Vous êtes sur la page 1sur 7

Col.

Category Size P M2-2 M3-3

C1 380 x 1200 535 2.06 0.03


C2 380 x 1200 651 1.65 1.14
C3 300 x 1000 402 1.5 14
C3-A 300 x 1000 451 1.74 15.5
C4 380 x 900 394 4 13
C5 380 x 900 432 2 2
C5-A
C5-B 380 x 900 401 10 1.2
C6 300 x 750 302 4 8
C7 300 x 750 282 4.58 11.5
C8 380 x 750 318 2.06 0.03
C9 380 x 750 303 1.06 3
C10 380 x 750 251 1.5 1.5
C11 450 x 750 360 1.33 1.25
C12 350 x 600 258 0.41 0.45
C13 450 x 920 506 0.33 2
C14 300 x 1000
C15 300 x 900
C16 300 x 900 368.47 7.37 17.92
C17 300 x 900 305.73 6.13 17.81
C18 300 x 900 315.18 7.57 3.88
C19 300 x 750 302.53 6.07 13.43
C20 300 x 750 277.00 5.54 11.25
C21 300 x 750 270.20 5.40 16.13
C22 300 x 750 163.73 1.47 4.87
DESIGN FOR RECTANGULAR FOOTING

PROJECT NAMEPRAYAG TRUSS


Date: 24/12/10 Designer: PHANI CHANDRA
FILENAME 'file:///var/www/apps/conversion/tmp/scratch_3/347266259.xls'#$RECTANGLE
COLUMN ID F6 Footing ID F6
Column Load ( P in MT ) 150 Grade of
Self wt of footing in MT 10.5 Conc M 25
S.B.C of footing considered (MT/m2) 13 Steel Fe 415
Area of footing required in M2 12.35
Footing
Required footing size (in M) 3.51 Area
Provided footing size (in M) 3.00 4.20 12.60
Column size provided (in M) 0.30 0.45
Pedestal size provided (in M) 1.00 1.35
Z-of the footing 8.82
Min axis moment on column from analysis (T-M) 1.2
Max axis moment on column from analysis (T-M) 1.2
P/A 11.90476
M/Z 0.136054
(P/A)+(M/Z) 12.04082
(P/A)-(M/Z) 11.76871
Net upward soil pressure (MT/m2) 12.18 HENCE O.K
Max B.M at face of pedestal (MT-M) 25.57 37.09
Effective width of footing (in M) 1.71 1.25
Effective depth of footing required (in MM) 255 359
Overall Depth of footing provided (in MM) 900 900
Effective depth of footing provided (in MM) 850 850
Ast required (in mm2) 1458 2115
Ast provided (in mm2) 14 12tor 20 12tor Column size
SHEAR CHECKS FOR FOOTINGS 113 113 300 x 450
HENCE O.K HENCE OK
FOOTING
Area of steel provided in sqmm= 1582 14 2260 20
12tor 12tor min Pedestal
Provided D in mm 900 300 1000 x 1350
Straight depth in mm 800
Slant depth in mm 100 100
Total D in mm 900
800
d provided in mm 850
One way shear: 150
Maximum overhang= 1000.00
Shear V in tons 7.7 ### - 12tor

d' @ d from the face of the footing 765


b @ d from the face of the footing 2753
Vu/bd' in N/sqmm.= 0.055
percentage of steel provided= 0.109 1000

4.20 mts
Ref to table 61 of SP-16 300
allowable shear stress in N/sqmm 0.279
###
###

O.K

Two way shear:


Shear V in tons 104
Depth do @d/2 from the face of pedestal 808

b0 8100
Vu/bo.do in N/sq.mm 0.238 <0.25sqrt(fck)= 1.250 3.00 mts
O.K ### - 12tor

Beta 21.28903

Pedestal reinforcement (in mm2) 2025


Provide # 18 12tor as Pedestal Reinforcement 2034 mm
DESIGN FOR RECTANGULAR FOOTING

PROJECT NAMETHE BOTANIKA


Date: 7/10/2010 Designer: PHANI CHANDRA
FILENAME 'file:///var/www/apps/conversion/tmp/scratch_3/347266259.xls'#$RECTANGLE (3)
COLUMN ID NC NEAR SWF13 Footing ID DCF
Column Load ( P in MT ) 106 Grade of
Self wt of footing in MT 7.42 Conc M 40
S.B.C of footing considered (MT/m2) 120 Steel Fe 500
Area of footing required in M2 0.95
Footing
Required footing size (in M) 0.97 Area
Provided footing size (in M) 0.93 2.55 2.35
Column size provided (in M) 0.30 0.45
Pedestal size provided (in M) 0.30 0.45
Z-of the footing 1.00
Min axis moment on column from analysis (T-M) 1
Max axis moment on column from analysis (T-M) 1
P/A 45.02735
M/Z 1.001461
(P/A)+(M/Z) 46.02881
(P/A)-(M/Z) 44.02588
Net upward soil pressure (MT/m2) 47.03 HENCE O.K
Max B.M at face of pedestal (MT-M) 5.84 23.87
Effective width of footing (in M) 0.71 0.38
Effective depth of footing required (in MM) 149 414
Overall Depth of footing provided (in MM) 600 600
Effective depth of footing provided (in MM) 550 550
Ast required (in mm2) 422 1724
Ast provided (in mm2) 8 12tor 16 12tor Column size
SHEAR CHECKS FOR FOOTINGS 113 113 300 x 450
HENCE O.K HENCE OK
FOOTING
Area of steel provided in sqmm= 904 8 1808 16
12tor 12tor min Pedestal
Provided D in mm 600 300 300 x 450
Straight depth in mm 590
Slant depth in mm 10 10
Total D in mm 600
590
d provided in mm 550
One way shear: 150
Maximum overhang= 312.50
Shear V in tons -28.4 8 - 12tor

d' @ d from the face of the footing 532


b @ d from the face of the footing 1286
Vu/bd' in N/sqmm.= -0.623
percentage of steel provided= 0.231 300

2.55 mts
Ref to table 61 of SP-16 300
allowable shear stress in N/sqmm 0.491
###
###

O.K

Two way shear:


Shear V in tons 71
Depth do @d/2 from the face of pedestal 541

b0 3700
Vu/bo.do in N/sq.mm 0.530 <0.25sqrt(fck)= 1.581 0.93 mts
O.K ### - 12tor

Beta 10.0577

Pedestal reinforcement (in mm2) 202.5


Provide # 4 12tor as Pedestal Reinforcement 452 mm
DESIGN FOR SQUARE FOOTING

PROJECT NAME: IBADAT KHANA


Date: 7/1/2011 Designer: PHANI CHANDRA
FILENAME 'file:///var/www/apps/conversion/tmp/scratch_3/347266259.xls'#$F19
COLUMN ID C1 Footing ID F1
Column Load ( P in MT ) 17 Grade of
Self wt of footing in MT 1.19 Conc M 20
S.B.C of footing considered (MT/m2) 25 Steel Fe 415
Area of footing required in M2 0.73
Footing
Required footing size (in M) 0.85 Area
Provided footing size (in M) 1.38 1.38 1.90
Column size provided (in M) 0.23 0.30
Pedestal size provided (in M) 0.38 0.38
Z-of the footing 0.44
Min axis moment on column from analysis (T-M) 1
Max axis moment on column from analysis (T-M) 1
P/A 8.926696
M/Z 2.283042
(P/A)+(M/Z) 11.20974
(P/A)-(M/Z) 6.643654
Net upward soil pressure (MT/m2) 13.49 HENCE O.K
Max B.M at face of pedestal (MT-M) 2.33 2.33
Effective width of footing (in M) 0.51 0.51
Effective depth of footing required (in MM) 158 158
Overall Depth of footing provided (in MM) 380 380
Effective depth of footing provided (in MM) 330 330
Ast required (in mm2) 342 342
Ast provided (in mm2) 12 10tor 12 10tor Column size
SHEAR CHECKS FOR FOOTINGS 78.54 78.54 230 x 300
HENCE O.K HENCE OK
FOOTING
Area of steel provided in sqmm= 942 12 942 12
10tor 10tor min Pedestal
Provided D in mm 380 300 380 x 380
Straight depth in mm 370
Slant depth in mm 10 10
Total D in mm 380
370
d provided in mm 330
One way shear: 150
Maximum overhang= 500.00
Shear V in tons 3.2 ### - 10tor

d' @ d from the face of the footing 323


b @ d from the face of the footing 1040
Vu/bd' in N/sqmm.= 0.141
percentage of steel provided= 0.566 380
1.38 mts
Ref to table 61 of SP-16 230
allowable shear stress in N/sqmm 0.502
###
###

HENCE O.K

Two way shear:


Shear V in tons 19
Depth do @d/2 from the face of pedestal 327

b0 2840
Vu/bo.do in N/sq.mm 0.305 <0.25sqrt(fck)= 1.118 1.38 mts
HENCE O.K ### - 10tor

Beta 4.106142

Pedestal reinforcement (in mm2) 216.6


Provide # 4 12tor as Pedestal Reinfor 452
DESIGN FOR RECTANGULAR FOOTING

PROJECT NAMETHE BOTANIKA TOWER-E


Date: 12/10/2010 Designer: PHANI CHANDRA
FILENAME 'file:///var/www/apps/conversion/tmp/scratch_3/347266259.xls'#$F23
COLUMN ID C2 Footing ID F23
Column Load ( P in MT ) 233 Grade of
Self wt of footing in MT 16.31 Conc M 40
S.B.C of footing considered (MT/m2) 120 Steel Fe 500
Area of footing required in M2 2.08
Footing
Required footing size (in M) 1.44 Area
Provided footing size (in M) 1.80 2.00 3.60
Column size provided (in M) 0.30 1.10
Pedestal size provided (in M) 1.00 1.10
Z-of the footing 1.20
Min axis moment on column from analysis (T-M) 0.85
Max axis moment on column from analysis (T-M) 1.73
P/A 64.72222
M/Z 1.441667
(P/A)+(M/Z) 66.16389
(P/A)-(M/Z) 63.28056
Net upward soil pressure (MT/m2) 66.87 HENCE O.K
Max B.M at face of pedestal (MT-M) 10.70 12.19
Effective width of footing (in M) 1.21 1.10
Effective depth of footing required (in MM) 155 174
Overall Depth of footing provided (in MM) 450 450
Effective depth of footing provided (in MM) 400 400
Ast required (in mm2) 1062 1210
Ast provided (in mm2) 12 12tor 12 12tor Column size
SHEAR CHECKS FOR FOOTINGS 113 113 300 x 1100
HENCE O.K HENCE OK
FOOTING
Area of steel provided in sqmm= 1356 12 1356 12
12tor 12tor min Pedestal
Provided D in mm 450 300 1000 x 1100
Straight depth in mm 440
Slant depth in mm 10 10
Total D in mm 450
440
d provided in mm 400
One way shear: 150
Maximum overhang= 400.00
Shear V in tons 0.0 ### - 12tor

d' @ d from the face of the footing 390


b @ d from the face of the footing 1800
Vu/bd' in N/sqmm.= 0.000
percentage of steel provided= 0.280 1000

2.00 mts
Ref to table 61 of SP-16 300
allowable shear stress in N/sqmm 0.533
###
###

O.K

Two way shear:


Shear V in tons 100
Depth do @d/2 from the face of pedestal 395

b0 5800
Vu/bo.do in N/sq.mm 0.657 <0.25sqrt(fck)= 1.581 1.80 mts
O.K ### - 12tor

Beta 8.305826

Pedestal reinforcement (in mm2) 1650


Provide # 8 16tor as Pedestal Reinforcement 1608 mm
DESIGN FOR RECTANGULAR FOOTING

PROJECT NAMETHE BOTANIKA TOWER-E


Date: 12/10/2010 Designer: PHANI CHANDRA
FILENAME 'file:///var/www/apps/conversion/tmp/scratch_3/347266259.xls'#$F24
COLUMN ID C13 Footing ID F24
Column Load ( P in MT ) 670 Grade of
Self wt of footing in MT 46.9 Conc M 40
S.B.C of footing considered (MT/m2) 120 Steel Fe 500
Area of footing required in M2 5.97
Footing
Required footing size (in M) 2.44 Area
Provided footing size (in M) 2.00 3.20 6.40
Column size provided (in M) 0.30 1.80
Pedestal size provided (in M) 1.00 1.80
Z-of the footing 3.41
Min axis moment on column from analysis (T-M) 0.85
Max axis moment on column from analysis (T-M) 1.73
P/A 104.6875
M/Z 0.506836
(P/A)+(M/Z) 105.1943
(P/A)-(M/Z) 104.1807
Net upward soil pressure (MT/m2) 105.44 HENCE O.K
Max B.M at face of pedestal (MT-M) 42.18 51.67
Effective width of footing (in M) 1.98 1.13
Effective depth of footing required (in MM) 241 353
Overall Depth of footing provided (in MM) 1000 1000
Effective depth of footing provided (in MM) 950 950
Ast required (in mm2) 1763 2160
Ast provided (in mm2) 10 16tor 12 16tor Column size
SHEAR CHECKS FOR FOOTINGS 201 201 300 x 1800
HENCE O.K HENCE OK
FOOTING
Area of steel provided in sqmm= 2010 10 2412 12
16tor 16tor min Pedestal
Provided D in mm 1000 300 1000 x 1800
Straight depth in mm 990
Slant depth in mm 10 10
Total D in mm 1000
990
d provided in mm 950
One way shear: 150
Maximum overhang= 500.00
Shear V in tons -151.8 ### - 16tor

d' @ d from the face of the footing 931


b @ d from the face of the footing 2180
Vu/bd' in N/sqmm.= -1.122
percentage of steel provided= 0.107 1000

3.20 mts
Ref to table 61 of SP-16 300
allowable shear stress in N/sqmm 0.350
###
###

O.K

Two way shear:


Shear V in tons 109
Depth do @d/2 from the face of pedestal 941

b0 9400
Vu/bo.do in N/sq.mm 0.186 <0.25sqrt(fck)= 1.581 2.00 mts
O.K ### - 16tor

Beta 21.67681

Pedestal reinforcement (in mm2) 2700


Provide # 14 16tor as Pedestal Reinforcement 2814 mm
DESIGN FOR SQUARE FOOTING

PROJECT NAME: PRAYAG FILM CITY


Date: 24/12/2010 Designer: PHANI CHANDRA
FILENAME 'file:///var/www/apps/conversion/tmp/scratch_3/347266259.xls'#$F5
COLUMN ID F5 Footing ID
Column Load ( P in MT ) 75 Grade of
Self wt of footing in MT 5.25 Conc M 25
S.B.C of footing considered (MT/m2) 13 Steel Fe 500
Area of footing required in M2 6.17
Footing
Required footing size (in M) 2.48 Area
Provided footing size (in M) 2.50 2.50 6.25
Column size provided (in M) 0.30 0.90
Pedestal size provided (in M) 1.35 1.00
Z-of the footing 2.60
Min axis moment on column from analysis (T-M) 1
Max axis moment on column from analysis (T-M) 1
P/A 12
M/Z 0.384
(P/A)+(M/Z) 12.384
(P/A)-(M/Z) 11.616
Net upward soil pressure (MT/m2) 12.77 HENCE O.K
Max B.M at face of pedestal (MT-M) 5.28 8.98
Effective width of footing (in M) 1.19 1.49
Effective depth of footing required (in MM) 139 162
Overall Depth of footing provided (in MM) 500 500
Effective depth of footing provided (in MM) 450 450
Ast required (in mm2) 466 792
Ast provided (in mm2) 8 12tor 8 12tor Column size
SHEAR CHECKS FOR FOOTINGS 113 113 300 x 900
HENCE O.K HENCE OK
FOOTING
Area of steel provided in sqmm= 904 8 904 8
12tor 12tor min Pedestal
Provided D in mm 500 300 1350 x 1000
Straight depth in mm 490
Slant depth in mm 10 10
Total D in mm 500
490
d provided in mm 450
One way shear: 150
Maximum overhang= 575.00
Shear V in tons 4.0 8 - 12tor

d' @ d from the face of the footing 442


b @ d from the face of the footing 2174
Vu/bd' in N/sqmm.= 0.062
percentage of steel provided= 0.169 1350
2.50 mts
Ref to table 61 of SP-16 300
allowable shear stress in N/sqmm 0.339
###
###

HENCE O.K

Two way shear:


Shear V in tons 46
Depth do @d/2 from the face of pedestal 446

b0 6500
Vu/bo.do in N/sq.mm 0.240 <0.25sqrt(fck)= 1.250 2.50 mts
HENCE O.K 8 - 12tor

Beta 13.72709

Pedestal reinforcement (in mm2) 2025


Provide # 18 12tor as Pedestal Reinfor 2034