Presented by:
Yan Adriansyah
Geotechnical & Hydrogeological Superintendent Mine Technical Services
PT Newmont Nusa Tenggara
Geotechnical Workshop Hasanuddin University, Makassar - April 2nd, 2016
Outlines :
Introduction
Background
Collection Data
Modeling & Slope Stability Analysis
Pit Wall Stabilization
Pit Slope Monitoring Program
Risk Analysis
Geotechnical Audit
Geotechnical Drilling
Background
X-Section View
Data Collection Structural model
Data Collection Combine RMR-Structure
Slope Stability Analysis Terminology Lereng
OBSERVATION CHANGES
Quality of
Monitoring
Result
TIME TOOL
Slope Movement Monitoring
Objectives:
Kayesa (2006) :
Pit design verification
Early warning system
To give an update of the unstable area from the measurement result
To give a technical guarantee to the mine ops in regard to the current/latest of
stability status.
Management tool to measure the risk analysis that impacted by pit slope failure
Read & Stacey (2009) :
Prediction of all potential mechanism that control instability
Determination of parameters to be monitored and potential magnitude
Establishment of suitable monitoring system
Formulation of measurement procedures
Assignment of tasks for design, construction and operation of system
Planning of regular calibration and maintenance
Establishment of trigger action response plans to minimize impact of ground
movement.
Slope Movement Monitoring - Type of instrument
Tools :
Surface Displacement
Visual inspection
Crackmeter/extensometer
Survey monitoring
GPS
Photogrametry
Laser Scanning
Radar
Tiltmeter
Sub-
Sub-surface Displacement
Inclinometer
Micro-seismic
Piezometer (VWP)
Time domain reflectometer (TDR)
Slope Movement Monitoring Batu Hijau Mine
Monitoring Equipment:
Radar
4 units operates and 1 standby as back up.
Robotic Total Station
4 RTSs operates and 1 standby as back up.
Prism
At least around 250 pcs are installed
Inclinometer
High GPS precision
Displacement Extensometer
as required
Extensometer
as required
Slope Movement Monitoring - Radar
Slope Movement Monitoring Graph result
Slope Movement Monitoring Prisms distribution
Slope Movement Monitoring - RTS
Slope Movement Monitoring Scan region
Slope Movement Monitoring Graph result
Creep deformation
ES2015-489
ES2015-483
ES2015-484
ES2015-488
F#129
Failure event, 7 Oct 2015
Slope Movement Monitoring - Application
Drilling
Cable
Installation
Grouting
Strapping
Tensioning Strapping - Tensioning
Grouting
Pit Wall Stabilization Dowel Installation
Pit Wall Stabilization Reducing GWL
HD Holes
HD Drilling
HD Holes
Blast Treatment
Definisi:
Definisi:
Metode peledakan yang terdiri dari 1 baris/row
lubang tembak dengan jarak yang lebih rapat.
Diameter lubang lebih kecil sepanjang batas
penggalian.
Lubang bor dibuat incline menyesuaikan dengan
desain bench face angle/sudut lereng individu.
Tujuan:
Tujuan:
Membuat bidang bebas sebagai pencegah energi
peledakan (trim+prod blast) merambat/merusak
dinding/lereng yang direncanakan.
Toe-line achievement
Risk Analysis
Committee Category Standards Champion Team
Working at Heights Working at Height, Ladders, Scaffolding, Elevated Paul Giles John Noldi, Eddy Suryawan, Arif
Work Platforms Gunawan
Yakub Imansah
Isolation Lock out Tag Out, Permit Systems, Andy Maclean Budi Susanto, Basna Bangun,
Mukhsin
Burhan Manurung, Rudy Susanto
Electrical Compliance Electrical Safety Brett Rae Andreas Santoso, Khairul Fahmi,
Teguh Pujiono, Eko Sucipto
Lifting Cranes, Rigging & Lifting Gear, Forklifts, Boom Trucks, Brett Ronald Timbuleng, Purwanto
Overhead Cranes Fairweather John Pickerill, Andries Smallberger
Dwi Widodo
Traffic Management LV, Mobile Equipment, Fatigue, Signs & Signage Cindy Lewis Anis M., Cindy Lewis, Frans
Batubarra
Juvens Goan
Confined Space Work Permit Systems Karl Smith Zainul Wahidin, Mustakim, Sumiardi
Dinar Aryasena, Eddy Riyanto
Ronald Timbuleng
Surface Ground Control Radars, Ground Control Mgt., Excavation, Wall Yan Adriansyah Syarifuddin AP, Muhammad Abbas
Treatment, Berms, Permitting Agus Sudarjat, Raymond Boyska
Fatigue Management FMS, Global initiatives, Clockwork Review Sunarto Suwito Paul Giles
TBA
Geotechnial Audit
The audit is one of the most important aspect for the
mining company, why???
Education :
Bachelor Degree Of Engineering Geology,
1992 1997
Magister of Engineering Geology; 2012
2014.
Ph.D Student; 2015 now (Padjadjaran
University)