Vous êtes sur la page 1sur 1

File: Company: Jotun India Pvt.Ltd.

Site: A1 Fence PCO Process: Powder Coating Product: I beam Data Collection Details:
Created By Download
Number of Probes 6
Sample Interval 0:05.00 (mm:ss.t)

Process End
Data Loaded 9/28/2016 1:54:25PM
Collection Started 9/28/2016 1:11:53PM
Max. Internal Temp. 48.6 C
Logger EasyTrack2
Logger ID #20291
200 Operator BHANDM
Time Printed 9/28/2016 2:11:02PM

Notes:
A1 Fence PCO
Set Temp. 235-240 Degree C.
Line speed 1.21Mtr/min
150 Loaded oven only for TTR (No contineous Production)
Temperature C

Component I Beam.

100

50

0.0 10:00.00 20:00.00 30:00.00 40:00.00


Time (mm:ss.tt)

Datapaq Value
Maximum / Minimum
Probe Min Temp 180.0 Max Temp 210.0C
180.0C 190.0C 200.0C Datapaq Maximum Max. Reached Minimum Min. Reached
15:00.00 (mm:ss.tt) 12:00.00 (mm:ss.tt) 10:00.00 (mm:ss.tt) Value (C) (mm:ss.tt) (C) (mm:ss.tt)
#1 (C) Top Air 18:15.00 16:05.00 11:55.00 192 220.9 26:00.00 33.7 00:00.00
#2 (C) Top Metal 14:25.00 11:15.00 07:20.00 141 208.6 28:15.00 37.4 07:25.00
#3 (C) Middle Metal 12:25.00 09:00.00 04:20.00 114 203.3 27:50.00 34.7 09:55.00
#4 (C) Bottom Metal 11:50.00 08:45.00 04:00.00 108 201.5 30:35.00 33.2 09:10.00
#5 (C) 00:00.00 00:00.00 00:00.00 0 *** *** *** ***
#6 (C) 00:00.00 00:00.00 00:00.00 0 *** *** *** ***

Datapaq Insight EasyTrack v5.50 Copyright (C) Datapaq 2002-2008 Page 1 of 1

Vous aimerez peut-être aussi