LONGITUDES POR DIAMETRO


Nro ELEM. Nro PIEZAS LONGITUD
ITEM DESCRIPCION DIAMETRO 1/4'' 3/8'' 1/2'' 5/8'' 3/4'' 1'' PESO (KG) TOTAL
IGUALES X ELEM. POR PIEZA
0.25 0.56 0.99 1.55 2.24 3.97

- ACERO EN ZAPATAS
01.06 CONCRETO ARMADO
01.06.04 VIGAS
01.06.04.03 VIGAS: ACERO DE REFUERZO F'Y:4200KG/CM2 943.89

V 12 X 30
EJE 1-1 entre A-J
0.12 ESTRIBOS
3/8'' 1.00 270.00 0.90 - 243.00 - - - - 136.08

0.3 VERTICAL
1/2'' 1.00 6.00 45.24 - - 271.44 - - - 269.81

V 12 X 30
EJE J-J entre 5-8
0.12 ESTRIBOS
3/8'' 1.00 84.00 0.90 - 75.60 - - - - 42.34

0.3 VERTICAL
1/2'' 1.00 6.00 15.24 - - 91.44 - - - 90.89

V 12 X 30
EJE 12-12 entre A-G
0.12 ESTRIBOS
3/8'' 1.00 180.00 0.90 - 162.00 - - - - 90.72

0.3 VERTICAL
1/2'' 1.00 6.00 30.32 - - 181.92 - - - 180.83

V 12 X 30
EJE A-A entre 9-12
0.12 ESTRIBOS
3/8'' 1.00 84.00 0.90 - 75.60 - - - - 42.34

0.3 VERTICAL
1/2'' 1.00 6.00 15.24 - - 91.44 - - - 90.89