Vous êtes sur la page 1sur 2

MALIK MIJ CHONGXING METAL RESOURCES RECYCLING

MMC Civil Construction Drawings


Sr. No. Area Sub Area/Description Drawings Reference Remarks Status
1 Layout Plan ---- 524-LA-A-01 Last Revision 12 November 2015 OK
2 Car Parking-H Foundation Layout Plan & Sections 524-H-S-01 Footing Beam & Pedestal Connection Detail Required
Foundation Layout Plan 524-G-S-02 Footing Beam & Pedestal Connection Detail Required
3 Material Storage-G Sections 524-G-S-05 RCC Floor with Hardener Required
Sections 524-G-S-05 Brick Work Foundaion Detail Required
Stairs 524-LA-A-01 Required
Brick Work 524-A-S-01 In-Between Columns Required
Bracing Beam 524-A-S-01 Beam Column Connection Details Required
Pedestals footings & Connecting Beam 524-A-S-01 Grid: G-1,G-2,G-3 & G-4 Required
524-A-S-01
4 Main Plant Building-A C1&C2 Foundation Details
Detail "A" 524-A-S-07 Required
Grid 18-D,C&19-D,C&19'-D,C
524-A-S-07
Hold on Grid 15-D 524-A-S-01 Required
Floor /Slab on Grade 524-A-S-01 RCC Floor Required
Internal Plumbing Drawings Not Received Required
Control Room Required
Toilets 524-A-A-07 OK
4 Wagon Parking-H Foundation Layout Plan & Sections 524-J-S-01 Footing Beam & Pedestal Connection Detail Required
Columns on Grid A-1&A-4
Ground Floor Plan 524-B-A-01 Columns in Brick Work on Grid A-3&A-2 Required

Columns on Grid A-1&A-4 Details not available


Columns in Brick Work (Concealed Columns) on Grid A-3&A-2
5 Washing Room-B Foundation Layout Plan Section Details 524-B-S-01 Required
Details not available

Foundation Layout Plan Section Details 524-B-S-01 Plinth Beam not shown on drawing. Please confrom Required
Internal Plumbing Drawings 524-B-PH-01 OK
Roof Beam Elevations and Sectional Details 524-B-S-03 Lap Details not available Required
Ground Floor internal plumbing details 524-F-PH-01 Drawings Received OK
First floor internal plumbing works 524-F-PH-02 Drawings Received OK
Second floor internal plumbing works 524-F-PH-03 Drawings Received OK
6 Admin Block-F Plinth beam layout plan and sectional details 524-F-S-02 Beam(Plinth) Column Connection details Required
Founndation Drawings Received OK
Internal Plumbing Drawings OK
Super Structure All drawings not Received Required
7 Typical Ramp ---- 524-A-S-01 OK

1/2/2016 civil drawings status 1


MALIK MIJ CHONGXING METAL RESOURCES RECYCLING

9 Loading Bay Platform Required

---- 524-WS-01

External layout plan external Sections 524-WS-02 OK


10
water supply system TubeWell 524-WS-03 OK
Column C-1,C-2&C-3 Longitudnal sections and footing details
Raw water Tank & Pump Plumbing 524-WS-04 Required
Stair Steps Reinforcement details
524-R-01
Layout Plan of roads, walkways
11
and storm water drainage Road & Walkways X-Sections 524-R-02 OK
Drain X-Sections 524-R-03 OK
Layout Plan of external sewerage ---- 524-PH-01 OK
system
Sewarge Appurtenances Details 524-PH-02 OK
13 Fire Control Pool '---- Required
Sedimentation Pool ---- Required
14 Rain & Sewage Treatment Station ---- Required
Pump Room ---- Required
Column C-1,C-2&C-3 Longitudnal sections and footing details
Underground water ground tank Reinforcement details 524-S-01 Required
Stair Steps Reinforcement details
15 Septic Pool & Sewage Pool 524-LA-A-01 Required
16 Toilet Required
17 Bag House Foundation Required
18 Lead Slag Pool Pre-Heating Furnace Foundation Required
19 Heat-Exchanger Foundation Required
Exhauster Foundation Required
20 Lead Slag Pool-C&D Required
21 Desulfurizing pool '---- Required
22 Emergency Pool '---- Required
23 Transformer Foundation '---- Required
24 Generator Foundation '---- Required
25 Compressor Foundation '---- Required
26 Gas Holder Foundation '---- Required
27 Weigh Bridge '---- Required
28 Standard Hook Details '---- Required
29 Finished Product Storage '---- Required
29 Maintenance Workshop '---- Required
Note: In relation to these queries, we may request later if any other details/drawing found missing for final construction.

1/2/2016 civil drawings status 2