Materials :
Q.2: Explain the concept of Master Schedule. Also define the Characteristics of the master schedule.
A Concept of Master Schedule
Characteristics of the master schedule
ANS:
Concept of Master Schedule:
Master schedule is the presentation of the production schedule at the summary level, depicting various key
elements, resulting
Q.3: Define the various steps of VA.
A Various steps of VA
ANS:
Mass Production:
A term sometimes used in the popular press for a line process that uses the make-to-stock strategy. Mass
production is the process of
Elements of cost:
The total cost consists of three