Vous êtes sur la page 1sur 4

MINISTERIO DEL PODER POPULAR PARA EL AMBIENTE

SANEAMIENTO, OPERACIN Y CLAUSURA DEL VERTEDERO SAN VICENTE,


OBRA:
MUNICIPIO GIRARDOT, ESTADO ARAGUA
ZONA: 4 TOPOGRAFIA ORIGINAL VS TERRENO COMPACTADO
INSPECCION:
DIST. RELLENO CON DESECHOS
PROG. DIST.
MEDIA REA S / REA VOLUMEN VOL. ACUM.
1 0+000.00 0.51
2 0+020,00 20.00 10.00 0.85 1.360 13.60 13.60
3 0+040,00 20.00 10.00 8.13 8.980 89.80 103.40
4 0+060,00 20.00 10.00 6.64 14.770 147.70 251.10
5 0+080,00 20.00 10.00 1.21 7.850 78.50 329.60
6 0+100,00 20.00 10.00 11.61 12.820 128.20 457.80
7 0+120,00 20.00 10.00 11.35 22.960 229.60 687.40
8 0+140.00 20.00 10.00 6.48 17.830 178.30 865.70
9 0+160.00 20.00 10.00 26.04 32.520 325.20 1,190.90
10 0+180.00 20.00 10.00 25.70 51.740 517.40 1,708.30
11 0+200.00 20.00 10.00 4.11 29.810 298.10 2,006.40
12 0+220.00 20.00 10.00 14.30 18.410 184.10 2,190.50
13 0+240.00 20.00 10.00 35.51 49.810 498.10 2,688.60
14 0+260.00 20.00 10.00 32.73 68.240 682.40 3,371.00
15 0+280.00 20.00 10.00 37.61 70.340 703.40 4,074.40
16 0+300.00 20.00 10.00 37.66 75.270 752.70 4,827.10
17 0+320.00 20.00 10.00 12.21 49.870 498.70 5,325.80
18 0+340,00 20.00 10.00 86.37 98.580 985.80 6,311.60
19 0+360.00 20.00 10.00 59.47 145.840 1458.40 7,770.00
20 0+380.00 20.00 10.00 7.69 67.160 671.60 8,441.60
21 0+400.00 20.00 10.00 5.01 12.700 127.00 8,568.60
22 0+420.00 20.00 10.00 4.42 9.430 94.30 8,662.90
23 0+440.00 20.00 10.00 11.28 15.700 157.00 8,819.90
24 0+460.00 20.00 10.00 1.48 12.760 127.60 8,947.50
25 0+480.00 20.00 10.00 1.17 2.650 26.50 8,974.00
26 0+500.00 20.00 10.00 1.40 2.570 25.70 8,999.70
27 0+520.00 20.00 10.00 0.00 1.400 14.00 9,013.70
28 0+540.00 20.00 10.00 1.77 1.770 17.70 9,031.40
29 0+560.00 20.00 10.00 4.40 6.170 61.70 9,093.10
30 0+572.00 12.00 6.00 7.25 11.650 69.90 9,163.00

0.00

TOTAL VOLUMEN RELLENO CON DESECHOS (M3)=. 9,163.00


MINISTERIO DEL PODER POPULAR PARA EL AMBIENTE

SANEAMIENTO, OPERACIN Y CLAUSURA DEL VERTEDERO SAN VICENTE,


OBRA:
MUNICIPIO GIRARDOT, ESTADO ARAGUA
ZONA: 4 TOPOGRAFIA ORIGINAL VS TERRENO COMPACTADO
INSPECCION:
DIST. CORTE
PROG. DIST.
MEDIA REA S / REA VOLUMEN VOL. ACUM.
1 0+000.00 1.36
2 0+020,00 20.00 10.00 3.16 4.520 45.20 45.20
3 0+040,00 20.00 10.00 3.77 6.930 69.30 114.50
4 0+060,00 20.00 10.00 24.01 27.780 277.80 392.30
5 0+080,00 20.00 10.00 22.39 46.400 464.00 856.30
6 0+100,00 20.00 10.00 0.00 22.390 223.90 1,080.20
7 0+120,00 20.00 10.00 0.000 0.00 1,080.20
8 0+140.00 20.00 10.00 0.41 0.410 4.10 1,084.30
9 0+160.00 20.00 10.00 0.00 0.410 4.10 1,088.40
10 0+180.00 20.00 10.00 10.50 10.500 105.00 1,193.40
11 0+200.00 20.00 10.00 15.15 25.650 256.50 1,449.90
12 0+220.00 20.00 10.00 1.02 16.170 161.70 1,611.60
13 0+240.00 20.00 10.00 1.87 2.890 28.90 1,640.50
14 0+260.00 20.00 10.00 1.75 3.620 36.20 1,676.70
15 0+280.00 20.00 10.00 1.55 3.300 33.00 1,709.70
16 0+300.00 20.00 10.00 0.61 2.160 21.60 1,731.30
17 0+320.00 20.00 10.00 7.99 8.600 86.00 1,817.30
18 0+340,00 20.00 10.00 7.990 79.90 1,897.20
19 0+360.00 20.00 10.00 0.000 0.00 1,897.20
20 0+380.00 20.00 10.00 24.54 24.540 245.40 2,142.60
21 0+400.00 20.00 10.00 38.32 62.860 628.60 2,771.20
22 0+420.00 20.00 10.00 41.36 79.680 796.80 3,568.00
23 0+440.00 20.00 10.00 90.84 132.200 1322.00 4,890.00
24 0+460.00 20.00 10.00 96.98 187.820 1878.20 6,768.20
25 0+480.00 20.00 10.00 116.53 213.510 2135.10 8,903.30
26 0+500.00 20.00 10.00 126.85 243.380 2433.80 11,337.10
27 0+520.00 20.00 10.00 115.20 242.050 2420.50 13,757.60
28 0+540.00 20.00 10.00 87.29 202.490 2024.90 15,782.50
29 0+560.00 20.00 10.00 38.57 125.860 1258.60 17,041.10
30 0+572.00 20.00 10.00 7.70 46.270 462.70 17,503.80
31

0.00

TOTAL VOLUMEN CORTE (M3)=. 17,503.80


MINISTERIO DEL PODER POPULAR PARA EL AMBIENTE
SANEAMIENTO, OPERACIN Y CLAUSURA DEL VERTEDERO SAN VICENTE, MUNICIPIO
OBRA:
GIRARDOT, ESTADO ARAGUA
ZONA: 4 TOPOGRAFIA ORIGINAL VS TERRENO COMPACTADO
INSPECCION:
DIST. VIALIDAD INTERNA
PROG. DIST.
MEDIA REA S / REA VOLUMEN VOL. ACUM.
1 0+000.00 3.82
2 0+020,00 20.00 10.00 1.73 5.550 55.50 55.50
3 0+040,00 20.00 10.00 0.92 2.650 26.50 82.00
4 0+060,00 20.00 10.00 2.85 3.770 37.70 119.70
5 0+080,00 20.00 10.00 2.98 5.830 58.30 178.00
6 0+100,00 20.00 10.00 2.39 5.370 53.70 231.70
7 0+120,00 20.00 10.00 0.50 2.890 28.90 260.60
8 0+140.00 20.00 10.00 3.52 4.020 40.20 300.80
9 0+160.00 20.00 10.00 5.70 9.220 92.20 393.00
10 0+180.00 20.00 10.00 3.19 8.890 88.90 481.90
11 0+200.00 20.00 10.00 2.16 5.350 53.50 535.40
12 0+220.00 20.00 10.00 1.91 4.070 40.70 576.10
13 0+240.00 20.00 10.00 2.88 4.790 47.90 624.00
14 0+251.00 11.00 5.50 2.62 5.500 30.25 654.25
15 0.00
16 0.000 0.00
17
18

TOTAL VOLUMEN VIALIDAD INTERNA ZONA 4 (M3)=. 654.25