mm
fy = 240 MPa
fc' = 25 MPa
b = 150 mm
h = 450 mm
d' = 40 mm
d = 410 mm
m = 11.2941176471
Rn = 3.9658933175
(rho) = 0.0184459937
As = 1134.4286127533
n = 3 22
As pendekatan 3
As = 1140 mm
Cc = 0.85 x fc'x a x b
Ts = As x fy
Cc = Ts
0.85 x fc' x a b = As x Fy
a = 85.8217411765
Mn = .xTsxz
80335782.0453346
Cc= 0.85 fc'ab
85.82
450 z=d-(a/2)
Mn=Ts.z
Ts = As . Fy
150
P = 10 T 100000 N
L = 1.8 m 1800 mm
Mu = 45,000,000.00
1.6 Mu = 72,000,000.00
fy = 400 MPa
fc' = 15 MPa
m = 31.3725490196
b = 1000 mm
h = 200 mm
d' = 30 mm
d = 170 mm
Mn =
TUL bagi
As bagi = 400 mm
As terpasang 448 mm
10
Jd = 175 mm
670
12 168.8019933272
16 125
1800 mm
KOPEL
180 kNm
Mu = 180,000,000.00 Nmm
fy = 400 Mpa
fc' = 25 Mpa
b = 200 mm
h = 600 mm
d' = 40 mm
d = 560 mm
As1 = 600 mm
a = 56.47 mm
.Mn1 = 102,098,823.53 Nmm
Mn2perlu = 97,376,470.59 Nmm
As2 = As'
= 468.16 mm
Astotal = 1,068.16 mm
jadi pakai 4 D 19
As' = As2
= 468.16 mm
jadi pakai 2 D 19
.Mn1 .Mn2
102,098,823.53 > 97,376,470.59
.Mn total Mu
199,475,294.12 > 180,000,000.00
OK
As'= 468.16 mm
Cc= 0.85 fc'ab
600 mm d-a/2
Ts1 = As1 . fy
200 mm As1= 600 mm
As total = 1,068.16 mm
468.16 mm
Cc= As' . Fy
Ts2 = As2 . fy
As2= 468.16 mm
.Mn total Mu
199,475,294.12 > 180,000,000.00
OK
Mu = 173 kNm Ts total =
Mu = 173,000,000.00 Nmm Cs =
fy = 400 Mpa
fc' = 15 MPa
b = 200 mm
h = 600 mm
d' = 40 mm
d = 560 mm
c = 336 mm
fs' =
.Mn total Mu
321,769,412 > 173,000,000.00
OK
480,000.00 N
240,000.00 N
600 d-a/2
mm
Cs= As' fs' 240,000 N
Mn2
d-d'
Mn1
L = 6m
= 6000 mm
Mu = 300,000,000.00 Nmm
Fy = 400 Mpa
Fc' = 15 Mpa
bw = 200 mm
h = 600 mm
hf = 200 mm
d' = 30 mm
d = 570 mm
As = 1700 mm2
1/4 L = 1500 mm
bw + 16.hf = 3400 mm
jb = 1800 mm
bef = 1500 mm
a = 35.56 mm
Mn = .TS.Z
= 300,408,888.89
Mn Mu
300,408,888.89 > 300,000,000.00
OK
jadi dipakai = 1962500 D 25