@KM 41 EWRR-1 Al Crude

Saudi Aramco 5645-1-ENG (11/2010)

SAUDI ARABIAN OIL COMPANY


0.0

FOR CONSTRUCTION UNTIL CERTIFIED


SAFETY INSTRUCTION SHEET FOR CROSS COUNTRY PIPELINE - MAIN LINE0.0
PIPE

THIS REVISION IS NOT TO BE USED


1 PIPELINE NAME 2 START POINT 3 END POINT 4 SERVICE 5 VALVE OPER. DIAGRAM 6 YR. BUILT

CRUDE OIL Km. 41 (East west Pipeline Corridor) Aramco Crude oil Metering Station ARABLITE SW -

AND DATED
7 THIS LINE BEGINS AT Km. 8 THIS SHEET BEGINS AT Km.
REVISION DESCRIPTION

ISSUED FOR APPROVAL

9 MAIN PIPELINE, SHEET: THROUGH: 10 CRITICAL PIPING, SHEET: THROUGH:

SEGMENTS 11 1

12 NOMINAL PIPE DIAMETER 8 in. in. in. in. in.

13 NOM. WALL THICKNESS (Tn) 0.250 in. in. in. in. in.

14 MATERIAL GRADE OF PIPE (eg. GR. B, X 52, etc) X60

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
15 STARTING AT Km. 0.0000

16 ENDING AT Km. 20+0.000


2/17/2017

21-000083-0001

17 LENGTH - (Feet) 65617 ft ft ft ft ft


DATE

18 LENGTH - (Meters) 20000 m m m m m


JOB ORDER/EWO NO.

19 PROCESS OF MANUFACTURE (ERW, SMLS, SAW, etc.) ERW

20 S.M.Y.S. OF PIPE - (PSI) 60000


REV. NO.

EQUIPMENT DATA

21 FLANGE RATING 600


A

22 CONSTRUCTION TYPE (B:BURIED, AGR or AGN: ABOVE GROUND) B

23 COATING TYPE (FBE,TAP, EXTERNAL, INTERNAL) FBE

24 RATING 600
BY/DATE
OTHER

25 FACING RF

26 MATERIAL ASTM A350 LF2

27 SPEC. / GR. CL.2

28 REMARKS
OPERATIONS/DATE

1) Refer SAES-L-410 for Design Factor and Table 3 for Minimum wall thickness .
854
REVIEW FOR KEY DRAWINGS
REQUIRED (SAUDI ARAMCO)

CONST. AGENCY/DATE

29 M.A.O.P. AT DESIGN FACTOR (D.F.) - PSIG 1420

30 M.A.O.P. LIMITING FACTOR PIPEWALL

31 DESIGN FACTOR (eg., 0.72 , 0.5 , etc.) 0.50 Pls provide correct
32 DESIGN TEMPERATURE, oF 150 value as per saes-
33 MINIMUM TIE IN TEMPERATURE, (o F oF 70 L-450
34 ALLOWABLE BENDING STRESS (Sb) - PSIG 23662
CERTIFIED/DATE

ADF/02-2017

35 CALCULATED WALL THICKNESS @ MAOP & D.F. (Tm - inch.) 0.123


DESIGN CERTIFICATION

36 PRESSURE AT LOW POINT - PSIG 2225


(DESIGN AGENCY)

INITIAL
37 TEST DATE *
PRESSURE TEST
38 LIMITED BY FLANGES
OPERATING LIMITS

39 PRESSURE AT LOW POINT - PSIG *


MGB/02-2017

REVALIDATION
ENGG./DATE

40 TEST DATE *
PRESSURE TEST
41 LIMITED BY
854 SEE NOTE
INSTRUMENT 42 BASE LINE RUN DATE
SCRAPING
TEST 43 LATEST RUN DATE

44 SYSTEM M.A.O.P. PSIG 45 LIMITED BY:

46 REMARKS

1. MAIN PIPELINE DESIGNED IN ACCORDANCE WITH ASME B31.8/ASME B16.5/ASME B16.34


IS COVERED, FOR ALL APPROVAL

2. * TO BE COMPLETED BY CONSTRUCTION CONTRACTOR.


AND CERTIFICATION REQUIREMENTS, PER SAEP-334, UNDER

NOTE:
REVISION VALIDATION

SYSTEM M.A.O.P LIMITED BY DESIGN CONDITION


21-00083-0001
DRAWING COMPLETION CERTIFICATE NO.

AL CRUDE
47 REFERENCE DWGS.
A

P & ID NO : SK-A-ALCO-005.001
THIS REVISION NO.

SIS FOR 8"-P-XXXX-6CS1P DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV. NO

CRUDE OIL DELIVERY SYSTEM SIS


FUEL SUPPLY FOR YAMAMA NEW PROJECT A RE-XXXXX 001 A