Vous êtes sur la page 1sur 26

CPF Power Plant

Block 7&3 Oil Fields Project


10 MW Al-Jabalayn
OBC

PS #3

First River Crossing

PS #2 PS #4

Central Processing Facilities PS #5


Crude Oil
Export Pipeline Second River Crossing

Palouge FSF
PS #6
Palouge FPF Palogue OBC

PS #1
RED SEA
MOUNTAIN
AIRPORT
Adar FPF
Palouge Adar Pipeline
Power Plant 76km,)
40MW PORT SUDAN
Marine Terminal

Adar FSF Adar existing


Camp and airstrip
Project Components Supplier European Countries
UNITED KINGDOM GERMANY
NORWAY FINLAND

BELGIUM

BULGARIA

SWITZERLAND

FRANCE

HOLLAND

ITALY TURKEY

SPAIN
Project Components Supplier Asian Countries

CHINA
MIDDLE EAST(UAE)
JAPAN

KOREA

LEBANON MALAYSIA

INDIA

SINGAPORE

INDONESIA
Project Components Supplier American Countries

VENEZUELA

BRAZIL
Foreign Companies working in the Project

UNITED FRANCE GERMANY FINLAND


CANADA KINGDOM
RUSSIA

ITALY
JAPAN

EYGPET
CHINA

OMAN

INDIA MALYSIA

SOUTH
AERICA
Line Pipe Supply

Line pipes at storage yard in Port Sudan

Loading of pipes onto ship at Port


in China
Export Pipeline Segment A1 – CPPE

Line Pipe Transport

Welding

Welding
Construction Camps
Export Pipeline Segment A2 – STG/Troytransgaz

Transport

Office and accommodation for OWNER

Stringing
ADAR FSF

OGM 3 common manifold


Completed RMU building, wellhead & transformer @ Yale-1

Wellhead and sand-trap RMU Building


Flowline inlet to common manifold.
ADAR FPF

Trunkline & Flowline


@ receiver area

Overview of Train 1 (1st Stage Separators, 2nd Stage Separators


Crude Oil Storage Tank (2 nos). One and Heat Exchangers)
is undergoing painting.

Sub station Building Diesel storage & FW Tanks Overview of Tank Area
ADAR PIPELINE

Fitting up riser at Receiver Palogue

Installation of pig into NPS 20 Pig Launcher at


FPF
POWER PLANT - PALOGUE
PALOGUE FSF

Piping connected to Christmas Tree at


wellhead

Flowline connected to piping at the wellhead.

The pigging flowline activity. The dust


come out from receiver at OGM.
PALOGUE FPF

From left: Tank A, B & C


Sub station building Heat Medium Package

INSTRUMENT AIR SYS Piperack No 4

Installed 2nd stage Piperack No 2


separator Piperack No 1
CPF AL JABALAYN

Pipe Spool & Cable Tray


Cold vent Knock our drum TANK C & D

Surge Vessel
Gas Boot

Instrument Air Water Treatment Package CHEMICAL INJECTION SKID


& TANK
PIPELINE SEGMENT A1

Block Valve Installation

Block Valve Installation & Tie-in


PIPELINE SEGMENT A2

Blue Nile River crossing Linepipe ready for tie-in at Blue Nile
River crossing

New HDD Rig


Exit of – 28” Rimmer drill for HDD at Blue Nile
PIPELINE SEGMENT B1

Scraper Launcher installation at PS4

Scraper trap at PS4

Scraper Receiver installation at PS5


PIPELINE SEGMENT B2-1

Welding of incoming pipeline to MT Scraper Receiver at MT


PUMP STATION1 (PS1) - Palogue

MCC Building

Air Cooler

Pump & Drivers on its foundations with


shelter
PUMP STATION 2 (PS2) – Al Jabaleen

Main Pump Area

Flanges

Crude oil treatment package


PUMP STATION 4 (PS4) – El Fon

Air Cooler

Overview of PS4- Main Pump, Air Cooler, MCC, Genset Areas


Main Pump
Foundations

Pumps & Genset Foundations Sump Pit MCC Building


PUMP STATION 5 (PS5) – Jabal Umm Ali

Air Cooler Area

PUMP SHELTER

Crude Oil Treatment System


Crude Oil Treatment System
EXPORT MARINE TERMINAL – Port Sudan

HIEDYC – For soil improvement &


compaction
Rebars Works In Progress – Tank 30101B

Plate Bending - Tankage Concreting [Truck Ready Mixer ] of the


Ring Beam- Tank 30101C