UNIVESRITY OF THE EAST

COLLEGE OF ENGINEERING
CIVIL ENGINEERING DEPARTMENT

PROJECT : 2-storey residential building


OWNER/S : kristel marie r. sotto
LOCATION : san ildefonso, bulacan

BILL OF MATERIALS
Item to be
estimated SPECIFICATION CALCULATION TOTAL
Plumbing works
FLOOR DRAIN 4 PIECES 4
WATER CLOSET 3 PIECES 3
LAVATORY 2 PIECES 2
P-TRAP 12 PIECES 12
CLEAN OUT 6 PIECES 6
ELBOW JOINT (45) -100mm 11 PIECES 11
(90) 100mm 13 PIECES 13
SANITARY TEE 19mm 10 PIECES 10
SANITARY WYE 19mm 1 PIECES 1
CATCH BASIN 16 PIECES 16
SEPTIC TANK 1 PIECES 1
KITCHEN SINK 1 PIECES 1
SOIL PIPE 100mm PVC 65/6 = 10.83
11
(sanitary line) Soil pipe x 6m Say 11 pieces
CATCH BASIN PIPE 52.1/6 = 8.68
100mm PVC 9
LINE Say 9 pieces
PIPE (74.5)/6 = 12.42
pvc x 6m 13
(water supply) Say 13 pieces
FAUCET 3 PIECES 3

SHOWER 3 PIECES 3

TEE JOINT 19mm 15 PIECES 15


GATE VALVE 1 PIECE 1
WATER METER 1 PIECE 1
CHECK VALVE 1 PIECE 1

Prepared by: Approved by:


Cayetano, Kristel C.
Sotto, Racquel O. Engr. Mark G. Costelo
Sulit, Shiella Marie M.