ACTIVITY: GAS CUTTING, WELDING, GRINDING, LOADING AND UNLOADING OF ANODE PALETTE.
PACKAGE NUMBER: CE-0994
Verify isolations
Main After getting valid permit from SLII
contractor/client only start work.
coordination Engineer/supervisor ensure that the
fails,job work permit is valid for date and
6.1.1 TO 6.2.2 stopped,work time
unapproved All workers are inducted by EMAL 3 1 3
Operatives should All personnel involve in the activities
be aware of must wear the required PPEs at all
emergency times (hard hat safety glass for gas
procedure of cutting /welding safety shoe
EMAL ,welding apron,hand gloves
,coverall)
Supervisor to ensure all mobile
equipments are duly inspected by
Use of mobile EMAL / SLI with valid load test
equipments e.g. certificates 3 1 3
6.3.1 TO 6.3.3 forklift/dumber A banks man must be to guide the
transportation of the welding set in
to the required position
All lifting gears must be in good
Lifting
condition with valid load test
gears(shackles,lifti
certificate and colour coded. 3 1 3
ng cable,nylon
Inspect lifting gears before use,
sling etc)
ensure the validity of certificates.
ACTIVITY: GAS CUTTING, WELDING, GRINDING, LOADING AND UNLOADING OF ANODE PALETTE.
PACKAGE NUMBER: CE-0994
ACTIVITY: GAS CUTTING, WELDING, GRINDING, LOADING AND UNLOADING OF ANODE PALETTE.
PACKAGE NUMBER: CE-0994
ACTIVITY: GAS CUTTING, WELDING, GRINDING, LOADING AND UNLOADING OF ANODE PALETTE.
PACKAGE NUMBER: CE-0994
ACTIVITY: GAS CUTTING, WELDING, GRINDING, LOADING AND UNLOADING OF ANODE PALETTE.
PACKAGE NUMBER: CE-0994
ACTIVITY: GAS CUTTING, WELDING, GRINDING, LOADING AND UNLOADING OF ANODE PALETTE.
PACKAGE NUMBER: CE-0994
ACTIVITY: GAS CUTTING, WELDING, GRINDING, LOADING AND UNLOADING OF ANODE PALETTE.
PACKAGE NUMBER: CE-0994
ACTIVITY: GAS CUTTING, WELDING, GRINDING, LOADING AND UNLOADING OF ANODE PALETTE.
PACKAGE NUMBER: CE-0994
ACTIVITY: GAS CUTTING, WELDING, GRINDING, LOADING AND UNLOADING OF ANODE PALETTE.
PACKAGE NUMBER: CE-0994
ACTIVITY: GAS CUTTING, WELDING, GRINDING, LOADING AND UNLOADING OF ANODE PALETTE.
PACKAGE NUMBER: CE-0994
NOTE: All Current Risk ranked above C-15 must have additional control measures: Risk = Consequence x Probability (R = C x P)
Tolerable Risk (Low) = 1-6, Medium = 8 -12, (Methods statement), Intolerable Risks (High) = 15 25 (Method Statement plus additional Control Measures in place)
503406-AD0000-68AF-12303_R01 (2012-01-30) Page 10 of
12
EHS RISK ASSESSMENT
ACTIVITY: GAS CUTTING, WELDING, GRINDING, LOADING AND UNLOADING OF ANODE PALETTE.
PACKAGE NUMBER: CE-0994
Consequence
Consequence ( Severity) Rating Factors (5) Probability Rating Factors (5) Frequency/Probability
(Severity)
No Safety Health Environ. Financial No Frequency A B C D E
1 First Aid Immediate Minor <AED 1k <1 hr A (1) Practically impossible or Once in 10 years 5 5 10 15 20 25
2 Medical Temporary Short term <AED50K 1-2 hrs B (2) Not likely or Once per year 4 4 8 12 16 20
3 Lost Time Short term Long term >AED300k 2-4 hrs C (3) Could happen or Monthly 3 3 6 9 12 15
4 Disability Long term Serious >AED500k 4-8 hrs D (4) Has happened or Weekly 2 2 4 6 8 10
5 Fatality Fatal Catastrophic >AED1m >1 shift E (5) Common or Daily 1 1 2 3 4 5
Risk Assessor:
EHS Department:
Construction:
503406-AD0000-68AF-12303_R01 (2012-01-30) Page 11 of
12
EHS RISK ASSESSMENT
ACTIVITY: GAS CUTTING, WELDING, GRINDING, LOADING AND UNLOADING OF ANODE PALETTE.
PACKAGE NUMBER: CE-0994
Management: