). The cables from ECBs., VMS~~.meteorolpgical
data systems, ATCC shal!
,
.be Polythene Insulated Jelly filled (PIJF) copper cables and those from CCTV cameras
shall be coaxial 'cable's. Repeaters/ amplifjeg.shal1be.us9.d to maintaln the quality of
. .
signals.
' All the cables shall have at least 20 percent spare capacity to.allaw for expansion.
The interface system shall be capable.of handling.thec'omposite audio, video and data'
.
signals at various interface levels and process.thom.
. ... . . .. . .. .. . .. ... .. .
'
. . . . . . . . _ ._..
. . . . :. .' . . . . .. . . . .. . . . .. . . , '
1 ..,. .
. . . .
. . . . :. .. .. .
. e. terminal comprising 0peiato.r
:i). ~. o...b, i.l radio PC and engineering terminal
.:. .: . . . . .: ... . . . . ..: .
'
. . ' .
I
d
I . . . . .
:)
1 ..,...; . . .
.: '~omputers ~ L k v o r ~a&ernent
...... . , k
Communication System. ,', ,.
syitem
. . ( ~ ~ $ f oFiber
.... . . .. .
1
. .
i opticr .
. . .. .
, : _ ."
I .-. . . . . . vi) CCTV Console E,quipment , . .
j ' . . ...... '.: .: . .:, ,:: . . ... .. .. . .;.. . . . . . . .. . ...
. .. A n Office Computer
x), . . . .. . . .
..
. . . . . . . . . . . .
. , -
xi), A Power Supply and back up system ......:
. . . . ,.
..
. .. . . . -. . . .
. . . . . .
:., ::: :12,12.12 Dissemination of information : lnformationgeneratec!Bt thecontrol Csntre ,. . :.
i
. : ... . . .. shall: be dissemin!ted in the folaaing rninner:
. . .. . .. .. .. ..... . .. . .
. . . . .
. .. . . .. ..
,
. . . .
. . .
. .
I" '.
! , - Q) To the users :
Ii > ..
1 . . . . :.' the relevant information.
1 . -..
. .
. ...
7 .
. '
I '.
1.. .. b) To the Operation and maintenance teams :By mobile phones.
! .. ' .
I . - . . . . . .
j.:- .,,. ... ,. ' iv) workshop. . . . . . . . . . . . . .. .. . . . . . .. .
1:..
-$ I
..... . . . . . . .
.
. . . . .. . . . '
. . .
1; ...... V) . d e n e r d iarage and repair shop. . . . . . . .
8 . '
. . . . . .
. ., . . .
' vi) ~ e s t i la
h bo!atd
~ j. . '. . .
. . . .
vii). parking spacefor minimum 4,number of large "ehlcles and for other "' . .
visi!ors. ..
. . . . .. .
'
: . .
1233.1 All buil,cijn; works ;tiall be designed to meet the functional requirementsand
shall'be compatible with' regional archlte~tiureand mlcro cl!mate. Lacally available mate+ ..
. . . .. .: ..
.
'
>.
.. !...
,:
rials shall be given.preference but riot at the cost of constr'~ctionquality: .
.
.
.
,
. . . . . . . .... . .L i
12.13.3 The circulation roads and pirkiig spaces in the Q&M c e n h shall be paved to
:
I
i:
, . . ,
:
12.13.4 The whole campus of operation and maintenance centre shall have system for .
i .. security with safe entry and exit. . . . . . . i
I' ' ... .
j :.'.
! .. . . . 12.14 : Report to be submitted . . .
i . ... I
1.. . . .
ii
'
! .: . The Concessionaire shall submit report contilning the proposals for pro;ision of.project
i ......
to'the IE foireview and comments, if any.
..
. . I
. . . .
...
. . .
143
- . . 323
. .
....... . . . .
Em;.-.:-.
. . . . . . . . . . . . . .,. ....?............ ,. ---lr.-.r,----*z<*-w----II
I-' ..,
t-'
1' .:.. . . .
. . .
. . . .
..
z:,:
..
.
t
,f::
..... : IRC:SP:84-2009
-.;, ..
:,.
,
SECTION 13
.. .. .
'13.1 General
13.1.1. . The additionallnew carriageway in hilly areas may either be constructed at the
s a m i level as that of the existing carriageway or atdifferent levelsto form a splil highway
depending upon the . feasibility
. . . and geo-tkchnicalstability of the area. . . .. .
,
,
i:...;.-
1;.
,
.........
'
;,,,
....:.;.
.
:,:,
.
;:. . . .
'
I 13.1.3
'
'
. , .. . . . .. . :. .. . .
I f there are 'any landslide prone B i a s a16ig the road alignm&, adeo;ats,
:. .
) ,;. . . . . .
I .......... .investigation shall be undertaken and appropriata remedial measures shall be provided .
. . . .
* .., .:.
q .
. .
1.; . ' . 1 .
1.: . : . .- . 13.1.I where ahy new con~tructionlreali~nment is involved, the alignment shall avoid
j.,:.. . :'. .:. :. '. large scale cutting and filling and follow the profile of land, as far as possible. -.
. . ... .
,(
I-. :. . .
. .. .. . . .
1 :.. .......
.- ..:. ,
Areas having potehtial landslide or'settlement problems shall be avoided. Adverse
. . . impact on the environment shall be reduced by adopting p@per mitigation measures.
:
;. -
.... " . 13.1.5 Unstable hill slojiles shall be adequately addressed by providing appropriate
. . , , bioengineering and stabilization rnessuros.
. .
...
1 :::.'..
.'
. i
...:.... wild life and bird sanctuaries, reserve forests, national
. . parks, etc.
1,
I
. .
.. - . .
. .
. !
.
, . . , . .. .,. .
i .3 7 Protective structures for traffid Such as railings, roadside. safety
.
:
! . . .:... barriers, boulder nets, etc, shall be provided, where necessary..
i
..
3 . .
. . .
. . , ' 13.18 In msuntainous and steep terrain, the scope of work defined by the~uthority
! . . may be two-lane carriageways on different alignments (contours). In that case, the Manual
and Standards for two-laning of Highways shall apply to the two-lane ,
ays on different alignments (contours).
147
325 . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ......................*.--
13.2 Set Back ~ i s t a n c eatHorizontal Curves
. . .
. . ..... ...: ... .... . . .
' . ~ e ~ u i s i.&hidistance
ie should be a&slibel .acmss the inside of h~rizontalcuwes, Lack
-. of visibility in the .lateral direction may arise.due to obstruc'tions like walls, cut-slopes, ,
... . . '
wooded aroas, elc. Set back d,istance from the central line of TI%-carriageway, within
. . whlch the offending obstructions should be cleared to ensure the ngeded visibility, car) be
. . .
Ii.").:,
*
:1.;
. . . . . .
At hDrizonlal kutves, ih8.gr8die"i shall:be Gasid by applying the d!adii;cdrnpendion
.,.correctionfprg!adients'steeper: than.4 p'er cent in accordance with.IRC:52,. . . . . . . . :.
.'.'
.
.
.
- -.. . -I.
. . . .
. . . ..
bends; whek 'unavoidable, may be de$igned eiher a?.. .. circular
. . curve with a , . .
... Design criterla given IRC:52 shall be adopted for the design of hairpin bends. At . :'
1,.'.. . , hairpin bends, thefuli roadway w1dth.shall be,surfa.cgd.
..........
. .. . . ..
i: . ,,13.5. .
. .
,.Climbing . .
1.: ... - . . Lane . . . . . . . . .
t ' . . , . . .
-!.. .
. . ' clir.-ribinglano &dl1 bs provided, where specified in Schedule. 'B' of tho
. -j...
on cession .
" . . . .Agreement, in order to'address fhe necessi1y:of making avajlable.separate lane for safe :
.
%
. ... . . . . .
.
.
.
. . .. . . ..'..overtakingfor vehicle traveling uphlll.. . .
. . .
. . ...
_ . . . . , '. . . . . . .. . .. . . . :. . .
. .L .: . . . . .
. . . . . .' ~ r d p & s ~ ~a"d'i6ad'rn(lrklngs
ns shall. b.6 prol . . thattl~e
. ided. . . t$. ensure absolute right of way
-.. . . . .
1 '
i
. ; . .for~climbbgvehiclesisavailable. .' .
r . . . . .
. . . . .:., !. . . . . . . . . .. "'
....
.Rock
. .
Blasting.
.. .
' ,
. . ..
. . . . . . .
, . ! , . . i . . . . . .
. .
1.. Heavy rock blasting should be avoided. ~ n t r o l l e dblasting shall be resorted to. Blasting . .
: shall be supervised by experienced personnel. ~!astingand related operations shall be
. .
. :
carried out in accordancewith Clause 302 of MORTH Specifications. . . . .
.. ... . . . . .
. . . ... .
. . . . . . .. . .:
. . ..:13.7 . . . - . C u tSlopes
. . . . . . . . . .
...
:
. . Cut slopes.sh,all.be rendered stable in the constructionstage it.self,'.by cutiing at the . f' . .
... . correct angle and bariching etc, including
. . slope stabilizing structures like drain's,
.
breasf ; .
.. . . . . . .
.' ',
. .
. .
I . Wh.ere it-Is necessary-tocross hills or high ridges, the.various alternatives including. ' .
+ . .
, . -
.
........, .:................
..,...........
..,&.
...
I :,,, ,. .....,
.
.
. , ~
...
, .
" alternative shall be chosen. The alternative to be followed shall be indicatedin schedule
'B'of the Concession Agreement, Whereroad is to be taken through tunnel, its salient . ..
. .
. .
details shall be indicatedin
. . schedule . .
'8'of .the. ConcessionAgreement.
. . . . \. . ...
. .. . . .r
. . . . . .. . . . . . . . ... . .. . .
,
. -.
. 13.9. . ~. r a .i n.a g
. 6 . . ' . . ' . . . . .
.
. . . . . . . . . . . . . . ,
.
. . .
fordrainage of waier from roadside, an effective system ofdrainage shdl b&canstnicpd . , . .. . .
.' to,lkd the run-offto natural water courses. In pgytlculal;:catch water dtains (Refer to para . '
6.5 of this Manual) shall.be provided above the cut slopes. IQhall be ensured that water is .,
a .
.... npt.drdinedinfo.villagesand cul<vatedland. Location of crossdrains and culverts should . . . :,... ' . i
/ , ' ,
..... .
., 13.10..1, Retainin$ walls shall be provided
. .
:'
.
.. .
. .
. .
- ..
.
. .
. .
.
.
.
.
....
I ., '
i) To s~ppor~th=c%n hill side unstable &ta orfills,
-. -
.
..
I
':
. .. ,
1 . ,. , .'. .
. .
,. . .. ii) To achhvci $dth of roadway, where cutting intb hill.i~.h?itr.icl~J, . . . . . .
. . .
. . '
, . . ill) To arrest damage ceusedto thevalley side and the road, by underc,utting .
. .
by 4 stream or ot'herwatercaurse,:'. . ;' . . . .. . .,. . . . . . .. . . .. .
. .
I
!'
.
:.
. .:. .
.
'
. .. . .. . . . . . . . . . , ... . . .
. .
I
i .... : . .
.
..
?
. . .._
I .
likely to result in slips and damage to the road, 4
'
.
. .
.
. . 1
. : "i) At any other locations warranting provision of retahiniwalls.
L . ,
. . .. . .. .. . .. .., . . . . . .. . . . . .
13.10.2 . he re&ning
wallson the existing. roads shall be inspected b i t h e
I
....'..~oncessionaireto check and assess the requirementsof repairs andlor.strengtheningor . . . . . i
. . . .'reconst~uction,lfso rkquired;the repair, streng!hening or reconstructionwork shsil be . . , .:
. .-
'. : carried out as ,per the assessment,
... . . .
. . . . . L
. .
13.10.3 'FB,: generilfeaturesl
'. .,
, Arrangement . design, guideli"is'give" in I R C : S P : ~.~
. . . . .and '. ~!
{
.
'
.
..' may be referred to.
_ .. . . . . :.". . . . . . . . . .. . , . I
. . . .. . .
. . . . . . . . . . .. .. !
Construct~onof apron, pitchrng, flooring shall conformto Clauses 2503 to 2507 of MORTH
. . . .
i . . .-
1 . .
. . .
. . .
I . . . . . .
1. . '
. .
1 ...,:.....
. . .
. :hill areas tothe I for review,and,cfirhents,, if any.
. :. .:
. .-
., ' . .
, , . . . . . . .
"'
'
. . . . .
:.:
^^
\* .
.
>&
. ..
" .: ,
-
.,
:
.:;,
.'
,. -
. -
...
c.. '
..
.
-
f' .
i..
..
-
f
.,
.. , -
. .
1 ..
.
. . . . . .
. -. .
.: ?
I
: ... .
.', '.'
-Appendix 1 - b.,
c;.
.:
. , A
!.. ' .!
--
..'
:. .
i ..'. : ':_.. . . . , . .. List
! . . , . '.
.
of Paras for preparing schedules of the.Concession
-
.
: ~greement(Refer Para 1.I?). .
. . .
:;.. \\
-
....... . . . . . . . . . . . . . . '.
. . . ..
$ :............
.
.
.:
:
.
':; .
,
.
',
'
- Section Para . Particulars to b.e specified
. .
,! .;
&.
. . . . . . .
....'.' . . .
.$..._.. ....:. ..._.
'.... ..;. ..
. .. .. . \ ....
c.: '
'
?
1
::
. ..... .':. . ..
. . . . ...,
. . ..,...
1.20 .
L . . . .
' ~ h s l l ii.i ..
iist of str~tchBs~ h ~ 8 6 ~ l ~ i i n gb8'kojided 1.
,[
. . ..:.:. . . . : .
.part of 4-1anir.g of ths Projec'iHighGay .," ,
7
!):;:.;:'
%,*.
; : I.
I.:."
:#;;;:
] .:.' . ;:.
..........
.......
.
....
. . . .
. .
..;,
.
~ec!i;2,
. .
2.1 );( (a)
2.1 ( i i ) (b)
. tL: ofstr~tcheswhere~~e~ulrementof6-laning
through built-up areas isdispensedwith
Construction of bypass, alignment and land for the
bypass ..
. 1 fl-c:-?:.Js
k-.
6
<,-.'
'3
-\
-
. .: 8
. . . . .
'. . . . L. '
-\
i ' :
f .. - . .
.
2.1 (v) and for geometric improvements; and such stretchis
2I ...
, . 1.
,... . :.:.. . . . '
? ' ,
.\ 3
!.. : ;.'.: ... . . . .. 2.2.2 Land for geometric improvementsand.such stretches h..: .-
1!-,: . . .. . .
. : -- !.::.
..
..... . . . .
for ruling design speed . . . 9 -
L'
!:. :. :.: . ' .
,. . . . . . . . . . . . 2.3" Right of way available and land to be acquired.
i::;... <.;. ..... 4 ,
,/-,
,,
I..:
, .:, :
...
. '. . . . . . . .
.. . - ' . > ' ; ,: . . . . .' 2.5.1, Type and widths of median in various stretches . : i.,.
0-
-
'
:.... .
I.;.. ;
. .
.::..,: . ...
. .
. ' . 2.9.4 List of sections where radlus of cur& less than . . . . . . fw- ;
. .. . . .
. . : : . ..
. .; . . . . .
desirable minimum ,
-
&*-.
,,....
I
. ., . . ... . .. C
u-Q -7
.
\ .:".:; :
,
.,
,'
. ' . : 2.10.2 (ii) P,edestralnand cattle underpasses where vertical . c
b.22
-
..
.
clearance shall be 4.5 m 8 &.. ;) ,-
, '
.
"'
- ..:.-,
:,: ,
. .
' ,
. .. . . .
-
I: . . . :'.. .. .. . .. . 2.12.1 Locations of intersections
i : . . . ,....:
: . '. . ' 2.12.2.1 Location and,length of service roads
I.:.
i . .
..::.. . .
?( . .. . . . .%.
. .".
. . . . : 2.1 2:2.2 Treatment of seyice road at bridge locations . .
I : .'i.' :, .
2.1 3;1 . ~bcationand other featuredof grade iep&t6d .:
. !
i:.
, . .: . ,
;
, .
' . structures
1 . ....;...'.t;..
... . - 2.13.2 Type of structure for vehicular underpass or overpass
1, :.. .
i . ;, ;. ::': ,
. and whether cross road shall be carried at the existing
level
Location of cattle andpedeitriai, underpasses or
overpasses
. . . . . . . .
-
.
"' 329
.
. :
..
$
. ' : IRC:SP:84-2009
. . .
..
. . .
.
.. . .Section
. . . . . . F'ar'a. .
. .
:. .Particulars to be specified
. .:. ' '
. . . . . 3.34 .. ~en~lh:df
viaducf atgrade separated structures . .
.
' 1 secti.0.n 4
.
. .
I
I (I) -
.-
.
. .
I
.~ecti.ons.of
exisling.road to be raised . . .
. . sictian?.,I. :. '5.2.1
. ,.: .......
...
. ~ ~ . ~ e $ p i i q efor
n tnew construction
. . . . . .
] 5.'2;2 " . . . Type,ofstrengthening of existingflexible
. . . . . .pavement,
. . . If
.
. . . .
. . . . . . . . not~bltum'~nous.overIay~
.......... .. . .
. . . ........
. .-. : 5-23 . . '. ~ e ~ i i i r e m ~ ' n~t ~. opfa v e r n e nand
t , desigri,' ,
. . . .
. .
' ' '
: . . . . . . ... .. . .:
.., i.
. . . . .
..: .').: ..:' ..performance; co;'~instruction
and maintenance . _ - .
:. .
. .. ' . . . ieqplrgrjmnts;
. . .. ...: .... :: . . .
. . . . . . . . . .
. .. . 5.9.4:
. . .'....... ,.~tret~h~s:ib:be.rec.onstructed
. .
.. . .. .
... Section : .. '7.1 ,(ii).......... bridg&.&hich ace.nat required to have independent
., .... .71:. - .. . .
. . supeigiructur.e
. . . .' . . ' ' . ,,
. . . . . . . .
.. . . ... . ... .. .. . . 7.1 ( i i i ) . . ~rid&siihicharenot required to be high level bridges
.........
. .
. .
, : . ' . 7 1( v ) : ~tiliti.s&rvides
.>. to,becarriedover thestructuiris
..
. .
:
, I
..
...
. .: . .
.
'
......
:'
.. .
. :.
9 . .
.
. 7.3 I ) ( b
7.3 (ii),.(c)
:. :!:',..
' ' list <f:bridge.s required
. . to be 6-lane wide
iisiof-bridg4s.orgr& separated s t r u c t u r ~where -
..... passlng places'are tb be provided . :
':' , ,,
. . :,. .
7.15.1 . ~e~uire'mentof reinforced earth retaining structures, , -
. when height more than 10 m.
. .
. 7.17(iv) Requirement of Crash barrier'sfor existinn bridnes
...
. ..
, . :
,
. .
I:ir;-.,
. .. ... . . . . .
............... .,
......
:.,. , : .
. .
.
. .
. ..
. .. .. .
'
........ . . .
{.>..'. : :
... '
!'., , '
!
! . . IRC:SP:84-2009
*
I,.!. ........ ;;
.. 7.19(i) . Location and type of grade-separated structures
/,.
,
,;:.;.:
I - -
.
,
- . - 1 - - - 1 - - - . ,
i '
1'.
):..,.
. .
:.. ' . . .. 7.21 ' . ~easuresfor.protecting structures in marine
, '.:: ',
. . environment . . .
. .
iI::..i ' .....
,. . . .:'.. .. ;. :. .,.- . .
7.22 [i) ~tribilureito berepairedlstrengthened,nature and ,
..:
.-':. .........
: . . . . . . . : extent of repairs . . . . . .
.
. .....
j:.:.,:. . . .. .; . .:. Section, 9
;": ' . :;. ..
. ' 9.27 ' . . . Loca'tions and:size;ofoverhead traffic sigris .
-- .." -.-
.:' . . . .
I--.----
. . . . , .. . .
I . . .,: . . . . . . . . .
1 , . . .. . . .-... 12.12.5 . l o c. a .t i b. n .s 6 f v ~ ~ . , ' , ' ,
. . . . .
-
,
. . . .
1
:
. . .
.,i Section 13 195 ~ e .~. u. i r e ~ulclirr\bing
i ~ e l i ~ lane . .
;i1 :. ..;>.;,
. . ..
.
. . . .
,
.
. .
. .
. . . .
. . .
-
1{ ... .: ,::..I::. . .
::. -I:. .
' '
. 1.3.8 . . .. tunnel and itisalien!
: . .. ;41ig~mentlconstruction'of details
. .
. . . . . . .
; .
i';.:;
j. ..
:. .: Appendix 2
. . . .. . . .
National HIqhwavs ~ulhorilvo/india Schedules
SCHEDULE -E
(See Clause 4.1.3)
Applicable Permits
The Concessionaire shall obtain, as required under the Applicable Laws, the
following Applicable Permits on or before the Appointed Date, save and except to
the extent of a waiver granted by llle Authority in accordance with Clause 4.1.3 of
the Agreement:
(h) Permission of 'Village Panchayat and State Ciovernment for borrow earth;
4 Laning of Rohtak Jind Section from km 307.000 to km 347.800 o:NH-71 and connecting link from km
347.800 ol NH-71 to km 9.400 of NH-71A to be executed as BOT (Toll) project on DBFO Pettern under
NHDP Phare IJI in the State ofHaryana Page E - 1
.<"
Nalional H~qhwavsAulhodv ollnd~a Schedules
1
SC tI EDULE -I:
(See Clause 9.1)
PERFORMANCE SECURITY
..
en The Cbainnan,
National Highways Authority of India
:% New Delhi
1. The Bank hereby unconditionally and irrevocably guarantees the due and faithful
performance of the Concessionaire's obligations dgring !he Construction Period,
-. under and in accordance with the Agreement, and agrces and undertakes to pay to
the Authority, upon its mere first written demand, and without any demur,
reservation, recourse, contest or protest, and without any reference to the
Concessionaire, such sum or sums uplo an aggregate sum of the Guarantee
Amount as the Authority shall claim, without the Authority being required to
prove or to show grounds or reasons for its demand andlor for the sum specified
therein.
due and faithfill perrorrnance of its obligations during the Construction Period
under the Agreement and its decision that the Concessionaire is in default shall be
final, and binding on the Bank, notwithstanding any differences between the
Authority and the Concessionaire, or any dispute between them pending beforc
any court, tribunal. arbitrators or any other authority or body, or by the discharge
of the Concessionaire for any reason whatsoever.
3. In order to give effect to this Guarantee, the Authority shall be entitled to act as if
the Bank were the principal debtor and any change in the constitution of the
Concessionaire andlor the Bank, whether by their absorption with any other body
or corporation or otherwise, shall not in any way or manner affect the liability or
obligation of the Bmk undcr this Guarantee.
4. It shall not be necessary, and the Bank hereby waives any necessity, for the
Authority to proceed against the Concessionaire before presenting to the Bank its
demand under this Guarantee.
1
5. The A~~thorityshall have the liberty, without affecting in any manner the liability
of the Bank undcr this Guarantec, to vary at any time, tilt terms iltld oondilions of
the Agreement or toextend the time or period far the co~npliancewith, fulfil~nent
-. andl or perfomance of aH or any of the obligations of the Concessionaire
contained in the Agreement or to.postpone for any time, and from time to time,
any of the rights and powers exercisable by the Authority against the
Concessionaire, and either to enforce or forbear from enforcing any of the terms
and conditions contained in the Agreement and/or the securities available to the
Authority, and the Bank shall not be released from its liability and obligation
under these presents by any exercise by the Authority of the liberty with reference
to the matters aforesaid or by reason of time being given to the Concessionaire or
any other forbearance, indulgence, act or omission on the part of the Authority or
of any other matter or thing whatsoever which under any law relating to suretles
and guarantors would but for this provision have the effect of releasing the Bank
from its liability and obligation under this Guarantee and the Bank hereby waives
all of its rights under any such law.
ghts of the Authority under this Guarantee"shal1 be forfeited and the Bank
be relieved From its liabilities hereunder. -
335
e Performance Security shall cease to be in force and effect when the
Concessionaire shall have expended on Project construction an aggregate sum not
.i i-ming c i P.ohlak Jind Secrion from kn ?07.600 ro km 347.800 of NH.71 and connecting link from km
345.8iJC of i.jli.71 ro km 9.400 of NH-?!A I Q be execured 25 ROT (Toll) project nn DBFO Pailern oncici
NED? P h a e i l l in the Stair of Hzryzna. Page F - 2 I
. .
pationel Hiuhwavs Aulhorily of India Schedules
less than 20% (twenty per cent) of the Total Project Cost which is deemed to be
Rs.56.65 cr. (Rupees Fifty Six crore and Sixty Five Lakhs Only) for the purposes
of this Guarantee, and provided the Concessionaire is not in breach of this
Agreement. Upon request made by the Concessionaire for release of the
Performance Security alongwith the particulars required hereunder, duly certified
by a statutory auditor .of the Concessionaire, the Authority shall release the
Performance Security forthwith.
9. The Bink undertakes not to revoke this Guarantee during its currency, except
with the previous express consent of the Authority in writing, and declares and
warrants that it has the power to issue this Guarantee arid the undersigned has full
powers to do so on behalf of the Bank.
10. Any notice by way of request, demand or otherwise hereunder may be sent by
post addressed to the Bank at its above referred Branch, which shall be deemed to
have been duljr authorised to receive such notice and to effect payment thereof
forthwith, and if sent by post it shall be deemed to have been given at the time
when it ought to have been delivered in due course of post and in proving such
notice, when given by post, it shall be suffi~ientto prove that the envelope
containing the notice was posted and a certificate signed by an officer of the
Authority Bat the envelope was so posted shall be conclusive.
11. This Guarantee shall come into force with immediate effect and shall rerhain in
force and effecr for a period of one year and.six months or until it is released
earlier by the Autho:ity pursuanf'to the provisions of the Agreement.
(i) The bank guarantee should contain the name, designation and code number of the
--.f officer(s) signing the guarantee.
l l m h * r rind n t h p r . d e f ~ i l oflhe
s he Head
-<*'
(ii) ~ h n n *n
The address, telephone number a Head Office
Office of
of the
the Bank
Bank as
as
well as of issuing Branch shoul on the covering letter of issuing
,-$
Branch.
-'-,:.'
.%i
. 336 1
I
i
4 &ing of Rohrak Jind Section from k TNH-71 and connecring link from krn
A<*!
347.800 of NH-71 to km 9.400 of NH-7 (Toll) project on DBFO Panern under
NHDP Phase Ill in [he State af Haryana. Page F - 3 II
. . . . . . . .
,, . .
.. .
. .
. .
. ..
. . . .
. . .. ..
N a ( i o n a l y of India Schedules
SCHEDULE -G
(See Cla~rse12.1)
2 Project Milestone-I
2.1 Project ~ilestone-Ishall occur on the date falling on the 180th (one hundred and
eightieth) day from the Appointed Date (the "Project Milestone-l[").
2.2 . Prior to the occurrence of Project Milestone-I, the Concessionaire shall have
comm'enced construction of the Project Highway and expended not lessSthan 10%
(ten per cent) of the total capital cost set fonh in the Financial Package.
3 Project Milestone-I1
3.1 Project Milestone-11 shall occur on the date falling on the 365th (three hundred
and sixty fifth) day from the Appointed Date (the "Project Milestone-II").
3.2 Prior to the occunence of Project Milestone-11, the Concessionaire shall have
commenced construction of all bridges and expended not less than 35% (thirty
five per cent) of the total capital cost set forth in the Financial Package.
4 Project Milestone-I11
4.1 Project Milestone-111 shall occur on the date falling on the 550th (five hundred
and fiftieth) day from the Appointed Date (the "Project Milestone-111").
4.2 Prior to the occurrence of Project Milestcnc-111, thz Concessionaire shall have
commenced construction of all Project Facilities and expended not less than 70%
(Seventy per cent) of the total capital cost set forth m the Financial Package,
5.1 The Scheduled Four-Laning Date shall occur on the 730th (Seven hundred and
Thirtieth) day from the Appointed Date.
..
4 Laning of Rohtak Jind Section from krn 307.000 to krn
347.800 of NH-71 to knl 9.400 of NH.7lA to be executed as BOT (Toll) project on DBFO Pattern under
NHDP Phare ill in thc State ofHaryena P n ~ eG - I
. .
. . . . . . . . . . .
National Hiohwevs ~vthorilvol lndia SC~SO'U/SS
6 Extension of period'
5; -
C-,
4 Laning of Rohrak Jind Section from km 307.000 lo km 347.800 of NkI-71 and connecting link from km
347.800 of NH-71 to km 9.400 of NH-71A to be executed as BOT (Toll) project on DBFO Panern under
NHDP Phase 1I1 in the Sink o f Haryana Page G - 2
. . . .
.. . .
' ..
. -. . . .
, .
National HiahwavsAuthor;&af India .. . .
' " Schedules.
. . .
SCHEDULE-11
(See Clause 12.3)
DRAW1,NGS
. .
. .
I. ,. Drswings
Tn compl'iance of the obligations set forth in Clause 12.3 of this Agreement, the
Concessionaire shall furnish to the Independent Engineer, free of cost, all
Drawings listed in Annex-] ofthis Schedule-H.
2 Additional drawings
If the hldtpeodelfl Ellginrer determines that for discharging its duties and
functions under this ~ ~ r e e m e nitt requires
, any drawings other than those listed in
Annex-I, it may by notice require the Concessionaire to prepare and fumish such
drawings forthwith. Upon receiving a requisition to this effect, the Concessionaire
shall promptly prepare and fumish such drawings to the Independent Engineer, as
if such.&awings formed part of Annex-I of this Schedule-H. '
,-
#a
&an-
' .
4 Laning o f Rohtak l i n d Section from km 207 000 to km 247.800 o f NH-71 and connecting l ~ n kfrom km
347.800 o f NH-71 to km 9.100 o f NH-71A l o be executed as B O T (Toll) projecr on DBFO Pattern under
NHDP P h v e 111 in the State o f Haryana Page H I -
National Hiuhwavs ~uthoiilvof lndra Schedules
Annex - 1
(Schedtrle-H)
List of Drawiugs
I. All the Drawings that the'concessionaire is required to.furnish rmder Clause 12.3
Specifying the Drawings for Four-L,aning are as under.
Horizontal and Vertical Alignment with details of reference pillars, Horizontal
Intersection Points, Vertical Intersection Points, elements of curves, and sight
distances.
Cross-section at 50m interval along the alignment within ROW '
Street lighting
Landscaping
_ _ . .- . &Tree plantation
Traffic aid post
Medical aid post
Vehicle rescue post
Traffic management drawings for safety in construction zones
Detailed drawings of road side furniture and safety structures
-.;
I
9;
.\
7-
->a*.
-. .
. . 310 r
!
-.+ 4 Laning o l Rohrak Jind Section from km 307.000 to km 347. connecting link from krn I
347.800 of NH-71 ro km 9.400 of NH-71A co be executed as BOT (Toll) projcct on DBFO Pattern under !
- .
. NHDP Phase Ill in [he Stale of Haryana Page H - 2 I
. . . .
. . . .
. .
. . . ~alional
. . . Hiohwavs ~uiharitv
01 lno'ia ~chedul~s , , .'
SCHEDULE -I
(See Clause 14.1.2)
TESTS
The Concessionaire shall, no later than 30 (thirty) days prior to the likely
completion ofFour-Laning, notify the Independent Engineer and the Authority of
its intent to subject thc Project Ilighway to Tests, and no later than 7 (seven) days
prior to the actual date of Tests, furnish to the Independent Engineer and the
Authority detailed inventory and particulars of all works and equipment forming
parr of Four-ianing.
shall, in consultation with the Cur~cessionaire,determine the date and time for
each Test and notify the same to the Authority who may designate its .
representative to witness the Tests. The Independent Engineer shall thereupon
c.onduct the Tests itself or. 'cause any of the Tests to be conducted in accordance
with Article 14 nnd this Schedule-I..
Tests
, . ...
Visual and physical Test: The Independent Engineer shall conduct a visual and
physical check of Four-Laning to determine that all works and equipment forming
part thereof conform to the provisions of this Agreeroent.
Test drive: The Independent Engineer shall undertake a test drive of the Project
Highway by a Car and by a fulIy loaded Truck to determine that the quality of
service conforms to the provisions of the Agreement.
Riding quality Test: Riding quality of each lane of the carriageway shall be
checked with the help of a calibrated bump integrator and the maximum
pzrmissible roughness for purposes of this Test shall be 1,800 (one thousand and
eight hundred) mm for each kilometre.
4
341- -.
Laning of Rohtak Jind Seclion from km 307.0'00'10km 147.800 of NH-71' and connecring link Iron km
,'?-/
, ,,;ti;
J;
road portion, the sample shall consist of one spot to be selccted at random in each
stretch of 1 (one) kilometre of the Project Highway. The first spot for the sample
shall be selected by the Independent Engineer through an open draw of lots and
the spots located at every one kilometre from such first spot shall form pait.oPthe
sample. For the bridge portion, one spot shall be selected at random by the
Independent Engineer in each span of the bridge.
Striictural Test for bridges: All major and minor bridges constructed by the
Concessionaire shall be subjected to the Rebound Hammer and Ultrasonic Pulse
Velocity tests, to be conducted in accordance with the procedure described in
Special Report No. 17: 1996 of the IRC Highway Research Board on Non-
destructive Testing Techniques, at two spots in every span, to be chosen at
random by the Independent Engineer. Bridges with a span of I5 (fifteen) metres --.
or more shall also be subjected to load testing.
Other Tests: The Independent Engineer may require the Concessionaire to carry
out or cause to be carried additional Tests, in accordance with Good Industry
Practice, for determining the compliance of the Project Highway with .
Specifications and Standards.
Environmental audit: The Independent Engineer shall carry out a check to
determine conformity of the Project Highway- with the environmental
requirements set forth in Applicable Laws and Applicable Permits.
All Tests set forth in this Schedule-I shall be conducted by the Independent
Engineer or such other agency or person as it may specify in consultation with the
Authority.
CompletionlProvisional Certificate
Upon successful completion of Tests, the Independent Engineer shall issue the
Completion Certificate or the Provisional Certificate, as the case may be, in .
accordance with the provisions of Article 14.
. . . .
. . 312
4 kaninc of RohtU ii"d Section from km 307.000 to Xm 347.800 of NH-71 and connecting link
347.800 of NH-71,to !m 9.400 of NH-71A to be executed as BOT (Toll) project on DBFO Panern under
NHDP Phase Ill in the Stale of Haryann Page I - 1
I
. -
. . . .
...
. .
. . . . . ~ a l i o i aHiqhways-Authorih,
l ofIndia . . . . . Schedules
SCHEDULE - J
(See Clalises 14.2 & 14.3)
COMPLETION CERTIFICATE
I, ..................... (Name of the Independent Engineer), acting as lndcpendent
Engineer,' under and in accordance with the Concession Agreement dated
............(the "Agreement"), for 4 Laning of Rohtak Jind Section from krn
307.000 to km 347.800 of NH-71 and connecting link f b m krn 347.800 of NH-71
to km 9.400 of NH-71A to be executed as BOT (Toll) project on DBFO Pattern
under NHDP Phase 111 in the State of Haryana (the "Project Highway") on
desigil, belld, I i ~ t l t a . uperile und transfer (DBFOT) basis, through
..................(Name of Concessionaire), hereby certify that the Tesu specified
in Article 14 and Schedule-I of the Agreement have been successfully undertaken
to determine compliance of the Project Highway with the provisions of the
Agreement, and I am satisfied that the Project Highway can be safely and reliably
placed in commercial service of the Users thereof.
2 It is certified that, in terms of the aforesaid Agreement, all-works forming part of
pour-Laning] have been completed, and the Project Highway is hereby declared
fit for entry into commercial operation on this the ......... day of ...;.....20 .....
(Signature)
mame)
(Designation)
(Address)
4 Laning of Rohtak Jind Section from km 307.000 to km 347.800 of NH-71 and connecring link from km
347.800 of NH-71 to km 9.400 of NH-7 l A to be executed as BOT (Toll) project on DBFO Pattern under
NHDP Phase 111 in the State of Herynna Page J - 1
National H ~ q h w a ~Aulhorttv
s of India . Schedules
PROVISIONAL CERTIFICATE
(Signature) (Signature)
(Name and Designation) (Name and Designation)
(Address) (Address)
4 Laning of Rohtak Jind Section from km 307.000 to km 347.800 tin^ link from km
347.800 of Nt1.71 to km 9.400 of NH-71A to be executed as BOT (Toll) project on DBFO Panerll under
NHDP Phase Ill in the Stare ofHaryana Page J - 2
..
. . . .. .. .
. . . . . -. . . ,. . .
. .
. . . . National Hiahwavs Authoritv oflndia 'Schedult~s. ' . ,
SCHEDULE -K
(See Clause 17.2)
MAINTENANCE .REQUIREMBNTS
1 . Maintenance Requirements
I/.] The Concessionaire shall, at all times, operate and maintain the Project Highway
in accordance with the provisions of the Agreement, Applicable haws and
' ....
Applicable Permits. Jn particular, the Concessionaire shall, at all tirnes during the
. Operation period, conform to the maintenatice requirements set forth in this
Schcdiile-K (the."Maintenance Requirelpents").
. . 1.2 'Ihe Concessionaire shall repair or rectify any defect or deficiency set forth in
Paragraph 2 of this Schedule-K within the time limit specified therein and any
failure In &Is behalPshall constitute a,breach of the Agreement. Upon occurrence
of any breach hereunder, the Authority shall be entitled to recover Damages as set'
forth in Clause 17.8 of the Agreement, w i t h o ~prejudice to the rights of the
Authority under the Agreement; including Termination thereof.
2 Repairlrectification of defects and deficiencies
The obligations of the Concessionaire in respect of Maintenance Requirements
-:
shall include repair and rectification of the defects and deficiencies sp5cified in
-
Annes I of this Schedule - K within the time limit set forth therein.
3.1 In respect of any defect or deficiency not specified in Annex - I of this Schedule-
K, the Concessionaire shall undertake repair or rectification in accordance with
Good Industry Practice.
3.2 -
In respect of any defect or deficiency not specified in Annex I of this Schedule-
K, the Indepcndcnt Engineer may, in conformity with Good Ind~rstryPractic.e,
I
specify the permissible limit of deviation or deterioration with reference to the
. Specifications and Standards, and any deviation or deterioration beyond the
permissible limit shall be repaired or rectified by the Concessionaire within the
time limit specified by the Independent Engineer.
4 Extension of time limit
Notwithstanding anything to the contrary specified in this ~chedille-K,i
nature and extent of any defect, or deficiency justifies more time for its rep
rectification than the time specified herein, the Concessionaire shall be entitl
additional time in conformity with Good Industry Practice. Such additional
shall be determined by the Independent Engineer and conveyed to
Concessionaire and the Authority 'with reasons thereof.
5 Emergency repairslrestoration
." ."
...-I
4 Laning of Rohtak Jind Section from km 307.000 to km 347.800 of NH.71 and connecting link from km .,
. .
. .
. .
-.
. .
Nalionel Hiohways ~ulh'orilvollndia
.. .
.
.
Schedules
i . . . .
All defects and deficiencies specified in this Schedule-K shall be repaired and
rectified by the Concessionaire so that the Project Highway conforms to the
. Maintenance Requirements on the Transfer Date.
I
8 Display of Schedule - K
The' Concessionaire shall display a copy of this Schedule-K at the Toll Plaza[s]
along with the Complaint Register stipulated in Article 46.
4 Lan~ngof Rohrak Jind Section irom km 307.000 to km 347.800 of NH-71 and connecting link from km
347.800 of NH-71 lo km 9.400 of NH-71A ro be exeiuicd as ROT (Toll) projecl on DBFO Paltetn under
NHDP Phase 111 in the Stale of Haryana Pagr K - 2
.: . ,
Annex - I
(Schedule-K)
The Concessionaire shall repair and rectify the defects and deficiencies specified in this
Annex-I df Schedule-K within the time limit set forth herein.
,. .
Nature of defect o i deficiency Time limit for
repair1 rectification
ROADS
. .
f-G.1 -
(a) Carriageway and paved shoulders
_..I
C
- 7 days
(c) Road side furniture including road signs and pavement marking
(i) Damage to shape or position; . - 48hours
poor visibility or loss of retro-reflectivity
(i) Cracks
Temporary measures - within48hours
--- Permanent mcnsurcs - within 45 days
4
345
Laning of Roh~skJind Scct~onfrom km 507.000 lo km 347.800 of NH-71 and connecting link from
347.800 of NH-71 ro krn 3 400 of NH-71A to be execuled as BOT (Toll) project on DBFO Pattern
f
NHDP Phase I l l in the Stare ofHaryana PogeK- 5 I
t
. . . .
. .. .
~alionalHiohwavs Aulhorilv dl India . . .
Schedules
. .
, " ,
' , . .
4 Laning of Rohrak Jind Scction from krn 307 ,000 to km 347 ,800 of NH-71 and connecting
347.800 o f NH-71 to km 9.400 of NH.71A ta be executed as BOT (Toll) p~.ojecton DBFO
NHDP Phase 111 in the State of Haryana
. . ' . . . ..
. .
. '
. .
. .
. . .. .
. . .. . .
Nelional ~iahwaysAulhorit~of India . . Schedules . . ,
SCI-IEDULE-L
(See Claz~se18.1.1)
SAFETY REQUIREMENTS
-. .
1 Guiding principles
1.1 Safety Requirements aim a t reduction in injuries, loss of life and damage to
property resulting from accidents on the Project Highway, irrespective of the
person(s) at fault.
1.2 Users of the Project Highway include motorised and non-motorised vehicles as
well as pedestrians and animals involved in, or associated with accidents.
Vulnerable Road Users (VRU) include pedestrians as well as riders of motorised
two-wheelers, bicycles and other vehicles which do not provide adequate
. occupant protection.
1.4 >
.
. Safety Requirements include measures associated with traffic management and
regulation such as road signs, pavement marking, tiaffic control devices, roadside
furniture, highway design elements, enforcement and emergency response.
The Concessionaire shall abide by the following insofar as they relate to safety of
tha Users:
For carrying out safety audit of the Project Highway under and in accordance with
this Schedule-L, the Authority shall appoint from ~imeto time, one or more
qualified firms or organisations as its consultants (the "Safety Consultant"). The
Safety Consultant shall employi'team corn rising. wiihos: limitation, one road
4 Laning of
35P
Rohtak Jind Section from km 307.000 to krn 347.800 oTNH-71 and connecting I ~ n kfrom km
347 800 of NH-71 to km 9.400 of NH-71A robe exauted'as BOT (Toll) projec~on DBFO Pattern under
N H D P Phabc I l l in the State of Hzryana Pobc L I -
safety expert and one traffic planner to undertake safety audit of the Pro-ject
Highway,.
The Concessionaire shall provide to the Safety Consultant, in four copies, the
relevant drawings containing the design details that have a bearing on safety of
Users (the "Safety Drawings"). Such design details shall include horizontal and
vertical alignments; sighuines; layouts of intersections; interchanges; road cross-
section; bridges and culverts; side drains; provision for parked vehicles, slow
moving vehicles (tractors, bullock carts, bicycles) and pedestrians; bus bays; truck
lay-bys; and other incidental or consequential information. The Safety Consultant
shall review the design details and forward three copies of the Safety Drawings
with its recommendations, if any, to the Independent Erigineer who shall record
its comments, if any, and forward one copy each to the Authority and the
Concessionaire.
The accident data and the des~gndetails shall be compiled, analysed and used by
the Safety Consultant for evolving a package of recommend tions consisting of
1
safety related measures for the Project Highway. The sa ety audit shall be
completed in a period of three months and a report thereof (the "Safety Report")
shall be submitted to the Authority, in five copies. One copy each of the Safety
Report shall be fomarded by the Authority to the Concessionaire and the
Independent Englneer forthwith.
4.5 Without prejudice to the provisions of Paragraph 4.4, the Concessionaire and the
-,
,2 Independent Engineer shall, within IS (fifteen) days of receiving the Safety
3'
..
.: 4
352
Lalning of RohtaX lind Section from Xm 107.000 to Xm 347.800 of NH-71 and conneciing link from k m ,
347.800 of NH.7i to km 9.400 of NH.7lA to be executed as BOT (Toll) project on DBFO Paaern under . .
. , -
I . .
k:. c " -
Report, send their respective comments thereon to the Authority, and no later than
IS (fifteen) days of receiving such comments, the Authority shall review the same
...
C'..!.
.
'.
, .-.
. . . ..
--
t.r
alongwith the Safety Report and by notice direct the Concessionaire to carry out
. !-.. .i
any or all of the recommendations contained therein with such modificafions as ;
'.d.
..
the Authority may specify; provided that any works or services required to be - .
undertaken hereunder shall be governed by the provisionsof Article 18.
. .
.
5.2 The Safety consultant shall collect and analyie the accident data foithe preceding
two years in the manner specified in Paragraph 4.1 of this Schedule-L. It shall
'
study the Safety Report for the Development Period and inspect the Project
Highway to assess the adequacy of safety measures. The Safety Consultant shall .
complete the safety audit within a period of 4 (four) months and submit a Safety
Report recommending a packagc of additional road safety measures, if any, that
are considered essential' for reducing accident hazards on t h e Project Highway.
Such recommendations shall be processed, nlutatis rnutand~XaTd-acted @n in
the manner set forth in Paragraphs 4.3,4.4 and 4.5 of this Schedule-L.
5.3 ' The Concessionaire shall make adequate arrangements during the. Construction
Period for the safety.of workers and road Users in accordance with the guidelines
of IRC for safety in construction zones, and notify the Authority and the
Independent Engineer about such arrangements.
6.2 The concessionaire shall establish a Highway Safety Management Unit (the
"HSMU") to be functional on and after COD, and designate one of its
be in-charge of the HSMU. Such officer shall have specialist
training in road safety and traffic engineering by having
conducted by a reputed organisation on the subject.
6.3 Tbe Concessionaire shall keep a copy of every FIR recorded by the Po
respect to any accident occurring on the Project Highway. In addi
Concessionaire shall also collect data for all cases of accidents not recor
the Police but where a vehicle rolled over or had to be towed away. The
-
information so collected shall be sumrnarised in the form prescribed b; IRCl 1
MOSRTH for this purpose. The Concessionaire shall also record the exact
location of each accident on a road map. The aforesaid data shall be submitted to
353
4 Laning of Rohtak Jind Section from km 307.000 to km 347.800 of NH-71 and connecting link from km
347.800 of NH-71 lo km 9.400 of NH-71A to be execuled as BOT (Toll) project on DBFO Panern under *
NHDP Phare Ill in the Stare o f Haryana Page L - 3
I
. . . .
Nalional Hiohwavs Aulharitv ollndia ~ctiedules'~
the Authority at the conclusion of every quarter and to the Safety Consultant as
and when appointed.
6.4 The Concessionaire shall submit to the Authority before the 31st (thirty first) May
of each year, an annual report (in ten copies) containing, without limitation, a
detailed listing and analysis of all accidents of the preceding Accounting Year and
the measures taken by the Concessionaire pursuant to the provisions of Paragraph
6.1 of this Schedule-L for averting or minimising such accidents in future.
6.5 once in every Accountir~gYear, a safety audit shall be carried out by the Safely
Consultant to be appointed by the Authority. It shall review a n d analyse the
annual report and accident data of the preceding year, and undertake an inspection
of the Project Highway. The Safety Consultant shall complete the safety audit
wirhin a period of 1 (one) month and submit 'a Safety Report recommending
specific improvements, if any, required to be made to the road, bridges, culverts,
markings, signs, road furniture and Project Facilities,. including cattle crossings
. and pedestrian crossings. Such recommendations shall .be processed, mufatis
mutandis, and acted upon in the manner set forth in Paragraphs 4.3,4.4 and. 4.5. of
' this Schedule-L. -
Costs and expenses incurred inwmnection with the Safety.Requirements set forth
herein, including the provisions of Paragraph 2 of this Schedule, shall be met in
accordance with Article 18, and in particular, the remuneration of the Safety
Consultant, safety audit, and costs incidental thereto, shall be met out of the
Safety Fund.
4Laning olRohrak Jind Section from km 307.000 to km 347.800 of NH.71 and connecring link from km
347.800 of NH.7 I Lo km 9:400 of NH-71A lo be executed as BOT (Toll) projec! on DBFO Partem under
NHDP Phase III in thc State ofHaryana ' Page L - 4
. . . .
National Hiqhwavs ~uth&ity'ofinilia - . .
schedules
. . . '
. .
SCHEDULE -M
(See Clause19.5)
-
B LCV
..--
C Bus
D Truck
E Three Axle
Truck
F Multi-axle
Truck
G Oversized
vehicle
H Total
Note 1: The above statement does not include Local Users and vehicles travelling on
Passes
Remarks, if any:
'
- . 3 5.5
4 Laning of Roh~akJind
347.800 of NH.71 to Xm
NHDP P h s e 111 in the State of Haryana
.
+l.>
:.I
,
'-.. ,
, . . . ., , . .:.
. .
'-7 . . . .
. . . .
. . . .
-, . . .. . \ . .
. .. .
. .
' Nalional Hiqhways ~ulh&ilvof India , '- . Schedules , . . .
-?
SCHEDULE - N
(See Clause22.1)
WEEKLY TRAFFIC CENSUS
Project Higbway: 4 Laning of Rohtak Jind Section from km 307.000 Week ending:
to klli 347.800 of NH-71 and connecting link from km 347.800 of
NH-71 to km 9.400 of NH-71A to be executed as BOT (Toll) project
I n DBFO Pa; under ?+IDl Phase 1;Uin the st[ of;aH (41 ,
B Local Users
B1 Car
'
Total (B)
I
C Exempted Vehieles
C1. Motor Cycle
C2 Car
C3 LCV
--
C4 Bus
C5 Truck
C6 Three Axle
C7 Tractor
Total (C)
.. . . '. ...
. . . . . . . .. .. .-
..
....... . . . . . . . . <..,.. .!. , . > ........... : ..,
i r - .
. .
I
'
,.,
<
.
-.
.
.. . .: . . a .
..:.. . . ' 1. j,. : . . . ., . . . . , , ,,. ! . 7
. . u -
. , .. : . . . .
. .
. . .Ld
,
. .
.
,. --
. . ..
. . . . . . - ., . . . -. . . T
excess
- .
13 Truck
p
!;:a
,;t'--'
<?
-
..
n
k..:'
,.i:> ,
, 'L;
b
C Three Axle
i.d ,
Truck 6,)
,,: j' "
;:
i.
D Multi-axle .-,
Truck
I .-. . .!
6
... :
,
.
E Total
, .
-
I
L
.. p
Note: Sample size shall not be less than 200 Trucks per week and 20 Trucks per day, and ,,
.
<.. . .%
--
should include a proportionate number of ~ulti-axleTmcks. . .
--
Remarks, if any:
351
4 Laning of Rohrak Jind Section from km 3 0 7 000 ro km 347.800 of NH-71 and connecting link from k
347.800 of NH-71 ro km 9.400 ofNH-71A to be executed as BOT (Toll) project on DBFO Pattern under
NHDP Phase I11 in the State of Haryana Page N - 2
.
,-
-
3 . ,
.
'
.
. .
.
..
.
. .
National Hishwavs Authority of l n i a . . . . .
. . . . .
'.
..
Schedules
.
,'
. .
.
.
. .
SCHEDULE -0
(See Clause 22.3.1)
TRAFFIC SAMPLING
1 Traffic sampling
The Authority may, in its discretion and at its own cost, undertake traffic
sampling, pursuant to Clause 22.3, in order to determine the actual traffic on the
Project Highway. Such traffic sampling shall be undertaken through the
Independent Engineer in the manner set forth below.
The Independent Engineer shall employ the required number of enumerators who
shall count, classify and record all the vehicles as they pass by, and divide the
survey into fixed time periods. The count stations shall be located near the Toll
Plazas on a straight section of the road with good visibility. The survey shall be
conducted continuously for a minimum of 24 (twenty four) hours and maximum
of 7 (seven) days at a time. The count period shall be I 5 (fifteen) minutes with
results summarised hourly.
- .
' A 358
4 Laning of Rohrak Jind Seclion from km 307.000 to km 347.800 of NH-71 andconnecting link from km
347.800 of NH-71 to km 9.400 of NH.71A to be executed as BOT (Toll) projecr on DBFO Panem under
NHDP Phose !ti in [he Sta[e of Haryana Pog* 0.1
0; $!!{%
c<::...o~ -7 :
1
* .g;
.
1
!
. , National HiQhways Aulhorilv of Indie . . . . . . Schedules. . . -
SCHEDULE -P
(See Clause 23.1)
In the event that the Authority shall follow the selection process specified in the
Model RFP for selection of Technical Consultants, as published by the Ministry
of Finance/ Planning Commission, the selection process specified i
Schedule-P shall be deemed to be substituted by the provisions of the said
RFP and the Concessionaire shall be entitled to scrutinise the relevant r
forming part of such selection process.
Fee and expenses
In determining the nature and quantum of duties and services to be perfo
the Independent Engineer during the Development Period and Constru
Period, the Authority shall endeavour that payments to the Independent Engineer
on account of fee and expenses do not exceed 2% (two per cent) of the Total
Project Cost. Payments not exceeding such 2% (two per cent) shall be borne
equally by the Authority and the Concessionaire in accordance with the .,:
provisions of this Agreement and any pa rnents in excess thereof shall be borne fi:' n'Ge8'p
- .
4
3i 9
Laning of Rohrak Jind Secrion irom km 307.000 to km 347.800 ofNH-71 and connecting link from km
. .
,-..
347.800 of NH-71 to km 9.400 of NH-71A 10 be execured as BOT (Toll) project on DBFO Pattern under
i
NHDP Phase III in the State of Haryana -
Pcge P I
+
.&'
1
L...
., ..
-
-
. . Nalional Hiohways Authorily 0'7 India . .
.. ~chedules . . .
h, .. ..
4 Laning of ~ o h l a k . ~ i Section
nd from k m 307.000 to k m 347.800 ofNH-71 and connecling link from km
347.800 of NH-71 lo km 9.400 of NH-71A lo be executed as BOT (Toll) project on DBFO Pattern under
NHDP Phase 111 in the Srate of Haryana . -
Page P 2
\* . .-
. . . . . .. . ..
L i
-
. . .. .
-
. , .
. >
. -
. . . .
. .
. . . .
. .. ..
. L-';
..
. .
. .
National Hiqhways Autharilv of India
. . .. .
Schedules 'c. '
/-
s~
SCHEDULE -Q
(See Clause 23.2.1)
\
r'
kv
-
.
,
-
Scope
These Tenns of Reference for the Independent Engineer (the "TOR")are being
specified pursuant to the Concession Agreement dated ............... (the
"Agreement"), which has been entered into between the Authority and MIS VIL
Rohtak Jind Highway Private Limited (the "Concessionaire") for 4 Laning of
Rohrak Jind Section from Lm 307.000 to hti 347.800 uf NH-71 and connecting
i i n ~from km 347.800 of NH-71to km 9.400 o f NH-71A to be executed as BOT
(Toll) project on DBFO Pattern under NHDP Phase III in the State of Haryana on
design, build, finance, operate and transfer (DBFOT) basis;and a copy of which
is annexed hereto and marked as Annex-A to form part of this TOR.
1.2 This TOR shall apply to construction, operation and maintenance of the Four-
Lane Project Highway
- --- -
2 ncfinltions and interpretation
2.1 The words and expressions beginning with or in capital letters used in this TOR
an& not de.fined herein but defined in the Apeetnent sbballhave, nniess repugnant
to the context, the meaning respectively assigned to them in the Agreement.
2.2 Refcrenccs to Articles, C1a11sr.Sand Schedules in this TOR shnll, except whcrc the
context otherwise requires, be decmcd to'be references to the Articles, Clauses c
and Scl~edultsof drr: Ag~.eerr~ent, and references to Paragraphs shall be deemed to
be references to Paragraphs o f this TOR.
2.3' 'I'he rules of interpretation. stated in Clauses 1.2, 1.3 and 1.4 of the Agreement ,.
shall apply, muratis murandis, to this TOR.
3.1 ' The role and functions of the Independent Engineer shall include the following:
(vii) determining, as required under the Agreement, the period or any extension
thereof, for performing any duty or obligation;
.3.2 The Independent Engineer shall discharge its duties in a fair, impartial and
efficient manner, consistent with the highest standards of professiona! integrity
and Good Industry Practice. ,
4 Development Period
'7,
4.1 During the ~eveloplnentPeriod, the Independent Engineer shall undertake a
, . detailed review of the Drawings to beturnlshed by the Concessionaire along with..
.4 . . . supPofling data, . including the geo-technical and hydrological investigations, . .
characteristics of materials from borrow areas and quarry siW, topographical
A surveys and traffic surveys. The Independent Engineer shalI complete suchreview -- -- .
and send its comrnents/observations to the Authority and the Concessionaire
within I5 (fifteen) days of receipt o f such Drawings. In panicular, such comments .., .
,
-
\
shall specify the conformity or.otberwise of such Drawings with the Scope of the
4, Project and Specifications and Standards.
I
4.2 The Independent Engineer shall review any modified Drawings or supporting
Documents sent to it by the Concessionaire and furnish its comments within 7
(seven) days of receiving such Drawings or Documents.
4.3 The Independent Engineer shall review the Drawings sent to it by the Safety
Consultant in accordance with Schedule-L and furnish its comments thereon to
the Authority and the Concessionaire within 7 (seven) days of receiving such
Drawings. The Independent Engineer shall also review the Safety Report and
furnish its commants thereon to the Authority within IS (fifteen) days of
receiving such report.
4.4 The Independent Engineer shalI review the detailed design, construction
methodology, quality assurance procedures and the procurement, engineeri
construction time schedule sent to it by the Concessionaire and fum
comments within 15 (fifteen) days of receipt thereof,
5 Construction Period
5.1 In respect of the Drawings, Documents and Safety Report received by the
4 Laning ol'Rohtak Jind Section from km 307.008 to km 347.800 of NH-71 and connccllng link from km
347.800 of NH.71 l o km 9.400 of NH-7IA ro be cxecur
NHDP Phase Ill In the Srate of Haryana
35$T (Toll) p r o j ~ c lon DBFO Panem under
- . Pagee-2
. . . : . . . . . . . . . . . . .. ,
. . . . . . . . .
I . .
.. .&
.
. .
. . .
. . . '.
.
. .
.
. . . . . .
. . ..
(?.'
%w
: '
. . > .,.
. . .
. . . . Nations1 Highwavs~ulhorilv
of India . . . . . . . . Schedules. .... . 'b :. :
,
b
Independent Engineer for its review and comments during the Construction
Period, the provisions of Paragraph 4 shall apply, mufatis mufondis. +w'. =J
5.2 The Independent Engineer shall review the monthly progress report furnished by
the Concessionaire and send its comments thereon to the Authority and the
Concessionaire within 7 (seven) days of receipt of such report.
5.3 The Independent Engineer shall inspect the Construction Works and the Project
Highway once every month, preferably after receipt of the monthly progress
report from the ~oncessionaire,but before the 20th (twentieth) day ofeach month
in any case, and 111ake out a report of such inspection (the "Inspection Reporl")
setting forth an overview of the status, progress, quality and safety of
construction, including the .work methodology adopted, the materials used and
their sources, and conformity of Construction Works with the Scope ofthe Project
and the Specifications and Standards. in a separate section of the inspection
Report, the Independent Engineer shall describe in reasonable detail the lapses,
dafccts or dcflciehcics observed by it in tht: construction of the Project Highway. . .
The Inspection veport shall also contain a review of thc maintenance ofthe
existing lanes in conformity with the provisions of the Agreement. The
Independent Engineer -shall send a copy of its Inspection Report to the Authority .
-.....and.the
- Concessionaire within 7 (seven) days of the inspection. . .
5.4 The 1~dcpcsde&~nglncer may inspect the Project Highway more than once in a
month if any lapses, dclects or deficiencies require such inspections.
.I. . ,
5.5 For determining that the Construction Works conform to Specifications and
Standards, the Independent Engineer shall require the Concessionaire to carry out,
or CRIISI: to be carricd out, tests on a samplc basis, to be specified by the
Independent Engineer in accordance with Good Industry Practice for quality
assurance. For purposes of this Paragraph 5.5, the tests specified in the IRC
Special Publication-1 1 (Handbook of Quality Control for Co~lstructiunof Roads
and Runways) and the Specifications for Road and Bridge Works issued by
MOSRTH (the "Quality Control Manuals") or any modification/substitution
thereof shall be deemed to be tests conforming to Good Industry Practice for
quality assurance. The Independent Engineer shall issue necessary directions to
the Concessionaire for ensuring that the tests are conducted in s fair and efficient
manner, and shall monitor and review the results thereof.
!
5.6 The sample size of the tests, to be specified by the Independent Engineer under
Paragraph 5;5, shall comprise 10% (ten per cent) of the quantity or nu
tests prescribed for each Category o r type of tests in the Quality Control
provided that the Independent Engineer may, for reasons to be recor
writing, increase the aforeshid samplesize by up to 10% (ten per cent) for
categories or types of tests. . ,
5.7 The timing of tests referred to in Paragraph 5.5, and the criteria for ac
rejection of their results shall be detem'ined by the Independent En
accordance with the Quality Control Manuals.The tests shall be undertaken on a
random sample basis and shall be in addition to, and independent of, the tests that
may be carried oa by the Concessionaire for its own quality assurance in
accordance with Good Industry Practice.
5.8 In the event that the Concessionaire carties out any remedial works for iemoval or
rectification of any'defects or deficiencies, the Lndependent Engineer shall require
the Concessionaire to carry out, or cause to be carried out, tests to determine that
such remedial works have brought the Construction Works into conformity with
the Specifications and Standards, and the provisions of this Paragraph 5 shall
apply to such tests.
5.9 In the went that the Concessionaire fails to achieve any of the9roject Milestones,
the Independent Engineer shall undertake a review of the progress of construction
and identify potential delays, if any. If the Independent Engineer shall determine
that colnpletion of thc Project Highway is not feasible within the time specified in
the Agreement, it shall require the Concessionaire to indicate within 15 (fifteen)
days the steps proposed to be taken to expedite progress, and the period within
which the Project Completion Date shall be achieved. Upon receipt of a report
from the Concessionaire, the Independent Engineer shall review the same and
send its comments to the Authority and the Concessionaire forthwith.
5.10 If at any time during the Construction Period, the Independent Engineer
determines that the Concessionaire has not made adequate arrangements for the ,
' safety of workers and Users in the zone of construction or that any work is being
carried out in a manner that threatens the safety of the workers and the Users, it
shall make a recommendation to the Authority forthwith, identifying the whole or
part of the Construction Works that should be suspended for ensuring safety in
respect thereof.
5.1 1 In the event that the Concessionaire carries out any remedial measures to secure
the safety of suspended works and Users, it may, by notice in writing, require the
Independent Engineer to inspect such works, and within 3 (three) days of
receiving such notice, the Independent Engineer shall inspect the suspended
works and make a report to the Authority forthwith, recommending whether or
not such suspension may be revoked by the Authority.
5.13 The Independent Engineer shall carry out, or cause to be carried out, all the Tests
specified in Schedule-I and issue a Completion Certificate or Provisi
Certificate, as the case may be, For carrying out its functions under this Para
5.13 and all matters incidental thereto, the Independent Engineer shall act
and in accordance with the provisions of Article 14 and Schedule-I. i
4
5.14 Upon reference from the Authority, the Independent Engineer shall make
and reasonable assessment of the costs of providing information, work
i
services as set forth in Article 16 and certify the reasonableness of such costs
payment by the Authority to the Concessiona~re
5.15 The Independent Engineer shall aid and advise the Concessionaire in preparing
the Maintenance Manual.
4Laning of Rohrak Jind Section from km 307.000 to7tm 347.800 of NH-71 and connecting link from km
337.800 of NH-71 ro km 9 400 olNK-71A to be execured as 3940") project on DBFO Panern under
NHDP Phase Ill in [he Stare olHaryana .P~geQ - 4
. .
6.;'
w
Operation Pcriod . . ... >
(.; :.:
L&
In respect of the Drawings, Documents and Safety Report received by the . . ~.,
Independent Engineer for its review and comments during the Operation Period, C, ?-
-...\
The Independent Engineer shall review the monthly status report furnished by the &.,
Concessionaire and send its comments therenn to the Authority and the
Concessionaire within 7 (seven) days of receipt of such repo~t.
The Independent Engineer shall inspect the Project Highway once every month,
preferably after receipt of the monthly status report from the Concessionaire, but
before the 20th (twentieth) day of each month in any case, and make out an O&M
Inspection Report setting forth an overview of the status, quality and safety of
O&M including its conformity with the Maintenance Requirements and Safety
Requirements. In _a separate section of the 0 & M Inspection Report, the
Independent Engineer shall describe in reasonable detail the lapses, defects or
deficiencies observed by it in O&M of the Project Highway. The Independent
E ~ ~ g i l ~sliall
e e l bend a copy of its O&M Inspection Report to the Authority and the
Concissionaire witllirl7 (seven) days of the inspection.
Thc Independent Engineer may inspect the Project Highway more than once in a
month, if any lapses, defects or deficiencies require such inspections.
The Independent Engineer shall in its O&M Inspection Report specify the tests, if
any, that the Concessionaire shall carry out, or cause to be carried out, for the
purpose of determining that thc Prujcct Highway is in conformity with the
Maintenance Requirements. It shall monitor and review the results of such tests
and the remedial measures, if any, taken by the Concessionaire in this behalf.
6.9 The Independent Englneer shall examlne the request of the Concess
closure of any lane(s) of the carriageway for undertaking maint
thereof, keeping in view the need to minimise disruption in traffic i
required for completing such maintenancelrepair in accordance with Good
Industry Practice. It shall grant permission with such modifications, as it may
4 Laning 01Rohtak Jind Section irom km 307.Q00to krn 347.800 of NH-71and connecting link from krn
347.800 of NH-71 to krn 9.400 of NH-71A ro be exec OT (Toll) project on DBFO Pattern under
NHDP Phasc 111 in the State of Haryana ,
Page Q - S
. .
6.10 The Independent Engineer shall monitor arid review the curing of defects and
deficiencies by the Concessionaire as set forth in Clause 19.4.
In the event that the Concessionaire notifies the Independent Engineer of any
n~odificationsthat it proposes to make to the Project Highway, the Independent
Engineer shall review the same and send its comments to the Authority and the
Concessionaire within 15 (fifteen) days of receiving the proposal.
. At any time, not earlier than 90 (ninety) days prior to Termination but not later
than 15 (fifteen) days prior to such Termination, the Independent Engineer shall,
in the presence of a representative of the Concessionaire, inspect the Project'
Highway for determining compliance by the Concessionaire with the Divestment
Requirements set forth in Clause 38.1 and, if required, cause tests to be carried
out at the Concessionaire's cost for determining such compliance. If the
lndependent Engineer determines that the status of the Project Highway is such
that its repair and rectification would require a larger amount than the sum set
forth in Clause 39.2, it shall recommend retention of the required amount in the
Escrow Account and the period of retention thereof.
The Independent Engineer shall inspect the Project Highway once in every
15(fifteen) days during a period o f 90 (ninety) days after Termination for
determining the liability of the Concessionaire under Article 39, in respect of the
defects or deficiencies specified therein. If any such defect or deficiency is found
by the Independent Engineer, it shall make a report in reasonable detail and send
it forthwith to the Authority and the Concessionaire.
8.1 The Independent Engineer shall determine the costs, and/or their reasonableness,
that are required to be determined by it under the Agreement.
9.2 In the event of any disagreement between the Parties regarding the meaning,
scope and nature of Good Industry Practice, as set
4 Lening of Roh~ekJind Sect~onfrom kin 307.000 to km 347 800 of NH.71 end connecting link from km
347.800 of NH-71 10 km 9.400 of NH-71A to be exccu OT (Toll) projecl on DBFO Patfern under
NHDP Phase 111 in [he Stare of Heryana - 3??8 Pngr Q -6 *
,
National Hiqhwavs Aufhoritv of Indre SChedules
Agreement, the lndepe~~dcnt Engineer shall specib such meaning, scope and
nature by issuing a reasoned written statement relying on good industry practice -
and authentic literature.
The Independent Engineer shall perfornl all other duties and functions specified in
the Agreement.
11 Miscellaneous
11.1 The Independent Engineer shall notify its programme of inspection to the
Authority and to the Concessionaire, who may, in their discretion, depute their
respective representatives to be present during the inspection.
11.3 The Independent Engineer shall obtain, and the Concessionaire shall furnish in
two copies thereof, all communications and reports required to be submitted,
under this Agreement, by the Concessiollaire to the lt~dependenlEngineer,
whereupon the Independent Engineer shall send one of the cupies to Lhe Aulhority
along with its comments thereon. .
11.4 The Independent Engineer shall retain at least one copy each of all Drawings and
Documents received by it, including 'as-built' Drawings, and keep them in its safe
custody.
11.5 Upon completion of its assignment hereunder, the Independent Engineer shall
duly cIassify and list all Drawings, Documents, results of tests and other relevant
records, and hand them over to the Authority or such other person as the
Authority may specify, and obtain written receipt thereof. Two copies of the said
documents shall also be furnished in micro film form. or in such other medium as
may be acceptable to the Authority.
- . 36 7
4 Laning of Roh~aklind Sectipn from krn 307.000 to krn 347.800 of NH-71 and
347.800 of NH-71 ro krn 9.400 of NH-71A to be executedas BOT (Toll) projec
NHDP Phase Ill in [he State of Haryzna
.' .
.
~ .
. . .
. .
' Schedules
SCliEDU1,E -R
(See Clause 2 7.1.1)
FEE NOTIFICATION
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS
(Department of R o ~ dTransport and Highways) .
NOTIFICATION
New Delbi,'the ...... ...
20
S.O. .............. Whereas, by the notification of the Government of India in
-: the Ministry. of Road Transport and Highways, number .***** dated the *****,
issued under section 11 of the National Highways Authority of India Act, 1988 (68-
of 1988), the Central Government has entrusted the section of Xationai Highway 4
, Laning of Rohtak Jind Section from km 307.000 to km 347.800 of NH-71 and
connecting link from km 347.800 ofNH-71 to km 9.400 of NH-71A to be executed
as BOT (Toll) project on DBFO Pattern under NHDP Phase 111 in the State o f
Hatyana to the National Highways Authority of India. (hereinafter referred to as
the "Authority");
.?'?rp
4
Tt*i
-
-,
-72
- .
q.2 '
Rohiak lind Secrion from Xm 307.000
4 ~ a n i n gof
? .
-. .
347.800 of NH-71 lo km 9.400 of NH-71A ro be
NHDP Phase Ill in the State olHaryana -
PageR l I
. .
. .
. . . . . . . . . .
. . . .
. . . . .
* . .
. . . . . . . .
. .
. . . . . . . .
Na~ional~ioh&vi~ufhorilvof India ' Schedules
The fee levied and collected hereunder shall be due and payable at the
following Toll Plazas for the distance specified for each such Toll Plaza:
In addition'to the above, the rate of fee for use of bypass forming part of
the section of National Highway constructed with the cost of Rs. 10 cr. (Rupees ten
crore) or more, for the. base year 2007-08, shall be 1.5 times of the rate of fee
specified in sub rule 2 of National Highways Fee (Determination of Rates and
Collection) Amendment Rules, 2010' and 2011 Gazette of India dated 3*
December, 20 10 & 12h January, 20 11:
(Name)
Deputy Secretary
Govcnuncnt of India
. , i
' 369.
4 Laning of Rohtek Jind Section from krn 307.000 to krn 347.800 of NH-71 and connecting link from kin .I
347.800 of NH-71 to km 9.400 of NH-7IA to be executed as BOT (Toll) project on DDFO Pattern under
NHDP Phase 111 in the State of Haryana Page R - 7
I
, . .. . . . . .. . . %
2. ~elinlfions;:
. _ I .
:
6
.
' .. .
,. ..
. ., . . :
.
: .. ciy; .. .. , . .
.. .. .
. .
.. . .. . .
. . . (d) "codcessionaire" means a pcrson w i l h . ~ h o r nan agre&cn.t has been ' ; .
.
. .
... .. .
, ..
.: seciiob EA'oltht Act; .... ] .. . . - . . . . .. .
. . ...
'. , e " ~ e r dinto'inder
.
I . .
.. , () , "clivakd highway"~rneansIhny. seilion .bf pationel highway raistd ' . . .
. . . . .
. .
.. above gound lcvcl~throughsupport o f piers or columns; ' :
. 6' '
. . (9 . " c x e c ~ t i niYfhorify'*
~ means an officer i r authotity notified by the
. .
'
. . .
:
.
s u i ~ b l efor high speed traflic and wifh control,of eccess; . . i
. .
(h) "finahcia1 y;ar",rlcans thc year eomrncncing on the l 8 ' d i y o r April o f , . .
.: I '
, ;-
.
?
. .
, a year and tnding'on'3.I" day of March o f the succeedingyear; .
t
.:.. ..
:
. .
.>'.!; : . . . . j.,S 1
, . . . . .
j'
.-- ,--------..--...-,,.i,
-.[, *,p.t:y-& ~(i.11
' '
----.$mil
. _ .51
_.~_G. ~..:.T~RII:JI(VI'
.I .- .'
. .
.. . .
. . . . ...........-..-....-............. . ......
lj'
,' , -_i-- . _.._r_"i ; ......... -.--.--------...I__ ..-.
'.
'
...
> :
..
. ., >.
. . .
.
. . , expired; . . . . . . . .; ,: : ,
. . .
. . , I.. (oj ..b ' t.d l .~ p ldn* ~mehns.hnybuilding,
~ . .for .collcc~08
s~nlcturcor bootlt:madc . ..
.:.
I
. . . . . . . .
offec. l , . .
. . . . . . . . . . . . .
. .
(2) Words a @ &vpressions used he?iin and not de'fined but defined iq the Natipnal,
I . .
>
i i -
. ....
.
. . . . . . ,
-. . . .
' .
,Highways ' ~ u t h o r i ~ ~ .lid;&
o . f ~ct,i.1988 shali have thc meanings respcctiucly as!igncd
...
. .
. . .: . . .
to. tl!em .in that I\'ct:;
. . ' . . , . . . .
'3.' ..~ e ~ o f : f c e(I)
. - The Cen~raI~ovehrnentmay b i notificatio?, !evy'f~e,for use ,
'
.:
o f any seciion ofnational highway; ,pcrmaninf,bridgc, bypass or lunncl lorming pa? of.
. . ,
.. , . . .
. .:the'na.~iorial highivay, as the case may bc, in accordance. with ~ h cppvisions:of 1he;c.. . . .
. . .
rile$. . . 8
:
~tobic$d that t h i cintiel Gpvernmer~tmay, b y notificati~n..tsch~~
. .
any kction of,
. .
.: '
(3). ' i n case o f private investmen! projcct. thc collecfion o f fce levied undeisub-rule
. . .: I.
(1)shall bc madc i n accordance with thc terms of the agrcemcnt entered into by the
. .
,
,
.
'
.'
.
,: .3
L
. ... ..
.
...
...
.....
. ..
!.
.. . ..
i
,'.
',
.
g-...
,
L/.
:
.
I
owner,
. ..:
.
Proyidcd
f$ih0,i,j",,.
ar; ,
.
Pmr'ided
. funhcr.lhst
.
. . . . . . .
. . ar . .puson
.._ driver
.. ,
. k
. . .
b;char&
the camiigijn(mi of
docs noi
..
wllcrc service road
:_ . . . . . . . . . .
. charge
.
. . . ',
.
. .
....... , . . . . .
fi$ pci&n~:pf\hc'fcc lcvid on a ' l .
F~~Uebu,-posd'ofihii
. . . . . .
(r)"al~cnia~ik
. .
,.
. . . . . . .
of a. tk90 whcel~iis making ofthe
e ~;. s . . . . . .
\pied in mul~iple$he nearest ~ u ~ five.
.
. .IhC. _ . : . . . ...
kctlon of .
OYS ~ he Or s* . . :1
. . .
. . . . . .
.
. .
,
,
...
'
'
'
.
#
. .
.
I ..
;
.
.
.
'.
.
,-
... . .
.
. . ... .. .... . .
. . .
...
. .
.:.
. .
,
hii~,g~,i,
p(mane"l b f i d ~ ,bypass or WnncI cons~ructed[!rough public fund* p!0jec!
or p + a ~inrc.+nint
c projec~slicl811
be identical. , . ' - : ..
(11'
of fee for.yle a. s e. c $ ,~~f~niitional highway'oi@l ore lane$'
Par2 0 0 0 . ~ ~ i ~the. produ~t.of Iht o f ~ l c h
SCC~~O'u
' !
i
~ Ted
ia,ll,sr
.. .
.k foIIoivi?g riles; namely:. ' ' . .
'
. .. . .
.
. ,
. .
. $& ;atc,di . fec ..pcr:km (in.
_. ...
'
. .Type tjr\'ehicle..
. . .. . . . . . :
. . : r .. . . . Rupees) . '., ', .. '.
. ,
, '
I
372
. . . .
. . . . .
vm tI-tm ~['i:?I-2 ..----..---..: -.-,
.
--- ,_
..--,.---.-.. ..-..--..-.
.
-.....;.. ;-.-..-.
i. -.---.--- 2
. .
. .
1
------...-- Qnl ;rn.Tw! : .)m~m'l -..---.. . ...-........... : .., -'
. f Z . . . .:
. . .r .
c"\ . ja) y;&ir~o i "j&p
,
or'~lv&'l br:!il~!is~t.pnto~ . .
r&~tle"means 'any rnreBnnjcrl . . . .
. .
'. . . . . .
, . . . ... ... ..
.....
. . . . . . vehicl;. ihr vfhicle 'weigh{ if&hich
.
does
.
nqt.h:c;etd seven thousand five . . . 2 .
. . .
. . ' . h ~ ~ l d l ~ e d . k i l ~br~ ftah m
j rcgiste'ed
s pa.i;enel- carrying capability as specified in .
.
. . - ' >
.!
. . .
:
thCce?iiica;e bfrellir~jdiidi,issu$d under !ti;holbr Vehicles Act, 1988 docs [lot
i
... .
. . . . . .
exc,c<d. twelve exctu.dingthk d&r;
.
;. '(i)
. 1.
.li'. . .. . . . . . . . . . . .
!.I . . . .'
.
' $,. '
:.
. la,iihl
.:
. i~l"~c~rcjai iehjcrbl!. or:']ighj
. . . goods
. vt.lhkq'
or "mini bu&"i!l$!"s '
.. . . .
_ . . an;. .&chanical
. _ _ vrfir . . gas vihiole
:. . weight ixcecding.:, S C V . .~lhou~alld
~ . . . '
. .
.
.. fivc hl~ndrcdkilogrrm)'but ltrr than t\veIvc thouund kil&ams
. . . . .,.... .. . : . .: ...:, :,:.
the regilkrcd
. .
: . . .~.~ .r s. e n g u i ~ T i n cap&il$
. . . . . . ...:, ..
g a syccifirb i,1& ccrhhe&. . .f. .i c. d. s w a t i ~i~...
5l~.d~
.
. .. . . . . .
. ,.' .. . . . . ', u"d(r.ih<~~tor.~chiclb ~ ~ &\re LC dies no1 c.i.y c d tl~i~>y
A& 1 9 8exceeds
!. . . . . . ., ... . .
'
. .. .. . :... ..::..
' '
. . . . . ..
. . . . . . .. . . . . . . . . . .. _ _ .
' (*) .~h&+ k.iiruttiin .,&,hirev'.' "rrrth cqui(n!tnr
. . Or
.. '
!'"u(li.aFlh'rehf 1.:'.
~ ~ ~ a n s ' h cinsiwllon
n*
....
. .
machincry
__.
~ovinb . ..i:~$h . ,.
. ..
'
. '
. . . . . . . .
1 i u 1d t , vdiiclc *@ l$$~@k ; ..
'
e $ i p n ~ j { l a imrch&iC~llvchi~Ieeincludin~sa
.. . . . . . :. .. .. : . . . . . . _
. ..... . . . .
. @ .v&ic]: ksi
.
.,
wilh a .iroa, vihiclc ?"eigFl ~cctding.,Wcnry .._ U
h
. .~
.
"., O, $. ~, Y
. .:. ,si1
*$, . .
. . ' .. kilograms b"t less tlla?&ty ;irbusand.k(logranl; and ,' . . .
....--
. . . .
. . . . . .
.. . ' . "I& five ciorc or . .
. . . . . . . . . . . . . .
.. . . .
,
. . t~;~d;cdcrorc. . . . . ..: . . .
--.
..
---:3.9. . . . h.j?
2.25
. F~~. c ~ . qadditiya~
. o!is .. . ,
.? . '
. .
.-..
, , . .
hiFFe$
five crorc ol'
.
. . . . .
. .
.
. . .
.. ..
,
. . . Pan '.i~~ercof, . .
. .
. '
exceeding Rupees
... . . . . .
hucidied &ore . . .
. ..
. ' ,
. . . . . .
. .
.'and IJ~IO'R$~C~S
NO
...
.. . ...
:_
... . . . . .
hu'ndtcd crore.: '. -
:?or, &cry idditional "
- - v -
0.50 . . 5 . - 0 0.75 .. . . .
:
.:
. 3 ~
..
... .. ..
. .. ...
Kupees five crorc or
_ .-
'
. .
. . . _ _ _ _ -. - - . , . . .
_tkoj~unilrcd
- crcrc. ..
-.---
. . . :
.
.:
. . . . .
.... . . . .......
. . . . . . . . lh!l c9,,+is
~ ~ t ~of oll~~io".!,~fhwa~rOn
. . fFcfY
. ! .. .'
whh!ch
is si~uated,the, .
. . . . . . ...a. . . . . . . . . ...:..;. . . . . . . . . . . crorc
. . .. ..b&a?s
b,i.Jge, .. . . . orI~ll!leI . . Rt~?ccs
. . . .~?sI.~'!s . . . .
pl;nlahl,t M ~ S0S1 I U ~ C I a? bc e ~ c ~ ~ ~ dlalSh ~ ~ Of. ~ ~ ~ n . *r
, '
:
.. . . ,o,i l;I
sv& . .
or ,,oli~nalLidl&uymd .. . spccifid . . . . ...
~hnllly.l y i r,d nrthe.raks
. C ' . . ,.-.;.. .
. . . .. . .
,
. .
. ..,icimJ~cnt?~GIge,
.... bypas! and_tllnncl:
. : . . . .
:.:.<. . . . .
.. . . .- . . .
. . ...~.y~--.7=~...7.1.z.r...
------------.-------
. .miTI m3 :~&msmt *-----
.<...r:.
...-..........-.7=. . .
1')
......
.,.. .. .. Proviicd fti~thcr.:lnt where t!~ccost ofatcl~pcriiinentbddsc, bypass or.iunnel,
. . ' '
C .
as lltc case may he, is 11% rhni~Uttpces fihy crorc; grid t l ~said
i pel.tt;iit~rt~tbridge, "
, . . . Explanation.-
. .
For the p u r b c o f this &l-rule,. . . .
. . . . . .(;I) [he .cost for priva~einvcs!!den~
, shrill be the cost its ass:sscd. by tilt - . . . . . .
.:
. . . . .!2) TI!! applicable barc riles shnllbe r&iscd sn;\ually \s,irhcllcy from h p r i l Itnclt
yf?r. to reflecl the it,crcase 'in ' ~ $ l e _ ~ r i c'index,bcty~i-k.-weck
e ending on.
. . .
~anuaty.6,2007 (i.e. 208.7) pnd the Gcck ending.on pr imnediaqly nker h&ayI . df
. . . .' ..
. . . the year in whicll sic11 rcvision is uridert$k;n, bu!:sucl~ rcvisio~~
shill: bc rrs!rictd, to
(3) T h e formull for determining the applicable rate of fee shall be ~sf~lloi\.s:. . . . .
. . . . . I- 7. ' * . '
. .
1. : 9
.
. . (ai
..
for ihc purpdscs otthis sub-rule ,- ,
~.xplo~:aiion-
a p p ~ i , c ~ b l c ~ ~ t be,tll<~a;e
~ q i ~ ~ '.pay;bl
s l. ~et ~by~ thjC.urFr;
~ ,,..'
' .
, . , . . .
,
' 1 .
.. . (' '.'
:.. . . . . . . .. ,:... . . . . . . . . .
: *
. ::. . .
. .
. .. .... . . . .(c).WPI 6 mean3 ihc .bholcs~lcprjcd indcx of.the yeek eliding on .OI. st~bscquent.
l o 1; ~ a ~ u a r ~ ' i m r n c b i a r e ~ ~ r e cthC ' i n ~6f rc;ision cmdcr lhCsi rul&i and '
t ddale
. . . .
-
.f qm o.-bv.ijlj)]
-----.-.
:
. . - -
(sj'rhe p~rson'receivin~
.
-
.
5 --Li
such LC ~ n t t e i w b . ~ (21bhllc
,l~
.
..-..-....-.----- .------- .-.---.....-.-i-i-i-,
....----.--.-..I.--.
' ' . '
--.......i.
)
. .
6,
driver, ;rsvc. ,,I,h:
OrpCrsGn in charge of'n~chnicll~~lli,h!ercccipi, sptc;fi.i n, therein ~ h cdate
a"d ril"e
of kc.hltll amounl reieiyid, and tic ,ji!a uf.*,:hiL&'ror
whih the fee'has been received: . I
. PiOvidrd
. 'thgt where !hi k 'ir paid thmjgh smart card br .on board, un;l. '
.
. . ~ h a receipt shall iciiuc+j on demand Dnlr
fia"~O"cr)aan~ o f h u s ~ dzvici, .. ,
, '. . . ... . .
. .
' 0)In r e r ~ c l o fpubliclunded projeils the fee le~;~dirn"der.
these: &lei
kc. .
c0Litcd .by 6e Central Govrrnme"t, 6 tnc cxeculing auUwr;;y, ' . ;
.. . .
I
. :.
..
.
.. .. _ . . . . . ... . I . .
. .
PriviC!* 9?1the;. Cerrtr.1
.
. & .n&jclti&. allow a"v or
~ G o v ~ r n t may
n~t ,' .
e"t"f2 a$hodties foapptopdie
.. the w h o l ~ o r ' n njar( l for'lhh
~ ~ f l h'fee
. . .. . PYrp:OS~I. ..
' and,r~bjcct10 suth condilio"~as may,hc r&ei&i in raid"oIifiiarion: . .
. .' . . ':
. . . . . . . . . .. , '
.:
I Rovided funherfiat in *ie.orpriiate i n. t .e t h. phjc:r, ~ the co,h,,d . :. . . .
,. '
:*ilh,.the
... . . pmvisionr of and for the perforian&,pf';ls ,jblb:i9"s-~nder
.. . . . agrcemea . ,. '
. . . . . . . L
.
,
, . . .
. . . .
. .; , . , . .
.
'
Evcry.rnecuting o u f l l e r i ~ l h ~r hl li t to thc~;nfral~ ~ v ~ ~ ~ ai
" i i ,
I
ti
fie c o ~ ~ ~ d oandv eabove
r I ~ ain01~n1
C p c r m i t t ~10 bc appropriated rxccul;,,g : . ,
aulhorit~ ~ n d subrruld
~ r (I) Of I I7, wilhinniney days fmij,. dale .rlht
. . closing or.
1" finrncial r l o n ~hi(ll L innl~rlrelurn sllowing lllr a,-,,ounl b6{1eclrd and thc
If-
[+Im l l - . T : X . 3 ( i i ] +11. : ,
------
....-.--...------..............-..LL.. .
. . . .-.-.-------.-..---.-.--.-
jmir ik; W * I ~*16?4~3
-.=5:=~-z=-.-=L::: ---.-- ....- ...
..----.---I..-.--
.
..... .....-.-... L.: ,.......
......--..... "-...... !Z :%
b.--^--_.-i I_
. . . . ;
,
.
.. ..
.
be, ihal!.upon request pro\oide.apass for tnt~ltiylejourneys t o cross ? tolt phz? &hic ' . . .. .
. . . . . .... . . .
. . . the specified
. period o;thcrat& ;pecili:d in subnlic (%)of iulc 9.. ;, .
. . .
( 2 ) A driler, owner 01. person in chnrge ofin olechanicnl velliclz who makes use of the
secliot~of h ~ i o f l ahighway,
l permanent bridge,'bypass or lunncl, may opt fo~*such
pass
... . .
. and he o i she shall have to pay the fec.in rccordalce with ~ l l efollorvi~~g
rafcs, namely:- . .
. . . .
. . . .
. . (
-. . . . . . . . .
..
...... . . .,. . , . . . . . . . .. .....
. .... .. ...
. .
. . Amount payable
. .
. . .
.
' '
fee for ocr wayjourncy
'
. .
ihe i d ~ i p ~ ~specifid
. .
arr by suc!~,pcrson pnd thc use ofsuch sbction of nationsl.liighivai,.
. .
. ': . . .
. ,
.' percisneat bridge, b$j;pass
. . .or tunnel;ns the cbsc iqty hi, !!lees not exiund biynnd ~ h 1011
c
. . . '. .
.plaza next t o l l ~ c$cciijed. toil plaza. .' 0 .
.
. . .
. . . .
.' . . .
. .
...
. . Provided further thal nosucll pass shall he issvetl i f a service road c,r ~ I t c n ~ a ~ i v c
1.; -
rpad is
ve hiclc.
available for use by such driver, o&er or pkrson i,r charge of a rncchonieal
is:., .
* * .1.
,!.' !.
. q
. . . ....
... , 2.12.. ,; . : .. '
.. . , . ,
' ..\ . . ..
. .
. . ..
. .
':
., . !:.. ! ,
. . :
r- \ .
, i .: Rile b l f i e fir
.,nli j+-ove, (1) wittnui prejudice to. be lilbilib' or lhc
:.,
.
.
... .
... Ihelime .
$3 driik,ol,"cr oi
.
.$. . +ii
e i l michanicd vchiclc under any Inw
hi velirtjon
'..>. .... . . . . .. _ .
&iiiO,i.fd& . ychiilc u,h!ch irl&ded,ii
a &&i(al .
rrcfir of the pehissiblr
.
. .?.
r- .
O .
utcgorlulderr u ~ . r ~(2)l ~01 rule 4, dldl'be liable io
for its pay
such i
.
. :. . . .
c- ,
. . .
rile issppli[able
e r 11; r x l higher ca!egoP, 0fm~chanicsl
. .
velllFsj , .. -
.:
/. .
. . . . . . . . ...
a driver
p,ovi\ed hlal ,he of fec'for o v ~ l i i d i n b~llfill
<n
' , ,
. . . . . . .,_ . . . . I. . !.
% . :. ; or a ,,Gobinchugc if
a m c c h i n i ~ dv:Ilicb lo us wch nnlOna', .
6- ,*:
0
u,slno . national
.
ldghiay or ,
8l
..I'
h&,,ay
ii.initY
.-
rndhir or. hu. vehicle Shd! be.prerenld
tol,,plYIun,il
......
escess .lO+,fi$betn
. !e.oved . fr.."uch
, , , ,
. . .. . .: '
.
L .
.
. ,.
. : . -" .
....
.. vehicl:; ' . . :.. ....
.. . .: .. . . . .
. .
,t- .. 3
lv
'
.
.
.;.. . . : . ,
. ,
: cd a, a weighbridge,i?.ta!led .
. (2) . ~h~ weiiht. qfamahani~dl
... vehiclc:as FCo . . . .
j.- ;
..
....
. . . . '
c &di2g uhdcr this rule:
shill, the bat's foi Icvyi~lylhc [CC for01. . . . . . . .
..
. .
..
.
. !. .
6 1
. '
,
, .
.. . . . . Pro,vided that wherenp
,i3hb,idge
. ,
iaS
.
b&, iiistnlled 11 11% loll PIaa. 110 'fee, , . :
:
.
.
:
.
. . . ,
I? . , , . oveilol~ini
,shall.~r \evi$da h coltected. under thisylenlld the. driver@
. . Owner Or . .
such
,- prriin
inc,,arp-irhc
,,,A,anical
. . vehid$ k a.l l *.li3blc
_.
lobay fee 3~~'1cable .
\
.. ,
-. .
..
I? . . . . ,
' . ' .<. . .
*
.. vchiclco~ly. . . . . _ . . . . . .
if-" . .
.
.
. . . . . .
...
. . ' I
. . . . .
I.
.
. . .
: '(i) N~ fiebe iFvied and C O I' ~ C C ~
, ~. ~
ion from paymat of Fe;
"
F? . .I 1, .. -
.
. . . . from a rtxchanical vehicle,: , . . ,
:
:-. s .
..I
ll+33(i)]
[W . 25.
'. I-------
I ! I
.. '
.--- -----------..-- .
' . . . (viii) the khief~inistei;.
' . . . .
. . .
.(ix) the Judgc of Soprenrc C.ourt; . .
. : . . . . .. . .. . . . . .
-... ,
. ...*? . . . . . . . . . . . .
. . . ...
i . . .
.! . . (xvi) Ministen ofstates; and . .
......
.. :. ... .. ... . . . . - . .
-'
*
, (xvii) Foreign digflitarics&I State visit.
.
. , .
, .
. . (i) the Minist? of Defence including those which are cligible for
..
.
. . .
. . ,exemption' in accorde;lcc kith the.provisions if lhz indiiin 70!l (P.ny
. .
. a d Air
.. Force) Act, 1901 and rules made tbereundcr. as extended to
. . .. . N ~a ~V
sb;~ .
:. .
. a .. . .
. .
(ii) ihc Cbnfrsl and Stale m e d fdrtfs in uniform including para rni1ita.y , '. .
. . ... '-
.
. . . ..
..
.
. ..
a
.
'
[orces and police; . .
. . . .. . !
.
. . .
. . . (iii) an executive Magistrate; . '
. . . . . . . .. . n .
. #
- ----
! (iv) a fire-fightin$dcpartm;ni or orianisation;
(e) the National llighyay ,Authority or ally other organisation or . .*
. .
.. using such vehicle for irlspcction, survey, construclion oi operation and
. . . . .
mai~ilenancethzrcoc and . . . . . .
(c) tlscd as amhulancc. .
.
$
. .
. . . . . .
. .
. .. . '
. . 12. -
. display
.
b f 1nrormafion.- (1)The executing tuihoiity or the co~ssionairc,.as
'. the. case. r?~ai:bb, shall.publiL a notice specifying the aniount of fcc to'bc charged'fpm
. . :
.
.
'. ihk mechanical 'vellicle,' in.a~'leastone Novspapcr, crch ih Gglish'aid ven~acular
. .
, . :
lango4e, hiving a wide circutatidn in such ores.
. .'I . . .
L .
. . .. .
. . .
~ ~ ( 2 ) !'h'e executing ?;lthority shail prorninenlly di$ay in Hindi ant1 'gnglish on;
. .
. . .
. thousand mcters ahead orthe toll plaza and ill English and local langpge.fivc hundred
. ..
. . , mctirsihead oithe toll )liia,- . - . .
. .. .
(i)the ambunt of fee payable fo; each class of vchiclzs and the discounts available
. .
under rule.9; ' .
.- .
-.-.
- C -..-- --.--..--- --. -.-'111C---.--...-.-..
.------.--.---"."-.--.-.*- (;A%Irl'f! OF.-- ,,. ..-.,-.-. ...-.-.-..
EX'I:~\AI~[~J]~N.U.'Y
Ifit)&:...--.
-_-.------......--..-- .. .... ....-.----._._
....J!??~&~?I?~~JJJ - ..
, .
(ii) the categories of vehicles ~kcrn~~edfrorn pbmenr if Tee; and : ., .. . . ' . .. . ..
t
.
. . . .
. .
(iii).rhr name, odd!esr and telrfio~~r
or conact cumbzr orthe ex:ru~i!rg authority
: or the concessionairr. is the caic may be.
. . . . :.
. . . . .
. . '.
. .
.. .
. . . .
.. .
7,
(3) Thc height of rhe display boards, their quality and sizc of lettering shall be
clearly'visibleand legible to the users,
. . . .
.
..
13. Unaulhiirkcd eollceli&.- (I) An officer aythoriscd by the central Government ." ' ;. - .
bauthoriscd collcctio~
off&, may lodgt atomplaint with ihe oficcr aulhoriscd by.
' '
,. . . '
.. 'f
. .
,
.;he Central Government or the executing autl~ority,.as tho casemay bc,,'in ~his.bcbalf,,
i '
. .who shall. aItcr. .hcorinj: ihc bass an order on such cornplalnl fo(rcfund o f excess '.!... ' .
..'!
. . . . .. . .
,
. .
.. - and damages for the inconrenie~icc;iffirid by such user yithin thirty days. .. .
. . . :
-. -. -
....,
~
: -.~ . .~
, . ..
, 14. Failure lo' ply Ice.- (1) If any drivcr, owner or in chn!gc of a: ' :. , .
. .
. .
,mechanical vehicle doc; not pay or rifus.is to pay the fee for use'of national highway, .: . .
. . :
perrrianent bri:dge, bypass or tun;icl, his or her vehicle shall not be allowed to use such
. :. '.
i\
.
.
'sectiqn of nationei highway, pcminent bridge, bypass or tunnel and in: carc such
.. . .
9
1
.. .
'vehicle obslructs Ulc no&?l ,low .df tiafic, the executing' au!&rity or the . i( .
1 .
conccssio;airc, aslhe care.may h.'rnayget iuch obstructing vehicle rcmoycd rrom thc ,
.. . . ..
..
i . .
n?tional l,ighw&, perniancn~Cidge, bypass or tuilncl; w the case.may b!; . . . . !
,
. . . . ,
. . $ .
(2) .- heret the drivcr or the person in tharge of a mechanical xhiclc refuses or faiis '
5' .'to pay.the fee levied under these rulcs,thc same shill bc recovered
. .
frcrn the, registered . .,
. .
ownciof the rkechanicsl vehicl~." .. '
. . , .
' , ; : ;A ,
. .
. . . . . .
. .:
or the execr~tingauthority, a3 the case
'
..: . ,::. ;: .
,> :. .> may bc, may, at any' t h e , for reasons. to ba-recorded. in.writing,
. . withdraw such' ' . . . . ;
,.. ',. P P ' . . . . .. '
. . .i . .
. ;.. . !.:, permissian. . . .
.>'; .,'. . '.',; . , . ' % . . . . ,
.. ,
:.: :. ..:!_
'
. . . . .
. .;. 1.
:
.
.;'S. ::. . ,' .
!
. Provided hither'that where'the Central Government or ..tht executing a"lhprity, '
. .
<; ,.
8.a a i the c a s c may be, do not allow installation of'ati additional barrier by the .
,;.
.. 3 3 .j; . . . ..
. .......
.
.::. . . .-$
.. . --. , . .
.... '
.
: . . . . . .
.....
... ... . .. . . . . . . . . . .
I
. . . ..
:: . :
, .
... . .
- .
?83 j
I
.!,
; ./
p.. '.
b 7
I-
6 :
.....-
. jm
$J~&-W!~ 1.. . . . .
..., -- ....... ,
FMh-:
q% . 5 r ~ d r n' T X n : - . mvlirPr Rahor a ~ ?R?im m*.."
.
;*
#
W
qj
.m ;r S f . q t.2 T. . m. xmc
'.
'
(mT O ) m . .1 vn.
.~ .
. m ; .
..,W.ay.$-m.~ t i .
. . . _ m ; t mir m .m
..
'
. . . . . FR;R.irir. . .
. ..
I--
... . U s 6
to .t...LI-
W~ir
IS L . -6 .
I
z LI-
.
1.50
.-<<----
'
.J
i
,
s . : 22
4.50.
- . .
:"
JI)
,
6' . .
.sfi?r '$&. *..z,[ : , . .
.. . .. .
*.. .hi G. Rv, . . . . . !. .
. .. &.w:m '* . . .. .
., .
. .
..
. m:a,PJi Tit .I.
.
. .
. . .
*mim,
--: ..
*
..
'
. . . . . . :,'
'
. , .
' .
:*, o.rr. 1.15. i2.25 .3.4o + ., ... . '4.50 .
.' +r@mrn.
. '
* wm.
-
. ;
-rn;ril.m.&./
Si'QT,
. .
.
.
.,.. .. . . . :
. . . .
. . . . . . . .:.. . .
. . .
...
. .
*&jlh&tll.: . ;
. .. . ,
. :
5
.. . .. ..
. . ,
'sStrg m'm . . ' ' . .
. . . ** ...mfkti$ . 0.50. . 0.i.s . .' I . S O . , ' . 2.25". .3
. . . .
. .
3fbK . .'. ' '8 . . . ..
.. . . .
'.
. . . . . .
P'"
..%3
. .
OF INDIA :P.XI'RAORIlINARY4-.-.~~'L~:$:~,~~ . t
i: .
,.. . h**KS;snI':
. . .. . . . ...: .
.. .. . . . . . . . .
. 9
. .
. . ... . .
. . . .
..
. %
. $,I . . . _.. _ . . .
.
. . :
. .. .
.. *
.
. . .. . . . .
. - I. :
. . .. .. . . ..
. . .. . . ..... ...
. , .k
. .
. .
'. I
. .. . . , . ':i . .
:.:. . . . . . . .. . ..<. .
. I
.
. . .
:.., . . . . ..ii ;,.,.; ;':!,.\V; :,.. .. . . . . . , ' i , , . ..,..!..;..'.; s..;. ,:
.
..I.. .,.>..
. . . . .,,.;-: ....... . .i. .. . . . . . . . . . . . . . : ;...A:.. .r;.
t
:.>/;
'
... .
L f ' .
-'I
-
(.T.
'. .
I
:
'
.
*
4
- - - - - -
TIE GAZEY?E
-
-.-
.........
L
CF "DlA :~'IRAORDINAIY
. .-: -. - .-' ...;..,... ,. -. ...--I.--..
--
@r J! -Ssc. :
,
3- ,
. 1 1 . . . - ......
.? J&STRY OF abbi~ks~oiir . AND ....!
~ C W P .I Y S
: .,. . .
:
,
- ... . ; , ,
.- . . .,,.woTyC+~low :
li
'
. . . . . . . :.-. .
I-' ... .
Mew Relhj, I c 3rd ~ e c c m b c r ,10' ~.~' .'
I i' .. ,
!?
.. .. . . ........I(
. . .
. :;, ...
.
...]V, ! 'CJL%hk)4n
.
ixarire
. .
..:; .*$..
i f he pauet~~hfini&
., . ..
. .
~ ~ i. ~. ~ ~ ! . ~
by hr s c c t i m ~ o f . ~ ~ ; :..,;:.:.#.:
. .
. a ' " : . .
- .
1 ':,I . . >
.'
. . . . .. - ..: . ... . .-.:
. .'
:'
. . I. . . ....Highwayi kt,l9j6 (4k it'lija th;cennd$wykcsnt hci;bY mkcs the fol~okinl . . *
.....
. f .
7
/
.
.N~S .. ~ m d .;i hV~. ~.:'
' ~ ~. O..M.. I .' '.*N' ~ @~~m&ati&
~WIP O ~ ~ O I U~ ~ l ~ e c ~ i i f .i ~ , ,
..
--. . ;.* . ." nungly:.,. ., .* ..'. .. . - ..-,;;, -::v:
RUIW, iw~, . . L ,
, : . . . . -2;. .'..., . . ,#.
-;
..:.)
. ... ,
.,.
. .. .. . . . . . .,+'*., L...
.n
. I ' '
. 1. ..:,(I)'. Thes! ha!r;)rmaybe...... y s ~ ~,~: * . .of- . , ..
c?Jh! l h ~ ~ +. ~.r l.a .l I .U g. b w a.(D&on'~alim
. .. , ,
. . >.:!. ! :
. (2j . T~&'&II pir . . . in". . fwe b. .l ~ c ~ ~. ~ :n
.. .fhail& ~ f .t h. c ~., ~ ~.1"~l'he~flitiJl
. ... .. fm
... . . . . . . .
........ .
.. . . . . . . .;:-.
: :........... ... . . .
.;: Y,: :.. . .. .;.. .. . . .. .. .
. I .
*;- . . .
. , . . ... . .-
'. . .. -. '>*A:.::..:.".:>.,
. .. :I. . ;' ;: . r. . . . .... - . . . . .
t -9
. I . a '
- ..
. . .2 . . ..'in. .~il'.~d6omi K$& : , : ~ c ~ ~.: .~ c t t r..-. m i.~. a.rim
.t t o n AUIes,
,
. .: . . &1t~b'3n1 , '
.. . .. . 1.'
1 7
:. .- :. . . ~. .O.(icreiiiien
P . . .. . . '
..,.
. . . .. . . . . ...
p?.:;<: & A ! o :;; saited,in,G:4J..
. . . . . . . .. . . . . . . . .... . . :::\:::.
. . .. . '
. .:; ,:.. .,.., . . . . .
.: . . .. . ../ , . :. ,. , . -. .. . . .
?I
I
.. I
.C
. .
B
..
-9 .. . . . . . . .
. . . .: .... . -
-',)
. . .
. . .. . ..
...:
"j . .
-7; . . . . .. . . . .
I
'Yj
. . .
I
+-y I
. . . .
- ,j
! '
. .
.
I
-
I
["I::1l+g4 !(i)]
....... -----
VJ
. -. ......
~ C :Rgh?pl
...
=z-==za
-=
-s-
:. ' . ;
' . I .
..... . . '
.
.. . .
Provided finher thnt .j/htrc the cost of sych bypass si lesr han lupees im c t c q ' " .
v.
, .
. the rateof fcc for the ust aid
. . . . . .. .. . . . . then bypasshall be the ranle es thdof ~he.se:tion of Ihe
.
highway of which it fomj ipid;..'::.'. . .
naci~n~l .--.-. ....... - - .- . .. -. .. . . .
..em....,.
. . .
. .
..... . . .
' , 3. m!t 5. (a) in :;ub-r~lc(4,for.Fe k
In the shid rul.es,,._in .. rds and figure "tie
. * ': . .
, :. .. , .
w+,~din~,m~~~djatell ~ ~ ~ ~ ~y~~!l,:tht.k~~d~,?th~:,~h~~&le
~ l ~ ~ o f . $ ~.
.
:.
. .
ptice index mo& cSDeccrubiiof
~ ~ ' ) i e $ ' ~ h ~ & @ ' & & ~ . ' - " !:Y.':. .:, %: -.
, . . , . .-
' . .\' , .
.
'
. (b)
. : (3),. :.
to subah . . . . . s.
I.
. . I
; , *
. . ..,:. . , .i.i:~l$&$,o?!:, ,.-*,%.,,;:.. . :,< ;1% , : . ;,-, .: 8 a +
. .
, !...
. .
. .. . . . . . . .
. . . . . . ., . .i? t q ~ b ma+
$thejtvision i ipr br )..Y 2@8@. by.anlyir$ H.
. . . . .' . .
1 0 h e x f o r ~ h ~imnth$f
6 0 1 ~ ~pic0 e &aF& 2067 O.e. 2 lbq,tha '-. : '
.. . . .
! ,I * .'
. . offee.
. . . (I) No l&&llbe levied Rnd hleCtee
:
:
.
.;I
.I
.
I
.
.
,
.
.;'
.
'. Ill:1 ~ ~ c m p l i fibfl
. ,.,'... ........
.
.
o n pajnieit
. a mocl~nicelvtrhicb,.- . . .
i
. ... . . . . . .. . . ..
....
hm
" . ..
I
'I
. '
; I
! *I (i) theYresldcnt offndii.
i .
,
'. ;;
,I ) lhcVic~.PrcsidcntofIn&; ,
- .. , .(iv) . the~ovmo;crf
, .
astale;' ' '
L; 6 CIL1 --* .,
399
.... . . ... ... .. .. .
'
.i*.,ihc'S ccret{rj,~&~iij
:: ' "' "
&&,,; f. .. .:. .
"
. .. .. .. . .
. .'.. . . . . . .bfpC+/i;-
( ~ .the4 &cr$tary;.~@&
......
I . . .
.. . . .. ' . . ..
.:%'
. . . . .. . .. . .,.
.'(+yfi). . . h e i dignitwin
~ snle :.
I.
...........s.,-. . . . . . . . . .
@U M ~ . b. .i ..&... .f. .~.:, ~ j,mkbii
I
. .,&bl;tiye Qunril bf isiatO>chin
q .~ i ~ ~ iil*c
th
~ ~.lad. . ..: ....
. ' : .' ... .. . . _ MiiL
. . . . . . . . ',!. c;! respclive or$hc .
.
1
'
.
? ~ "
%
I..~ ~
.
.
' h
. 6
'
? ~ ~
id~n!l) b
'
C?d w issued
,
byihe
. . satt,.ifhe
.kKb;l'L8iiMmo(
. ,
...
. ' IMSlato; " .,. . . , ' , . . . ... . :.. .. . . . "
. . . *.
.. *
. . .- .. . . .
vi,alh
" I.
~.
. . .
.(~') b'aw8fdb.~fpbm
~if'~h&',(i~~$ aibj-hlilha .
' ~ md kau&
. . : .K ..'.cqa!~vir,chka irIoib ..
*rd&
-
. .
', lus ar h!r phob ideati6 cud duly arth&Jald bl.tht,i
pp,op dek or
com~ent.bu&origfor su$ award: .
. . .
. . . . . (i) 'bh j r of~ kfmt bcludini 6; whkh ' '
. .
;
. . . ..
.
.
.
.. . . .. . . . .
. . . . .
...- s.... . . . . . .
s.,:.J:
I..
i ,.,,.;:,+* :
:.. .:. .
I i. .
...
.I...:
:
. .. .
. .
.THEGAZETIEOF DJDIA': EXTRAORDMARY
9
.. . ' MIN~Y~OEROADTR4NSPORT
. . N ~ A ~ AOND NHIGHWAYS . ,. .. . *; .
i
..i
i
:
I
,
-. ..
. - ~SR'IS(E~-I~
NcwDel!i, tbt 12th lanuary, 201 1
exercije of thepowm~conftrredby lhc3.~llon9 of the National Highways Act,
. .
I '
1. '
1956
... (48.of 1956),Lhe.GCncral Govemment'haeby make the following mlm further to ainend
I . 1 the.NQiooAl.H~ghways~ e (~clemiinationof
e R&S and Collection) Rules, 2908, namely:.
!
i I. ,(1) These ru!u may, be caH~dihe Natlonal Highways Fee (Geterrninatlo~,of Flab
l
and Csllection) ~me~dmcnt.kdles, 201 1.
i .
. . . .
, (2) .' They shafl 'comej,nb force on the date of their publi+ion in ths Oacial ' ..
I
! Gazette. , ,
..
. .
(3) They $hall-not apply to a g n i e n t s adconhach execuled and bids invijed pri$r ' .
.
.
.
1 to the publieation ofUitst.rults. . ...
. .
. ..
. .
.. .. . ,2. {a) : In Nafional.Highways
. Fee (~eterminstibnof Rates and dollection) Rules. 2008
(henhnftar refend to as hi said rulu), in sub-nle (2) of lulid, ; ' . .
, ,
I . .
I .
'
(i) .for the table. thc'following table shall be substituted, namely:-
.
Type of Vehlcle
. . . .
Base me of fee .
. . . . . . . .._ ' Per
.Rap&)
@,!I?. ,.
: (ii) in the explanation; for para '(d)', tl~cfollowing shall be substituted, namely:.
i
. '(0 Three-Axle Vehicle means any mechanical vehicle having threc.wla (inclusive
. .
' . , of the axle of the trailer, if any) and with a.gross vehicle weight, less than or qua1 to twenty
1 1
-.
.
.
five thousand lo'lograms;";
.
(b)
.
Insub-rule (4) of rule 4,- for the lable relating to bare rub of fee, the foll&ng ..
. .1 1
:.,
.
'
..
. '
Cost of permanent
bridge, or tunnel
(Rupees In crorej .
:
Car,Jecp, Light .
. Van
or
.Commerci
a l Vehlcle,
Llght ; I,ight
Truck Tbree-axle
or . cammcrcial
But vchlelu.
HCM, Oiekize
EME d
or . Vehlcle
My
.
..
.. Motor Goods . . . .
.. - .
. ' Vchlrle Vehicle or . . .
. . .
Mlnl Bus
10 to 1s 5' .ZXI IS 16.50 n 3 0 ; -,.
) .
. , '
For every &.idi~ional
'
Rupees five crore or
I . 1.50 3 3.30 450 6
1 part thereof, exceeding
, i
! . . . ' Rupees . fifte.cn aore .
1, . . . ;.: , and up 10 Rupccs one ',
hundred crore. .:
. j 1. '. . .:.
. . For every additional
- Rupees five cron or .
. . . . . . . . . . . part therqof, cxy+ing : .,.
0.75
~
. 1.15
.,
. . . . . . -... ...
'
2.25 . . 2.45. 3.40.
, .
4.50
.. . -, . .. ......
. .
Rups one hundred ,'
wo hundnd crore. . .
For e ~ r yadditional ' 0.50 0.75 . 1.50 1.65 225 3 -
'
Rupees f!ve crore or .
part.theryf, exyeding . .
Rupces two .hundred'
'
crore. . ,, -
. . . .. . . . , .
3. . For B U ~ - N I C(6) of r ~ l 6t of the said rules, tlie following shall be subslituted, namely:.
"(6) (a). The fee shdl bc collected by the Central Government or UE cxccuting
Autllority ns the use may be end for a spcclficd period 111 acco~dancevilh the tcrms of
ngrecmcnt entercd by the Coacasio~~aire.
- - . - -.-....-... . ...:' ,:.:.' .;. :..". . . .:.. . .. .....
. . 'q:..
. l.\
. . . ..
. ;?*\ . .
6 . . . ' ..
(bp4hi.fe;as.e;ao.nddfii~i.~
concessidq:puibd&&8fkt'lhd~~nces$ion
T H E G , U E ~ : O E ~ D ~ A:EXTRAORD~~ARY
. . . .
::
p t F ' ~ ~ C ~ $ ~ O n ~ t ~shall
.
e l nbee nleviable
t t
i
:'
1the endiof the
'~greuncntis OVtl, the feqshall be cokeled by ihe
PAR^ I-SEC. 3(i)]
' .,
.
:.;:I, -
:
' ;
.I. . :
. of- the- fee on die date of:
6 ~ a t nrte of 40%
Cenpl ~ o d ~ .t :. e x e r ; d t i q ~ , i d h oa~reduced I. L.
.-
tranrfer o f ~ h . & t i o n . o f ~ ~ i o ~ ~ ~ ibridge,
.. ~ , or bypas, as the case may be, lo be
~ h w atunnel
revised &nuaJIy.ina c c d r d ~ %ih~el;ruler:.
e
public fundtd.prqject, thcffefeeileviable huld.be.reduced !0'40% of.the met fee for such section
of National~High~ys,~bn'~c,:huurtl.lor~byPass
as lhe case may be, to bc revised annually in
. ~eserules;'!.
accotdancedfb . i.
. ... . . . . '
.
;
. . . I
4. .. In rule $ aftv:s~~"le;(3J,1hchbv~o~shall
be inserted. namely:-
. .. . . .
. . . .
.
:. '
1.
I
. . . I
"(3~)Alpcrson, w%o o m a conmc;clal vehicle (atcluding vehicle plying under .
! '
7
!@. -.
Is*,
.-
$??.. .
I."..'
.
I
, - ,/!v
Pfinhd by rho Manogu, Oovcmmcnl of Indig Prcx. n i n ~Road. Mayspd~i.N~,,~ ~ l l , i - 1 1 0 0 b , l L-.
, ~ . _ _ . _ _ _ _ _ - - -
end Pablijhcd by (IN Coomllcr or !'ublita[io,,;, )3cll,i.~100j(.
, -.__--__.. ---..----- :
P1L
--.
'L.<.'
8 . . .?
.-:a .. , ,
..
. .
-.
-- . --
...... _
.'. . .
Wl n-BG (I)
f--&-IFk .
:.
'
. . . - ~ ~ ~ ~ t I 4 e c34ub-sec'tioi.(i)
t i o n
- . . ~ ' i r ~
. I
., .. . . , ' . PuBIJSAED'BYArnORflY
. !
'., .' U. 141 . . . ~ 1,2 , 2 0 1 l h 22,1932
~ , ~
..
' : NO. 14) NEW DEW,WEDNESDAY, JANVARY 12, ~OIUPAUSA 21,1932 . . . ., .
i
i
. . . +**&* ' .
. . . JrArqpm
i. . .
d w,12 m,201 1 . . .
.. ..
; : : ~ - m&. ~
. w~
, f+i .(~ ~
s (n
~ ~f- ~~m n
, ~ ~& ~~,195s ~ , 2M o~ ~o Z aR *T ~. ~ aR jV Ih~ .~ W* Tm ~ +C t~ ~~ ~ ~
) (i9sd+4i)
. . .. .: t,Wfq+.
.:...
I
I
! ., . I: (11 n m * t ~ m * t a n ~.........
* ~ m ) , ~ b b ~ , 21 d m &
AAO
. . .
.. . . . . . . . . .
........................... . . . . ........
. . . . <.>a,.--*
'.......!.,I..)....-
.. . . . : . .. , , . . . . . . . . . .,.<..',
. 1 .
....
_.
. . .. .. ._. .. ' .
. ... . . :
. . . .
. .. . . . . . . . . . .
. . .. ; ..:
:
. . . . . . . . . . . . . .
. .
' ~ a t i o n ghl i ~ h w a y S ' ~ u l h oof
r i llndia
~ Schedules
. . . . .
'
.. .
I
-. . .
SCIEDULE -S
(See Clause 31.1.2)
ESCROW AGREEMENT
.-
THIS ESCROW AGREEMENT is entered into on this the ........day of ..........20,...
AMONGST
1 MIS VIL ROHTAK JIND HIGHWAY PRIVATE LIMITED, a company
incorporated under the provisions of the Companies Act, 1956 and having its
rcgistcrcd officc at ..................(hereinafter referred to as the "Concessionnire"
which expression shall, unless repugnant to the context or meaning thereof,
include its successors, permitted assigns and substitutes);
2 .....................name and particulars of Lenders' Representative and having its
registered office at ...............
acting for and'on behalf of the Senior Lenders as
their duly authorised agent with regard to matters arising out of or in relation to
this Agreement (hereinafter referred to as the "Lenders' Representative" which
expression shall, unless repugnant to the context or meaning thereof, include its
successors and substitutes);
3 .......................name and particulars of the Escrow Bank and having its
'
rcgistcred officc at ........................
(hereinnfler referred t o a; the "Escrow
Bank" which expression shall, unless repugnant to the context or meaning
thereof, include its successors and substitutes); and
4 The National Highways Authority of India, established under the National
Highways Authority Act 1988, represented by its Chairman and having its
principal offices at G-5 & 6, Sector 10, Dwarka, New Delhi-110075 (hereinafter
referred to as the "Authority" which expression shall, unless repugnant to the
context or meaning thereof, include its administrators, successors and assigns).
WHEREAS:
(A) The Authority has entered into a Concession Agreement dated .................... . .
with the Concessionaire (the "Concession Agreementn) for 4 Laning of Rohtak
Jind Section from km 307.000 to km 347.800 of NH-71 and connecting link from
kin 347.800 o f NH-71 to km 9.400 of NH-71A to be executed as BOT (Toll)
project on DBFO Pattern under NHDP Phase I11 in the State of Haryana on
design, build, finance, operate and transfer (DBFOT)basis, And a copy of
is annexed heretoand marked as Annex-A to form part of this Agreement.
(B) Senior Lenders have agreed to finance the Project in accordance with the t
and conditions set forth in the Financing Agreements.
4
4ii
Laning olRohtak Jind Section from km 307.000 ro km 347.800 of NH-71 and connecting link froni km
347,800 oS NH-71 to kn! 9.400 of NH-71 A co be executed as BOT (1'011) project on DBFO Pattern under .._-I.
NHDP Phase Ill in the State of Haryana .Pages- I I
. : . . . . . . . .
Nationel Hi~hwavsAuthorilv of India .Schedules
acknowledged, and intending to be legally bonnd hereby, the Parties agree as follows:
1.1 Definitions .
In this Agreement, the following words and expressions shall, unless repugnant to
the context or meaning thereof, have the meaning hereinafter respectively-
assigned to them:
"Escrow Default" shall have the meaning ascribed thereto in Clause 6.1;
"Lenders' Representative"' means the person referred to as the Lenders'
Representative in the foregoing Recitals;
"Parties" means the parties to this Agreement collectively and "Party" shall mean
any of the Parties to this Agreement individually;
"Payment Date" means, in relation to any payment specified in Clause 4.1, the
date(s) specified for such payment; and I
1.2 Interpretation
1.2.1 References to Lenders' Representative shall, unless repugnant to the co
meaning thereof, mean references to the Lenders' Representative, acting
on behalf of Senior Lenders.
1.2.2 The words and expressions beginning with capital letters and defined in
4 Lsning 44
of Rohtak Jind Section from krn 307.800 to m 7.800 of NH-71 and connecting link fro
j47.800 of NH-71 to km 9.400 ol'NH-71A l o be executed as BOT (Toll) projecl on DBFO Paltern undcr
NHDP Phase 111 i n the Stale of Haryana Pnge S 2-
. . .
. .. . . ..
* , . .
. . . . ..
. .
National ~iqhw&s ~ulhon?vof India Schedules'
Agreement shall have the meaning ascribed thereto herein, and the words and
expressions used in this Agreement and not defined herein but defined in the
Concession Agreement shall, unless repugnant to the context, have the meaning
ascribed thereto in the Concession Agreement. .
1.2.3 References to Clauses are, unless stated otherwise, references to Clauses of this
~greement.
1.2.4 . The rules of interpretation stated in Clauses 1.2, 1.3 and 1.4 of the Concession
Agreement shall apply, mutatis mutandis, to this Agreement.
2 ESCROW ACCOUNT
2.1 Escrow Bank to act as trustee
2.1 .I The Concessionaire hereby appoints the Escrow Bank to act as trustee for the
Authority, the Lenders' Representative and the Concessionaire in connection
herewith and authorises the Escrow Bank to exercise such rights, powers,
authorities and discretion as are specifically delegated to the Escrow Bank by the
terms hereof together with all such rights, powers, authorities and discretion as are
reasonably incidental hereto, and the Escrow Bank accepts such appointment
pursuant to the terms hereof.
2.1.2 The Concessionaire hereby declares that all rights, title and ~nterestin and to the
., Escrow Account shall be vested in the Escrow Bank and held in trust for the
Authority, the Lenders' Representative and the Concessionaire, and applied in
accordance with the terms of this Agreement. No person other than the Authority,
thc Lcndcn' Representative and the Concessionaire shall have any tights
hereunder as the beneticiaries of, or as third party beneficiaries under this
Agreement.
The Escrow Bank hereby agrees to act as such and to accept all payments and
other amounts to be delivered to and held by the Escrow Bank pursuant tn the
provisions of this Agreement. The Escrow Sank shall hold ai-td safeguard the
Escrow Account during the term of this Agreement and shall treat the amount in
the Escrow Account as monies deposited by the Concessionaire, Senior Lende
or the Authority with the Escrow Bank. In performing its functions and d
under this Agreement, the Escrow Bank shall act in trust for the benefit of, an
agent for, the Authority, the Lenders' Representative and the Concessionair
their nominees, successors or assigns, in accordance with the provisions of
Agreement.
2.3.1 Within 30 (thirty) days from the date ofthis Agreement, and in any case prior to
the Appointed Date, the Concessionaire shall open and establish l e Escrow
Account with the ............................ (name oEBranch) Branch of the Escrow
Bank. The Escrow Account shalI be denominated in Rupees.
413
4 Lanine. of Rohtak Jind Section from km 307 000 to km 347.800 of NH-71 and connectme. link from km
3 4 7 . 8 0 6 0 1 . ~ ~ -to7 1km 9.400 of NH-71A ro be executed as BOT (Toll) projec[ on D B F Pattern
~ under
NHDP Phase IIJ in the State of Haryana f'ageS- 3
. .
.. . .
.. .
~alionalh ' i ~ h ~ a ~ ~ k ~ l h o India
rilvoi Schedules
2.3.2 The Escrow Bank shall maintain the Escrow Account in accordance with the
terms of this Agreement and its usual practices and applicable regulations, and
pay the maximum rate of interest payable to similar customers on the balance in
the said account from time to time.
2.3.3 The Escrow Bank and the Concessionaire shall, after consultation with the
Lenders' Representative, agree on the detailed mandates, terms and conditions,
and operating procedures for the Escrow Account, but in the event of any conflict
or inconsistency between this Agreement and such mandates, terms and
conditions, or procedures, this Agreement shall prevail.
(a) all monies received in relation to the Project from any source, including
the Senior Lenders, lenders of Subordinated Debt and the Authority;
I
(b) all funds received by the Concessionaire from its share-holders, in any
manner or form;
(d) ' any other revenues, rentals, capital receipts, as the case may
4 Laning of Rohtak Jind Section from km 307.000 of NH-71and connecting link from km' . .
37.800 o f NH.71 to km 9.400 o f N H - 7 I A to be executed as BOT (Toll) projecl on DBFO Parrcrn under
NHDP Phasc 111 in thc of Haryana Page S - 4 8
. . .
. . . . . . . . . . :. . +'. ..'< . .!. ,
/--
. - \ ,-
/,: '.
'cr
be, from or in respect ofthe Project Highway; and ,:.> ,-
.,.;'
'v-'. .
4
.,
such deposits.
c.:.:-.'.-., -
.
.
'
deposit into and/or credit the Escrow Account with:
(a) &ant and any other monies disbursed by the- Authority to the &@ ,q
(b)
Concessionairc;
Revenue Shortfall Loan; .
4
-
ad*
all Fee collected by the Authority in exercise of its rights r~nderthe
(c)
. Concession Agreement; and .*.e
Hi. L.J
-.-?
.-
'
Provided that, notwithstanding the provisions of Clause 4.1.1, the Authority shall
be entitled to appiopriaie -from the aforesaidamounts, any Concession Fee due
and payable to it by the'concessionaire, and the balance remaining shall be
deposited into the Escrow Account.
a-@
&CJ
'-9
-.
,-.
3.3 Deposits by Senior Lendcrs
2 -.
The Lenders' Representative agrees, confirms .and undertakes that the Senior CP'
Lenders shall deposit into and/or credit the Escrow Account with all
'
Senior Lenders shall be entitled to make direct payments to the EPC Contractor
under and in accordance with the express provisions contained in this behalf in.
. ; .
'. . .
T~
-
+a.
Escrow Bank shall be entitled to appropriate therefrom the fee id:
nr,
Ly' . .
WITHDRAWALS FROM ESCROW ACCOUNT
4
m
&< . ,.. 7.
4
415
ani in^ of Rohfak Jind Section from km 30j.000 to km 347.800 ofNH.71 and connecting link from km
. -
*;"
b+ k '
.?
,-I.
347.800 of NH-71 lo km ?.COO ofNt!-71A to be executed 2s BOT (Toll) projecf on UBFO Partern under -d
NHDP Phase I l l in the Stare of Haryanz, Page S S - . L b . .
'7
--.
f7 Representative and the Concessionaire may by written instructions determine, the
Escrow Bank shall withdraw amounts from the Escrow Account and appropriate
.Pi them in the following order by depositing such amounts in the relevant Sub-
Accounts for making due payments, and if such payments are not due in any
q month, then retain such monies in such Sub-Accounts and pay out therefrom on -.
the Payment Date($:
R
(a) all taxes due and payable by the Concessionaire for and in respect of the
a. Project Highway;
(c) O&M Expenses, subject to the ceiling, if any, set forth in the Financing
Agreements;
(h) all payments and Damages certified by the Authority as due and payable
to it by the Concessionaire pursuant to the Concession Agreement,
including repayment of Revenue Shortfall Loan;
(j) any reserve req~iirementsset forth in the Financing Agreements; and '
. .
(k) balance, ifany, in accordance with the instructions of the Concessionaire.
-i
,< 4.1.2 No later than 60 (sixty) days prior to the commencement of each Accoun
Year, the Concessionaire shall provide to the Escrow'Bank, with prior
approval of t h e Lenders' Representative, details of the amounts likely
--i
required for each of the payment obligations set forth in this Clause 4.1;
that such amounts may be subsequently modified, with prior written ap
- f a
the Lenders' Representative, if fresh information received during the cou
:-Y
year makes such modification necessary.
(b) 90% (ninety per cent) of Debt Due excluding Subordinated Debt;
(c) outstanding Concession Fee;
.(d) all payments and Damages certified by the Authority as due and payable
-.to it by the Concessionaire pursuant to the Concession Agreement,
including {Premjum,} repayment of Revenue Shortfall Loan and any
claims in connccticn with or arising- out of Termination;
(e) retedtlon and payments arising out of, or in relati011 lo, liability for dcfect.ts
arrd deficiencies set firth in Article 39 o f thc Concession Agreement m.. 1
k..
-l
., -
(f) outstanding Debt Service including the balance of Debt Due; #& -.,) ..-
(i) any other payments required to be made under the Concession Agreement;
and
Monies and other property received by the Escrow Bank under this Agreement
shall, until used or applied in accordance with this Agreement, be held by the
Escrow Bank in trust for the purposes for which they were received, and shall be
segregated from other funds and property of the ~ s c i o wBtnk.
5.2 Notification of balances
7 (seven) business days prior to each Payment Date (and for this purpose the
Escrow Bank shall be entitled to rely on an affirmation by the Concessionaire
andlor the Lenders' Representative as to the relevant Payment Dates), the Escrow
Bank shall notify the.Lenders' Representative of the balances in the Escrow
Account and Sub-Accounts as at the close of business on the immediately
preceding business day.
(a) may, in the absence of bad faith or gross negligence on its pan, rely as to
any matters. of fact which might reasonably be expected to be within the
knowledge of the Concessionaire upon a certificate signed by or on behalf
o f the Concessionaire;
(b) may, in the absence of bad faith or gross negligence on its pan, rely upon
the authenticity of any communication or document believed by it to be
authentic; ..
. .
(c) shall, within 5 (five) business days after receipt, deliver a copy to the
Lenders' Representative of any notice or document received by it in its
capacity as the Escrow Bank from the Concessionaire or any. other person
heieunder or in connection h'erewith; and
.
(d) shall, within 5 (five) business days after receipt, deliver a co
Concessionaire of any notice or document received by it
Lenders' Representative in connection herewith.
he Escrow Bank agrees not to claim or exercise any right ofset off, banker's I~en
or other right or remedy with respect 10 amounts standing to the credit of the
Escrow Account. For [he avoidance of doubt, it is hereby acknowledged and
agreed by the Escrow Bank that the monies and properties held by the Escrow
Bank in the Escrow ~ c c o u n t i h a l l as part of the assets of lhc
4 Laning of Rohtak Jind Section from km 307.000 and connecting link from km
347.800 of NH-71t o km9.400 of NH.7lA to be executed as BOT (Toll) project on DBFO Pattern under ,
NHDP Phnsc 111 in the State of Huyann -
Page S 8
\
. - . . . . . .
Escrow Bank and be~ng trust property, shall in the case of bankruptcy or
liquidation of the Escrow Bank, be wholly excluded from the assets of the Escrow
Bank in such bankruptcy or liquidation.
(b) the Concessionaire causes the Escrow Balk tu trinsfcr funds to any
account of the Concessiona~rein breach of the terms of this Agreement
and fails to cure such breach by depositing the relevant funds into the
Escrow Account or any Sub-Account in which such transfer should have
been made, within a Cure Period of 5 (five) business days; or
(c) the Concessionaire commits or causes any other breach of the provisions
of this Agreement and fails to cure the same within a Cure Period of 5
(five) business days.
6.1.2 ' Upon occurrence of an Escrow Default, the consequences
with underand in accordance with the provisions of the Concession
347.800 of NH.71 to krn 9.400 of NH-71A to be executed as BOT (Toll) project on DBFO Pattern under 5.;
NHDP Phase III in the State of Haryana Pogr S-9 !
Pi'
. .. .
-
-\
, ,,). ! , ' . .. . , ,!;.':!$, ., , ....;:
I. . ;
. .
. . .
. .
. .
. .. . . ..
. . . .. . ... .
Nalional Hiohwavs Aulhorilv oflndia Schedules
The Concessionaire may, by not less than 45 (forty five) days prior notice to the
Escrow Bank, the Authority and the Lenders' Representative, terminate this
- Agreement and appoint a new Escrow Bank, provided that the new Escrow Bank
. is acceptable to the Lenders' Representative and arrangements are made
satisfactory to the Lenders' Representative for transfer of amounts deposited in
the Escrow Account to a new Escrow Account established with the successor
Escrow Bank. The termination of this Agreement shall take effect only upon
coming into force ofan Escrow Agreement with the substitute Escrow Bank.
7.3 Closure of Escrow Account
The Escrow Bank shall, at the request of the Concessionaire and the Lenders'
Representative made on or after the payment by tine Concessionaire of all
outstanding amounts under the Concession Agreement and the Financing
Agreements including the payments specified in Clause 4.2, and upon
confirmation of receipt of such payments, close the Escrow Account and Sub-
Accounts and pay any amount standing to the credit thereof to the Concessionaire.
Upon closure of the Escrow Account hereunder, the Escrow Agreement shall be
deemed t o be terminated.
8 SUPPLEMENTARY ESCROW AGREEMENT
8.1 Supplementary escrow agreement
The Lenders' Representative and the concessionaire shall be entitled to enter into
a supplemen!ary escrow agreement with the Escrow Bank providing, inter alia,
for detailed procedures and documentation for withdrawals from Sub-'Accounts
pursuant to Clause 4.1.1 and for matters not covered under this Agreement such
as the rights and obligations o f Senior Lenders and lenders of Subordinated Debt,
investment of surplus funds, restrictions on withdrawals by the Concessionaire in
the event of breach of this Agreement or upon occurrence of an Escrow Default,
procedures relating to operation of the Escrow Account and withdrawal
therefrom, reporting requirements and any matters incidental thereto; provided
that such supplementary escrow agreement shall not contain any provisionwhich
is inconsistent with this Agreement and i n the everit of any conflict or
inconsistency between provisions of this Agreement and such
escrow agreement, the provisions of this Agreement shall prevail.
9 INDEMNITY
9.1 General indemnity
9.1.1 The ~oncwsioiairewill indemnify, defend and hold the
and the Senior ~enders,acting through the Lenders' Representative, harmless
against any and all proceedings, actions and third party claims for any loss,
damage, cost and expense arising out of any breach by the Concessionaire of any
of its obligations under this Agreement or on account of failure of the
concessionaire to comply with Applicable Laws and Applicable Permits.
9.1.2 The Authority will indemnify, defend and hold the Concessionaire .hamless
against any and all proceedings, actions and third party claims for any loss.
4
420
Laning of Rohrak Jind Section from krn 307.000 to krn 347.800 ofNH-71 and connec~inglink from krn
347.800 of NH-71 ro km 9.400 of NH.71A to be execuled as DOT [Toll) project on DBFO Panern under
NHDP Phwe I11 in the Slate ofHaryana Pogr S - 10
.. : .<.
. ' , .
. . .. . .
..1 .: ...... . :.-
,
..!. :!.;*...;.i.r.:$:. . ! .,.: :.: . . . . . . . . . :*.,.!.. .......
.
<
. . c..,: .,
. . . . . . . .,: . . . . . .
. . .. . .If.-idli.. . . . . . . . ...,.:
. 't. .
,A
<
-.- .
.
.
...I
. .
. . . . .<. .'..
. . ..
':l;:c:.:':,::b:- . k:,! ,. k . , : ! . .. .
, I.. I...
",. ........ :... . ..:..: '..;'.,j
. .
.
. . . . . t . ' j ' :
'*a
.. . . .
National Hiqhwavs Aulhorilv of India Schedules
damage, cost and expense arising out of failure of the Authority to fulfil any of its
obligations under this Agreement materially and adversely affecting the
performance of the Concessionaire's obligations under the Concession Agreement
or this Agreement other than any loss, damage, cost and expense arising out of
acts done in discharge of their lawful functions by the Authority, its oficers;
servants and agents.
9.1.3 The Escrow Bank will indemnify, defend and hold the Concessionaire harmless
against any and all proceedings, actions and third party claims for any loss,
damage, cost and expense arising out of failure of the Escrow Bank to fulfil its
obligations under this Agreement materially and adversely affecting the
. performance of !he Concessionaire's obligations under the Concession Agreement
other than any loss, damage, cost and expense, arising out of acu done in
discharge of their lawful functions by the Escrow Bank, its officers, servants and
agents.
In the event that any Party hereto receives a claim from a third party in respect of
which it is entitled to the benefit ofan indemit~underClause 9.1 or in respect of
which it is entitlcd to reimbursement (the "Indemnified Party"), it shall notify
the other Party rcspol~sible for indcrnnifying such claim hereunder (the
"Indemnifying Party") within I > (fifteen) days of receipt o l the r;laim and shall
not settle or pay the claim without-the prior approval of the Indemnifying Party,
which approval shall not be unreasonably withheld or delayed. In the event that
the Indemnifying Party wishes to contest or dispute the claim, it may conduct the
proceedings in the name of the Indemnified Party and shall bear all costs involved
in contesting the same. The Indemnified Party shall provide all cooperation and
assistance in contesting any claim and shall sign all such writings and documents
as the Indemnifying Party may reasonably require.
10
10.1
DISPUTE RESOLUTION
Dispute resolution
10.1.1 Any dispute, difference or claim arising out of or in conr~ection with 'k$ /VEWD+
@
Agreement, which is not resolved amicably, shall be decided finally by reference
to arbitration to a Board of Arbitrators comprising one nominee of each Party to
the drspute, and where the number of such nominees is an even number, the
nominees shall elect another person to such Board. Such arbitration shall be held
in accordance with the Rules of Arbitration of the International Centre for
Alternative Dispute Resolution, New Delhi (the "Rules") or such other rules as
may be mutually agreed by the Parties, and shall be subject to the provisions of
the Arbitration and Conciliation Act. 1996.
10.1.2 The Arbitrators shall issue a reasoned award and such award shall be final and
binding on the Parties. The venue of arbitration shall be Delhi and the language of
arbitration shall be English.
11 MISCELLANEOUS PROVISIONS
4
4 r"!
Laning of Rohtak J ~ n dSection from km 307.000 to km 347 800 of NH.7 I and connecting link from km
347.800 of NH-7 I to krn 9 400 of NH-71A ro be execured as BOT (Toll) project on DBEO Pattern under
NHDP Phwe Ill in the State o f Haryana PogeS- I 1
11.1 Governing law and jurisdiction
(b) agrees that, should any proceedings be brought against it or its assets,
property or revenues in any jurisdiction in relation to this Agreement or
any iransaction contemplated- by this Agreement, no immunity (whether
by reason of sovereignty or otherwise) from such proceedings shall be
claimed by or on behalf of the Authority with respect to its assets;
(c) waives any right of immunity which it or its assets, property or revenues --_ _
now has, may acquire in the future or which may be attributed to it in any
jurisdiction; and
In the event of any conflict between the Concession Agreement and this
Agreement, the provisions contained in the Concession Agreement shall prevail
over this Agreement.
11.5 Waiver
11.5.1 Waiver by any Party of a default by another Party in the observance and
performance of any provision of or obligations under this Agreement:
4 Lsning of Rohtak Jind Section from km 307:000 to and connecting link from km
347.000 of NH-71to km 9.400 of NH-7IA to be executed as BOT (Toll) project on DBFO Patfern under
NHDP Phase Ill in the State of Haryana Pogc S - I2 1
. . . .
. . . . . .. . .
. . . .
. . . . .
. . . . . .. .. . . . . .
National Hiqhwavs Authoritv of India Schedules
Agreement;
(c) shall not affect the validity or enforceability of this Agreement in any
manner.
11.5.2 Neither the failure by any Party to insist on any occasion upon the performance of
the te&s,-conditions and provisions of this Agreement or 'any obligation
thereurider nor time or other indulgence granted by any Party to another Party.
. shall be treated or deemed as waiver ofsuch breach or acceptarrce of any variation
or the relinquisli~rlc~rt
of any such right hereunder.
.This Agreement. is solely for the benefit of the Parties and no other person or
entity shall have any rights hereunder.
(a) shall not relieve the Partiks of any obligations hereunder which expressly
,, or by ilnplicatio~lsurvive termination hereof; and
11.8 Severability
If for any reason whatever any provision of this ~ ~ r e e m e isn tor becomes invalid,
illegal or unenforceable or is declared by any court of competent jurisdi '
any other instrumentality to be invalid, illegal or unenforceable the . ,
legality or enforceability of the remaining provisions shall not be
manner, and the Parties will negotiate in good faith with a view to
or more provisions which may be substituted for such invalid, unen
illegal provisions, as nearly as is practicable to such invalid,
unenforceable provision. Failure to agree upon any such provisions .
subject to dispute resolution under Clause10.1 of this Agreement or o
This Agreement shall be. binding on and s h a i r e to the benefit of the Paniei
and their respective successors aid pem'itted assigns. :.
42 3
4 Laning of Rohtak Jind Section from krn 307.000 to km 347.800 of NH-71 and connecling link from krn '
347.800 of NH-71 to km 9.400 of NH-71A to be executed as BOT (Toll) project on DBF0,Paitern under
NHDP Phase Ill in the State of Haryana Page S - I1
National Hiohwavs Aufhorrlv of Inda Schedules
11.10 Notices
. .
4 Laning,of Rohtak Jind Section from krn 307.000 to krn 347.800 of NH-71 and connecting link from km
347.800 of NH-71 to km 9.400 of NH-7IA to be execu~edas BOT (Toll) project on DBFO Partcm under
NHDP P h ~ lli
c i n ~ h Statc
c of Haryana P a g e r - 14 1 '
!
IN WITNESS WHEREOF THE PARTIES HAVE EXECUTED AND DELIVERED
THIS AGREEMENT AS OF THE DATE FIRST ABOVE WRITTEN.
THE COMMON SEAL OF SIGNED, SEALED
--
CONCESSIONAIRE has been affixed AND
For and on behalf of
pursuant to the resolution passed by the SENIOR LENDERS by
Board of Directors of the Concessionaire ~ ~~ ~ d~ ~ ~ ~ ~ v ~ ~
at its meeting held on the ......... day of
.
20.. . .. hereunto affixed in the presence (Signature)
cf .........., Director, who has signed these mame)
presents in token thereof and ........., (Designation)
(Address)
Company Secretary 1 Atlthorised Officer (Fax No.)
who has countersigned the same in token (e-mail address)
thereof ':
(Name) (Name)
(Designation (Designation)
(Address) (Address)
(Fax No.) (Fax No.) .
(e-mail (e-mail address)
address)
In the presence of:
To be affixed in accordance with the anicles of association of the Concessionaire. Pi;'.,,3 -'* .
4 Laning of Rohtak lind Section horn km 107.000 to krn 347.100 of NH-II and connecting link from krn
%L
347.800 otNH.71 to km 9.400 of NH-71A lo be executed as BOT (Toll) project on DBFO Pattern under
NHDP Phase Ill !n the State of Haryana Page S 15. -
. .
F=, . . . ..
... .
. . . . ...
%- < Nalional Hiqhwavs Aulhorilv of India schedules
SCHEDULE -T
(See Clause 33.2.1)
Pursuant to the provisions of Clause 33.2.1 of the Agreement, the Authority and
the Concessionaire shall prepare a mutually agreed panel of 10 (ten) reputable
firms of Chartered Accountants having their registered offices in India (the
"Panel of Chartered Accountants"). The criteria for preparing such Panel and
the procedure to be ~doptedin this behalf shall be as set forth in this Schedule-T.
The Authority shall invite offers from all reputable firms of Chartered
Accountants who fulfil the following eligibility criteria, namely:
(a) the f i n should have conducted statutory audit of the annual accounts of at
least one hundred companies registered under the companies Act, 1956,
of which at least ten should have been public sector undeitakings; . .
(b) the firm should have at least 5 (five) practising Chartered Accountants on
its rolls, each with a minimum experience of ten years in the profession;
(c) .the firm or any of its partners should not have been disqualified or black-
listed by the Comptroller and Auditor General of lndia or the Authority;
. and,
(d) the firm should have an office in the State or in an adjacent State with at
least 2 (two) practising Chartered Accountants on its rolls in such State.
2.2 lnterested firms meeting the eligibility criteria shall be required to submit a
statement of their capability including the bio-data of all the practising Chartered
Accountants on its rolls. In particular, each firm shall be required to furnish year-
wise information relating to the names of all the companies with an annual
turnover exceeding Rs. 100,00,00,000 (Rs. one hundred crore) whose annual
accounts were iudited by such firm in any of the preceding 5 (five) A c c o u n t i k
Years.
3.2 The Authority shall prepare a list of all the eligible firms along with the points
scored by each, such fim and 10 (ten) firms scoring the highest pointsshall be
identified and included in the draft Pan 1
aM
hartered Accountants.
4 l i n i n g of RohlakJind Section from krn 307:oab to km 347.800 ofNH-71 and connecting link born km .
347.800 of NH-71 to km 9.400 of NH-71A to be executed as BOT (Toll) . - on DBFO.Pancrn under
. ..proiecl
NHDP Phase Ill i n the State o f Haryana Page 7 - 1
. . fi
. . . #
-., .'., -;, .
. ., . . . .
. .
.
:
..
...
,
' .
' 'I
b:
fi', .
. -:, . . -
Nalional Hiahwavs Aulhorilv of India Schedules LP
c- ,-
4 Consultation with the Concessionaire
P'-
'w"
G;.. .
,
. .
the reIevant records of the Authority to ascertain whether the selectio? of firms . . ., , -
- .
. ,
has been undertaken in accordance with,the prescribedprocedure and it shall send
its comments;if any, to the Authority within 15 (fifteen) days of receiving the
c:' ..
. .
A
. . .-
5 ' Mutually agreed panel G..J
-
5.1 The Authority shall, after considering all relevant factors including the comments,
if any, of the Concessionaire, finalise and constitute a panel of 10 (ten)' firms
which shall be deemed to be the mutually agreed Panel of Chartered Accountants.
5.2 After completion of every five years from the date of preparing the mutually
agreed Panel of Chartered Accountants, or such earlier period as may be agreed
between the Authority and the Concessionaire, a new panel shall be prepared in
accordance with the provisions of this Schedule - T.
.?*$ .
w .
--,
!'V? 7
\,d
. . 427 C..,
-:.'
,
' ?
4 Laning of Rohtak Jind Section from km 307.000 to km 347.800 of NH-71 and connecting link-from km -7
347.800 of NH-71 io km 9.400 of NH.7lA to be executed as BOT (Toll) projecr on DBFO Pattern under a'.,-
...
Pagt T - 2
L :
NHDP Phase I l l in the State of Haryzna -7
5 ! . , , . . . . ,::, . , .;<:;, . . ..'"<L..'..
..,
. i$$';'! , . ,, ..,,,,::;>,fi?, : : $<, . , ,.. , .,,,:,
. . .
.::!..:.. t,L,x i;r:;
. .
. .
.
. . ..:!:!';: . . . . .
...:;: : .........
. ,,i:.
. ..,...,. .
,
, , , . , ; . . . . ....
...
.. .
. . .
.>.',>.6 . :I < ! ".. :,. i . .
7 .. . . -.
.f. . . . . .
. .
A
. . .
VESTING CERTIFICATE
1: 2.
;
4 Lening of Rohlak Jind Section from kn 307.b00 t o km 347.800 of NH-71 and connecting link from km
428
347.800 of NH.71 lo km 9.400 of NH.7lA ro be execured as DOT (Toll). .project
- on DBFO Pallern under
NHDP Phase I l l in !he Slate of H a r y n a Page U - 1
I
-
. . . . . . . . . .
.'~alional~ i o h w a i s~ulhorilvof I n d i a schedules
F" ,:
-
L
SCHEDULELV L. --
p ' , ,;: )
(See Clause 40.3:l) * .
e:j -
THIS SUBSTITUTlON
.. AGREEMENT is entered into on this the ................day of
....a*. 20 ....
&&" .--.
1 I The National Highways Authority of India, established under the National 2 9
Highways Authority Act 1988, represented by its Ciiairtrlan arid having its
principal offices at G-5 & 6, Sector 10, Dwarka, New Delhi-110075 (hereinafter
referred to' as the "Authority" which expression shall unless repugnant t o . the
context ur rneanit~gthereof iilcludc its administrators, success&s and assigns);
'
'
.
..
6
&' '+-
-.
2
L
.,. ,--
J
J --:
its registered office at ...................1 ...., acting for and on behalf of the Senior
. .
Lenders as their duly authorised agent with regard to matters arising out of'or in .. -
o:.'
' ,
i@--,
(B) Senior Lenders have agreed to finance the ~roject'inaccordance with the terms
and.conditions set forth in the Financing Agreements.
(C) Senior Lenders have requested the Abthority to enter inti this substitution
Agreeme"t for securing their interestj fhrough assignment, transfer.and
substitution of the Concession to a Nominated Company in accordance with 'the
'4 Laning of Rohtak Jind Section 'from krn 30f000 to krn 347.800 ofNH.71 and co"ncc;ing link fro& krn .
347.800 of NH-71 to kni 9.400 of NH-71A to be ex
NHDP Phase I11 in the State of Haryana . 4e19BOT (Toll)
. project on DBPO Panern under
:. ~ n g .Yr - I
. .
:
i
. . . ..
National Hiqhwavs Authorilv of India Schedules
. .
1.1 Definitions
. .
In this Substitution ~ ~ r e e m e nthe
t , following words and exprcsiions shall, unless
.. repugnant, to the context or meaning thereof, have the meaning hereina'fter
respective!^ assigned to them: . . , . . ~
"Notice of Financial Dcfault" shall have the meaning ascribed thereto in Clause
3.2.1; and
1
"Parties" means the parties to this Agreement collectively and
any of the Parties to this Agreement individually.
Interpretation
4
4 - 30
Laning of Rohtak Jind Section from krn 307:0(r0 to km 347.800 of NH-71 and connecting link from km
347.800 of NH-71 lo km 9.400 of.NH.71A to be cxecu!cd as BOT(Toll) projea on DRFO Pancrn under
NHDP Phase 111 in the State of Heryana Pnpr V - 3
National Hi~hwavsAulhorilvaf India Schedules
1.2.2 References to Clauses are, unless stated otherwise, references to Clauses of this
Agreement.
1.2.3 The words and expressions beginning with capital letters a d defined in this
Agreement shall have the meaning ascribed thereto herein. and the words and
expressions used in this Agreenient and not defined herein but defined in the
Concession Agreement shall, unless repugnant to the context, have the meaning
ascribed thereto in the Concession Agreement.
1.2.4 The rules of interpretation stated in Clauses 1.2, 1.3 and 1.4 of the Concession
Agreement shall apply, rn~rtatisrnutnndis,to this Agreement.
2 ASSIGNMENT
The Concessionaire hereby agrees to assign the rights, title and interest in the
~on'cessionto, and in favour of, the Lenders' Representative.pursuant to and in
accordance with the provisions of this Agreement and the Concession Agreement
by way of security in respect of financing by the Senior Lenders under the
Financing Agreements.
3 SUBSTITUTION, OF 'THE CONCESSIONAIRE
3.1.1 Pursuant to the rights, title and interest assigned under Clause:2.1, the Lenders'
l<epresentativ'e shall be entitled to substitute the Concessionaire b y a Nominated
Company under and in accordance with the provisions of this Agreement and the
Concession Agreement.
3.3.2 In the event that the Lenders' Representative makes a representation to the
Authority within the period of 15 (fifteen) days specified in Clause 3.3.1, stating
that it intends to substitute the Concessionaire by a Nominated Company, the
Lenders' Representative shall be entitled to undertake and compIete the
substitution of the Concessionaire by a Nominated Company in accordance wit q'
the provisions of this Agreement within a Period of 180 (one hundred and e i "@"' :
days from the date of such representation, and the Authority shall eiiher with
Termination or undertake Suspension for the aforesaid period of 180 (one hun
and 'eighty) days; provided that upon written request from the Lende *
Representative and the Concessionaire, the Aufhoriry shall extend the aforeraid'h 4 1.*
period of 180 (one hundred and eighty) days by a period not exceeding 90 (ninety)
days.
4
. . 4 32
Laning of Rohtak Jind Section from krn 307.000 to krn 347.800 ofNH-71 and connecting link from km
h
347.800 oiNII-71 to krn 9.400 oTNk1-71A to be executed as 801 (Toil) project on DBFO Pancm under
NHDP Phase Ill in the Slate of Haryana Pnge V - 4
National Hlohweus Authorily of India Schedule$
3.4.1 The Authority and the Concessionaire hereby agree that on or after the date of
Notice of Financial Default or the date of representation to the Authority under ,
Clause 3.3.2, as the case may be, the Lenders' Representative may, without
prejudice to any of the other rights or remedies of the Senior Lenders, invite,
negotiate and procure offers, either by private negotiations or public auction or
tenders for the take over and transfer of the Project Highway including the
Concession to the Nominated Company upon such Nominated Company's
assumption
.. of the liabilities and obligations of the Concessionaire towards the
Authority under the Concession Agreemedt and towards the Sedior Lenders ur~der .
the Financing Agreements.
(b) endorse and transfer the Concession to the Nominated Company, on the
same terms and conditions, for the residual Concession Period; and
3.4.4 If the Authority has any objection to +he transfer of Concession in fav
Nominated Company in accordance with this Agreement, it shall w
(fifteen) days from the date of proposal made by the Lenders' Repres
give a reasoned order after hearing the Lenders' Representative. If
objection is raised by the Authority, the Nominated Company shall be d
have been accepted. The Authority thereupon shall transfer and endorse the
Concession within 15 (fifteen) days of its acceptanceldeemed acceptance of the
Nominated Company; provided that in the event of such objection by the
Authority, the Lenders' Representative may propose another Nominated
Company whereupon the procedure set forth in this Clause 3.4 shall be followed
1 Laning of R o h a k lind Seclion from krn 307000 to krn 341.800 olNH-71 and mnnerhng link from krn
347.800 ofNH.71 to km 9.400 of NH-71A lo bc executed as 11) project on DBFO Panern under
NHDP Phase I11 in the State of ~ a r y a n a . . Pngt V - s
P . . . ... - . .. .. . .. . . . . . . .
National Highways Authority of lndia Schedules
s'?
for substitution of such Nominated Company in place ofthe Concessionaire.
Selection to be binding
'The decision of the Lenders' Representative and the Authority in selection of the
Nominated Company shall be final and binding on the Concessionaire. 'The
Concessionaire irrevocably a@ees and waives any right to challenge the actions
of the Lenders' Representative or the Senior Lenders or the Authority taken
pursuant to this Agreement including the transferlassignment o f the Concession in
favour of the Nominated Company. The Concessionaire agrees and confinns that
it shall nct have any right to seek revaluation of arsets of the Project or the
Concessionaire's shares. It is hereby acknowledged by the Parties that the rights
of the Lenders' Representative are irrevocable and shall not be contested in any
proceedings before any court or Authority and the Concessionaire shall have no
right or remedy to prevent, obstruct or restrain the Authority or the Lenders'
Representative from effecting or causing the transfer by substitution and
endorsement of the Concession as requested by the Lenders' Representative.
-
PROJECT AGREEMENTS
Substitution of Nominated Company in Project Agreements
The Concessionaire shall ensure and procure that each Project Agreement
contains provisions'that entitle the Nominated Company to step into such Project
Agreement; in its discretion, in place and substitution of the Concessionaire in the
event of such Nominated Company's assumption of the liabilities and obligations
of the Concessionaire under the ~once'ssionAgreement.
Concession Agreement forthwith; and upon receipt of such notice, the Aut
shall undertake Termination under and in accordance with
Article 37 of the Concession Agreement.
H
The Authority and the Concessionaire hereby acknowledge and agree that,
without prejudice to their any other right or remedy, the Lenders' Representative
is entitled to receive from the Concessionaire, without any further reference to or
consent of the Concessionaire, the Debt Due upon Termination of the Concession
Agreement. For realisation of the Debt Due, the Lenders' Representative shall be
entitled to make its claim from the Escrow Account in accordance with the
provisions of the Concession Agreement and the Escrow Agreement.
6 DUR4TION OF THE AGREEMENT
This Agreement shall come into force from the date hereof and shall expire at the
earliest to occur ofthe following events:
7.1.1 The Concessionaire will indemnify, defend and hold the Authority and the
Lenders' Representative harmless against any and all proceedings, actions and
third party claims for any loss, damage, cost and expense of whatever kind and
nature,arising out uf ally breach by the Concessio~laireof any of its obligatioils
under this Agreement or on account of failure of the Concessionalre to comply
with Applicable Laws and Applicable Permits.
7.1.2 The Authority will indemnify, defend and hold the Concessionaire
against any and all proceedings, actions and third party claims fo
damage, cost and expense arising out of failure ofthe Authority to fu
obligations under this Agreement, materially and adversely a
performance of the Concessionaire's obligations under the Concession
or this Agreement, other than any loss, damage, cost and expense, arls~
acts done in discharge of their lawful functions by the Authority, its officers,
servants and agents.
7.1.3 The Lenders' Representative will indemnify, defend and hold the Concessionaire
harmless against any and all proceedings, actions and third party claims for any
loss, damage, cost and expense arising out of failure of the Lenders' ,
Representative to fulfil its obligations under this Agreement, materially and iI
[T. . .
. . . .. . . :;,. . . . :; .... :!?:.: ;;. !, . , .. ._. , . . . .' : , . . . . . .. ' . .
.
.:.,,,.
. . . .
.. .
, .; ,:. ., .. . .
I., \
. .
: , L . ; !: , , ,
' - .....
.
p, . ' , . . .
. . . . . .
. .
,
. : . .
In the event that any Party hereto receives a claim from a third party in respect of
which it is entitled to the benefit of an indemnity under Clause 7.1 or in respect of
which it is entitled to reimbursement (the "Indenlnilied Party"), it shall notify
the other Parry resporsible for indcmnifiing zud! c l e h hereuider (the
"Indemnifying Party") within 15 (fifteen) days of receipt of the claim and shall
not settle or pay the claim without the prior approval of the Indemnifying Party,
such approval not to be unreasonably withheld or delayed. In the event that the
Indemnifying Party wishes to contest or dispute the claim, it may conduct the
proceedings in the name of the Indemnified Party and shall bear all costs involved
in contesting the same. The Indemnified Party shall provide all cooperation and
assistance in contesting any claim and shall sign all such writings and documents
as the Indemnifying Party may reasonably require.
8 DISPUTE RESOLUTION
8.1.1 Any dispute, difference or claim arising out of or in connection with this
Agreement which is not resolved amicably shall be decided by reference to
arbitration to a Board of Arbitrators comprising one nominee each of the
Authority, Concessionaire and the Lenders' Representative. Such arbitration shall
be held- in accordance with the Rules of Arbitration of the International Centre for
Alternative Dispute Resolution, New Delhi (the "Rules") or such other rules as
may be mutually agreed by the Parties, and shall be subject to provisions of the
Arbitration and Conciliation Act, 1996.
8.1.2 The Arbitrators shall issue a reasoned award end such
binding on the Parties. The venue of arbitration shall be
arbitration shall be English.
9 MISCELLANEOUS PROVISIONS
4 36
4 Laning of Rohtak Jind Section from kni 307.000 to krn 347.800 of NH-71 and connec~inglink from km
347.800 of NH-71 10 krn 9.400 of Ntl.7IA lo he exccuted DOT (Toll) projecl on DBFO Panern under ,
NHDP Phase 111 in the Sta~cof Haryana Pngr V .8
!
:,'i :,
. . . . . . . . . . . #.! < I : . . . . . r ., .,:. .,%-,,a> . :.;,:., .. 1. . .. : . . . . . . . . . . .
. .
!.i(
.
. .:
.. . . . .. . . . .
. , .
. ,
. . . . . .
. . .
. .
.. . . . . . . . . . . . . .,
National Hiohwavs Authorilv of India Schedules
(b) agrees that, should any proceedings be brought against it or its assets,
property or revenues in any jurisdiction in relation to this Agreement or
any transaction contemplated by this Agreement, no immunity (whether
by reason of sovereignty or otherwise) from such proceedings shall bc
ciaimed by or on behalf of the Authoriiy with respect to its assets;
(c) waives any right of immunity which it or its assets, property or revenues
now has, may acquire in the future or which may be attributed to it in any
jurisdiction; and
In the event of any conflict between the Concession Agreement and this
Agreement, the provisions contained in the Concession Agreement shall prevail
over this Agreement.
I
9.5 Waiver
.?
autllorised representative of the Party; and
9
r> . (c) shall not affect the validity or enforceability of this Agreement in any
?
manner.
!
9,5.2 Neither the failure by either Party to insist on any occasion upon the performance
of the terms, conditions and provisions of this Agreement or any obligation
thereunder nor time or other indulgence granted by a Party to another Party shall
be treated or deemed as waiver of such breach or acceptance of any variation or
the relinquishment of any such right hereunder.
7 9.7 Survival
- -- -
?! 9.7.1 Termination of this Agreement:
2- .
,
'y .
(a) shall not relieve the Parties of any obligations hereunder which,..expressly
or by implication survive termination hereof;
,
..:
... '
.
and
.
f,
. . . ....
.
..
<?
.:;:.
.:.:.<....,.
:...
. . .. .. . . .
except as otherwise provided in any prbCiiion of this Agreement e$%sly
.,.
. :::.::::.
.?....:-
?;j (b)
limiting the liability of either Party, shall not relieve either Party of any
<
: 1
obligations or liabilities for loss or damage to the other Party arisingout of
Y
\ or caused by acts or omissions of such Party prior to the effectiveness, of
'3
. . . .i such termination or arising out of such termination.
Severabilitv
This Agreement shall be binding on and shall inure to the benefit of the Parties
and their respective successors and permitted assigns.
9.10 Notices
hereby agreed and acknowledged that any Party may by notice change the address. . .
to which 'such notices and communications to it are to be delivered or mailed. : I,
., Such change shall be effective when all the Partieshave notice of it.
9.11 Language
Each of the Parties shall by notice in writing designate their respective authorised
representatives through 'whdm only all communications shall be made. A Party
hereto shall be entitled to remove andlor substitute or make fresh appointment of
such authorised representative by similar notice.
. . -440
'To be affixed in accordance with the anicles of association of the Concessionairc.
4 Laning of Rohtak Jind Section from km 307.000 to km 347.800 olNH-71 and connecting link from km
347.800 of NH-71 to km 9.400 of NH.7lA to be exe'cuted as DOT (Toll) project on DRFO Palte~nu,nder
NHDP Phase 111 in the StaleofHaryana Pngc v - 12
..