Foundation Layout Plan Section Details 524-B-S-01 Plinth Beam not shown on drawing. Please confrom Required
Internal Plumbing Drawings 524-B-PH-01 OK
Roof Beam Elevations and Sectional Details 524-B-S-03 Lap Details not available Required
Ground Floor internal plumbing details 524-F-PH-01 Drawings Received OK
First floor internal plumbing works 524-F-PH-02 Drawings Received OK
Second floor internal plumbing works 524-F-PH-03 Drawings Received OK
6 Admin Block-F Plinth beam layout plan and sectional details 524-F-S-02 Beam(Plinth) Column Connection details Required
Founndation Drawings Received OK
Internal Plumbing Drawings OK
Super Structure All drawings not Received Required
7 Typical Ramp ---- 524-A-S-01 OK
---- 524-WS-01