Académique Documents
Professionnel Documents
Culture Documents
On May 7, 1992, the space shuttle Endeavor was launched on mission STS-49, the purpose of
which was to install a new perigee kick motor in an Intelsat communications satellite. The table
gives the velocity data for the shuttle between liftoff and the jettisoning of the solid rocket boosters.
A computer (MS-EXCEL) was used and the following function was generated for the time
interval 0 t 125
3 2
v(t)= 0.0015t -0.1155t +24.982t-21.269
a. Find a model for the acceleration of the shuttle and use it to estimate the maximum and
minimum values of acceleration during the first 125 seconds.
1
Solution:
4500
4000
3500
3000
2500
2000
1500
1000
500
0
0 20 40 60 80 100 120 140
3 2
v(t) = 0.0015 t 0.115 t + 24.982t21.269
d v (t) 2
a(t) = dt = 0.0045 t - 0.231t + 24.982
d a (t)
a(t) = dt = 0.009t - 0.231
0.231
Critical points are when a(t) = 0. So,
t 1 = 25.67 seconds
0.009
2
a(25.67) = 22.0 ft/ s
2
a(0) = 24.982 ft/ s
2
a(125) = 66.42 ft/ s
2
2
MAXIMUM ACCELERATION = 22.0 ft/ s
2
MINIMUM ACCELERATION = 66.42 ft/ s