CONTRACTOR WORK METHOD STATEMENT (EHS)

1. Contractor Name : Danway EME 3. Trades / Disciplines Involved In Work :

2. Work Location : NEW ABB LAYDOWN Engineer, Supervisor, Electricians and Helpers.
(Near to existing GIS building)
Proposed Starting Date :

4. Brief Description Of Work To Be Undertaken : 5. Tools / Substance


Portable Tools
EXACAVATION FOR UNDERGROUND FACILITY
BY USING MECHANICAL EXCAVATOR Hand Electrical Pneumatic
Hazardous Substances
Toxic Flammable Corrosive
Harmful Irritant
Environment Impact
Health & Hygiene Effect

Environmental Impact Health & Hygiene

Yes No Yes No

Hazardous waste Significant Dust Generation


Emissions Noise (above 85 DbA)
Discharge to sea or drains Hazardous substances (if yes attach list)
If answer to any of the above is yes, please circulate to If answer to any of the above is yes, please circulate to
Manager, Environmental Affairs Senior Occupational Hygienist

6. Person Completing The Work Method Statement :

Name : G.J. PILLAI Position : Supervisor Company : Danway

Signature : Date : 15-05-2012

File: Revision: 0(26-May-2011) Page 1 of 8


HS.SAF.09.F12

7. Approvals

Contractor Site Rep. Name Signature : Date :

EMAL Representative Name Signature : Date :

Area Owner Name Signature : Date :

Name Signature: Date:


EMAL EHS Department

The completed Work Method Statement must be submitted at least seven full working days prior to the
commencement of activities.
Where the Work Method Statement indicates the use of Hazardous Substances, a Material Hazard Data
Sheet must be attached.
After the Area Owners approval the Work Method Statement shall be forwarded to EHS department for
approval
The approved Work Method Statement must be attached to the permit(s) to work and all persons involved
in the job instructed in its requirements.

2. RISK ESTIMATOR CHART


The Risk Estimator chart should be used as an assistant for filling out the work
method statement.

Severity
Probability Low x1 Medium x 2 High x3

Low x1 Low Probability x Low Severity LP x MS LP x HS


1x1=1 1x2 = 2 1x3 =3
Medium x2 MP x LS MP X MS MP x HS
2x1 =2 2x2 =4
2x3 =6
High x3 HP x LS HP X HS HP x HS
3 x 1 =3 3x2 = 6 3x3=9

Significant Risk = High Risk (6-9) or Medium Risk (3-4) in terms of probability and severity
Tolerable Risk = Risk reduced to an acceptable level = Low Risk (1-2)
Residual Risk = Risk remaining after implementing recommended control actions (usually very minor).

File: Revision: 0(26-May-2011) Page 2 of 8


SM-CMS.TSK.01.F02

8. Safety Analysis

Identified Hazard(s) Persons Exposed To Precautions and Plan of actions To Be Taken Severity x Probability =
Individual Activities To Associated With Activity Hazard To Remove / Control Hazards Risk
Complete Work. List In
Sequence of Activity Residual Risk
(Use Risk Estimator
Chart)

PREPARATION. Slips, trips and fall at Emal rep., Engr., Maintain housekeeping around in the
1x2=2
the same level. Supv. Elec, helpers. working area.

All workers involve in the activity must


Emal rep., Engr.,
Hot weather. be aware of heat stress, supervisor to 2x2=4
Supv. Elec,helpers
ensure drinking cold water is
available.

Emal rep., Engr., Wear P.P.E.'s at all times (hard


2x2=4
Not using P.P.E.'s Supv. Elec, helpers. hat, safety glass, safety shoes, hand
gloves, dust mask, coverall.)

Manual handling Supervisor to give tool box talk


Supv. Elec,helpers 1x1=2
hazards regarding proper manual handling.

File: Revision: 0(26-May-2011) Page 3 of 8


SM-CMS.TSK.01.F02

Supervisor to ensure approved PTW,


MS and RA are available on site NO
PERMIT NO WORK.
No approved Ensure that working crew does not
EXACAVATION BY USING Engr., Supv., Elec.,
permit to work enter into the operational area. 3x1=3
BY USING MECHANICAL & helpers
from emal Complete the pre-work check list on a
EXCAVATOR.
daily basis.
Daily toolbox meetings to be
conducted on days activity, which
will include TRA for the activity.
Post appropriate warning signage
which read DANGER DEEP
EXCAVATION.
Cordon the work area to avoid
Deep excavation
unauthorized entry during
Possible existence All workers excavation.
of underground involved in the Obtain clearance and excavation 3x2=6
services activity permit prior to excavate.
(power,telephone,
Futher necessary precautions to
water)
consider for excavating 1.2 mtrs
depth or more. (Eg. Confined space
entry, hazardous gases, protective
system, proper access & egress.).

Use of mechanical Operator must be safety inducted,


excavator. All workers certified and competent.
( incompetent involved in the 2x2=4
operater) activity Excavtor must be certified by
Mechanical Failure approved third party certification
agencies and EMAL

File: Revision: 0(26-May-2011) Page 4 of 8


SM-CMS.TSK.01.F02

Supervisor to conduct daily crew


All workers meeting prior to start the activity.
Fall, trip and Post appropriate warning
involved in the 1x3=3
slipping hazards. signage.hard barricade the work area
activity
to aviod anauthorized entry.
Excavation that is more than 1.2 mtrs
depth shall administer protective
system. (Sloping of 1:1 ratio or
Cav-ins and All workers
benching not less than 0.6mtr wide
collapses of involved in the 2x2=4
level, shoring, etc.)
excavation walls activity
Keep spoiled sand and other
materials atleast 1mter away from
the edge of excavation.
Provise a ramp.
Limited and All workers
Provide ladder long enough for
unstable involved in the 1x2=2
activity temporary access / egress, atleast
access/egress
one meter above the ground level.
Post appropriate warning signage
which read DANGER DEEP
EXCAVATION.
Cordon the work area to avoid
No warning sign All workers involved
unauthorized entry during 1 x 3= 3
MANUALEXCAVATION boards /barricade in the activity
excavation.
Obtain clearance and excavation
permit prior to excavate.

Damage unidentified under Supervisor to ensure taat PTW available


All workers involved 3x2=6
ground services at site all time, pick axe and craw bar
in the activity
are not allowed to be used if there is
undergroud suspected.

File: Revision: 0(26-May-2011) Page 5 of 8


SM-CMS.TSK.01.F02

Excavation that is more than 1.2 mtrs


depth shall administer protective
system. (Sloping of 1:1 ratio or
Cav-ins and
All workers involved benching not less than 0.6mtr wide
collapses of 2x2=4
in the activity level, shoring, etc.)
excavation walls
Keep spoiled sand and other
materials atleast 1mter away from
the edge of excavation.
Use dust mast and eye protection (safety glass).
Adverse weather condition
All workers involved Excation to e stopped at high velocity wind
(high wind velocity, sand 1x3=3
in the activity resulting to sandstorm or poor velocity.
storm etc.)
Job rotation,rest break to be given during the hot
All workers involved weather.
Fatigue 1x3=3
in the activity

This sheet must be properly completed detailing all of the steps required to complete the job along with the sequence of events and each of the hazards
arising. Failure to properly complete the form will result in non-approval.
(Additional sheets to be used as required)

File: Revision: 0(26-May-2011) Page 6 of 8


SM-CMS.TSK.01.F02

9. Chemical Analysis (This form to be used as required)

Product Name

MSDS supplied Yes / No

Dangerous Goods Class

Hazardous Material Yes / No

Nature of Hazard Irritation / Carcinogen / Corrosive / Toxic / Other

Form Solid /Liquid / Gas / Dust / Vapour / Mist

Exposure Route Inhalation / Skin / Eye / Ingestion

Number of People Exposed

Duration of Exposure

Frequency of Exposure

File: Revision: 0(26-May-2011) Page 7 of 8


SM-CMS.TSK.01.F02

Controls to be implemented

Estimate of Exposure Negligible / Marginal / High


This sheet must be properly completed detailing all the necessary information. Failure to properly complete the form will result in non-approval.