ABOUT THIS GUIDE: General Information


Documentation Copyright........................................................................1-1
Game Copyright, Trademark, and Patent Laws......................................1-1
Check Local Laws.....................................................................................1-1
CE Marking ...............................................................................................1-1
Customer Service.....................................................................................1-1
Conventions..............................................................................................1-1
Text Conventions ..............................................................................1-1
Safety Symbols and Information .......................................................1-2
Preventing Injury and Damage................................................................1-3
Prevent Shock and ESD ...................................................................1-3
Special Instructions for PCBs............................................................1-4
Notices......................................................................................................1-4

CHAPTER 1: Introduction and Features


Table of Contents .....................................................................................1-1
Reference Documentation ......................................................................1-2
Tools Required..........................................................................................1-2
Introduction ..............................................................................................1-3
Base Game Dimensions and Weights ....................................................1-4
Dimensions .......................................................................................1-4
Weight...............................................................................................1-4
Power Dissipation .............................................................................1-4
BB2-Mech Components...........................................................................1-5
Arm Mechanism ................................................................................1-5
Barrier Panel .....................................................................................1-5
Bill Acceptor ......................................................................................1-6
Organic Light-Emitting Diode (OLED) Button Panel .........................1-6
Cabinet Shelf ....................................................................................1-6
Cabling and Cable Routing ...............................................................1-7
Coin Handling .................................................................................1-10
Diagnostic Switch............................................................................1-10
Doors .............................................................................................. 1-11
Lower Door ..................................................................................... 1-11
Door Switches.................................................................................1-13
Power Supply..................................................................................1-14
Printer .............................................................................................1-14
Reel Controller Board Assembly.....................................................1-14
Reel Tray ........................................................................................1-15
Service Lamp ..................................................................................1-15
Side and Back Panels.....................................................................1-15
Transmissive Reels LCD Display Features.....................................1-16
CPU Enclosure........................................................................................1-16
Hard Meters............................................................................................1-17
Bose Audio System ............................................................................ 1-18
Top Box Mounting Hardware ................................................................ 1-18
Bulkhead Board .................................................................................... 1-19
Safety Features ..................................................................................... 1-20

February 2009
16-022128-03
2 Table of Contents:

Liquid Diversion .............................................................................. 1-20


Ground Braids ................................................................................ 1-21
Electrical Requirements ........................................................................1-21
Properly Ground Gaming Devices .................................................. 1-21
Use Functional AC Line Cord ......................................................... 1-21
Outdoor Use ................................................................................... 1-21
Game Maintenance ........................................................................ 1-21
Radio Interference .......................................................................... 1-22
Service Fuses ................................................................................. 1-22
Line Voltage Auto-Detect ................................................................ 1-22

CHAPTER 2: Installation and Setup


Table of Contents ..................................................................................... 2-1
Overview ................................................................................................... 2-1
Preparation .............................................................................................. 2-2
ESD Prevention ................................................................................ 2-2
Install Game onto Stand ................................................................... 2-2
Lock Specifications ........................................................................... 2-8
Change CPU Shipping Lock(s)......................................................... 2-8
Cashbox Locks ................................................................................. 2-9
Power Setup ..................................................................................... 2-9
Verify CPU-NXT2 Connections....................................................... 2-11
Verify Bose Primary Amplifier Connections ................................. 2-12
Jumper Settings .....................................................................................2-13
Bill Acceptor Jumpers ..................................................................... 2-14
Progressive Port Jumpers .............................................................. 2-15
Host 1 Jumpers .............................................................................. 2-16
Host 2 Jumpers .............................................................................. 2-16
Removing the Transmissive LCD and Reels .........................................2-17
Remove the Transmissive LCD ...................................................... 2-17
Remove the Reel Controller Board Assembly ................................ 2-19
Remove a Mechanical Reel............................................................ 2-20
Replacing the Transmissive LCD and Reels .........................................2-21
Replace a Mechanical Reel ............................................................ 2-21
Replace the Reel Controller Board Assembly ................................ 2-22
Replace the Transmissive LCD ...................................................... 2-23
Installing the Accessory Box..................................................................2-25
Electronic Connections..........................................................................2-29
Starting the Game .................................................................................2-30
Check/Install SPI and BIOS Firmware Hub .................................... 2-30
Performing a RAM Clear................................................................. 2-31
Install the CompactFlash Cards...................................................... 2-32
OLED Start-UP Sequence .............................................................. 2-35

CHAPTER 3: Maintenance
Table of Contents ..................................................................................... 3-1
Overview ................................................................................................... 3-2
ESD Prevention ........................................................................................ 3-2
Cleaning the Game .................................................................................. 3-2
Game Cabinet .................................................................................. 3-2
LCD .................................................................................................. 3-2
Bill Acceptor...................................................................................... 3-3

February 2009
3
Printer ...............................................................................................3-3
Removing the Bill Acceptor and Cashbox...............................................3-3
Remove the Bill Acceptor .................................................................3-3
Exchange Cashboxes .......................................................................3-5
Coin Handling Maintenance....................................................................3-5
Remove the Hopper..........................................................................3-5
Install the Hopper..............................................................................3-6
Fill the Hopper ..................................................................................3-7
Token/Coin Wiper Alignment ............................................................3-7
Remove the Coin Drop Chute from the Hopper................................3-8
Install the Coin Drop Chute on the Hopper .......................................3-9
Hopperless Mode: Coin Drop Chute Installation.............................3-10
Access the Coin Comparator .......................................................... 3-11
Mechanical Reels...................................................................................3-12
Count Reel and Optic Band Stops ..................................................3-12
Removing a Mechanical Reel................................................................3-13
Remove the Reel Controller Board Assembly ................................3-13
Remove a Mechanical Reel ............................................................3-14
Remove the Reel Strip....................................................................3-15
Replace Reel Strip ..........................................................................3-16
Replace the Optic Band..................................................................3-17
Replace the Reel Drum & Associated Parts ...................................3-19
Replacing a Mechanical Reel................................................................3-22
Replace a Mechanical Reel ............................................................3-22
Replace the Reel Controller Board Assembly ................................3-23
Replace the Transmissive LCD ......................................................3-24
Replace the Reel Tray ....................................................................3-25
Reel Conversions ...................................................................................3-26
Button Panel Maintenance ...................................................................3-26
Printer Replacement..............................................................................3-26
Power Supply Replacement ..................................................................3-28
Replace Fuses ................................................................................3-30
Replace the Mechanical Arm Mechanism ......................................3-31
Bose Audio System Maintenance ......................................................3-46

CHAPTER 4: Troubleshooting
Table of Contents .....................................................................................4-1
Overview ...................................................................................................4-1
ESD Prevention ........................................................................................4-1
Tower Light Codes....................................................................................4-2
Basic Game Troubleshooting ...........................................................4-3
Tilts ...........................................................................................................4-6
Major Tilts .........................................................................................4-6
Minor Tilts .........................................................................................4-6
Indicators..................................................................................................4-7
Performing a RAM Clear ..........................................................................4-7
Clearing a Tilt ...........................................................................................4-9
Attendant Key Switch........................................................................4-9
Diagnostic Switch .............................................................................4-9
Diagnostics .....................................................................................4-10
Bill Acceptor Test ............................................................................4-10
Coin Acceptor Diagnostics..............................................................4-13
Printer Diagnostics..........................................................................4-14

16-022128-03
4 Table of Contents:

Hopper Diagnostics ........................................................................ 4-16


Progressive Diagnostics ........................................................................4-17
WMSP Diagnostics - Traffic Statistics............................................. 4-17
WMSP Diagnostics - Link Statistics ................................................ 4-19
SPN Diagnostics.....................................................................................4-20
SPN Diagnostics - Traffic................................................................ 4-20
SPN Diagnostics - Link Statistics.................................................... 4-21
SPN Devices - Diagnostics............................................................. 4-22
Using SVC/GAT .......................................................................................4-24
Tilt Codes................................................................................................4-26
Bluebird 2 Mechanical (BB2-Mech): Verify OLED Start-Up Sequence4-34
OLED Troubleshooting ...........................................................................4-35
CPU-NXT2 Failure Mode Analysis..........................................................4-36
Table of Contents ..................................................................................... 5-1

CHAPTER 5: BB2 Exploded Views & Block Diagrams


BB2 Power Components.......................................................................... 5-2
BB2 Upper Door (with Coin) .................................................................... 5-3
BB2 Upper Door (no Coin)....................................................................... 5-4
BB2 Lower Door ....................................................................................... 5-5
BB2 Bill Acceptor Housing....................................................................... 5-6
BB2 Reel Tray Assembly - 3 Reel ............................................................ 5-7
BB2 Reel Tray Assembly - 5 Reel ............................................................ 5-8
BB2 Reel Mechanism - 90 mm (for 3-Reel Cabinet) ............................. 5-9
BB2 Reel Mechanism - 66 mm (for 5-Reel Cabinet) ...........................5-10
BB2 22-in. Accessory Box .....................................................................5-11
BB2 17-in. Accessory Box......................................................................5-12
AC Block Diagram for Bluebird 2 (BB2) Cabinet ..................................5-13
DC Block Diagram for Bluebird 2 (BB2) Cabinet ................................5-14
Block Diagram for Bluebird 2 (BB2) Cabinet w/CPU-NXT2 .................5-15
Block Diagram for Bluebird 2 (BB2) Cabinet w/CPU-NXT2 -
Transmissive ..........................................................................................5-16
Block Diagram for 3 and 5 Mechanical Reel SPN and DC Power
Distribution Bluebird 2 (BB2) Cabinet w/CPU-NXT2 - Transmissive...5-17

CHAPTER 6: BB2 Replacement Parts


Table of Contents ..................................................................................... 6-1
Overview ................................................................................................... 6-1
Ordering Parts .................................................................................. 6-1
Arm Mechanism....................................................................................... 6-2
Bulbs and Ballasts................................................................................... 6-2
Batteries ................................................................................................... 6-2
Button Panel ............................................................................................ 6-2
Cables....................................................................................................... 6-2
Decals & Labels ....................................................................................... 6-3
Glass......................................................................................................... 6-3
Fans .......................................................................................................... 6-3
Fuses ........................................................................................................ 6-3
Hardware .................................................................................................. 6-3
Inserts....................................................................................................... 6-4

February 2009
5
LCDs..........................................................................................................6-4
Locks ........................................................................................................6-4
Meters.......................................................................................................6-4
Power Supply............................................................................................6-4
Printed Circuit Boards..............................................................................6-4
Plates, Brackets, and Covers ..................................................................6-5
Reel Components ....................................................................................6-5
Sound Components .................................................................................6-5
Switches ...................................................................................................6-5
Tower Lights .............................................................................................6-5

16-022128-03
6 Table of Contents:

February 2009
List of Tables

CHAPTER 1: Introduction and Features


Table 1-1 Reference Documentation. ...................................................................1-2
Table 1-2 Game weight. .........................................................................................1-4
Table 1-3 Heat/Electricity Dissipation. .................................................................1-4
Table 1-4 Left Wire Harness Connectors. .............................................................1-8
Table 1-5 Right Wire Harness Connectors. ...........................................................1-9
Table 1-6 Bulkhead Board connectors. ..............................................................1-19
Table 1-7 Game Power Requirements. ...............................................................1-21

CHAPTER 2: Installation and Setup


Table 2-1 Lock Specifications. ...............................................................................2-8
Table 2-2 Lock Specifications (metric). .................................................................2-8
Table 2-3 CPU Enclosure Connections. ...............................................................2-11
Table 2-4 Primary Amplifier connections. ...........................................................2-12
Table 2-5 Bill Acceptor jumpers. ..........................................................................2-14
Table 2-6 Progressive Port jumpers. ...................................................................2-15
Table 2-7 Host 1 jumpers. ...................................................................................2-16
Table 2-8 Host 2 jumpers. ...................................................................................2-16
Table 2-9 Left Wire Harness Connectors. ...........................................................2-29
Table 2-10 Right Wire Harness Connectors. .......................................................2-30
Table 2-11 CPU Enclosure Connections. ............................................................2-34
Table 2-12 Start-up States of OLED Button Panel. ............................................2-35

CHAPTER 3: Maintenance
Table 3-1 Division of maintenance responsibilities .............................................3-2
Table 3-2 Reel Stop Counts. ................................................................................3-12

CHAPTER 4: Troubleshooting
Table 4-1 Tower Light Troubleshooting. ................................................................4-2
Table 4-2 Basic Game Troubleshooting. ...............................................................4-3
Table 4-3 SPN device diagnostic tests. ...............................................................4-23
Table 4-4 Tilt Codes. .............................................................................................4-26
Table 4-5 Start-up States of OLED Button Panel. ...............................................4-34
Table 4-6 Button Panel Related Error Messages and Possible Solutions. .......4-35
Table 4-7 CPU-NXT2 Failure Modes and Solutions. ...........................................4-36

CHAPTER 5: BB2 Exploded Views & Block Diagrams

CHAPTER 6: BB2 Replacement Parts


Table 6-1 Arm Mechanism. ....................................................................................6-2
Table 6-2 Bulbs and Ballasts. ................................................................................6-2
Table 6-3 Batteries. ................................................................................................6-2
Table 6-4 Button Panel. .........................................................................................6-2
Table 6-5 Cables. ....................................................................................................6-2
Table 6-6 Decals & Labels. ....................................................................................6-3
Table 6-7 Glass. ......................................................................................................6-3

February 2009
16-022128-03
2 List of Tables:

Table 6-8 Fans. .......................................................................................................6-3


Table 6-9 Fuses. .....................................................................................................6-3
Table 6-10 Hardware. .............................................................................................6-3
Table 6-11 Inserts. .................................................................................................6-4
Table 6-12 LCDs. ....................................................................................................6-4
Table 6-13 Locks. ...................................................................................................6-4
Table 6-14 Meters. .................................................................................................6-4
Table 6-15 Power Supply. ......................................................................................6-4
Table 6-16 Printed Circuit Boards (PCBs). ............................................................6-4
Table 6-17 Plates, Brackets and Covers. ..............................................................6-5
Table 6-18 Reel Components. ...............................................................................6-5
Table 6-19 Sound Components. ............................................................................6-5
Table 6-20 Switches. ..............................................................................................6-5
Table 6-21 Tower Lights. ........................................................................................6-5

February 2009
List of Figures

CHAPTER 1: Introduction and Features


Figure 1-1 Bluebird 2 Mechanical (BB2-Mech). ................................................................................ 1-3
Figure 1-2 Game Dimensions. ......................................................................................................... 1-4
Figure 1-3 Pull Arm Mechanism. ..................................................................................................... 1-5
Figure 1-4 Barrier Panel. ................................................................................................................. 1-5
Figure 1-5 Bill Acceptor. .................................................................................................................. 1-6
Figure 1-6 OLED Button Panel. ....................................................................................................... 1-6
Figure 1-7 Cabinet Shelf. ................................................................................................................. 1-6
Figure 1-8 Cable routing through Cable Channels. ......................................................................... 1-7
Figure 1-9 Reel cable routed through Cable Guides. ...................................................................... 1-7
Figure 1-10 Left Wire Harness Connections .................................................................................... 1-8
Figure 1-11 Right Wire Harness Connections. ................................................................................ 1-9
Figure 1-12 Coin Tray, Hopper, and Coin Drop. ............................................................................ 1-10
Figure 1-13 Diagnostic Switch. ...................................................................................................... 1-10
Figure 1-14 Open BB2 Main Door. ................................................................................................ 1-11
Figure 1-15 Latches to separate doors. ......................................................................................... 1-11
Figure 1-16 Gas Strut. ................................................................................................................... 1-12
Figure 1-17 Main Door open. ......................................................................................................... 1-12
Figure 1-18 Interior of Lower Door. ................................................................................................ 1-13
Figure 1-19 Main Door switch. ....................................................................................................... 1-13
Figure 1-20 Lower Door switch in center of inside Lower Door (left), and close-up (right). ........... 1-13
Figure 1-21 Power Supply. ............................................................................................................ 1-14
Figure 1-22 Illuminated Printer Bezel. ........................................................................................... 1-14
Figure 1-23 Reel Controller Board Assembly-bottom view showing 3 reels connected. ............... 1-14
Figure 1-24 Reel Tray (top), 3-reel version (left), and 5-reel version (right). ................................. 1-15
Figure 1-25 Service Lamp. ............................................................................................................ 1-15
Figure 1-26 Side Panel laminate. .................................................................................................. 1-15
Figure 1-27 Transmissive 5-Reel LCD display-rear view (left),
and 3-Reel LCD display-front view (right). ............................................................................................ 1-16
Figure 1-28 CPU Enclosure installed (left), and four mounting tabs w/CPU removed (right). ....... 1-16
Figure 1-29 Hard Meters. .............................................................................................................. 1-17
Figure 1-30 Primary Amplifier. ....................................................................................................... 1-18
Figure 1-31 Sound System inside cabinet (left), and speaker grill (right). ..................................... 1-18
Figure 1-32 Top Box Posts. ........................................................................................................... 1-18
Figure 1-33 Bulkhead Board. ......................................................................................................... 1-19
Figure 1-34 Bulkhead Board inside game. .................................................................................... 1-19
Figure 1-35 Foam strips along speaker grill and in corners of grill. ............................................... 1-20
Figure 1-36 Ground Braids. ........................................................................................................... 1-21
Figure 1-37 Service Fuses. ........................................................................................................... 1-22

CHAPTER 2: Installation and Setup


Figure 2-1 BB2 Drill Template. .......................................................................................................... 2-2
Figure 2-2 Staging the game. .......................................................................................................... 2-3
Figure 2-3 Lifters and spotter in position. ........................................................................................ 2-4
Figure 2-4 Leaning the game forward. ............................................................................................ 2-4
Figure 2-5 Hand position under the game. ...................................................................................... 2-5
Figure 2-6 Lifting the game. ............................................................................................................. 2-5
Figure 2-7 Placing the game halfway on the base. ......................................................................... 2-6
Figure 2-8 Placing Game on the base. ............................................................................................ 2-6
Figure 2-9 Positioning the game. ..................................................................................................... 2-7
Figure 2-10 Coin Tray releases. ...................................................................................................... 2-7
Figure 2-11 Shipping Lock on the inside of the CPU Enclosure door. ............................................. 2-8
Figure 2-12 Punch perforated cover plate out ofCPU Enclosure door. ........................................... 2-9
Figure 2-13 Power switch. ............................................................................................................. 2-10
Figure 2-14 Location of the AC INPUT jack. ................................................................................. 2-10
Figure 2-15 Connections to the CPU-NXT2. ................................................................................. 2-11
Figure 2-16 Primary Amplifier connections. ................................................................................... 2-12
Figure 2-17 Bulkhead Board Jumper locations. ............................................................................ 2-13

February 2009
16-022128-03
2 List of Figures:
Figure 2-18 Bill Acceptor Jumpers. ............................................................................................... 2-14
Figure 2-19 Sample Jumper Settings. ........................................................................................... 2-14
Figure 2-20 Jumper setting at JP4 on Bulkhead Board. ................................................................ 2-15
Figure 2-21 Jumper setting at JP6 on Bulkhead Board. ................................................................ 2-15
Figure 2-22 Host 1 jumpers. .......................................................................................................... 2-16
Figure 2-23 Host 2 jumpers. .......................................................................................................... 2-16
Figure 2-24 Disconnect the DVI cable. .......................................................................................... 2-17
Figure 2-25 Location of Touch Screen power connector
on the Bulkhead Board. ........................................................................................................................ 2-17
Figure 2-26 Remove the Transmissive LCD. ................................................................................. 2-18
Figure 2-27 Lift the LCD out of the cabinet. ................................................................................... 2-18
Figure 2-28 Reel Controller Board Assembly under Cabinet Shelf. .............................................. 2-19
Figure 2-29 Flipped over Reel Controller Board Assembly. ........................................................... 2-19
Figure 2-30 Reel Mechanism latch. ............................................................................................... 2-20
Figure 2-31 Remove the Reel Mechanism. ................................................................................... 2-20
Figure 2-32 Push the Reel Mechanism into game. ....................................................................... 2-21
Figure 2-33 Hook the finger latch spring. ...................................................................................... 2-21
Figure 2-34 Reel Controller Board Assembly connectors
(3-Reel configuration shown as example). ........................................................................................... 2-22
Figure 2-35 Reel Controller Board Assembly under
Cabinet Shelf. ....................................................................................................................................... 2-22
Figure 2-36 Flipped over Reel Controller Board Assembly. ........................................................... 2-23
Figure 2-37 Lift and hold the Transmissive LCD. ........................................................................... 2-23
Figure 2-38 Connect the DVI cable. .............................................................................................. 2-24
Figure 2-39 Replace the Transmissive LCD. ................................................................................. 2-24
Figure 2-40 Remove the Accessory Box Crown. ........................................................................... 2-25
Figure 2-41 Remove the Accessory Box LCD. .............................................................................. 2-26
Figure 2-42 Disconnect Accessory Box LCD connections. ........................................................... 2-26
Figure 2-43 Accessory Box Posts. ................................................................................................. 2-26
Figure 2-44 Accessory Box on posts. ............................................................................................ 2-27
Figure 2-45 Connect Accessory Box LCD connections. ................................................................ 2-27
Figure 2-46 Replace the Accessory Box LCD. .............................................................................. 2-28
Figure 2-47 Replace the Accessory Box Crown. ........................................................................... 2-28
Figure 2-48 Left Wire Harness Connections .................................................................................. 2-29
Figure 2-49 Right Wire Harness Connections. .............................................................................. 2-30
Figure 2-50 SPI and BIOS Firmware Hub installed in CPU-NXT2. ............................................... 2-30
Figure 2-51 Install RAM Clear CompactFlash card. ...................................................................... 2-31
Figure 2-52 Game initialization screen. ......................................................................................... 2-31
Figure 2-53 RAM Clear message. ................................................................................................. 2-32
Figure 2-54 CompactFlash cards installed, opening Logic Door. .................................................. 2-32
Figure 2-55 Lock Logic Door (left), and close-up (right). ............................................................... 2-33
Figure 2-56 Close/Install Logic Door. ............................................................................................ 2-33
Figure 2-57 Connections to the CPU-NXT2. ................................................................................. 2-34
Figure 2-58 States of OLED during start-up. ................................................................................. 2-35

CHAPTER 3: Maintenance
Figure 3-1 Press Down Bill Acceptor Door. ...................................................................................... 3-3
Figure 3-2 Press Down Bill Acceptor release lever. ........................................................................ 3-4
Figure 3-3 Open Bill Acceptor Door. ................................................................................................ 3-5
Figure 3-4 Coin Tray releases. ........................................................................................................ 3-5
Figure 3-5 Remove Hopper. ............................................................................................................ 3-6
Figure 3-6 Engage flanges. ............................................................................................................. 3-6
Figure 3-7 Slide Hopper. .................................................................................................................. 3-6
Figure 3-8 Slide Coin Tray. .............................................................................................................. 3-7
Figure 3-9 Hopper wiper alignment. ................................................................................................ 3-7
Figure 3-10 Screw securing the Coin Drop ChuteBracket to Hopper. ............................................. 3-8
Figure 3-11 Coin Drop Chute Bracket separated from Hopper. ....................................................... 3-8
Figure 3-12 Screws securing the Coin Drop Chute Bracket to the Coin Drop Chute. ..................... 3-8
Figure 3-13 Align holes. ................................................................................................................... 3-9
Figure 3-14 Screws securing the Coin Drop Chute Bracket to the Coin Drop Chute. ..................... 3-9
Figure 3-15 Coin Drop Chute Bracket and Hopper. ......................................................................... 3-9
Figure 3-16 Screw securing the Coin Drop Chute Bracket to Hopper. .......................................... 3-10
Figure 3-17 Align holes. ................................................................................................................. 3-10
Figure 3-18 Align Coin Drop Chute Bracket and Coin Drop Chute. ............................................... 3-10

February 2009
3
Figure 3-19 Tilt the Coin Diverter Control Board Bracket. ..............................................................3-11
Figure 3-20 Remove the Coin Comparator. ....................................................................................3-11
Figure 3-21 Parts of the Reel Mechanism (Reel Strip not shown for clarity). ............................... 3-12
Figure 3-22 Count Positions on the Optic Band (five shown). ...................................................... 3-13
Figure 3-23 Reel Controller Board Assembly underCabinet Shelf. ............................................... 3-13
Figure 3-24 Flipped over Reel Controller Board Assembly. .......................................................... 3-14
Figure 3-25 Reel Mechanism latch. ............................................................................................... 3-14
Figure 3-26 Remove the Reel Mechanism. ................................................................................... 3-15
Figure 3-27 Remove the Reel Strip. ............................................................................................. 3-15
Figure 3-28 Locate the starting location for the tape and the Reel Strips with the indicator. ......... 3-16
Figure 3-29 Wrap the Reel Strip around the ReelDrum in display-readable direction. .................. 3-16
Figure 3-30 Prepare the adhesive at the top of the Reel Strip. .................................................... 3-17
Figure 3-31 Adhere the Reel Strip together. .................................................................................. 3-17
Figure 3-32 Remove clear part number tab. .................................................................................. 3-17
Figure 3-33 Remove the Optic Band. ............................................................................................ 3-18
Figure 3-34 Optic Band notches. ................................................................................................... 3-18
Figure 3-35 Install the Optic Band. ................................................................................................ 3-18
Figure 3-36 Complete the installation of the Optic Band. ............................................................. 3-19
Figure 3-37 Reel Drum E-ring. ..................................................................................................... 3-19
Figure 3-38 Reel Drum E-ring and flat washer. ............................................................................. 3-20
Figure 3-39 Remove Reel. ............................................................................................................ 3-20
Figure 3-40 Remove rubber O-rings. ............................................................................................. 3-21
Figure 3-41 Position the T-top with the Reel Drum (left: side view; right: top view). ...................... 3-21
Figure 3-42 Push the Reel Mechanism into game. ....................................................................... 3-22
Figure 3-43 Hook the finger latch spring. ...................................................................................... 3-22
Figure 3-44 Reel Controller Board Assembly under Cabinet Shelf. .............................................. 3-23
Figure 3-45 Flipped over Reel Controller Board Assembly. .......................................................... 3-23
Figure 3-46 Lift and hold the Transmissive LCD. .......................................................................... 3-24
Figure 3-47 Connect the DVI cable. .............................................................................................. 3-24
Figure 3-48 Replace the Transmissive LCD. ................................................................................. 3-25
Figure 3-49 Remove Reel Tray from Cabinet Shelf. ...................................................................... 3-25
Figure 3-50 Remove Reel Tray from Cabinet Shelf. ...................................................................... 3-26
Figure 3-51 Pull the Printer Tray latch. .......................................................................................... 3-27
Figure 3-52 Detach the Printer Tray. .............................................................................................. 3-27
Figure 3-53 Remove the printer. .................................................................................................... 3-27
Figure 3-54 Attach the Printer Tray. ............................................................................................... 3-28
Figure 3-55 Push the Printer Tray latch. ........................................................................................ 3-28
Figure 3-56 Disconnect cables from Power Supply. ...................................................................... 3-28
Figure 3-57 Loosen thumbscrew (left), or remove Keps nut (right). .............................................. 3-29
Figure 3-58 Remove and save the Power Supply Support Bracket. ............................................. 3-29
Figure 3-59 Remove Power Supply from Power Supply Shelf. ..................................................... 3-29
Figure 3-60 Location of the AC INPUT plug. ................................................................................. 3-30
Figure 3-61 Press Down Bill Acceptor Door. ................................................................................. 3-31
Figure 3-62 Press Down Bill Acceptor release lever (left), slide Bill Acceptor Head from game (right),
pull tab to release Bill Acceptor (bottom). ............................................................................................. 3-32
Figure 3-63 Disconnect Bill Acceptor cable. .................................................................................. 3-33
Figure 3-64 Disconnect Bill Acceptor Spacer Plate cable. ............................................................ 3-33
Figure 3-65 Remove screw securing Mechanical Arm Mechanism. .............................................. 3-34
Figure 3-66 Remove Pull Arm and hub. ........................................................................................ 3-34
Figure 3-67 Remove Keps nuts. .................................................................................................... 3-35
Figure 3-68 Swing laminate from cabinet (left), and lift laminate away-rear view (right). .............. 3-36
Figure 3-69 Loosen Mechanical Arm Mechanism screws. ............................................................ 3-37
Figure 3-70 Pull Mechanical Arm Mechanism away from game. .................................................. 3-37
Figure 3-71 Disconnect Mechanical Arm Mechanism cable. ......................................................... 3-38
Figure 3-72 Connect new Mechanical Arm Mechanism cable. ..................................................... 3-38
Figure 3-73 Push Mechanical Arm Mechanism towards game. .................................................... 3-39
Figure 3-74 Secure screws. ........................................................................................................... 3-39
Figure 3-75 Hook laminate to cabinet-rear view (left), and
swing laminate towards cabinet (right). ................................................................................................ 3-40
Figure 3-76 Secure Keps nuts. ...................................................................................................... 3-41
Figure 3-77 Secure the hub and Pull Arm. .................................................................................... 3-42
Figure 3-78 Tighten screw securing Mechanical Arm Mechanism. ............................................... 3-42
Figure 3-79 Connect Bill Acceptor Spacer Plate cable. ................................................................. 3-43
Figure 3-80 Connect Bill Stacker cable. ........................................................................................ 3-43

16-022128-03
4 List of Figures:
Figure 3-81 Place hand under Bill Acceptor Head (top left), press Bill Acceptor Release Lever (top
right), and push tab to secure Bill Acceptor (bottom left). ..................................................................... 3-44
Figure 3-82 Close Bill Acceptor Door. ........................................................................................... 3-45
Figure 3-83 Setup Menu. ............................................................................................................... 3-46
Figure 3-84 Sound controls. .......................................................................................................... 3-46

CHAPTER 4: Troubleshooting
Figure 4-1 Pending tilts. ................................................................................................................... 4-6
Figure 4-2 Call Attendant Prompt box. ............................................................................................ 4-6
Figure 4-3 Major Tilt In Prompt box example. .................................................................................. 4-6
Figure 4-4 Tilts indicated on the Game screen. ............................................................................... 4-7
Figure 4-5 ESD Wrist Strap on arm. ................................................................................................ 4-7
Figure 4-6 Installing CompactFlash cards. ...................................................................................... 4-8
Figure 4-7 Game Initialization screen. ............................................................................................. 4-8
Figure 4-8 RAM Clear message. ..................................................................................................... 4-8
Figure 4-9 The BB2 Attendant Key Switch. ..................................................................................... 4-9
Figure 4-10 Diagnostic Switch. ........................................................................................................ 4-9
Figure 4-11 Machine Setup Menu. ................................................................................................. 4-10
Figure 4-12 Bill Validator Menu. .................................................................................................... 4-10
Figure 4-13 JCM Billval Diagnostic screen. ................................................................................... 4-11
Figure 4-14 JCM Billval Diagnostic screen: $20 bill example. ....................................................... 4-11
Figure 4-15 JCM Billval Diagnostic screen: ticket. ......................................................................... 4-11
Figure 4-16 JCM Billval Diagnostic screen. ................................................................................... 4-12
Figure 4-17 Cash Device Diagnostics Menu. ................................................................................ 4-13
Figure 4-18 Coin Acceptor Diagnostics screen. ............................................................................ 4-13
Figure 4-19 Cash Device Diagnostics Menu. ................................................................................ 4-14
Figure 4-20 Printer Diagnostics screen. ........................................................................................ 4-14
Figure 4-21 Printer Diagnostics screen. ........................................................................................ 4-15
Figure 4-22 Cash Devices Diagnostics Menu. ............................................................................... 4-16
Figure 4-23 Hopper Diagnostics screen. ....................................................................................... 4-16
Figure 4-24 Network Diagnostics Menu. ....................................................................................... 4-17
Figure 4-25 WMSP Diagnostics Menu .......................................................................................... 4-17
Figure 4-26 WMSP/WSLL Traffic Statistics screen. ....................................................................... 4-18
Figure 4-27 WMSP Diagnostics menu. ......................................................................................... 4-19
Figure 4-28 WMSP Link Statistics screen. .................................................................................... 4-19
Figure 4-29 SPN Diagnostics Menu. ............................................................................................. 4-20
Figure 4-30 SPN Traffic Statistics screen. ..................................................................................... 4-20
Figure 4-31 SPN Diagnostics menu. ............................................................................................. 4-21
Figure 4-32 SPN Link Statistics screen. ........................................................................................ 4-21
Figure 4-33 SPN Diagnostics menu. ............................................................................................. 4-22
Figure 4-34 SPN Device Diagnostics screen. ................................................................................ 4-22
Figure 4-35 SPN Device Diagnostics Test screen. ........................................................................ 4-23
Figure 4-36 CPU Enclosure. .......................................................................................................... 4-24
Figure 4-37 SVC/GAT Menu. ......................................................................................................... 4-24
Figure 4-38 SVC Authentication Information screen. .................................................................... 4-25
Figure 4-39 Start-up States of OLED Button Panel. ...................................................................... 4-34
Figure 4-40 Example of Error Message. ........................................................................................ 4-35
Figure 4-41 Connections of Button Panel USB and Power cables at
Button Panel PCB (left) and CPU (right). .............................................................................................. 4-35

CHAPTER 5: BB2 Exploded Views & Block Diagrams

CHAPTER 6: BB2 Replacement Parts

February 2009
About this Guide
General Information

Documentation 2009, WMS Gaming Inc. (WMS). All rights reserved. No part of this documentation may be
Copyright reproduced in any form or by any means or used to make any derivative work (such as translation,
transformation, or adaptation) without written permission from WMS.
WMS reserves the right to revise this documentation and to make changes in content from time to
time without obligation on the part of WMS to provide notification of such revision or change.
WMS provides this documentation without warranty of any kind, either implied or expressed,
including, but not limited to, the implied warranties of merchantability and fitness for a particular
purpose. WMS may make improvements or changes in the product(s) and/or the program(s)
described in this documentation at any time.
Unless otherwise indicated, WMS registered trademarks are registered in the United States and
may or may not be registered in other countries.
Other brand and product names may be registered trademarks or trademarks of their respective
holders.

Game Strict legal regulations protect the gaming device. Unauthorized modifications may be illegal under
Copyright, international law. This principle also applies to WMS logos, designs, publications, and assemblies.
Trademark, and Facsimiles of WMS equipment (or any feature of it) may be illegal. This principle applies to
Patent Laws facsimiles manufactured with or without WMS components.

Check Local Operation of gaming devices may be subject to state and local laws and regulations. This manual
Laws does not solicit sale of gaming devices where they may not lawfully operate.

CE Marking The CE Marking appears on gaming devices that meet the requirements of the EU directives. On
these products, a Declaration of Conformity states that they satisfy all applicable EMC and safety
requirements.

Customer WMS is ready to help twenty-four hours a day. Contact our service number at
Service 800-378-7741.

Conventions For clarity, this Service Manual uses the following conventions:
Text Conventions Items that appear on a Screen Display (video screen) are identified in bold text.
Button names are shown in ALL CAPS text.
Individual parts, like the Printer or Coin Mechanism, are capitalized.
Data that is shown on an LED display are indicated with the special LED typeface.

February 2009
16-022128-03
2 About this Guide: General Information

Safety Symbols and When required, information is provided in procedures about potential challenges and dangers. The
Information terms WARNING, CAUTION, and NOTICE are used for specific safety reasons. For emphasis,
WARNING and CAUTION appear beside the characteristic triangle symbol. Table 1 lists notice
icons used in this guide.
Table 1 Notice Icon Descriptions
Icon/Format Description
Information note about important features or instructions but is not critical data.

NOTICE: Notice indicates a situation that requires special attention.

CAUTION: Caution alerts you to potential damage to a program, system, or device.

WARNING: Warning indicates a situation the may cause personal injury or death.

WARNING: Warning indicates a situation the may cause personal injury or death due to a
potential electrical hazard.

ESD: ESD alerts you to take proper grounding precautions against electrostatic
discharge (ESD) before handling a product.

February 2009
Preventing Injury and Damage 3

Preventing This section provides instructions for preventing electrical injury and protecting components from
Injury and ESD damage.
Damage
Prevent Shock and Begin any service procedure by completing the following steps to prevent electrical shock and/or
ESD electrostatic discharge (ESD):
1 Unlock and open the Main Door.
2 Power the game OFF at the power switch.
Figure 1 Power switch.

3 Fasten a resistive type (1 or 10 Meg) ESD wrist strap on arm and ensure that it makes good
skin contact, Figure 2 (A).
Figure 2 ESD Wrist Strap on arm.

4 Secure the clip end of the wrist strap to a ground braid on a game.
5 If one is installed, remove the Hopper to access the Power Entry Assembly.
WARNING: Disconnecting the game Power Supply Cord is the only means of disconnecting
the game from power.

16-022128-03
4 About this Guide: General Information

6 Disconnect the power supply cord from the Power Entry Assembly, Figure 3 (A).
Figure 3 Location of the AC INPUT plug.

7 If applicable, disconnect the Top Box line cord from the outlet.

Special Instructions Whenever accessing any printed circuit boards (PCBs) or components in direct contact with PCBs,
for PCBs including EPROMs, CompactFlash Cards, and PCB connectors, use the following procedure to
prevent ESD damage to sensitive components.
ESD: Opening the game and unplugging the Power Supply Cord defeats the grounding system on
the game, as the grounding pin on the Power Supply Cord ultimately connects the game to ground.
1 Verify that the game power switch is set to Off.
2 Verify that the ESD wrist strap is firmly secured to a game ground braid.
3 Reconnect the Power Supply Cord to the Power Entry Assembly.
4 Complete all necessary PCB or component handling steps.
5 If additional steps are required for this procedure, ensure the game power switch is still set to
Off, and disconnect the game Power Supply Cord before proceeding.

Notices This sections provides information that all persons using or providing maintenance to this product
must know and be aware.
NOTE: APPLIANCE IS NOT INTENDED FOR USE BY PERSONS (INCLUDING CHILDREN) WITH
REDUCED PHYSICAL, SENSORY OR MENTAL CAPABILITIES, OR LACK OF EXPERIENCE
AND KNOWLEDGE, UNLESS THEY HAVE BEEN GIVEN SUPERVISION OR INSTRUCTION
CONCERNING USE OF THE APPLIANCE BY A PERSON RESPONSIBLE FOR THEIR SAFETY.
CHILDREN SHOULD BE SUPERVISED TO ENSURE THAT THEY DO NOT PLAY WITH THE
APPLIANCE.

February 2009
Chapter 1
Introduction and Features

Table of This chapter contains the following topics:


Contents
Reference Documentation .......................................................... 1-2
Tools Required ............................................................................. 1-2
Introduction.................................................................................. 1-3
Base Game Dimensions and Weights........................................ 1-4
Dimensions .......................................................................................1-4
Weight...............................................................................................1-4
Power Dissipation .............................................................................1-4
BB2-Mech Components .............................................................. 1-5
Arm Mechanism ................................................................................1-5
Barrier Panel .....................................................................................1-5
Bill Acceptor ......................................................................................1-6
Organic Light-Emitting Diode (OLED) Button Panel .........................1-6
Cabinet Shelf ....................................................................................1-6
Cabling and Cable Routing ...............................................................1-7
Left Cable Channel ............................................................................... 1-8
Right Cable Channel ............................................................................. 1-9
Coin Handling .................................................................................1-10
Diagnostic Switch............................................................................1-10
Doors .............................................................................................. 1-11
Lower Door ..................................................................................... 1-11
Door Switches.................................................................................1-13
Power Supply..................................................................................1-14
Printer .............................................................................................1-14
Reel Controller Board Assembly.....................................................1-14
Reel Tray ........................................................................................1-15
Service Lamp ..................................................................................1-15
Side and Back Panels.....................................................................1-15
Transmissive Reels LCD Display Features.....................................1-16
CPU Enclosure........................................................................... 1-16
Hard Meters ................................................................................ 1-17
Bose Audio System ................................................................ 1-18
Top Box Mounting Hardware .................................................... 1-18
Bulkhead Board ......................................................................... 1-19
Safety Features .......................................................................... 1-20
Liquid Diversion ..............................................................................1-20
Ground Braids.................................................................................1-21
Electrical Requirements ............................................................ 1-21
Properly Ground Gaming Devices ..................................................1-21
Use Functional AC Line Cord .........................................................1-21
Outdoor Use....................................................................................1-21
Game Maintenance.........................................................................1-21
Radio Interference ..........................................................................1-22
Service Fuses .................................................................................1-22
Line Voltage Auto-Detect ................................................................1-22

February 2009
16-022128-03
1-2 Chapter 1: Introduction and Features

Reference See Table 1-1 for a list of relevant documentation available from WMS:
Documentation
Table 1-1 Reference Documentation.
Documentation Description
16-020832-xx Manual: CPU-NXT1 and CPU-NXT2 Contains installation and configuration steps for the CPU-NXT
Operating System (OS) Operating System, which runs on either CPU-NXT or CPU-NXT2
hardware.
The manual includes troubleshooting steps and a tilt code
reference.
16-020839-xx Manual: Bluebird Peripherals Contains installation and maintenance procedures for Bluebird
Peripheral Components, including the Coin Accceptor, Bill
Acceptor, Hopper, Printer, LCD, and Progressive Meters.
The manual also includes all replacement part numbers, some
exploded view drawings, and all available vendor documentation.
16-023444-xx Installation Bulletin: OLED Button Contains installation, configuration and maintenance procedures
Panel for BB2 and BBU for an OLED Button Panel.

Tools Required The following tools are required to complete the procedures in this manual:
Allan wrench set
dolly
full nut driver set
ladder
lift jack
metric set (Hopper only)
socket set

February 2009
Introduction 1-3

Introduction The Bluebird 2 Mechanical (BB2-Mech) cabinet, Figure 1-1, is a progression from the original
Bluebird Upright (BBU) cabinet and maintains most of the features and functionality of the current
BBU product including:
Backwards compatible with previous software versions to allow same functionality as existing
Reel Controller Board Assembly
Same CPU-NXT2, Hard Meter, and Bulkhead Board

Features include:
Updated reel mechanisms and mounting system
Updated cabinet design to support reel system and arm mechanism mountings

Additional design improvements include the following:


Transmissive LCD with 3 and 5 Reel versions
5-Reel version compatible for G + 4x5 Themes
Wider 5-Reel mechanism than Mechanical Reels for the 4-Reel or 3-Reel games
Single Reel Tray for use with 3 and 5 Reel versions
Updated side panel accommodates external arm mechanism

Figure 1-1 Bluebird 2 Mechanical (BB2-Mech).

16-022128-03
1-4 Chapter 1: Introduction and Features

Base Game To view the game cabinet, see the dimensions (in inches and centimeters) of the game, Figure 1-2.
Dimensions and Figure 1-2 Game Dimensions.
Weights

Dimensions Height = 55-7/8 with lamp (140.57 cm)


Width = 24-1/2 with arm mechanism (61.46 cm)
Depth = 22-1/2 (56.38 cm)

Weight The weight of the game is described in Table 1-2.


Table 1-2 Game weight.
Game Part Weight
Base Game 251.6 lbs (114.12 kg)
Skid 25 lbs (11 kg)

CAUTION: Verify that any non-WMS game stand specifications meet this weight requirement
before mounting the game. Using inadequate game stands voids the WMS Warranty and may lead
to distortion of the game cabinet, including the inability to close and lock the Main Door.
Power Dissipation Power dissipation and BTU ratings in Table 1-3 lists the BB2. Current values for all machines are
based on a 120VAC configuration, with Bill Acceptor installed.
The British Thermal Units (BTUs) were calculated by using the following equation:
BTUs = 3.413 * voltage * current
Any increase in BTUs due to actual work performed (spinning Hopper motor) was neglected. The
BTU calculation for game play should be used when determining air conditioning requirements, as
Hopper payout occurs infrequently when compared to standby and play conditions.

Table 1-3 Heat/Electricity Dissipation.


Type of Current Power Dissipation
BTUs STANDBY CURRENT (no Hopper) 831 BTUs
STANDBY CURRENT (Hopper on) 2.03A
BTUs STANDBY (Hopper on) 889 BTUs
STANDBY MAX CURRENT 2.67A
BTUs STANDBY MAX CURRENT 1094 BTUs

February 2009
BB2-Mech Components 1-5

BB2-Mech The components of the BB2-Mech are designed to provide more options for future games. This
Components section describes the new and supporting components of the BB2 cabinet.

Arm Mechanism A Pull Arm and Pull Arm Mechanism are available for the BB2-Mech game. The Pull Arm,
Figure 1-3, is angled forward, closer to the front of the game, and allows for a more comfortable
pulling position by the player.
Figure 1-3 Pull Arm Mechanism.

Barrier Panel The Barrier Panel, Figure 1-4, features are as follows (if applicable):
Coin Acceptor Assembly (containing Coin Acceptor, Circuit Board and solenoid),
Figure 1-4 (A), mounts directly to the panel
Cable, Figure 1-4 (B), connects Coin Acceptor Assembly to Bulkhead Board
Cutouts for Coin Spout and Coin Drop, Figure 1-4 (C)

Figure 1-4 Barrier Panel.


A B

16-022128-03
1-6 Chapter 1: Introduction and Features

Bill Acceptor The BB2 supports all Bill Acceptors, Figure 1-5, currently available.
Figure 1-5 Bill Acceptor.

Features include an illuminated Bill Acceptor Bezel for better player visibility.
Organic Light- The Organic Light-Emitting Diode (OLED) Button Panel, Figure 1-6, is compatible with CPU-NXT2
Emitting Diode only.
(OLED) Button Features include the following:
Panel
OLEDs are programmable
USB connection to CPU for data

Figure 1-6 OLED Button Panel.

Cabinet Shelf The Cabinet Shelf, Figure 1-7, holds the Reel Tray and the Reel Controller Board Assembly, which
is now able to handle both 3 and 5 Reel versions.
Figure 1-7 Cabinet Shelf.

February 2009
BB2-Mech Components 1-7
Cabling and Cable Most of the cable routing in the BB2, Figure 1-8, is routed in the back of the cabinet, keeping the
Routing cables from interfering with components.
The Cable Channels in the BB2, Figure 1-8 (A) and Figure 1-8 (B), are located at the rear of the
cabinet above the Cabinet Shelf.
Features include the following:
The Cable Channels, Figure 1-8, run along the sides of the game cabinet and are divided into a
left channel, Figure 1-8 (A), and a right channel, Figure 1-8 (B). For more information, see Left
Cable Channel on page 8 and Right Cable Channel on page 9.

Figure 1-8 Cable routing through Cable Channels.


A B

The addition of Cable Guides, Figure 1-9 (A), located under the Cabinet Shelf, allow for ease of reel
cable routing along the front of the Cabinet Shelf.
Figure 1-9 Reel cable routed through Cable Guides.

16-022128-03
1-8 Chapter 1: Introduction and Features

Left Cable Channel


The Left Cable Channel, Figure 1-10, contains multiple Wire Harnesses which includes:
DC power distribution for the Top Box Panel Player Tracking System
Switches
Tower Light
Communication

See Table 1-4 and Figure 1-10 for the Left Wire Harness channel connections.

Table 1-4 Left Wire Harness Connectors.

Figure 1-10 Left Wire


Channel ID Function Harness Connections
A Aux DC Power (8-pin)
B LCD Power (4-pin)
C LCD Power (4-pin)
D +12VDC/+24VDC (3-pin)
E +12VDC/+24VDC (3-pin)
F +12VDC/+24VDC (3-pin)
G +12VDC/+24VDC (3-pin)
H +12VDC/+24VDC (3-pin)
I +12VDC/+24VDC (3-pin)
J +12VDC/+24VDC
K Touch Screen Communication (6-pin)
L Top Box Communication (8-pin)
M Player Tracking Power Monitor and Auxiliary Fill Switch (12-pin)
N Tower Light (6-pin)
O Top Box Door and Auxiliary Logic (4-pin)
P Player Tracking, Top Box Door, and Auxiliary Logic (10-pin)
Q Player Tracking and Cabinet (24-pin) Switches

February 2009
BB2-Mech Components 1-9
Right Cable Channel
The Right Cable Channel, Figure 1-11, contains AC power distribution for the:
Player Tracking System
Service Lamp Switch

The Right Cable Channel also includes a line cord extension which is pre-routed through the game
cabinet for participation games.
See Table 1-5 and Figure 1-11 for the Right Wire Harness channel connections.

Table 1-5 Right Wire Harness Connectors.


Figure 1-11 Right Wire
Harness Connections.
Channel ID Function
A Switched AC (5-pin)
B Service Lamp Switch (6-pin)
C Player Tracking, Unswitched AC (3-pin)
D Player Tracking, Unswitched AC (IEC)

16-022128-03
1-10 Chapter 1: Introduction and Features

Coin Handling Coin handling features include:


Coin Tray, Figure 1-12 (A)
Hopper, Figure 1-12 (B)
Coin Drop system, Figure 1-12 (C)

Figure 1-12 Coin Tray, Hopper, and Coin Drop.

A B

Diagnostic Switch The Diagnostic Switch, Figure 1-13, is located under the Printer.
Figure 1-13 Diagnostic Switch.

February 2009
BB2-Mech Components 1-11
Doors The BB2 Main Door and Lower Door provide access to the interior of the cabinet, Figure 1-14.
Figure 1-14 Open BB2 Main Door.

Bill Acceptor

Hopper
Lower Door Coin Tray

Lower Door The BB2 door system is a two-part design comprised of a Lower Door, Figure 1-15, which opens
with the lower latch, Figure 1-15 (A), and the Main Door, which opens with the upper latch,
Figure 1-15 (B).

Figure 1-15 Latches to separate doors.

16-022128-03
1-12 Chapter 1: Introduction and Features

When the Main Door is opened, it is safely held in place by a gas strut, Figure 1-16.

Figure 1-16 Gas Strut.

The Main Door, Figure 1-17, connects the same way to the game cabinet except for changes in the
shape of the door mounting slots.
Figure 1-17 Main Door open.

February 2009
BB2-Mech Components 1-13
The Lower Door, Figure 1-18, features the following:
Updated styling including outer plastic fascia
Inner steel frame added for strength and security
Cold Cathode Fluorescent Lamps (CCFL) in Lower Door for:
longer life
improved efficiency
Figure 1-18 Interior of Lower Door.

Door Switches The Main Door switch, located under the Cabinet Shelf, Figure 1-19 (A), confirms that the door is
closed properly and places the game into play mode.
Figure 1-19 Main Door switch.

The Lower Door switch confirms that the Lower Door is closed. The Lower Door Switch is located in
the center of the inside of the Lower Door, Figure 1-20 (A).
Figure 1-20 Lower Door switch in center of inside Lower Door (left), and close-up (right).

Both switches are accessible with one hand, enabling easy maintenance and testing of game
functionality.

16-022128-03
1-14 Chapter 1: Introduction and Features

Power Supply The Power Supply, Figure 1-21, is located below the Power Switch and replaces two power supplies
and a toroid.
Figure 1-21 Power Supply.

Printer The BB2 supports all Printers currently available, Figure 1-22.
Features include an illuminated Printer Bezel
Figure 1-22 Illuminated Printer Bezel.

Reel Controller The Reel Controller Board Assembly, Figure 1-23, features are as follows:
Board Assembly Figure 1-23 Reel Controller Board
Assembly-bottom view showing 3 reels connected.

Handles both 3-reel (90mm) and 5-reel (66mm) versions


5-reel compatible for G + 4x5 Themes

February 2009
BB2-Mech Components 1-15
Reel Tray A Single Reel Tray, Figure 1-24, is available for use with 3 and 5 Reel versions.
Figure 1-24 Reel Tray (top), 3-reel version (left), and 5-reel version (right).

Service Lamp A Service Lamp, Figure 1-25, is located on top of the Power Supply.
Features include the following:
LED for illumination
Repositioned for better illumination; shines directly onto CPU and Bulkhead Board

Figure 1-25 Service Lamp.

Side and Back The Side and Back Panels on the game cabinet are removable, Figure 1-26.
Panels Removable panels now allow for Top Box updated cabinet finish or custom lamination on all BB2
cabinets

Figure 1-26 Side Panel laminate.

16-022128-03
1-16 Chapter 1: Introduction and Features

Transmissive Reels The Transmissive Reels LCD Display, Figure 1-27, functions identically to a standard touchscreen
LCD Display LCD, but includes transparent windows as part of the display area to enable viewing of the
Features Mechanical Reels.
Figure 1-27 Transmissive 5-Reel LCD display-rear view (left), and 3-Reel LCD display-front view (right).

CPU Enclosure The CPU Enclosure protects the CPU Board and is completely removable from the game. Four
square tabs on the back of the enclosure seat the CPU Enclosure, Figure 1-28.
Figure 1-28 CPU Enclosure installed (left), and four mounting tabs w/CPU removed (right).

February 2009
Hard Meters 1-17

Hard Meters If the game includes hard meters, Figure 1-29, they are located behind the Main Door on the right
side of the game, and track the following information:

(A) Coins In (C) Coins Drop (E) Jackpots


(B) Coins Out (D) Bills In (F) Custom/Spare

Figure 1-29 Hard Meters.

Features include:
Cabling outside of the Right Cable Channel to keep AC separate from the hard meter signal
An external meter window on the side panel for ease of reading meter data

16-022128-03
1-18 Chapter 1: Introduction and Features

Bose Audio The BB2 features a Bose Audio System, Figure 1-30, that is specifically designed for the BB2
System cabinet.
NOTE: The BB2 Amplifier Assembly (A-009820-00-03) is unique to the BB2.
Figure 1-30 Primary Amplifier.

An advanced sound speaker is located in front of the Bose system, Figure 1-31.
Figure 1-31 Sound System inside cabinet (left), and speaker grill (right).

Top Box A series of four posts located at the top of the game cabinet assist in accommodating various
Mounting thicknesses of top boxes, Figure 1-32 (A).
Hardware Figure 1-32 Top Box Posts.

February 2009
Bulkhead Board 1-19

Bulkhead Board Most game components, including peripherals, connect to the Bulkhead Board,
Figure 1-33 and Table 1-6.
Figure 1-33 Bulkhead Board.

C F G
A B D E

H
I

X
J K L M N O

P Q R S T

W
U U U V V V

Table 1-6 Bulkhead Board connectors.


ID Connector ID Connector ID Connector
A Touch Screen (purple) - J4 I +24 V - J11 (4-pin) Q Hopper - J19 (14-pin)
(10-pin)
B Printer (yellow) - J5 (8-pin) J Bill Acceptor (red) - J12 (18-pin) R Meter - J20 (12-pin)
C SPN - J3 K Coin Acceptor - J13 S Top Box - J21 (20-pin)
D Audio (green) - J6 (8-pin) L Tower Lamp - J17 (5-pin) T Aux/secondary Power (DC) - J22
(8-pin)
E Spare - J7 (6-pin) M Game Button Switches - J14 U Host Comm 1 - J24, J25, J26
(18-pin)
F Lamp Matrix - J8 (16-pin) N Game Lamps - J15 V Host Comm 2 - J27, J28, J29
(18-pin)
G Primary Power - J9 (22-pin) O Aux/secondary Power (DC) - J16 W 5V Isolated - J23 (2-pin)
(8-pin)
H Door/Key Switch - J10 (24- P Progressive - J18 (10-pin) X LED Power Indicators
pin)

The Bulkhead Board is located on the back wall of the game, Figure 1-34 (A).
Figure 1-34 Bulkhead Board inside game.

16-022128-03
1-20 Chapter 1: Introduction and Features

Safety Features Several safety features are included in the BB2 cabinet.
Liquid Diversion The liquid diversion parts on the game are designed to handle less than one liter of liquid. During
game setup, verify that all parts are securely installed and adequately cover the sensitive
components.
WARNING: Removal or alteration of any liquid diversion component violates CSA water safety
regulations.
To protect AC components of the game from electrical damage, and to prevent a fire/shock hazard,
several liquid diversion parts are included in the game.
Foam tape runs along the length of the speaker grill and also in the corners of the speaker grill,
Figure 1-35. This foam guides liquids down the sides of the cabinet and out of the game. In addition,
there is a rubber gasket that runs the length of the speaker grill above the foam.
CAUTION: To avoid electrical shock, always remove power from the game when servicing NON-
ESD items. Take all necessary precautions to avoid spillage of any liquids on or near the game to
protect critical game components from damage.
Figure 1-35 Foam strips along speaker grill and in corners of grill.

February 2009
Electrical Requirements 1-21
Ground Braids The Ground Braids, Figure 1-36, provide ground connectivity between the cabinet and door.
Figure 1-36 Ground Braids.

Electrical Review the following to confirm electrical safety requirements:


Requirements
WARNING: Plugging the game into an improper line voltage source may create a fire and/or
electrical shock hazards. An improper line voltage or frequency can also cause game damage or
malfunctions. Check the voltage configuration label on your game, located next to serial plate, for
proper line voltage.
Locate the socket outlet close to the installed position of this game and confirm that the power
output matches the game system requirements defined in Table 1-7.

Table 1-7 Game Power Requirements.


Voltage 120 VAC or 220-240 Vac
Line Frequency 50/60 Hz
Current maximum 6A at 120Vac
or
maximum 3A at 220-240Vac

Properly Ground Avoid electrical shocks by using proper grounding at all times. Do not plug in the gaming device until
Gaming Devices you inspect and verify the outlet. Only connect WMS equipment to grounded, three-wire outlets. Do
not use a cheater plug to defeat the AC Line Cords ground pin. Do not cut off the ground pin. After
servicing a gaming device, ensure that ground wires are secure.
Use Functional AC If the AC Line Cord is damaged, it must be replaced by the manufacturer, a service technician, or a
Line Cord similarly qualified person to avoid a hazard.
Outdoor Use This device is not suitable for outdoor use.
Game Maintenance When performing any maintenance or modification to the gaming device, ensure the AC Line Cord
is disconnected from the outlet. Unplugging all AC Line Cords is the only means of disconnecting
the game.

16-022128-03
1-22 Chapter 1: Introduction and Features

Radio Interference Please be aware of the safety notices listed below. Pending approval, some or all of the following
may apply:
FCC Interference Notice. This equipment has been tested and complies with the limits for a
Class B digital device, pursuant to Part 15 of the FCC Rules. These limits provide reasonable
protection against harmful interference when the equipment is operated in a commercial
environment. This equipment generates, uses, and can radiate radio frequency energy. If not
installed and used according to the instruction manual, this equipment may cause harmful
interference to radio communications. Operation of this equipment in a residential area is likely
to cause harmful interference. The user must correct interference at their expense.

Canadian Interference Notice. This Class B digital apparatus meets all requirements of the
Canadian Interference-Causing Equipment Regulations.

EU Interference Notice. This Class B digital apparatus meets all requirements of the EURO
(CISPR 22) EMC specifications and safety requirements.This Gaming Device is not intended for
use by young children or infirm persons without supervision. Young children should be
supervised to ensure they do not play with this Gaming Device.

Service Fuses The Power Supply has two service fuses, Unswitched and Switched, Figure 1-37.
The Switched AC Output Fuse, Figure 1-37 (A), provides circuit protection to system AC devices
when the power switch is in the ON position. This includes installed display devices, and all AC-
based illumination in the cabinet, with the exception of the service lamp.
The Unswitched AC Output Fuse, Figure 1-37 (B), provides circuit protection to AC devices when
the power switch is in either the standby or in the ON position. This is primarily used to power player
tracking systems, the service lamp, and service outlet.
Figure 1-37 Service Fuses.

Line Voltage The main power supply used in WMS Bluebird products has a line voltage feature that automatically
Auto-Detect detects the proper line voltage needed for the game and adjusts accordingly.
NOTE: Even though the Power Supply is auto-ranging, make sure that proper voltage and
frequency are available.

February 2009
Chapter 2
Installation and Setup

Table of Overview....................................................................................... 2-1


Contents Preparation ................................................................................... 2-2
ESD Prevention ................................................................................2-2
Install Game onto Stand....................................................................2-2
Lock Specifications ...........................................................................2-8
Change CPU Shipping Lock(s) .........................................................2-8
Remove Cover Plate To Install Second Lock (if necessary) ................. 2-9
Cashbox Locks .................................................................................2-9
Power Setup .....................................................................................2-9
Verify CPU-NXT2 Connections ....................................................... 2-11
Verify Bose Primary Amplifier Connections..................................2-12
Jumper Settings......................................................................... 2-13
Bill Acceptor Jumpers .....................................................................2-14
Progressive Port Jumpers...............................................................2-15
Host 1 Jumpers...............................................................................2-16
Host 2 Jumpers...............................................................................2-16
Removing the Transmissive LCD and Reels........................... 2-17
Remove the Transmissive LCD ......................................................2-17
Remove the Reel Controller Board Assembly ................................2-19
Remove a Mechanical Reel ............................................................2-20
Replacing the Transmissive LCD and Reels ........................... 2-21
Replace a Mechanical Reel ............................................................2-21
Replace the Reel Controller Board Assembly.................................2-22
Replace the Transmissive LCD.......................................................2-23
Installing the Accessory Box.................................................... 2-25
Electronic Connections............................................................. 2-29
Starting the Game ...................................................................... 2-30
Check/Install SPI and BIOS Firmware Hub ....................................2-30
Performing a RAM Clear.................................................................2-31
Install the CompactFlash Cards ......................................................2-32
OLED Start-UP Sequence......................................................................2-35

Overview This chapter describes the basic installation of a Bluebird 2 Mechanical (BB2-Mech), including
installation onto a game stand, the Bulkhead Board Jumper Settings, and Accessory Box
installation.

February 2009
16-022128-03
2-2 Chapter 2: Installation and Setup

Preparation This section provides instructions for preparing the game.


ESD Prevention Depending on the procedure, measures must be taken to prevent electrical shock and/or
electrostatic discharge (ESD) when servicing the game. See Preventing Injury and Damage in the
About this Guide chapter for details on ESD prevention.
ESD: Ensure that you take the following measures to prevent ESD:
Turn the game OFF at the Power Switch.
Wear an ESD wrist strap.

Install Game onto Complete the following steps to mount the game onto an 18" game stand. WMS recommends using
Stand the Bluebird 2 Drill template (16-023508-00-xx) or Plexiglas (03-023507-01-xx), Figure 2-1. To
obtain the template, contact the Customer Product Support Center at 866.967.4457 or
customersupport@wms.com.
CAUTION: The maximum weight for any BB2 base game is 251.6 lbs (114.123 kg). Verify that any
non-WMS game stand specifications meet this weight requirement before mounting the game.
Using inadequate game stands voids the WMS Warranty and may lead to distortion of the game
cabinet, including the inability to close and lock the Main Door.
Figure 2-1 BB2 Drill Template.

NOTE: Adhere to the following details:


All pilot holes are 0.13" diameter (0.3 cm)
Large holes are 3.75" diameter (9.2 cm)
Medium holes are 2.75" diameter (7 cm)
Small holes are 0.50" diameter (1.3 cm)

February 2009
Preparation 2-3

NOTE: Space the games at least 6" apart.


1 To secure the game stands, attach the game stand back-to-back and side-to-side
WARNING: The BB2 cabinet has a high center of balance. Immediately secure cabinet for
stability before conducting any procedure. Improper mounting can cause the stand to tip over,
risking damage and injury.
2 Using the Drill Template, complete the following steps:
a Position the template by setting it flush with the back of the drop stand and then centering it
side-to-side.
b Using a centerpunch and hammer, mark the bolt holes, electrical hole, and if applicable, the
drop hole.
c Drill a pilot hole for each of the four bolt holes.
d If applicable, drill two pilot holes for the drop and electrical holes.
e Remove the template.
f Drill the four bolt holes.
g Drill the electrical hole and, if applicable, the drop hole.
3 With a lift jack, lift onto the game stand.
NOTE: WMS recommends using a lift jack. If one is not available, three technicians are required
to lift the game cabinet: one on each side of the cabinet and one in the front.
4 Open the Main Door.
a All: Stage the rear of the game one (1) foot from the front of the base, Figure 2-2.
Figure 2-2 Staging the game.

16-022128-03
2-4 Chapter 2: Installation and Setup

b Lifters: Position yourselves on either side of the game, Figure 2-3 (A).
Spotter: Stand in front of the game, Figure 2-3 (B).
Figure 2-3 Lifters and spotter in position.

CAUTION: For maximum safety, do not rush. Perform the steps at a controlled even pace.
c Lifters: Place a hand approximately two-thirds up the front of the game for maximum grip
control. The grip point may vary depending on the game model.
d Lifters: Place your other hand at the top back edge of the game, near the top, and tip the
game forward so that the game pivots on its front bottom edge, Figure 2-4 (A). Use your
forward hand to control the tipping of the game.
Spotter: Assist by controlling and guiding the forward tilt of the machine, Figure 2-4 (B).
Figure 2-4 Leaning the game forward.
A
B

February 2009
Preparation 2-5
e Lifters: Squat down and slide your back hand under the back bottom edge of the game.
The forward hand should remain in its original position.
Figure 2-5 Hand position under the game.

f Lifters: Maintain eye contact with each other as one lifter counts to three to coordinate the
lifting of the game.
g Lifters: To lift the game up from the floor, use the technique of rising up with your back
straight Figure 2-6 (A), arms locked at the elbow, and using only the lifting power of your
legs.
Spotter: Control the forward tilt of the game.
Figure 2-6 Lifting the game.

16-022128-03
2-6 Chapter 2: Installation and Setup

h Lifters: With a smooth slow movement, place the game on the base so that the front edge
of the base is half way under the game bottom, Figure 2-7.
Spotter: Continue to control the forward tilt.
Figure 2-7 Placing the
game halfway on the base.

i Lifters: Once the game is supported by the front edge of the base, slide your hand from
under the game to a comfortable position on the rear of the game, Figure 2-8 (A).
j All: Allow the game to slowly tilt back so that the entire bottom of the game is supported on
the base.
Figure 2-8 Placing Game on the base.

February 2009
Preparation 2-7
k All: Slide the game back on the base and align the bolt holes in the bottom of the game with
the holes on the base, Figure 2-9.
Figure 2-9 Positioning the game.

l All: Mount the game as instructed in the Service Manual & User Guide corresponding to the
game.

5 Remove the Coin Tray by completing the following steps:


a Lift the releases, Figure 2-10 (A).
Figure 2-10 Coin Tray releases.
A

b Pull the Coin Tray forward and out, Figure 2-10 (B).
6 Carriage bolts are recommended for mounting the game for security and ease of assembly.
Drop four 3/8 x 2" carriage bolts down through the bolt holes and secure the cabinet to the
drop stand with the hex nuts and washers.

CAUTION: WMS requires that all BB2 games are mounted to game stands using the four
carriage bolts supplied with the game for stability and security. Failing to do so may lead to
cabinet warping.

16-022128-03
2-8 Chapter 2: Installation and Setup

Lock Specifications Replace the shipping locks with locks according to the specifications in Table 2-1 and Table 2-2:
Table 2-1 Lock Specifications.
Rotation to
Designed Extended Cam Lock (viewed
Lock Location Length Length* Description Cam Part No. from key end)
Main Door 5/8 1/2 inside or 1 1/2 lg. 1/4 01-001614-04 clockwise
outside offset
Lower Door 5/8 1/4 inside, 1 1/2 lg. 1/4 01-001614-04 clockwise
1/2 outside offset
CPU Enclosure 5/8 1/2 outside Special 01-010849 clockwise
CPU Enclosure 5/8 1/2 outside 1 1/4 flat 01-12793-08 clockwise
(secondary)
Bill Acceptor 5/8 1/2 outside 7/8 flat 01-12793-10 clockwise
Cassette Door

Table 2-2 Lock Specifications (metric).


Rotation to
Designed Extended Cam Lock (viewed
Lock Location Length Length* Description Cam Part No. from key end)
Main Door 16 mm 13 mm inside 38 mm lg. 6 mm 01-001614-04 clockwise
or outside offset
Lower Door 16 mm 6 mm inside, 38 mm lg. 6 mm 01-001614-04 clockwise
13 mm outside offset
CPU Enclosure 16 mm 13 mm outside Special 01-010849 clockwise
CPU Enclosure 16 mm 13 mm outside 32 mm flat 01-12793-08 clockwise
(secondary)
Bill Acceptor 16 mm 13 mm outside 22 mm flat 01-12793-10 clockwise
Cassette Door

*Conditions:

Extending the lock inside requires a new cam.


Extending the lock outside requires a spacer.

Change CPU To ensure that the CPU Enclosure Shipping Lock does not open during transport, a Torsion Spring
Shipping Lock(s) keeps the lock from slipping open, Figure 2-11 (A). The Torsion Spring must be removed when the
Shipping Lock is replaced.
Figure 2-11 Shipping Lock on the inside of the
CPU Enclosure door.

1 Ensure that the Power Switch is set to OFF.


2 Remove CPU Enclosure door from the game.
3 Release the Torsion Spring, Figure 2-11 (A).
4 Remove the Shipping Lock, Figure 2-11 (B).
5 When the Shipping Lock is removed, discard the Torsion Spring.

February 2009
Preparation 2-9
6 Remove the cam for the new lock, Figure 2-11 (C), using a 3/16" or 1/4" flathead screwdriver to
bend the cam until it breaks off.
7 Install the new lock according to casino protocol. Ensure that the cam removed in the previous
step is installed with the new lock.

Remove Cover Plate To Install Second Lock (if necessary)


If a second lock is required in the place of the cover plate, Figure 2-12 (A), complete the following
steps to remove the cover plate:
1 Use a 3/16" or 1/4" flathead screwdriver to punch the perforated cover plate out of the CPU
Enclosure Door, Figure 2-12 (A).
Figure 2-12 Punch perforated cover plate out of
CPU Enclosure door.

2 Install the second lock according to casino protocol.


3 Re-attach the door for the CPU Enclosure.

Cashbox Locks Please note the following:


On JCM 12 and 13 WBAs, the new cam is taped to the Cashbox.
Do not lose the cam. If the cam is lost, a new cam must be ordered.

Power Setup The Power Supply is a single unit, and is connected to a power source with an AC Line Cord.
Complete the following steps to connect the BB2-Mech to an approved power source:
WARNING: Plugging your game into an improper line voltage source may create a fire and/or
electrical shock hazards. An improper line voltage or frequency can also cause game damage or
malfunctions.
CAUTION: The power strip is the means of disconnection, and should be installed near the
equipment and be easily accessible.
1 Verify that the line voltage at the outlet is either 120 VAC or 220-240 VAC, per the rating of the
specific game.
2 Use an outlet tester to check for properly implemented ground, hot and neutral outlet wiring.
Only use a grounded AC outlet. The gaming device accepts a line frequency of 50 to 60 Hz. If
the outlet meets requirements, proceed to the next step.

16-022128-03
2-10 Chapter 2: Installation and Setup

3 Confirm that the game is switched OFF at the power switch, Figure 2-13 (A).
Figure 2-13 Power switch.

4 At the bottom of the cabinet, feed the AC Line Cord through the electrical hole.
5 Plug the right-angled female end of the AC Line Cord into the AC INPUT jack, Figure 2-14 (A),
of the Power Supply.
Figure 2-14 Location of the AC INPUT jack.

6 Plug the male end of the AC Line Cord into the tested socket.
7 If applicable, plug the male end of the Accessory Box AC Line Cord into a second AC Line
Cord.

February 2009
Preparation 2-11
Verify CPU-NXT2 Verify the CPU-NXT2 connections, Figure 2-15, as defined in Table 2-3.
Connections Figure 2-15 Connections to the CPU-NXT2.

A B C D

Table 2-3 CPU Enclosure Connections.


Connection Location
USB Port (4) Figure 2-15 (A)
VGA Video Port Figure 2-15 (B)
DVI Video Port Figure 2-15 (C)
SPDIF Port Figure 2-15 (D)

16-022128-03
2-12 Chapter 2: Installation and Setup

Verify Bose The audio system is connected and ready to use upon delivery. Verify the BB2 Amplifier Assembly
Primary Amplifier (A-009820-00-03) connections, Figure 2-16, as defined in Table 2-4:
Connections Figure 2-16 Primary Amplifier connections.

D
E

C
B
A

Table 2-4 Primary Amplifier connections.


Connection Location
3.5 mm Stereo cable Figure 2-16 (A)
SPDIF cable Figure 2-16 (B)
Speaker Assembly cable Figure 2-16 (C)
Subwoofer cable Figure 2-16 (D)
Power cable Figure 2-16 (E)

February 2009
Jumper Settings 2-13

Jumper The Bulkhead Board includes ten jumpers, Figure 2-17, that determine the game communication
Settings interface with the Bill Acceptor, Progressive System, and the Host System(s). If a feature is not used
by the game, then jumper settings have no effect on game functionality.
Figure 2-17 Bulkhead Board Jumper locations.

JP1
Bill Acceptor Jumpers
JP2

JP3

Progressive Port Jumpers

JP4 JP5 JP6

JP7 JP8

JP9 JP10

Host 1 Host 2
Jumpers Jumpers

16-022128-03
2-14 Chapter 2: Installation and Setup

Bill Acceptor Three jumpers on the Bulkhead Board control the Bill Acceptor interface option used by the game,
Jumpers Figure 2-18. Three interface options are available: RS-232, TTL, and Current Loop (C-Loop).
Figure 2-18 Bill Acceptor Jumpers.

Figure 2-19 Sample Jumper Settings.

Table 2-5 Bill Acceptor jumpers.


Interface JP1 JP2 JP3
JCM UBA or WBA Either Position (N/A) Position 1/2 (C-Loop) Position 2/3 (C-Loop)
MEI Position 2/3 (RS-232) Position 2/3 (RS-232) Either Position (N/A)

There are two possible jumper positions, which are referenced in Table 2-5 as 1/2 and 2/3.
Figure 2-19 shows sample jumper settings with TTL Selected (A), and RS-232 Selected (B). While
the pins are not actually numbered on the board, the assumption is that in text-legible board
orientation, the top pin is 1, and the bottom pin is 3.

February 2009
Jumper Settings 2-15
Progressive Port Three jumpers on the Bulkhead Board control the type of progressive system and interface used by
Jumpers the game. Four interface options are available: RS-232, RS-485 Half Duplex, RS-485 Full Duplex,
and Current Loop (C-Loop), Table 2-6:
The Jumper at JP4 must be set to RS485, Figure 2-20 (A).
Figure 2-20 Jumper setting at JP4 on Bulkhead Board.

A
B

The Jumper at JP5 must be set to FULL, Figure 2-20 (B).


The Jumper at JP6 must be set to RS232/485, Figure 2-21 (A).
Figure 2-21 Jumper setting at JP6 on Bulkhead Board.

Table 2-6 Progressive Port jumpers.


Interface JP4 JP5 JP6
RS-232 Position 2/3 (RS-232) Either Position (N/A) Position 2/3 (RS-232) (RS-485)
R-485 Half Duplex Position 1/2 (RS-485) Position 1/2 (Half) Position 2/3 (RS-232) (RS-485)
R-485 Full Duplex Position 1/2 (RS-485) Position 2/3 (Full) Position 2/3 (RS-232) (RS-485)
Current Loop (C-Loop) Either Position (N/A) Either Position (N/A) Position 1/2 (C-Loop)

16-022128-03
2-16 Chapter 2: Installation and Setup

Host 1 Jumpers BB2 may be configured as a dual host system. Two jumpers control the Host 1 communication
interface, Figure 2-22. The two options are RS-232 and RS-485, Table 2-7.
Figure 2-22 Host 1 jumpers.

Table 2-7 Host 1 jumpers.


Interface JP9 JP10
RS-232 Position 2/3 (RS-232) Position 2/3 (RS-232)
RS-485 Position 1/2 (RS-485) Position 1/2 (RS-485)

Host 2 Jumpers Two jumpers control the Host 2 communication interface, Figure 2-23. The two options are
RS-232 and RS-485, Table 2-8.
Figure 2-23 Host 2 jumpers.

Table 2-8 Host 2 jumpers.


Interface JP7 JP8
RS-232 Position 2/3 (RS-232) Position 2/3 (RS-232)
RS-485 Position 1/2 (RS-485) Position 1/2 (RS-485)

February 2009
Removing the Transmissive LCD and Reels 2-17

Removing the This section describes the steps to removing the Transmissive LCD and Reels from the game
Transmissive cabinet.
LCD and Reels

Remove the To remove the Transmissive LCD, complete the following steps:
Transmissive LCD

ESD: Ensure that you take the following measures to prevent ESD:
Turn the game OFF at the Power Switch.
Wear an ESD wrist strap.
1 Open the Main Door.
2 Disconnect the DVI cable from the Transmissive LCD, Figure 2-24.
Figure 2-24 Disconnect the DVI cable.

3 Disconnect the TOUCH SCREEN power connector, Figure 2-25 (A).


Figure 2-25 Location of Touch Screen power
connector on the Bulkhead Board.

4 Slide printer forward to gain access to Upper Cable Cover.


5 Remove cabling from game cabinet back to CPU.
CAUTION: A second technician is required when removing the Transmissive LCD from the game.

16-022128-03
2-18 Chapter 2: Installation and Setup

6 Holding on to the sides near the top of the Transmissive LCD, slowly pull the top of the LCD
away from the game until the spring clips disengage and the LCD is vertical, Figure 2-26 (A).
Figure 2-26 Remove the Transmissive LCD.

7 Lift the Transmissive LCD straight up until it clears the top of the mounting slots located on the
cabinet and pull forward, Figure 2-26 (B).
8 Rest the lower edge of the Transmissive LCD on the Cabinet Shelf, Figure 2-27.
Figure 2-27 Lift the LCD out of the cabinet.

9 Place the Transmissive LCD in a safe location.

February 2009
Removing the Transmissive LCD and Reels 2-19
Remove the Reel To remove the Reel Controller Board Assembly, complete the following steps:
Controller Board
Assembly

ESD: Ensure that you take the following measures to prevent ESD:
Turn the game OFF at the Power Switch.
Wear an ESD wriststrap.
1 Perform step 1 to step 4 in Remove a Mechanical Reel on page 2-20.
2 Under the Cabinet Shelf, identify the Reel Controller Board Assembly, Figure 2-28 (A).
Figure 2-28 Reel Controller Board Assembly under
Cabinet Shelf.
B

3 Under the Cabinet Shelf, on the left side, pull and hold the pull-pin, Figure 2-28 (B), to
disengage the Reel Controller Board Assembly, Figure 2-28 (A).
NOTE: Do not use the front thumbscrew. The front thumbscrew does not engage the Reel
Controller Board Assembly to the Cabinet Shelf.
4 Pull the Reel Controller Board Assembly away from the Cabinet Shelf and turn upside down so
that the connections are facing upward, Figure 2-29.
Figure 2-29 Flipped over Reel Controller Board Assembly.

5 Disconnect the SPN, Figure 2-29 (A), the reel, Figure 2-29 (B), and the power cables,
Figure 2-29 (C).
6 Remove the Reel Controller Board Assembly.

16-022128-03
2-20 Chapter 2: Installation and Setup

Remove a To remove a Mechanical Reel, complete the following steps:


Mechanical Reel 1 Lift the finger latch at the front of the Reel Mechanism, Figure 2-30 (A).
Figure 2-30 Reel Mechanism latch.

2 Unhook the finger latch spring, Figure 2-30 (B).


3 Pull the Reel Mechanism forward and lift off the Reel Tray, Figure 2-31 (A).
Figure 2-31 Remove the Reel Mechanism.

4 Place the Reel Mechanism in a safe location.

NOTE: If removing multiple reels, set them aside, noting the sequence on the cable in which
they were removed to ensure reinstallation in the same positions.

February 2009
Replacing the Transmissive LCD and Reels 2-21

Replacing the This section refers to reinstalling the Transmissive LCD and Reels into the game cabinet.
Transmissive
LCD and Reels

Replace a To replace a Mechanical Reel, complete the following steps:


Mechanical Reel

ESD: Ensure that you take the following measures to prevent ESD:
Turn the game OFF at the Power Switch.
Wear an ESD wrist strap.
1 Place the Reel Mechanism on the Cabinet Shelf, align with the track, and push the Reel
Mechanism into game, Figure 2-32 (A).
Figure 2-32 Push the Reel Mechanism into game.

2 Hook the finger latch spring onto the Cabinet Shelf, Figure 2-33 (A).
Figure 2-33 Hook the finger latch spring.

3 Press down the finger latch at the front of the Reel Mechanism, Figure 2-33 (B).

16-022128-03
2-22 Chapter 2: Installation and Setup

4 Connect the cable to the Reel Controller Board Assembly until it clicks into place when properly
seated. The number of the Reel Mechanism corresponds to the number on the Reel Controller
Board Assembly, Figure 2-34 (A).
Figure 2-34 Reel Controller Board Assembly
connectors (3-Reel configuration shown as example).
Optic Band

Replace the Reel To replace the Reel Controller Board Assembly, complete the following steps.
Controller Board
Assembly
ESD: Ensure that you take the following measures to prevent ESD:
Turn the game OFF at the Power Switch.
Wear an ESD wriststrap.
1 Perform step 1 to step 4 in Remove a Mechanical Reel on page 2-20.
2 Under the Cabinet Shelf, identify the Reel Controller Board Assembly, Figure 2-35 (A).
Figure 2-35 Reel Controller Board Assembly under
Cabinet Shelf.
B

3 Under the Cabinet Shelf, on the left side, pull and hold the pull-pin, Figure 2-35 (B), to
disengage the Reel Controller Board Assembly, Figure 2-35 (A).
NOTE: Do not use the front thumbscrew. The front thumbscrew does not engage the Reel
Controller Board Assembly to the Cabinet Shelf.

February 2009
Replacing the Transmissive LCD and Reels 2-23
4 Pull the Reel Controller Board Assembly away from the Cabinet Shelf and turn upside down so
that the connections are facing upward, Figure 2-36.
Figure 2-36 Flipped over Reel Controller Board Assembly.

5 Disconnect the SPN, Figure 2-36 (A), the reel, Figure 2-36 (B), and the power cables,
Figure 2-36 (C).
6 Remove the Reel Controller Board Assembly.
7 While holding the replacement Reel Controller Board Assembly, plug in the SPN,
Figure 2-36 (A), the reel, Figure 2-36 (B), and the power cables, Figure 2-36 (C).
8 Turn the Reel Controller Board Assembly so that the connections are facing downward.
9 Using the pull-pin, remount the Reel Controller Board Assembly, Figure 2-39 (A).
10 Perform step 1 to step 4 in Replacing the Transmissive LCD and Reels on page 2-21.

Replace the To replace the Transmissive LCD, complete the following steps:
Transmissive LCD

CAUTION: A second technician is required when moving the Transmissive LCD into the game.

1 Lift the Transmissive LCD near the cabinet and hold, Figure 2-37.
Figure 2-37 Lift and hold the Transmissive LCD.

2 Drop TOUCH SCREEN power cable through left side of Cabinet Shelf.

16-022128-03
2-24 Chapter 2: Installation and Setup

3 At the Transmissive LCD, connect the DVI cable, Figure 2-38.


Figure 2-38 Connect the DVI cable.

4 Holding the Transmissive LCD vertically from the top, place the bottom of the Transmissive
LCD into the lower bracket holes and slowly rotate the top of the Transmissive LCD toward the
game until the Transmissive LCD engages the holding springs, Figure 2-39 (A).
Figure 2-39 Replace the Transmissive LCD.

5 At the Transmissive LCD, connect the Reel Harness to the TOUCH SCREEN connector (J4),
on the Bulkhead Board, Figure 2-25 (A).
6 Close and lock the Main Door.

February 2009
Installing the Accessory Box 2-25

Installing the This section describes the steps to secure and connect a standard Accessory Box to a BB2.
Accessory Box Complete the following steps:

NOTE: A 17" Accessory Box is also available for certain jurisdictions.

ESD: Ensure that you take the following measures to prevent ESD:
Turn the game OFF at the Power Switch.
Wear an ESD wrist strap attached to the Accessory Box.
1 If applicable, prepare the Accessory Box for installation.
a Remove the Accessory Box Crown by pushing the latches, Figure 2-40 (A), (located at the
bottom of the left and right flanges) outward, and lifting the crown off the Accessory Box,
Figure 2-40 (B).
Figure 2-40 Remove the Accessory Box Crown.

16-022128-03
2-26 Chapter 2: Installation and Setup

b Remove and hold the Accessory Box LCD by lifting it up and then out of the bracket,
Figure 2-41 (A).
Figure 2-41 Remove the Accessory Box LCD.

c Disconnect the VGA cable, Figure 2-42 (A).


Figure 2-42 Disconnect Accessory Box LCD connections.

A B

d Disconnect the power cable from the back of the LCD, Figure 2-42 (B).
e Place the LCD in a safe location.
2 Four posts are located at the top of the game cabinet that are spring-loaded to accommodate
various thicknesses of Accessory Boxes, Figure 2-43 (A).
Figure 2-43 Accessory Box Posts.

CAUTION: Two technicians may be required to lift the Accessory Box onto the game cabinet.

February 2009
Installing the Accessory Box 2-27
3 If appropriate, together with another technician, carefully lift the Accessory Box onto game and
align over posts, Figure 2-44 (A).
Figure 2-44 Accessory Box on posts.

A A

A A

C C

4 Slide back the Accessory Box to engage with posts, Figure 2-44 (B).
5 To secure the Accesory Box, use a #2 Phillips screwdriver or ratchet with a 1/4" socket to install
two #8-32 screws at the front of the Accessory Box, Figure 2-44 (C).
6 Secure the #8-32 screws, Figure 2-44 (D).
CAUTION: For safety, it is critical that the two #8-32 screws are installed and are secured.
7 Run the cables for the Accessory Box into the game cabinet.
8 Connect the fan and tower lamp cables to the cabinet (see Electronic Connections on page 2-29).
9 Connect the VGA cable to the CPU Enclosure
(see Verify CPU-NXT2 Connections on page 2-11).
10 Reinstall the LCD:
a Rest the bottom edge of the LCD on top of the game cabinet.
b Connect the VGA cable to the LCD, Figure 2-45 (A).
Figure 2-45 Connect Accessory Box LCD connections.

A B

16-022128-03
2-28 Chapter 2: Installation and Setup

c Connect the power cable to the LCD, Figure 2-45 (B).


d Lift the Accessory Box LCD on the Accessory Box LCD brackets, Figure 2-46 (A).
Figure 2-46 Replace the Accessory Box LCD.

11 Replace the Accessory Box Crown by aligning it with the front of the Accessory Box and then
sliding it down until the latches engage, Figure 2-47.
Figure 2-47 Replace the Accessory Box Crown.

February 2009
Electronic Connections 2-29

Electronic Confirm or make the connections to the Left Cable Channel and Right Cable Channel by completing
Connections the following steps.
ESD: Ensure that you take the following measures to prevent ESD:
Turn the game OFF at the Power Switch.
Wear an ESD wrist strap.
1 Access the Cable Channels by performing the steps in Removing the Transmissive LCD and
Reels on page 2-17.
2 Make or verify connections for the Left Cable Channel. Refer to Figure 2-48 and Table 2-9 as
needed.

Table 2-9 Left Wire Harness Connectors.

Figure 2-48 Left Wire


Channel ID Function Harness Connections
A Aux DC Power (8-pin)
B LCD Power (4-pin)
C LCD Power (4-pin)
D +12VDC/+24VDC (3-pin)
E +12VDC/+24VDC (3-pin)
F +12VDC/+24VDC (3-pin)
G +12VDC/+24VDC (3-pin)
H +12VDC/+24VDC (3-pin)
I +12VDC/+24VDC (3-pin)
J +12VDC/+24VDC
K Touch Screen Communication (6-pin)
L Top Box Communication (8-pin)
M Player Tracking Power Monitor and Auxiliary Fill Switch (12-pin)
N Tower Light (6-pin)
O Top Box Door and Auxiliary Logic (4-pin)
P Player Tracking, Top Box Door, and Auxiliary Logic (10-pin)
Q Player Tracking and Cabinet (24-pin) Switches

16-022128-03
2-30 Chapter 2: Installation and Setup

3 Make or verify connections for the Right Cable Channel. Refer to Table 2-10 and Figure 2-49,
as needed.

Table 2-10 Right Wire Harness Connectors.


Figure 2-49 Right Wire
Harness Connections.
Channel ID Function
A Switched AC (5-pin)
B Service Lamp Switch (6-pin)
C Player Tracking, Unswitched AC (3-pin)
D Player Tracking, Unswitched AC (IEC)

4 Reinstall the Reels and Transmissive Reels LCD by performing the steps in Replacing the
Transmissive LCD and Reels on page 2-21.

Starting the This section provides instructions for inserting software into the CPU-NXT2.
Game

Check/Install SPI Depending on the jurisdiction, the SPI, Figure 2-50 (A), and BIOS Firmware Hub, Figure 2-50 (B),
and BIOS Firmware may not ship with CPU-NXT2. Before installing CPU-NXT2, verify that each chip is fully seated.
Hub Figure 2-50 SPI and BIOS Firmware Hub installed in CPU-NXT2.

February 2009
Starting the Game 2-31
Performing a RAM Follow the steps below to perform a RAM Clear on CPU-NXT2:
Clear

CAUTION: This procedure erases stored information. Do not clear the RAM and install software
unless Casino management has authorized the process.
1 Open CPU-NXT2 Enclosure Door to access the CompactFlash drive.
CAUTION: The game MUST be powered OFF before inserting or removing CompactFlash
cards. Inserting or removing a card with the power ON may cause permanent damage and data
corruption.
2 Install the RAM Clear CompactFlash card into the OS CompactFlash slot at board location,
Figure 2-51 (A).
WARNING: Do not force the RAM Clear CompactFlash card into the slot. If the card does not
engage easily, it is likely installed backwards.
Figure 2-51 Install RAM Clear CompactFlash card.
A

3 Close and lock CPU-NXT2 Enclosure Door.


4 Turn the game power to ON.
5 The machine boots and a progress indicator with the WMS logo displays while the RAM Clear
process initializes, Figure 2-52.
Figure 2-52 Game initialization screen.

16-022128-03
2-32 Chapter 2: Installation and Setup

The game completes the RAM Clear and displays the message in Figure 2-53.
Figure 2-53 RAM Clear message.

6 Power the game OFF.


7 Remove the RAM Clear CompactFlash card.
8 Install the game software card into the game CompactFlash slot.
9 Install the Operating System (OS) CompactFlash card into the OS CompactFlash slot.
10 Power the game ON.

Install the Complete the following steps to install the CompactFlash Cards:
CompactFlash 1 With the Logic Door Open or removed, install the two CompactFlash cards by gently pushing
Cards down on the center of the card, Figure 2-54.
If applicable, install the game software card into the game CompactFlash slot on left,
Figure 2-54 (A).
Install the Operating System (OS) card into the OS CompactFlash slot on right,
Figure 2-54 (B).
WARNING: Do not force the CompactFlash card down. If the card does not engage easily, it is
likely installed backwards.
Figure 2-54 CompactFlash cards installed,
opening Logic Door.

A B

February 2009
Starting the Game 2-33
2 Close the Logic Door and turn the lock to the left, Figure 2-55.
Figure 2-55 Lock Logic Door (left), and close-up (right).

NOTE: If the Logic Door detaches, reinstall it by first engaging the left mounting pin,
Figure 2-56 (A), turning the Logic Door Key to the right, and pushing the Logic Door slightly to the
left to engage the right mounting pin.
Figure 2-56 Close/Install Logic Door.

16-022128-03
2-34 Chapter 2: Installation and Setup

3 If applicable, reconnect the cables on the CPU-NXT 2, Figure 2-57 (A), as defined in
Table 2-11.
Figure 2-57 Connections to the CPU-NXT2.

A B C D

Table 2-11 CPU Enclosure Connections.


Connection Location
USB Port (4) Figure 2-57 (A)
VGA Video Port Figure 2-57 (B)
DVI Video Port Figure 2-57 (C)
SPDIF Port Figure 2-57 (D)

4 Remove the ESD wrist strap from the game.


5 Set the game Power Switch to ON.
The game boots for several minutes. As the game activates, the peripherals are started and
configured.

February 2009
Starting the Game 2-35
OLED Start-UP This section describes the start-up sequence for the BB2 of the OLED Button Panel. The states of
Sequence the OLED Button Panel during the start-up sequence, Figure 2-58, are described in Table 2-12.
Figure 2-58 States of OLED during start-up.

A B

D
C

E F

Table 2-12 Start-up States of OLED Button Panel.


State of Button #1 (largest button) State of Buttons #2 through #13 Meaning
OLED display on, with lowest Same as OLED Button #1. Initial Power-Up, No USB
intensity color, Figure 2-58 (A). Connection detected.
OLED display on, with 16 intensity Same as OLED Button #1. USB Connection detected during
color, Figure 2-58 (C). initial Power-Up.
OLED display blank, One White OLED displays blank, LEDs off. No USB Connection detected
Flashing LED, Figure 2-58 (C). (AFTER an initial USB Connection
had been established).
OLED display blank, red LED, Figure Same as OLED Button #1. Loading images from game
2-58 (D). software.
OLED display blank, red LED circles OLED display on, with 16 intensity Loading images into Button #1
screen, Figure 2-58 (E). color. only.
Images Display, yellow or blue LEDs Same as OLED Button #1. Ready for game play.
functional, Figure 2-58 (F).

Reference Installation Bulletin 16-023444-xx OLED Button Panel for BB2 and BBU for more
information.

16-022128-03
2-36 Chapter 2: Installation and Setup

February 2009
Chapter 3
Maintenance

Table of Overview....................................................................................... 3-2


Contents ESD Prevention............................................................................ 3-2
Cleaning the Game ...................................................................... 3-2
Game Cabinet...................................................................................3-2
LCD...................................................................................................3-2
Bill Acceptor ......................................................................................3-3
Printer ...............................................................................................3-3
Removing the Bill Acceptor and Cashbox ................................ 3-3
Remove the Bill Acceptor..................................................................3-3
Exchange Cashboxes .......................................................................3-5
Coin Handling Maintenance........................................................ 3-5
Remove the Hopper..........................................................................3-5
Install the Hopper..............................................................................3-6
Fill the Hopper...................................................................................3-7
Token/Coin Wiper Alignment.............................................................3-7
Remove the Coin Drop Chute from the Hopper................................3-8
Install the Coin Drop Chute on the Hopper .......................................3-9
Hopperless Mode: Coin Drop Chute Installation.............................3-10
Access the Coin Comparator .......................................................... 3-11
Mechanical Reels....................................................................... 3-12
Count Reel and Optic Band Stops ..................................................3-12
Removing a Mechanical Reel ................................................... 3-13
Remove the Reel Controller Board Assembly ................................3-13
Remove a Mechanical Reel ............................................................3-14
Remove the Reel Strip ....................................................................3-15
Replace Reel Strip ..........................................................................3-16
Replace the Optic Band ..................................................................3-17
Replace the Reel Drum & Associated Parts ...................................3-19
Replacing a Mechanical Reel.................................................... 3-22
Replace a Mechanical Reel ............................................................3-22
Replace the Reel Controller Board Assembly.................................3-23
Replace the Transmissive LCD.......................................................3-24
Replace the Reel Tray ....................................................................3-25
Reel Conversions ...................................................................... 3-26
Button Panel Maintenance........................................................ 3-26
Printer Replacement.................................................................. 3-26
Power Supply Replacement...................................................... 3-28
Replace Fuses ................................................................................3-30
Replace the Mechanical Arm Mechanism.......................................3-31
Bose Audio System Maintenance.......................................... 3-46

February 2009
16-022128-03
3-2 Chapter 3: Maintenance

Overview This chapter provides basic information about maintaining the Bluebird 2 Mechanical (BB2-Mech)
gaming machine. WMS games function optimally with periodic maintenance. The tasks in this
section are performed by personnel that fit into three categories:
Drop Crew
Attendants
Technicians

Table 3-1 identifies the tasks performed by these personnel:


Table 3-1 Division of maintenance responsibilities
Tasks Drop Crew Attendants Technicians
Removing the Cashbox X
Collecting Coins from the Drop Box X
Filling the Hopper X X
Removing Coin Acceptor X X
Cleaning game exterior X X
Installing paper into printer X X
Adjusting coin diverter X X
Removing Coin Acceptor X
Teaching Coin Acceptor X
Unlearning a Coin X
Routing Coin Acceptor cables X
Reading Meters X
Maintaining Bill Acceptor components X
Maintaining the Hopper X
Removing Optical Boards X

ESD Prevention Depending on the procedure, measures must be taken to prevent electrical shock and/or
electrostatic discharge (ESD) when servicing the game. See Preventing Injury and Damage in the
About this Guide chapter for details on ESD prevention.
ESD: Ensure that you take the following measures to prevent ESD:
Turn the game OFF at the Power Switch.
Wear an ESD wrist strap.

Cleaning the Cleaning of the game exterior should be performed every day and the peripherals should be
Game inspected and maintained at increments listed by the manufacturer. See 16-020839-xx Manual:
Peripherals for Bluebird Upright (BBU) & Slant (BBS) for details concerning each component. This
section provides only basic cleaning information.
CAUTION: This game must not be cleaned by a water jet, and is not suitable for installation in an
area where a water jet is used.
Game Cabinet Use a small vacuum cleaner to clean hard-to-reach and narrow places in the cabinet. Then, use a
non-ammonia, non-alcohol cleaning solution to clean the game exterior. Never spray the solution
directly onto the game. Instead, spray a soft, lint-free cloth and wipe the game exterior.
LCD A 50/50 mixture of distilled water and isopropyl alcohol is acceptable to use on the LCD. Never
spray liquid directly onto the LCD. Spray liquid onto a non-abrasive, soft cotton cloth and wipe the
LCD. Never use materials such as paper towels, which can cause scratches and damage the LCD.

February 2009
Removing the Bill Acceptor and Cashbox 3-3
CAUTION: The following cleaners should NOT be used on the LCD:
Acetone
Ethyl alcohol
Ethyl acid
Ammonia
Methyl chloride

Bill Acceptor The Bill Acceptor should be cleaned with a lint-free cloth lightly moistened in a mild detergent to
clean the optical sensor lenses and magnetic heads.

Printer Use a soft brush or a lint free cloth to clean the ticket path.

Removing the The procedures in this section describe how to remove the Bill Acceptor and Cashbox.
Bill Acceptor
and Cashbox
Remove the Bill Complete the following steps to remove the Bill Acceptor from the game:
Acceptor 1 Unlock and open the Lower Door.
2 Unlock and open the Bill Acceptor door, Figure 3-1 (A).
Figure 3-1 Press Down Bill Acceptor Door.

16-022128-03
3-4 Chapter 3: Maintenance

3 Press down on the release lever, Figure 3-2 (A), and slide the Bill Acceptor out of the game.
Figure 3-2 Press Down Bill Acceptor
release lever.

A
A

4 Slide in the replacement Bill Acceptor until the release lever clicks into place.
5 Close the Bill Acceptor door.
6 Close and lock the Main Door.

February 2009
Coin Handling Maintenance 3-5
Exchange When the Stacker Full tilt displays, the Cashbox must be exchanged with an empty Cashbox.
Cashboxes Complete the following steps:
1 Unlock and open the Lower Door.
2 Unlock and open the Bill Acceptor door, Figure 3-3 (A).
Figure 3-3 Open Bill Acceptor Door.

3 Slide the Cashbox out of the game, Figure 3-3 (B).


4 Slide an empty Cashbox into the game.
5 Close and lock the Bill Acceptor door.
6 Close and lock the Lower Door.

Coin Handling This section provides maintenance instructions for the components of coins and tokens.
Maintenance

ESD: Ensure that you take the following measures to prevent ESD:
Turn the game OFF at the Power Switch.
Wear an ESD wrist strap.

Remove the Hopper Remove the Hopper by completing the following steps:
1 Unlock and open the Main Door.
2 Lift the Coin Tray releases, Figure 3-4 (A).
Figure 3-4 Coin Tray releases.
A

16-022128-03
3-6 Chapter 3: Maintenance

3 Pull the Coin Tray forward and out, Figure 3-4 (B) then place the Coin Tray in a safe location.
4 Using the attached handle, slide the Hopper out of the game, Figure 3-5.
Figure 3-5 Remove Hopper.

Install the Hopper Install the Hopper by completing the following steps:

ESD: Ensure that you take the following measures to prevent ESD:
Turn the game OFF at the Power Switch.
Wear an ESD wrist strap.

1 Using the attached handle, slide the Hopper into the game, Figure 3-5, by engaging the flanges
at the bottom of the cabinet, Figure 3-6 (A).
Figure 3-6 Engage flanges.

2 Continue to slide the Hopper until the Blind Mate Connector seats, Figure 3-7.
Figure 3-7 Slide Hopper.

February 2009
Coin Handling Maintenance 3-7
3 Place the Coin Tray in front of the game, align, and slide into place, Figure 3-8 (A) until it
latches.
Figure 3-8 Slide Coin Tray.

4 Close and lock the Main Door.

Fill the Hopper Complete the following steps to fill the Hopper with coins or tokens for play when the Hopper empty
tilt displays:
WARNING: Use caution when filling the Hopper as it will become heavy. Improper handling can
cause the Hopper to tip over, risking damage and injury.
1 Remove the Hopper as instructed in Remove the Hopper on page 3-5.
2 Remove any dust, dirt, and other foreign matter from the Hopper Bowl.
3 Fill the Hopper with coins up to the maximum level.
4 Replace the Hopper as instructed in Install the Hopper on page 3-6.
Token/Coin Wiper To set the tolerance of the Hopper wiper alignment, complete the following steps:
Alignment 1 Using an 4mm hex wrench, loosen the Allan screws, Figure 3-9 (A).
Figure 3-9 Hopper wiper alignment.

2 Insert a token/coin into the token slot, Figure 3-9 (B).


3 Push the plate, Figure 3-9 (C), firmly against the back Hopper wheel housing, Figure 3-9 (D),
and hold in place.
4 Snug the front part of the wiper, Figure 3-9 (C), firmly against the token.
5 Release the alignment plate and, using an Allan wrench, tighten the Allan screws, Figure 3-9
(A).
6 Make sure the coin moves freely under the wiper.
7 Remove the coin.

16-022128-03
3-8 Chapter 3: Maintenance

Remove the Coin This section provides instructions to remove the Coin Drop Chute. Complete the following steps:
Drop Chute from the 1 Remove the Hopper as instructed in Remove the Hopper on page 3-5.
Hopper
2 Using a 8 mm nut driver, remove and save the screw securing the Coin Drop Chute Bracket to
the Hopper, Figure 3-10 (A).
Figure 3-10 Screw securing the Coin Drop Chute
Bracket to Hopper.

3 Separate the Coin Drop Chute from the Hopper by sliding the bracket out of the notch on the
Hopper base, Figure 3-11 (A).
Figure 3-11 Coin Drop Chute Bracket separated
from Hopper.

4 Using a 8 mm nut driver, remove and save the two screws holding the Coin Drop Chute
Bracket to the existing Coin Drop Chute, Figure 3-12 (A).
Figure 3-12 Screws securing the Coin Drop Chute Bracket
to the Coin Drop Chute.

5 Remove and save the Coin Drop Chute Bracket.

February 2009
Coin Handling Maintenance 3-9
Install the Coin Drop This section provides instructions to install the Coin Drop Chute. Complete the following steps:
Chute on the Hopper 1 Align the corresponding holes of the Coin Drop Chute Bracket with the Coin Drop Chute, by
securing the Coin Drop Chute to the bottom two holes on the Coin Drop Chute Bracket,
Figure 3-13 (A).

Figure 3-13 Align holes.

2 Using a 8 mm nut driver, secure the Coin Drop Chute Bracket to the Coin Drop Chute with the
two screws removed in step 2, Figure 3-14 (A).
Figure 3-14 Screws securing the Coin Drop Chute
Bracket to the Coin Drop Chute.

3 Connect the Coin Drop Chute Bracket to the Hopper by sliding the flange of the bracket into the
notch of the Hopper base, Figure 3-15.
Figure 3-15 Coin Drop Chute Bracket and Hopper.

16-022128-03
3-10 Chapter 3: Maintenance

4 Using a 8 mm nut driver, insert the screw and secure the Coin Drop Chute Bracket to the
Hopper, Figure 3-16 (A).
Figure 3-16 Screw securing the Coin Drop Chute
Bracket to Hopper.

Hopperless Mode: This section provides instructions to install the Coin Drop Chute when the game does not contain a
Coin Drop Chute Hopper. Complete the following steps:
Installation 1 If applicable, remove the existing Hopper as instructed in Remove the Hopper on page 3-5.
2 If applicable, remove the existing Coin Drop Chute from the Hopper as instructed in see
Remove the Coin Drop Chute from the Hopper on page 8.
3 Align the top two holes on the Coin Drop Chute Bracket with the holes on the existing or
replacement Coin Drop Chute, Figure 3-17 (A).
Figure 3-17 Align holes.

4 Using a 8 mm nut driver, secure the Coin Drop Chute Bracket to the Coin Drop Chute with two
screws, Figure 3-17.
5 Install the Coin Drop Chute by aligning the Coin Drop Chute Bracket with the first ridge of the
right track and sliding into place, Figure 3-18.
Figure 3-18 Align Coin Drop Chute Bracket and
Coin Drop Chute.

6 Close and lock the Main Door.

February 2009
Coin Handling Maintenance 3-11
Access the Coin To access the Coin Comparator, complete the following steps:
Comparator 1 Unlock and open the Main Door.
2 Draw on the pull-pin of the Coin Diverter Control Board Bracket, Figure 3-19 (A).
Figure 3-19 Tilt the Coin Diverter Control Board
Bracket.

3 Tilt the Coin Diverter Control Board Bracket away from the Coin Comparator Bracket,
Figure 3-19 (B).
4 Lift the Coin Comparator off the Coin Comparator bracket, Figure 3-20 (A).
Figure 3-20 Remove the Coin Comparator.

5 Reconfigure Coin Comparator (as described in 16-020839-xx Manual: Peripherals for the
Bluebird Upright (BBU) and Slant (BBS)) or replace.
6 Seat the Coin Comparator onto the Coin Comparator bracket, Figure 3-20 (A).
7 Seat the Coin Diverter Control Board Bracket onto the Coin Comparator Bracket. The pull-pin
snaps into place, Figure 3-19 (A).
8 Close and lock the Main Door.

16-022128-03
3-12 Chapter 3: Maintenance

Mechanical This section provides instructions for performing basic maintenance on the Mechanical Reel
Reels Mechanism, Figure 3-21.
Figure 3-21 Parts of the Reel Mechanism (Reel Strip not shown for clarity).

Lamp Array

Optic
Band

Reel
Harness

E-Ring and
Flat Washer

Reel Drum

NOTE: Depending on the game, all Reel Drums may receive identical Reel Strips or each reel
number may receive a specific strip. Confirm that the proper Reel Strip is applied to the intended
Reel Drum.
Count Reel and Depending on the game theme, specific numbers of reels and stops are required.
Optic Band Stops
NOTE: See the theme Software Release Notification (SRN) to view all the required reel strip and
optic band information. SRNs are available through the Customer Product Support Center at
866-967-4457 or at customersupport@wms.com.
The number of symbols on a Reel Strip correspond to the number of stops on an Optic Band.
Table 3-2 describes each of the reel and optic bands and their corresponding stops.

Table 3-2 Reel Stop Counts.


Number of Number of
Part Numbers Description Black Squares Stops Strip Color
20-017024-01-18S band: optic 18 sylst 18 18 Orange
20-024289-00-22S band: optic 22 sylst-3line 22 22 Green

February 2009
Removing a Mechanical Reel 3-13
To determine the number of stops on an Optic Band, count each of the black positions on either the
orange or green Optic Band. The small double lines represent one position, which is a stop,
Figure 3-22.
Figure 3-22 Count Positions on the Optic Band (five shown).
Stop #1 Stop #2 Stop #3 Stop #4 Stop #5

Removing a This section describes the steps to removing a Mechanical Reel from the game cabinet.
Mechanical Reel

Remove the Reel To remove the Reel Controller Board Assembly, complete the following steps:
Controller Board
Assembly

ESD: Ensure that you take the following measures to prevent ESD:
Turn the game OFF at the Power Switch.
Wear an ESD wriststrap.
1 Under the Cabinet Shelf, identify the Reel Controller Board Assembly, Figure 3-23 (A).
Figure 3-23 Reel Controller Board Assembly under
Cabinet Shelf.
B

2 Under the Cabinet Shelf, on the left side, pull and hold the pull-pin, Figure 3-23 (B), to
disengage the Reel Controller Board Assembly, Figure 3-23 (A).
NOTE: Do not use the front thumbscrew. The front thumbscrew does not engage the Reel
Controller Board Assembly to the Cabinet Shelf.

16-022128-03
3-14 Chapter 3: Maintenance

3 Pull the Reel Controller Board Assembly away from the Cabinet Shelf and turn upside down so
that the connections are facing upward, Figure 3-24.
Figure 3-24 Flipped over Reel Controller Board Assembly.

4 Disconnect the SPN, Figure 3-24 (A), the reel, Figure 3-24 (B), and the power cables,
Figure 3-24 (C).
5 Remove the Reel Controller Board Assembly.

Remove a To remove a Mechanical Reel, complete the following steps:


Mechanical Reel 1 Perform step 1 to step 5 in Remove the Reel Controller Board Assembly on page 3-13.
2 Lift the finger latch at the front of the Reel Mechanism, Figure 3-25 (A).
Figure 3-25 Reel Mechanism latch.

3 Unhook the finger latch spring, Figure 3-25 (B).

February 2009
Removing a Mechanical Reel 3-15
4 Pull the Reel Mechanism forward and lift off the Reel Tray, Figure 3-26 (A).
Figure 3-26 Remove the Reel Mechanism.

5 Place the Reel Mechanism in a safe location.

NOTE: If removing multiple reels, set them aside, noting the sequence on the cable in which
they were removed to ensure reinstallation in the same positions.
Remove the Reel To remove the Reel Strip, complete the following steps:
Strip

ESD: Ensure that you take the following measures to prevent ESD:
Turn the game OFF at the Power Switch.
Wear an ESD wrist strap.

1 Detach the current Reel Strip by lifting the strip at the edge of the seam and raising it slightly.
Slowly lift and pull the strip by the seam until it separates from the Reel Drum, Figure 3-27.
Figure 3-27 Remove the Reel Strip.

2 Slowly and steadily pull the Reel Strip away from the Reel Drum until it is removed.

16-022128-03
3-16 Chapter 3: Maintenance

Replace Reel Strip 1 On the Reel Drum, only one spoke is marked with an indicator, Figure 3-28 (A), that shows
where the Reel Strip starts. Locate the indicator.
Figure 3-28 Locate the starting location for the tape
and the Reel Strips with the indicator.

2 On the Reel Drum, align the notches of the Reel Strip, Figure 3-29 (A), with the indicator
protrusions on the sides of the Reel Drum, Figure 3-29 (B). Affix by applying pressure to the
front of the Reel Strip. To avoid deforming, support the inside of the Reel Drum with your hand
while adhering the Reel Strip.
Figure 3-29 Wrap the Reel Strip around the Reel
Drum in display-readable direction.

3 Rotate the Reel Drum while tightly wrapping the new Reel Strip around the drum and sliding
the strip into the channels on each side of the Reel Drum, Figure 3-29.
NOTE: With the Reel Mechanism chassis to the left of the Reel Drum, confirm that the images on
the Reel Strip are in the display-readable direction (not upside-down), Figure 3-29.

February 2009
Removing a Mechanical Reel 3-17
4 The adhesive for the Reel Strips is a special tape (20-000477) that deposits a glue residue.
When the tape is applied to the Reel Drum, and the tape backing is peeled, the exposed
adhesive is ready for attaching the Reel Strip to the Reel Drum. Adhesive tape is already
applied to the top end of the Reel Strip. Remove the backing from the adhesive, Figure 3-30.
Figure 3-30 Prepare the adhesive at the top of
the Reel Strip.

5 The top of the Reel Strip is designed to adhere over the bottom of the Reel Strip. Affix the top of
the Reel Strip over the bottom of the strip and apply pressure, Figure 3-31. To avoid deforming,
support the inside of the Reel Drum with your hand while adhering the Reel Strip.
Figure 3-31 Adhere the Reel Strip together.

Replace the Optic If applicable, replace the Optic Band by completing the following steps:
Band 1 Remove the clear part number tab by tearing the tab along the micro perforations, Figure 3-32.
Figure 3-32 Remove clear part number tab.

16-022128-03
3-18 Chapter 3: Maintenance

2 Remove the existing Optic Band by carefully and evenly pulling out each portion of the strip
until it is freed from the pinchers, Figure 3-33.
Figure 3-33 Remove the Optic Band.

3 Each Optic Band is notched with one large and two small notches, Figure 3-34. These notches
enable easy and accurate installation of the Optic Band into the center of the Reel Drum.
Figure 3-34 Optic Band notches.

smaller smaller larger


notch notch notch

Align the large notch on the Optic Band with the largest key in the inner ring and start to slide
the Optic Band into the pincher, Figure 3-35 (A).
Figure 3-35 Install the Optic Band.

4 While continuing to align the notches to keys Figure 3-35 (B) in the inner ring, slide the Optic
Band into the inner ring using the pinchers, Figure 3-35 (C), to hold the Optic Band into place.

February 2009
Removing a Mechanical Reel 3-19
5 Complete installing the Optic Band by sliding the end of the strip behind the beginning edge,
Figure 3-36.
Figure 3-36 Complete the installation of the Optic Band.

Replace the Reel When the Reel Drum or associated parts require replacement, complete the following steps:
Drum & Associated 1 Using a small flathead screwdriver, slide off the Reel Drum E-ring, Figure 3-37 (A), and save for
Parts reuse.
Figure 3-37 Reel Drum E-ring.

16-022128-03
3-20 Chapter 3: Maintenance

2 Remove the Reel Drum flat washer, Figure 3-38 (A), and save for reuse.
Figure 3-38 Reel Drum E-ring and flat washer.

3 Remove the Reel Drum Figure 3-39, and save for reuse.
Figure 3-39 Remove Reel.

February 2009
Removing a Mechanical Reel 3-21
4 Remove the four rubber O-rings from the T-top of the motor shaft, Figure 3-40, and discard
them.
CAUTION: Never reuse O-rings.
Figure 3-40 Remove rubber O-rings.

5 Install four new rubber O-rings (20-000536) onto the T-top of the motor shaft.
6 Position the saved Reel Drum onto the motor shaft, aligning the T-top with the Reel Drum,
Figure 3-41.
Figure 3-41 Position the T-top with the Reel Drum (left: side view; right: top view).

7 Push the saved Reel Drum completely onto the T-top, Figure 3-41.
8 Replace the saved Reel Drum flat washer onto the motor shaft.
9 Using needle-nosed pliers, slide the saved Reel Drum E-ring, Figure 3-37, onto the motor
shaft.

16-022128-03
3-22 Chapter 3: Maintenance

Replacing a This section describes the steps to replacing a Mechanical Reel in the game cabinet.
Mechanical Reel

Replace a To replace a Mechanical Reel, complete the following steps:


Mechanical Reel

ESD: Ensure that you take the following measures to prevent ESD:
Turn the game OFF at the Power Switch.
Wear an ESD wrist strap.
1 Place the Reel Mechanism on the Cabinet Shelf, align with the track, and push the Reel
Mechanism into game, Figure 3-42 (A).
Figure 3-42 Push the Reel Mechanism into game.

2 Hook the finger latch spring onto the Cabinet Shelf, Figure 3-43 (A).
Figure 3-43 Hook the finger latch spring.

3 Press down the finger latch at the front of the Reel Mechanism, Figure 3-43 (B).

February 2009
Replacing a Mechanical Reel 3-23
Replace the Reel To replace the Reel Controller Board Assembly, complete the following steps.
Controller Board
Assembly
ESD: Ensure that you take the following measures to prevent ESD:
Turn the game OFF at the Power Switch.
Wear an ESD wriststrap.
1 Perform step 2 to step 5 in Remove a Mechanical Reel on page 3-14.
2 Under the Cabinet Shelf, identify the Reel Controller Board Assembly, Figure 3-44 (A).
Figure 3-44 Reel Controller Board Assembly under
Cabinet Shelf.
B

3 Under the Cabinet Shelf, on the left side, pull and hold the pull-pin, Figure 3-44 (B), to
disengage the Reel Controller Board Assembly, Figure 3-44 (A).
NOTE: Do not use the front thumbscrew. The front thumbscrew does not engage the Reel
Controller Board Assembly to the Cabinet Shelf.
4 Pull the Reel Controller Board Assembly away from the Cabinet Shelf and turn upside down so
that the connections are facing upward, Figure 3-45.
Figure 3-45 Flipped over Reel Controller Board Assembly.

5 Disconnect the SPN, Figure 3-45 (A), the reel, Figure 3-45 (B), and the power cables,
Figure 3-45 (C).
6 Remove the Reel Controller Board Assembly.
7 While holding the replacement Reel Controller Board Assembly, plug in the SPN,
Figure 3-45 (A), the reel, Figure 3-45 (B), and the power cables, Figure 3-45 (C).
8 Turn the Reel Controller Board Assembly so that the connections are facing downward.
9 Using the pull-pin, remount the Reel Controller Board Assembly, Figure 3-48 (A).

16-022128-03
3-24 Chapter 3: Maintenance

Replace the To replace the Transmissive LCD, complete the following steps:
Transmissive LCD

CAUTION: A second technician is required when moving the Transmissive LCD into the game.

1 Lift the Transmissive LCD near the cabinet and hold, Figure 3-46.
Figure 3-46 Lift and hold the Transmissive LCD.

2 Drop TOUCH SCREEN power cable through left side of Cabinet Shelf.
3 At the Transmissive LCD, connect the DVI cable, Figure 3-47.
Figure 3-47 Connect the DVI cable.

February 2009
Replacing a Mechanical Reel 3-25
4 Holding the Transmissive LCD vertically from the top, place the bottom of the Transmissive
LCD into the lower bracket holes and slowly rotate the top of the Transmissive LCD toward the
game until the Transmissive LCD engages the holding springs, Figure 3-48 (A).
Figure 3-48 Replace the Transmissive LCD.

5 At the Transmissive LCD, connect the Reel Harness to the TOUCH SCREEN connector (J4),
on the Bulkhead Board, Figure 2-25 (A).

Replace the Reel To replace the Reel Tray, complete the following steps:
Tray

NOTE: The Cabinet Shelf supports 3 and 5 reel versions, but the Transmissive Reel LCD must be
changed if the number of reels changes.
ESD: Ensure that you take the following measures to prevent ESD:
Turn the game OFF at the Power Switch.
Wear an ESD wriststrap.
1 Remove all the existing reels by performing step 1 to step 5 in Remove a Mechanical Reel on
page 3-14.
2 To remove the Reel Tray, press the tabs located on the left and right sides, Figure 3-49 (A), and
slide the Reel Tray out from the Cabinet Shelf, Figure 3-49 (B).
Figure 3-49 Remove Reel Tray from Cabinet Shelf.

B C

3 Insert the replacement Reel Tray onto the Cabinet Shelf until the tabs lock, Figure 3-49 (C).
4 Perform step 1 to step 5 in Replacing a Mechanical Reel on page 3-22.

16-022128-03
3-26 Chapter 3: Maintenance

Reel This section contains the procedures for reel conversions. There are six types of conversions:
Conversions
3-reel to 5-reel video to 3-reel 5-reel to video
5-reel to 3-reel video to 5-reel 3-reel to video

NOTE: The 3-reel to 5-reel and 5-reel to 3-reel conversions do not require the entire Reel Tray, only
the Reel Mechanisms.
NOTE: The BB2-Mech Transmissive Reel Cabinet Shelf is flexible between a three-reel and five-
reel Reel Tray, but the Transmissive Reel LCD must be changed if the number of reels changes.
ESD: Ensure that you take the following measures to prevent ESD:
Turn the game OFF at the Power Switch.
Wear an ESD wriststrap.
1 Remove all the existing reels by performing step 1 to step 5 in Removing a Mechanical Reel on
page 3-13.
2 To remove the Reel Tray, press the tabs located on the left and right sides, Figure 3-50 (A), and
lift the Reel Tray from the Cabinet Shelf, Figure 3-50 (B).
Figure 3-50 Remove Reel Tray from Cabinet Shelf.

B C

NOTE: The new Reel Tray may come preassembled.

3 After converting to other reel or video as appropriate, insert the replacement Reel Tray onto the
Cabinet Shelf until the tabs lock, Figure 3-49 (C).

Button Panel Reference Installation Bulletin 16-023444-xx OLED Button Panel for BB2 and BBU for instructions
Maintenance on installing the Button Panel and firmware.

Printer To replace the Printer, complete the following steps:


Replacement

ESD: Ensure that you take the following measures to prevent ESD:
Turn the game OFF at the Power Switch.
Wear an ESD wrist strap.
1 Unlock and open the Main Door.

February 2009
Printer Replacement 3-27
2 Pull the Printer Tray latch, Figure 3-51, forward until it releases the Printer.
Figure 3-51 Pull the Printer Tray latch.

3 Lift the Printer to detach from the Printer Tray, Figure 3-52.
Figure 3-52 Detach the Printer Tray.

4 Remove the existing printer, Figure 3-53


Figure 3-53 Remove the printer.

5 Disconnect the printer cables from the existing printer.


6 Remove the four mounting pins from the old printer and install on the replacement printer.
7 Connect the printer cables to the replacement printer.

16-022128-03
3-28 Chapter 3: Maintenance

8 Place the replacement Printer on the Printer Tray with the mounting pins penetrating the holes,
Figure 3-54.
Figure 3-54 Attach the Printer Tray.

9 Push the printer tray latch until it secures the replacement Printer, Figure 3-55.
Figure 3-55 Push the Printer Tray latch.

Power Supply To replace the Power Supply, complete the following steps:
Replacement

ESD: Ensure that you take the following measures to prevent ESD:
Turn the game OFF at the Power Switch.
Remove the AC Line Cord from the Power Supply.
Wear an ESD wrist strap.
1 Unlock and open the Main Door.
2 Disconnect the cables connected to the Power Supply, Figure 3-56.
Figure 3-56 Disconnect cables from Power Supply.

February 2009
Power Supply Replacement 3-29
3 Loosen the thumbscrew, Figure 3-57 (A), or, if applicable, with an 11/32" nut driver, remove and
save the one Keps nut securing the Power Supply Support Bracket to the Power Supply
Mounting Bracket, Figure 3-57 (B).
Figure 3-57 Loosen thumbscrew (left), or remove Keps nut (right).

A B

4 Remove and save the Power Supply Support Bracket, Figure 3-58 (A).
Figure 3-58 Remove and save the Power Supply Support Bracket.

A A

5 Pull the existing Power Supply off the Power Supply Shelf, Figure 3-59 (A), in the back of the
cabinet and remove from the game.
Figure 3-59 Remove Power Supply from Power
Supply Shelf.

6 Place the replacement Power Supply on the Power Supply Shelf in the back of the cabinet,
Figure 3-59 (A).
7 Attach the saved Power Supply Support Bracket by attaching it to the replacement Power
Supply, Figure 3-58 (A).
8 Tighten the thumbscrew, Figure 3-57 (A), or, if applicable, with an 11/32 nut driver, tighten the
one saved Keps nut to secure the Power Supply Support Bracket to the Power Supply
Mounting Bracket, Figure 3-57 (B).
9 Connect the cables to the replacement Power Supply, Figure 3-56.
10 Remove ESD wrist strap.
11 Power ON the game.

16-022128-03
3-30 Chapter 3: Maintenance

12 Lock and close the Main Door.

Replace Fuses To replace the Power Supply fuses, complete the following steps:

ESD: Ensure that you take the following measures to prevent ESD:
Turn the game OFF at the Power Switch.
Remove the AC Line Cord from the Power Supply.
Wear an ESD wrist strap.
1 Unlock and open the Main Door.
2 Confirm that the AC Line Cord is disconnected from the Power Supply, Figure 3-60 (A).
Figure 3-60 Location of the AC INPUT plug.

A
C

3 To replace the switched AC output fuse, use a flathead screwdriver to remove the fuseholder,
Figure 3-60 (B).
4 To remove the fuse from the fuseholder, use a flathead screwdriver to insert and secure the
replacement fuse (T3, 15A/250V) and holder, Figure 3-60 (B).
5 To replace the unswitched AC output fuse, use a flathead screwdriver to remove the
fuseholder, Figure 3-60 (C).
6 To remove the fuse from the fuseholder, use a flathead screwdriver to insert and secure the
replacement fuse (T3, 15A/250V) and holder, Figure 3-60 (C).
7 Reconnect the AC Line Cord.
8 Power ON the game.
9 Lock and close the Main Door.

February 2009
Power Supply Replacement 3-31
Replace the To replace the Mechanical Arm Mechanism, complete the following steps:
Mechanical Arm
Mechanism

ESD: Ensure that you take the following measures to prevent ESD:
Turn the game OFF at the Power Switch.
Remove the AC Line Cord from the Power Supply.
Wear an ESD wrist strap.
1 Unlock and open the Main Door.
2 Unlock and open the Lower Door.
3 Unlock and open the Bill Acceptor door, Figure 3-61 (A).
Figure 3-61 Press Down Bill Acceptor Door.

16-022128-03
3-32 Chapter 3: Maintenance

4 Press down on the release lever, Figure 3-62 (A), and slide the Bill Acceptor Head forward,
being sure to clear the brackets located under the Cabinet Shelf.
Figure 3-62 Press Down Bill Acceptor release lever (left), slide Bill Acceptor Head from game (right),
pull tab to release Bill Acceptor (bottom).

5 Pull tab forward to release Bill Acceptor, Figure 3-62 (B).


6 Placing your hand under the Bill Acceptor Head, Figure 3-62 (C), lift and pull the Bill Acceptor
forward and out of the game.

February 2009
Power Supply Replacement 3-33
7 Disconnect the Bill Acceptor cable, Figure 3-63 (A), and remove the Bill Acceptor from the
game.
Figure 3-63 Disconnect Bill Acceptor cable.

NEED
PHOTO

8 If applicable, disconnect the Bill Acceptor Spacer Plate cable and remove the Bill Acceptor
Spacer Plate from the game, Figure 3-64.
Figure 3-64 Disconnect Bill Acceptor
Spacer Plate cable.

NOTE: The type of Bill Acceptor used determines whether or not a Bill Acceptor Spacer Plate is
installed in the game.

16-022128-03
3-34 Chapter 3: Maintenance

9 Via the left-side access hole located at the rear of the Bill Acceptor housing, use a 1/4" Allan
wrench to loosen and remove the 5/16"-24x3.5 socket head cap screw securing the
Mechanical Arm Mechanism, Figure 3-65.
Figure 3-65 Remove screw securing Mechanical
Arm Mechanism.

10 Remove the Pull Arm, Figure 3-66 (A).


Figure 3-66 Remove Pull Arm and hub.

NEED
PHOTO

11 Remove the hub, Figure 3-66 (B).

February 2009
Power Supply Replacement 3-35
12 Using a 11/32" nut driver, loosen and remove five 8/32" Keps nuts located inside the cabinet on
the right side, Figure 3-67, in order to remove the laminate panel.
Figure 3-67 Remove Keps nuts.

16-022128-03
3-36 Chapter 3: Maintenance

13 Swing the laminate panel away from the cabinet, then push it backwards, lifting the laminate
panel away from the three hooks located on the right side panel, Figure 3-68 (A),
Figure 3-68 (B).
Figure 3-68 Swing laminate from cabinet (left), and lift laminate away-rear view (right).

February 2009
Power Supply Replacement 3-37
14 Using a #2 Phillips screwdriver, loosen and remove four #10-24 FH HD screws securing the
Mechanical Arm Mechanism, Figure 3-69.
Figure 3-69 Loosen Mechanical Arm Mechanism
screws.
i

15 Carefully pull the Mechanical Arm Mechanism away from the game, making sure the cables
are tucked inside so they are not pinched, Figure 3-70 (A).
Figure 3-70 Pull Mechanical Arm Mechanism away
from game.

16-022128-03
3-38 Chapter 3: Maintenance

16 Disconnect the Mechanical Arm Mechanism cable, Figure 3-71.


Figure 3-71 Disconnect Mechanical Arm Mechanism
cable.

17 Remove the Mechanical Arm Mechanism from the game.


18 Connect the new Mechanical Arm Mechanism cable, Figure 3-72.
Figure 3-72 Connect new Mechanical Arm Mechanism
cable.

February 2009
Power Supply Replacement 3-39
19 Carefully push the Mechanical Arm Mechanism towards the game, making sure the cables are
tucked inside so they are not pinched, Figure 3-73 (A).
Figure 3-73 Push Mechanical Arm Mechanism
towards game.

20 Using a #2 Phillips screwdriver, secure four #10-24 FH HD screws securing the arm
mechanism, Figure 3-74.
Figure 3-74 Secure screws.
i

16-022128-03
3-40 Chapter 3: Maintenance

21 Lift the laminate panel onto the three hooks located on the right side panel, Figure 3-75 (A).
Push the panel forward and swing it towards the cabinet, until properly seated, Figure 3-75 (B).
Figure 3-75 Hook laminate to cabinet-rear view (left), and swing laminate towards cabinet (right).

A
B

February 2009
Power Supply Replacement 3-41
22 Using a 11/32" nut driver, secure the five 8/32" Keps nuts located inside the cabinet on the right
side, Figure 3-67, in order to reattach the laminate panel.
Figure 3-76 Secure Keps nuts.

16-022128-03
3-42 Chapter 3: Maintenance

23 Secure the hub, Figure 3-77 (A).


Figure 3-77 Secure the hub and Pull Arm.

NEED
PHOTO

24 Secure the Pull Arm, Figure 3-77 (A).


25 Via the left-side access hole located at the rear of the Bill Acceptor housing, use a 1/4" Allan
wrench to secure the 5/16"-24x3.5 socket head cap screw securing the Mechanical Arm
Mechanism, Figure 3-78.
Figure 3-78 Tighten screw securing Mechanical Arm
Mechanism.

February 2009
Power Supply Replacement 3-43
26 If applicable, secure the Bill Acceptor Spacer Plate to the game, Figure 3-79, by connecting the
Bill Acceptor Spacer Plate cable.
Figure 3-79 Connect Bill Acceptor
Spacer Plate cable.

27 Place the Bill Acceptor in the game and connect the Bill Acceptor cable, Figure 3-80 (A).
Figure 3-80 Connect Bill Stacker cable.

NEED
PHOTO

16-022128-03
3-44 Chapter 3: Maintenance

28 Placing your hand under the Bill Acceptor Head, Figure 3-81 (A), press Bill Acceptor Release
Lever to slide forward, Figure 3-81 (B).
Figure 3-81 Place hand under Bill Acceptor Head (top left), press Bill Acceptor Release Lever (top right),
and push tab to secure Bill Acceptor (bottom left).

29 Slide the Bill Acceptor into housing, making sure the pins engage, Figure 3-81 (C).
NOTE: Confirm that the pins located on the Bill Acceptor slide properly into the housing.
30 Push the Bill Acceptor Head back until it clicks.
31 Push tab into place to secure Bill Acceptor, Figure 3-81 (D).

February 2009
Power Supply Replacement 3-45
32 Close and lock the Bill Acceptor door, Figure 3-82 (A).
Figure 3-82 Close Bill Acceptor Door.

33 Close and lock open the Lower Door.


34 Close and lock the Main Door.

16-022128-03
3-46 Chapter 3: Maintenance

Bose Audio Complete the following steps to adjust the volume:


System
Maintenance
NOTE: The Bose Sound System contains no serviceable parts and must be replaced as a unit. Do
not remove speaker screens.
1 Press the DIAGNOSTIC switch. The Administration Menu displays.
2 Select Setup. The Setup Menu displays, Figure 3-83.
Figure 3-83 Setup Menu.

3 Select Sound Setup. The Sound Setup screen appears, Figure 3-84.
Figure 3-84 Sound controls.

4 Adjust the volume by touching the slider, Figure 3-84 (A), and moving your finger up or down,
or pressing the (-) and (+) buttons.
5 Once the volume is set to the preferred level, select Save. The Setup Menu displays.

February 2009
Chapter 4
Troubleshooting

Table of This chapter contains the following topics:


Contents
Overview.................................................................................................... 4-1
ESD Prevention......................................................................................... 4-1
Tower Light Codes.................................................................................... 4-2
Basic Game Troubleshooting .................................................................. 4-3
Tilts............................................................................................................. 4-6
Major Tilts........................................................................................................ 4-6
Minor Tilts........................................................................................................ 4-6
Indicators................................................................................................... 4-7
Performing a RAM Clear .......................................................................... 4-7
Clearing a Tilt ............................................................................................ 4-9
Attendant Key Switch...................................................................................... 4-9
Diagnostic Switch............................................................................................ 4-9
Diagnostics ................................................................................................... 4-10
Bill Acceptor Test .......................................................................................... 4-10
Coin Acceptor Diagnostics............................................................................ 4-13
Printer Diagnostics........................................................................................ 4-14
Hopper Diagnostics....................................................................................... 4-16
Progressive Diagnostics........................................................................ 4-17
WMSP Diagnostics - Traffic Statistics ........................................................... 4-17
WMSP Diagnostics - Link Statistics .............................................................. 4-19
SPN Diagnostics ..................................................................................... 4-20
SPN Diagnostics - Traffic .............................................................................. 4-20
SPN Diagnostics - Link Statistics .................................................................. 4-21
SPN Devices - Diagnostics ........................................................................... 4-22
Using SVC/GAT ....................................................................................... 4-24
Tilt Codes ................................................................................................ 4-26
Bluebird 2 Mechanical (BB2-Mech): Verify OLED Start-Up Sequence4-34
OLED Troubleshooting........................................................................... 4-35
CPU-NXT2 Failure Mode Analysis......................................................... 4-36

Overview The purpose of this chapter is to guide the troubleshooting steps and considerations for the
Bluebird 2 Mechanical (BB2-Mech) machine. In addition to several basic conditions, this chapter
explains the functionality of diagnostic tools that thoroughly ensure game functionality, as well as
tools for identifying operational errors in the game.
Errors in game functionality are communicated via Tilt Codes, which display on the LCD when the
error occurs. Reference the tables in the Tilt Codes section of this chapter for a complete list of
Errors and Solutions.

ESD Prevention Depending on the procedure, measures must be taken to prevent electrical shock and/or
electrostatic discharge (ESD) when servicing the game. See Preventing Injury and Damage in the
About this Guide chapter for details on ESD prevention.
ESD: Ensure that you take the following measures to prevent ESD:
Turn the game OFF at the Power Switch.
Wear an ESD wrist strap.

February 2009
16-022128-03
4-2 Chapter 4: Troubleshooting

Tower Light The two-stage Tower Light on top of the game indicates game status. The game employs both
Codes stages of the Tower Light to convey information. The following table contains the typical Tower Light
indicators (some jurisdictions have different Tower Light functionality). The upper stage of the Tower
Light is the Attendant indicator; the lower stage is the Service indicator. The lights illuminate for
several reasons, and characterize the exact nature of the event causing the indication. Each light
has five states--Off, On, Slow Flash, Medium Flash, and Fast Flash. Fast Flash blinks eight times a
second, Medium Flash blinks four times a second, and Slow Flash blinks twice per second. The
Tower Light codes are described in Table 4-1.

Table 4-1 Tower Light Troubleshooting.


Typical Tower Light Codes Troubleshooting Guide
Tower Light Tower Light
Stage Activity Meaning
Top Off Game is idle.
On Change request or game disabled.
Slow flash Tilt, Jackpot Mode, or low printer paper.
Fast Flash Administration mode.
Bottom Off Doors are closed and game is idle.
On Doors are closed and game is disabled.
Slow flash Jackpot mode.
Med. Flash Main Door is open.
Fast Flash Drop door is open.

February 2009
Basic Game Troubleshooting 4-3

Basic Game Reference Table 4-2 for a list of basic BB2-Mech troubleshooting steps.
Troubleshooting Table 4-2 Basic Game Troubleshooting.
Game Condition Troubleshooting Steps
The game is plugged in and the Accessory 1 Verify the VGA cable connection from the CPU to the Accessory Box
Box LCD is blacked out. LCD.
2 Verify the power cable is connected to the DC Distribution cables and to
the LCD.
3 Check the LED lights on the right side of Bulkhead Board.
4 Reseat the CPU.
5 Replace the blacked out LCD. Verify if LED indicator is ON/OFF first and
if video and power are applied.
6 Replace the CPU.
7 Replace the power supply.
8 Confirm the following:
ETX CPU module is receiving power. Fan is spinning.
BIOS Firmware Hub is properly installed.
The game is plugged in and the Transmis- 1 Verify the DVI cable connection from the CPU to the Transmissive LCD.
sive LCD is blacked out.
2 Verify the power cable is connected to the DC Distribution cables and to
the LCD.
3 Check the LED lights on the right side of Bulkhead Board.
4 Reseat the CPU.
5 Replace the blacked out LCD. Verify if LED indicator is ON/OFF first and
if video and power are applied.
6 Replace the CPU.
7 Replace the power supply.
8 Confirm the following:
ETX CPU module is receiving power. Fan is spinning.
BIOS Firmware Hub is properly installed.
The game is plugged in and both LCDs are 1 Verify the DVI cable connection from the CPU to the Transmissive LCD.
blacked out.
2 Verify the VGA cable connection from the CPU to the Accessory Box
LCD.
3 Verify that the power cable is connected to the DC Distribution cables
and to the LCD.
4 Verify that the DC Distribution cable is plugged into the Bulkhead Board.
5 Check the LED lights on the right side of Bulkhead Board.
6 Reseat the CPU.
7 Replace the blacked out LCD. Need to verify if LED indicator is ON/OFF
first and if video and power are applied.
8 Replace the CPU.
9 Replace the power supply.
No player tracking communication to the 1 Configure the game options.
back end, Host Comm error, or Protocol
error. 2 Configure the player tracking options on both the game and the back
end.
3 Verify the +5V DCI connection on the Bulkhead Board from the power
supply.
4 Check the LED power lights on the Bulkhead Board.
5 Verify the harness connection for the SMIB to Comm Ports 1 or 2 on the
Bulkhead Board.
6 Replace the power supply.
7 Replace the SMIB.
Game comes up with a double call atten- 1 Replace the BIOS chip.
dant window or No Trigger errors.
2 Replace the SPI chip.
3 Replace both chips at the same time.
4 Replace the CPU.
Game keeps rebooting. 1 Replace the power supply.
2 Replace the CPU.

16-022128-03
4-4 Chapter 4: Troubleshooting

Table 4-2 Basic Game Troubleshooting. (continued)


Game Condition Troubleshooting Steps
Programmable Button Panel buttons are not See "OLED Troubleshooting" on page 4-35.
working.
Game is not booting up all the way. 1 Verify the size of the RAM card on the CPU.
2 Replace the RAM card.
3 Replace the game CompactFlash Card.
4 Replace the Operating System (OS) CompactFlash card.
5 Replace the BIOS chip.
6 Check for shorts or loose wiring.
7 Replace the power supply.
8 Replace the CPU.
Assert fail. 1 Replace the RAM card on the CPU.
2 Replace CPU.
3 Replace OS CompactFlash card.
4 Replace game CompactFlash card.
Game and OS mismatch. 1 Replace OS CompactFlash Card.
2 Replace game CompactFlash Card.
3 Replace CPU.
Tower Light not working. 1 Verify the Tower Light is connected to Left Cable Channel.
2 Verify connection J17 on the Bulkhead Board.
3 Replace Tower Light Bulbs.
4 Replace CPU.
5 Replace Bulkhead Board.
Errors showing T, or P (Accessory Box 1 Verify connection to corresponding Wire Harness.
Logic Door or Accessory Box Switch) with
no Participation Accessory Box. 2 Verify connection J10 to Bulkhead Board.
3 Replace CPU.
4 Replace Bulkhead.
Game does not seem to be receiving power. 1 Verify connection to outlet.
2 Verify the Power Strip under the game to see if it has been tripped (if
applicable).
3 Verify the line cord is connected to the power supply.
4 Replace power supply.
5 Replace CPU.
Sleeping forever error. 1 Perform a RAM Clear.
2 Replace CPU.
Game does not reboot properly. Confirm the following:
Check the LED power lights on the Bulkhead Board.
All cables are properly connected.
With CPU-NXT2 door open, the four power LEDs are lit (3.3V, 5V, 12V,
and 15V).
If power indicator LEDs are not lit, set the game Power Switch to OFF
and verify that CPU-NXT2 Board is properly seated.
OS and game CompactFlash Cards are installed and fully seated.
BIOS Firmware Hub is installed and fully seated.
CPU Fan does not spin. Confirm the following:
Power cable on CPU Fan is properly connected.
CPU-NXT2 is overheated. Confirm the following:
Power cable on CPU Enclosure Fan is properly connected.
Fan works.

February 2009
Basic Game Troubleshooting 4-5
Table 4-2 Basic Game Troubleshooting. (continued)
Game Condition Troubleshooting Steps
All CPU LEDs (VGA_E, VGA_A, 3.3V, 5V, Confirm the following:
12V, and 15V) remain lit for entire duration
the game Power Switch is set to ON. BIOS Firmware Hub is properly installed.
BIOS Firmware Hub is not damaged where connected to the socket.
RAM card is present, properly installed, and free of debris.
RAM is working properly by swapping it with a known good RAM card.
Display prompts user to use the touch Confirm the following:
screen to select an action while performing
RAM Clear. The RAM Clear CompactFlash card is installed in the OS CompactFlash
slot.
The two options given are as follows:
SPI chip is installed and in the proper orientation.
clear NVRAM
If the SPI was previously installed in the incorrect orientation, it will
clear NVRAM and EPROM require a replacement.
All the pins of the SPI are free of damage and are inserted into their
corresponding sockets.
Error Text Displays: Confirm the following:
PREPART DSS Signature Validation failed The non-conductive battery tabs were removed from CPU-NXT2 battery
holder.
The OS and game CompactFlash Cards are installed into their
corresponding locations and are fully inserted. Complete the following
steps to confirm:
1 Power down the game.
2 Remove the OS and game CompactFlash Cards.
3 Replace the OS and game CompactFlash Cards, ensuring they are
securely installed.
4 Power up the game.

16-022128-03
4-6 Chapter 4: Troubleshooting

Tilts The game displays tilts when errors occur, a peripheral device needs service, or when game
security is at risk. The game enters Tilt Mode when it cannot be played.
NOTE: If the information in this section cannot resolve the issue, contact the Customer Product
Support Center at 866.967.4457 or customersupport@wms.com.
To list all the tilts pending on the game, insert and turn the Attendant Key Switch.
The active tilts are listed on the right side of the screen, Figure 4-1 (A).
Figure 4-1 Pending tilts.

Major Tilts When a game enters the Tilt Mode with a major tilt, game play cannot continue and requires the
calling of an attendant, Figure 4-2.
Figure 4-2 Call Attendant Prompt box.

Complete the following steps to clear a major tilt:


1 To access the tilt, open the Main Door.
The most recent major tilt displays in the prompt box, Figure 4-3.
Figure 4-3 Major Tilt In Prompt box example.

2 See "Tilt Codes" on page 4-26 for steps on clearing the tilt.

Minor Tilts Minor tilts, when game play can continue but requires some attention, display while in the
Administration Mode or the Attendant Mode. Complete the following steps to clear a minor tilt:
1 To access the minor tilts, turn the Attendant Key Switch or press the DIAGNOSTIC Switch.
The active tilts are listed on the right side of the screen, Figure 4-1 (A).
2 See "Tilt Codes" on page 4-26 for steps on clearing the tilts.

February 2009
Indicators 4-7

Indicators Depending on the jurisdiction, some tilts and events display on the bottom of the Game Screen until
cleared, Figure 4-4 (A).
Figure 4-4 Tilts indicated on the Game screen.

Performing a Follow the steps below to perform a RAM Clear on CPU-NXT2:


RAM Clear

CAUTION: This procedure erases stored information. Do not clear the RAM and install software
unless Casino management has authorized the process.
1 Unlock and open the Main Door.
2 Power the game OFF at the power switch.
3 Fasten a resistive type (1 or 10 Meg) ESD wrist strap on arm and ensure that it makes good
skin contact, Figure 4-5 (A).
Figure 4-5 ESD Wrist Strap on arm.

4 Secure the clip end of the wrist strap to a ground braid on a game.
5 Unlock and open CPU-NXT2 Enclosure Door to access the CompactFlash slots.
CAUTION: The game MUST be powered OFF before inserting or removing CompactFlash
cards. Inserting or removing a card with the power ON may cause permanent damage and data
corruption.
6 Remove Game and OS Compact Flash cards from slots.
7 Install the RAM Clear CompactFlash card into the OS CompactFlash slot, Figure 4-6 (B).
WARNING: Do not force the RAM Clear CompactFlash card into the slot. If the card does not
engage easily, it is likely installed backwards.
Also, check to see if the BIOS and SPI chips are installed. If not, install them by lining up the
notches on the chip and on the board. Align the pins up with the sockets on the board and
gently push in the middle of the EEPROMS to insert the chip.

16-022128-03
4-8 Chapter 4: Troubleshooting

8 Turn the game power to ON.


Figure 4-6 Installing CompactFlash cards.

A B

9 The machine boots and a progress indicator with the WMS logo displays while the RAM Clear
process initializes, Figure 4-7.
Figure 4-7 Game Initialization screen.

The game completes the RAM Clear and displays the message in Figure 4-8.
Figure 4-8 RAM Clear message.

10 Power the game OFF at the power switch.


11 Remove the RAM Clear CompactFlash card.

February 2009
Clearing a Tilt 4-9
12 Install the Game Software CompactFlash card into the Game CompactFlash slot,
Figure 4-6 (A).
13 Install the OS CompactFlash card into the OS CompactFlash slot,
Figure 4-6 (B).
14 Close and lock CPU-NXT2 Enclosure Door.
15 Power game ON.
16 Remove ESD wrist strap and store in a dry location.
17 Close and lock Main Door.

Clearing a Tilt Many tilts are cleared by turning the Attendant Key Switch or pressing the DIAGNOSTIC Switch.
This section identifies the location of each.
Attendant Key On the BB2, Figure 4-9, the Attendant Key Switch is on the right side of the cabinet.
Switch Figure 4-9 The BB2
Attendant Key Switch.

Diagnostic Switch The Diagnostic Switch, Figure 4-10, is located under the Printer.
Figure 4-10 Diagnostic Switch.

16-022128-03
4-10 Chapter 4: Troubleshooting

Diagnostics The Diagnostics Menu, Figure 4-11, includes a Cash Devices option, which allows you to perform
the following tests:
Bill Acceptor Test (for tickets and vouchers)
Coin Acceptor Test (counting coins sent to the Drop)
Printer Test (printing a void ticket)
Hopper Test

NOTE: Before initiating any Cash Devices tests, ensure that the devices are correctly set. To set
the device, select Setup from the Machine Setup screen, Figure 4-11.
Figure 4-11 Machine Setup Menu.

Bill Acceptor Test Complete the following steps to initiate a Bill Acceptor Test:
1 From the Administration Menu, select Diagnostics | Cash Device Diagnostics | Bill
Validator, Figure 4-12.
Figure 4-12 Bill Validator Menu.

February 2009
Clearing a Tilt 4-11
The Bill Validator Diagnostic screen displays, Figure 4-13.
Figure 4-13 JCM Billval Diagnostic screen.

2 Insert a valid bill or voucher into the Bill Acceptor.


3 A message regarding the inserted bill or voucher displays, Figure 4-14 or Figure 4-15.
Figure 4-14 JCM Billval Diagnostic screen: $20 bill example.

Figure 4-15 JCM Billval Diagnostic screen: ticket.

16-022128-03
4-12 Chapter 4: Troubleshooting

4 Select Reject to return the bill or ticket. A message displays to denote the successful rejection,
Figure 4-16.
NOTE: After a time-out period, the Bill Acceptor rejects the bill or voucher automatically.
Figure 4-16 JCM Billval Diagnostic screen.

5 Press Exit or Return to Game. An Exit banner displays for 2.5 seconds, ensuring that the Bill
Acceptor is disabled.

February 2009
Clearing a Tilt 4-13
Coin Acceptor Complete the following steps to access the Coin Acceptor Test:
Diagnostics 1 From the Administration Menu, select Diagnostics | Cash Devices Diagnostics | Coin
Acceptor, Figure 4-17.
Figure 4-17 Cash Device Diagnostics Menu.

The Coin Acceptor Diagnostic screen displays, Figure 4-18.


Figure 4-18 Coin Acceptor Diagnostics screen.

2 Touch inside the Coin Acceptor field to toggle the setting to Enabled,
Figure 4-18 (A).
3 Touch inside the Coin Diverter field to Coin To Drop to indicate where the coins are being
routed, Figure 4-18 (B).
4 Insert coins.
5 The number of coins inserted increments each of the fields as follows:
Coin To Drop = Coins routed to the Drop.
Coin Total = The total number of coins.
6 Verify that the coin count increments each time a coin is inserted.
NOTE: The coin count accumulated during this Diagnostic Test does not affect the Accounting
Coin In meter. This coin count is for the purpose of testing the Coin Acceptor only.
7 When the test is complete, select Exit.
8 An Exit banner displays for 2.5 seconds to disable the Coin Acceptor.

16-022128-03
4-14 Chapter 4: Troubleshooting

Printer Diagnostics Complete the following steps to test the Printer:


1 From the Administration Menu, select Diagnostics | Cash Devices Diagnostics | Printer,
Figure 4-19.
Figure 4-19 Cash Device Diagnostics Menu.

The Printer Diagnostic screen displays, Figure 4-20.


Figure 4-20 Printer Diagnostics screen.

February 2009
Clearing a Tilt 4-15
2 Select Print Void Ticket.
A ticket prints while displaying a message on the screen, Figure 4-21.
Figure 4-21 Printer Diagnostics screen.

3 Verify that a ticket printed.


4 Select Exit once the test is complete.

16-022128-03
4-16 Chapter 4: Troubleshooting

Hopper Diagnostics Complete the following steps to test the Hopper:


1 From the Administration Menu, select Diagnostics | Cash Devices Diagnostics | Hopper,
Figure 4-22.
Figure 4-22 Cash Devices Diagnostics Menu.

The Hopper Diagnostic screen displays, Figure 4-23.


Figure 4-23 Hopper Diagnostics screen.

2 Perform a 1-Coin test by selecting Paid 1 Coin.


The Hopper dispenses a single coin and the Coin Paid counter increments to 1.
3 Perform a 10-Coin test by selecting Paid 10 Coins.
The Hopper dispenses 10 coins and the Coin Paid counter increments to 10.
4 If necessary, select Hopper Shutoff to stop the Hopper from dispensing coins.
5 When the test is complete, select Exit.
NOTE: Under special circumstances, such as when the Main Door is closed as the test is
completing, an Exit banner displays for 2.5 seconds.

February 2009
Progressive Diagnostics 4-17

Progressive Reference this section for Progressive Diagnostics:


Diagnostics WMSP Traffic Statistics
WMSP Link Statistics

WMSP Diagnostics - This function displays WMS Progressive traffic data corresponding to the game. Complete the
Traffic Statistics following steps:
1 From the Administration Menu, select Diagnostics | Network Diagnostics | WMSP
Diagnostics. The Network Diagnostics Menu displays, Figure 4-24.
Figure 4-24 Network Diagnostics Menu.

The WMSP Diagnostics Menu displays Figure 4-25.


Figure 4-25 WMSP Diagnostics Menu

16-022128-03
4-18 Chapter 4: Troubleshooting

2 Select WMSP Traffic Statistics to view data transfer information between the game and the
Progressive System. This displays the WMSP/WSLL Traffic Statistics screen, Figure 4-26.
Figure 4-26 WMSP/WSLL Traffic Statistics screen.

3 Select Update Data to refresh the displayed data.


4 Select Exit to return to the Administration Menu.

February 2009
Progressive Diagnostics 4-19
WMSP Diagnostics - This function displays WMS Progressive statistical link data corresponding to the game. Complete
Link Statistics the following steps:
1 From the Administration Menu, select Diagnostics | WMSP Diagnostics | WMSP Link
Statistics, Figure 4-27.
Figure 4-27 WMSP Diagnostics menu.

The WMSP Link Statistics screen displays, Figure 4-28.


Figure 4-28 WMSP Link Statistics screen.

2 Select Update Data to refresh the displayed data.


3 Select Exit to return to the Administration Menu.

16-022128-03
4-20 Chapter 4: Troubleshooting

SPN The Progressive System is a Smart Peripheral Network (SPN) device. Reference this section for
Diagnostics SPN Diagnostics.
SPN Traffic Statistics
SPN Link Statistics
SPN Devices Diagnostics

SPN Diagnostics - This function displays SPN traffic data corresponding to the game. Complete the following steps:
Traffic This function displays SPN traffic data corresponding to the game. Complete the following steps:

1 From the Administration Menu, select Diagnostics | Network Diagnostics | SPN


Diagnostics, Figure 4-29.
Figure 4-29 SPN Diagnostics Menu.

2 Select SPN Traffic Statistics.


The SPN Traffic Statistics screen displays, Figure 4-30.
Figure 4-30 SPN Traffic Statistics screen.

3 Select Update Data to refresh the displayed data.


4 Select Exit to return to the Administration Menu.

February 2009
SPN Diagnostics 4-21
SPN Diagnostics - This function displays SPN link data corresponding to the game. Complete the following steps:
Link Statistics 1 From the Administration Menu, select Diagnostics | Network Diagnostics | SPN
Diagnostics, Figure 4-31.
Figure 4-31 SPN Diagnostics menu.

2 Select SPN Link Statistics.


The SPN Link Statistics screen displays, Figure 4-32.
Figure 4-32 SPN Link Statistics screen.

3 Select Update Data to refresh the displayed data.


4 Select Exit to return to the Administration Menu.

16-022128-03
4-22 Chapter 4: Troubleshooting

SPN Devices - This function displays data for each individual SPN device in the game. Complete the following
Diagnostics steps:
1 From the Administration Menu, select Diagnostics | Network Diagnostics | SPN
Diagnostics, Figure 4-33.
Figure 4-33 SPN Diagnostics menu.

2 Select SPN Device Diagnostics.


The SPN Device Diagnostics screen displays with installed SPN devices and their firmware
version data, Figure 4-34.
Figure 4-34 SPN Device Diagnostics screen.

February 2009
SPN Diagnostics 4-23
3 To perform an SPN device diagnostic test, select the Start button next to the desired device.
The Device Diagnostics screen displays the device actively running its diagnostic test,
Figure 4-35.
Figure 4-35 SPN Device Diagnostics Test screen.

See Table 4-3 for information on the individual SPN device diagnostic tests.

Table 4-3 SPN device diagnostic tests.


Test Description
Mech Reels The Mechanical Reels spin to the home position and then revolve from symbol to
symbol. The lights for the Mechanical Reels are also lit in sequence.
Payline Lights up all the paylines.
Progressive Meter Changes the color of the Progressive Meter display.
Reel Illuminator Lights up all Reel Illuminator LEDs.
Universal Lights up all the LEDs in the Animator Button.
Animator

4 To end the diagnostic test, select Stop.


5 Select Exit to return to the Administration Menu.

16-022128-03
4-24 Chapter 4: Troubleshooting

Using SVC/GAT Complete the following steps to use a software verification (SVC)/game authentication terminal
(GAT) to verify game software components:
1 Unlock and open the Main Door.
2 Using an SVC or GAT terminal, connect a standard serial cable to the J3 connector on the CPU
Board, Figure 4-37 (A).
Figure 4-36 CPU Enclosure.

3 Press the DIAGNOSTIC Switch.


4 Select SVC/GAT, Figure 4-37.
Figure 4-37 SVC/GAT Menu.

February 2009
Using SVC/GAT 4-25
5 Access the SVC Authentication Information screen by selecting GAT3.
The SVC Authentication Information screen is displayed, Figure 4-38.
Figure 4-38 SVC Authentication Information screen.

Each component is automatically authenticated. The progress of the process is displayed for
each individual component and for the entire series of components.
NOTE: If necessary, consult the SVC/GAT documentation for more information on utilizing the
application or terminal.
6 When testing is complete, select Exit.
7 Close and lock the Main Door.

16-022128-03
4-26 Chapter 4: Troubleshooting

Tilt Codes Refer to Table 4-4 for a definition and possible solution(s) for the tilts displayed by a BB2-Mech
game.

Table 4-4 Tilt Codes.


Display Definition Possible Solution(s)
Assert Fail Message displays: NOTE: When doing a RAM Clear, be sure to wait for
RAM clear to complete.
Machine Fault
Assert: Perform a RAM Clear.
Assertion=Success
File=\SDG\framework\libslot\bid\tw Check the CPU.
entylineproxy. Check memory card.
Function=voidCtwentylineProxy:
activate[] Check software.
BillVal Acceptor Bill Acceptor Service Door is open. Check the Bill Acceptor Service Door.
Service Door Open
Check connections on switch.
Replace switch.
Replace the CPU.
Replace Bulkhead Board.
BillVal Acceptor Jam The Bill Acceptor reported that an Check the Bill Acceptor for jammed bills or
inserted bill or ticket is jamming tickets.
the acceptor.
BillVal Com Error The Bill Acceptor connector is Check the connections to the Bulkhead Board
disconnected or the Bill Acceptor and Bill Acceptor.
head is removed.
Check Device settings.
Replace Bulkhead Board.
BillVal Device Error The Bill Acceptor reported that one Replace the Bill Acceptor head.
of the following components has
failed:
Bill Acceptor
Stack Motor
Feed Motor
RAM
ROM
BillVal Door Open Bill Acceptor Door is open. Check the Bill Acceptor Door.
Check door lever on left side of Bill Acceptor
housing unit.
Check connections on switch.
Replace switch.
Replace the CPU.
Replace Bulkhead Board.
BillVal Port Error An attempt to open, close, read, or Reseat Bill Acceptor and check if communication
write through the COM port on the is restored.
Bulkhead Board has failed. The
Bulkhead Board is not Replace Bill Acceptor.
communicating with the Bill Replace Bulkhead Board.
Acceptor through the COM Port.
BillVal Reject Limit More than ten bills or tickets were Open and close the Main Door.
rejected in a row.
Clean and calibrate Bill Acceptor (if applicable).
BillVal Stacker Full The Cashbox is full. Exchange cashbox with empty cashbox.
BillVal Stacker Jam The Bill Acceptor reports a jam in Check the Cashbox for jammed bills or tickets.
the Cashbox.
BillVal Stacker Open The Cashbox is removed. Replace the Cashbox or verify that it is properly
seated.
Check connections on switch
Replace switch.
Replace the CPU.
Replace Bulkhead Board.
BillVal Tamper The Bill Acceptor reported a Check the Bill Acceptor for evidence of stringing
tamper. or other cheating attempts.

February 2009
Tilt Codes 4-27
Table 4-4 Tilt Codes. (continued)
Display Definition Possible Solution(s)
CashOut To Host Displays when attempting to Check host connection.
Failed cashout to the host and host fails
to respond.
Closure B Belly Door was closed. No action required. Error clears after one game
is played.
Closure D Drop Door was closed. No action required. Error clears after one game
is played.
Closure L Logic Door was closed. No action required. Error clears after one game
is played.
Closure M Main Door was closed. No action required. Error clears after one game
is played.
Closure P Accessory Box Logic Door was No action required. Error clears after one game
closed. is played.
Closure S Bill Acceptor Cashbox Door was No action required. Error clears after one game
closed. is played.
Closure T Accessory Box Main Door was No action required. Error clears after one game
closed. is played.
Closure V Bill Acceptor Door was closed. No action required. Error clears after one game
is played.
Coin Acceptor The Coin Acceptor reported a
Device Error device error.
For the MC40:
The optics are blocked, 1.5 Unblock optics
seconds
A reverse coin was detected Clear tilt
Null >250 milliseconds Clear tilt
(stringing)
There was no sense signal Replace MC40
with an optic signal

For the IDX10:


A slow or stuck coin Clear coin
A reverse coin was detected Clear tilt
Excessive bad coin count Test with known good coins. If this does not
work, replace IDX10.
System malfunction Clear tilt. If this does not work, replace IDX10.
Coin Acceptor Jam The Coin Acceptor reported that Check Coin Acceptor and optics.
one or more coins are jammed in
the coin path. Clear any jammed coins.

Coin Acceptor The Coin Acceptor detected that Check connection J13 at the Bulkhead Board.
System Error the coin in signals did not occur in
the expected order.
Coin Acceptor The Coin Acceptor reported that a Check the Coin Acceptor for evidence of
Tamper tamper occurred. stringing or other attempts at cheating. If a
sample coin is used, verify the sample coin is
For the MC40 and the IDX10 correct and properly seated.
C480434 and C480435, a tamper
is reported if the sample coin was
removed or if a reverse coin was
detected.
Double Call Two separate Call Attendant Replace the BIOS Firmware Hub.
Attendant messages display.
Replace the SPI chip. If this does not work,
replace both the BIOS and SPI chips at the
same time.
Replace the CPU.
Drop Door Open Drop Door is open. Check the Drop Door.
Check connections on switch.
Replace switch.
Replace the CPU.
Replace Bulkhead Board.

16-022128-03
4-28 Chapter 4: Troubleshooting

Table 4-4 Tilt Codes. (continued)


Display Definition Possible Solution(s)
EPROM Device Critical error: An improper or non- Replace the Bulkhead Board.
Error functional device was detected
and all processes were
suspended.
EPROM System Critical error: An invalid signature Perform a RAM Clear.
Error ID was detected and all processes
were suspended. Replace the CPU Board battery and RAM Clear.
WARNING: Always disconnect AC Line Cord before
removing and replacing batteries.
Extra Coin Out The OS detected a coin out after Check Hopper knife.
the payout was complete.
Hard Meter 1 The meter connector is Check the meter connection. If necessary,
disconnected disconnected. replace the meter harness.
Replace the CPU.
Replace Bulkhead Board.
Hard Meter 2 The meter connector is Check the meter connection. If necessary,
disconnected disconnected. replace the meter harness.
Replace the CPU.
Replace Bulkhead Board.
Hard Meter 3 The meter connector is Check the meter connection. If necessary,
disconnected disconnected. replace the meter harness.
Replace the CPU.
Replace Bulkhead Board.
Hard Meter 4 The meter connector is Check the meter connection. If necessary,
disconnected disconnected. replace the meter harness.
Replace the CPU.
Replace Bulkhead Board.
Hard Meter 5 The meter connector is Check the meter connection. If necessary,
disconnected disconnected. replace the meter harness.
Replace the CPU.
Replace Bulkhead Board.
Hard Meter 6 The meter connector is Check the meter connection. If necessary,
disconnected disconnected. replace the meter harness.
Replace the CPU.
Replace Bulkhead Board.
Hard Meter 1 The meter connector is shorted. Check the meter connection.
shorted
If necessary, replace the meter harness.
Hard Meter 2 The meter connector is shorted. Check the meter connection.
shorted
If necessary, replace the meter harness.
Hard Meter 3 The meter connector is shorted. Check the meter connection.
shorted
If necessary, replace the meter harness.
Hard Meter 4 The meter connector is shorted. Check the meter connection.
shorted
If necessary, replace the meter harness.
Hard Meter 5 The meter connector is shorted. Check the meter connection.
shorted
If necessary, replace the meter harness.
Hard Meter 6 The meter connector is shorted. Check the meter connection.
shorted
If necessary, replace the meter harness.
IGM Bad Firmware The firmware installed in the Run SPN Diagnostics and make sure that the
Version Progressive Meter is the incorrect firmware version is correct.
version or it is outdated.
If the firmware is not correct, change the
The incorrect Progressive Meter firmware and/or Progressive Meter.
hardware is installed.
InGameMeter The Progressive Meter was not Run SPN Diagnostics and make sure that the
Config Error able to configure itself properly. firmware version is correct.
The Progressive Meter may not be
supporting all of the progressive If the firmware is not correct, change the
levels configured in physical firmware and/or Progressive Meter.
display.

February 2009
Tilt Codes 4-29
Table 4-4 Tilt Codes. (continued)
Display Definition Possible Solution(s)
Lamp Matrix Lamp Matrix did not respond to the Clear tilt by opening and closing Main Door. If
Command Timeout command sent. the error continues, power cycle the game.
Lamp Matrix Device Lamp Matrix returned a bad Clear tilt by opening and closing Main Door. If
Response Error response to the command sent. the error continues, power cycle the game.
Lamp Matrix Invalid Lamp Matrix firmware version did Run SPN Diagnostics and make sure that the
Firmware Version not match the requirement. firmware version is correct.
If the firmware is not correct, change the
firmware.
Logic Door Open Logic Door is open. Check the Logic Door.
Check connections on switch.
Replace switch.
Replace the CPU.
Replace Bulkhead Board.
Machine Disabled The Host has disabled the game. Displays for various reasons, including SAS
communication breakdown.
Review Host System messages for detailed
information.
Main Door Open Main Door is open. Check the Main Door.
Check connections on switch.
Replace switch.
Replace the CPU.
Replace Bulkhead Board.
Mech Reels Bad Internal failure of Reel Module. Clear tilt by opening and closing Main Door.
Command
Response If the error continues, change the Reel Module.

Mech Reels Bad Reel firmware incompatible with Install proper reel firmware to match game
Firmware Version game software. requirements.
Mech Reels Bad Tampering of reels may have Clear tilt by opening and closing Main Door.
Optic Band Reel x occurred.
Clean reel opto film strip.
Reel opto film damaged or dirty.
Replace reel opto film strip.
Mech Reels Bad The mechanical reels may have Clear tilt by opening and closing Main Door.
Opto Strip x incorrect opto strips installed.
If the error continues, change the opto strips.
If the problem persists, replace the Reel Module.
Mech Reels Bad Internal failure of Reel Module. Clear tilt by opening and closing Main Door.
Stop Symbol
If the error continues, change the Reel Module.
Mech Reels Comm Bad Reel Controller chip or a Clear tilt by opening and closing Main Door.
Timeout Reel x software issue.
If the error continues, power cycle the game.
Mech Reels The SPN cable from the Clear tilt by opening and closing Main Door.
Command Timeout mechanical reels is unplugged or
bad. If the error continues, check the cable and
reconnect or replace as necessary.
Mech Reels Invalid Tampering of reels may have Clear tilt by opening and closing Main Door.
Opto At Stop Reel x occurred.
Install correct opto film strip to match the number
Opto film strip number of stop of stop positions required by game.
positions does not match game
requirement.
Mech Reels Invalid Internal failure of Reel Module. Clear tilt by opening and closing Main Door.
State
If the error continues, change the Reel Module.
Mech Reels No Internal failure of Reel Module. Clear tilt by opening and closing Main Door.
Home Reel x
If the error continues, change the Reel Module.
Mech Reels Reel Tampering of reels may have Clear tilt by opening and closing Main Door.
Moving At Stop Reel occurred.
x If the error continues, change the Reel Module.

Mech Reels Reel Tampering of reels may have Clear tilt by opening and closing Main Door.
Not Spinning Reel x occurred.
If the error continues, change the Reel Module.

16-022128-03
4-30 Chapter 4: Troubleshooting

Table 4-4 Tilt Codes. (continued)


Display Definition Possible Solution(s)
Mech Reels Internal failure of Reel Module. Clear tilt by opening and closing Main Door.
Watchdog Timeout
Reel x If the error continues, check the Reel Mech
connections and, if necessary, change the Reel
Module.
No Trigger XX Error Message displays: Replace the BIOS Firmware Hub.
(where X is a
number) Machine Fault Replace the SPI chip.
Assert:
Assertion=Success If this does not work, replace both the BIOS and
File=\SDG\framework\libslot\bid\tw SPI chips at the same time.
entylineproxy. Replace the CPU.
Function=voidCtwentylineProxy:
activate[]
NVRAM Battery 1 The NVRAM battery 1 is low. Replace the CPU Battery at location BAT1.
Low
WARNING: Always disconnect AC Line Cord before
removing and replacing batteries.
NVRAM Battery 2 The NVRAM battery 2 is low. Replace the CPU Battery at location BAT2.
Low
WARNING: Always disconnect AC Line Cord before
removing and replacing batteries.
NVRAM Corruption Critical error: Corruption was Turn the Attendant Key Switch to display the
detected in the Non-Volatile fault information.
Random Access Memory
(NVRAM) and all processes were Turn the Attendant Key Switch a second time to
suspended. force a restart.
Replace the CPU.
NVRAM Device Critical error: An improper or non- Replace the CPU.
Error functional device was detected
and all processes were
suspended.
NVRAM System Critical error: An invalid signature Perform a RAM Clear
Error ID was detected and all processes
were suspended. Replace the CPU Board battery and RAM Clear.
WARNING: Always disconnect AC Line Cord before
removing and replacing batteries.
Open Door B Belly Door is open. Check the Belly Door.
Check connections on switch.
Replace switch.
Replace the CPU.
Replace Bulkhead Board.
Open Door D Drop Door is open. Check the Drop Door.
Check connections on switch.
Replace switch.
Replace the CPU.
Replace Bulkhead Board.
Open Door L Logic Door is open. Check the Logic Door.
Check connections on switch.
Replace switch.
Replace the CPU.
Replace Bulkhead Board.
Open Door M Main Door is open. Check the Main Door.
Check connections on switch.
Replace switch.
Replace the CPU.
Replace Bulkhead Board.
Open Door P Accessory Box Logic Door is Check the Accessory Box Logic Door.
open.
Check connections on switch.
Replace switch.
Replace the CPU.
Replace Bulkhead Board.

February 2009
Tilt Codes 4-31
Table 4-4 Tilt Codes. (continued)
Display Definition Possible Solution(s)
Open Door S Bill Acceptor Cashbox Door is Check the Bill Acceptor Stacker/ Cashbox Door.
open.
Check connections on switch.
Replace switch.
Replace the CPU.
Replace Bulkhead Board.
Open Door T Main Accessory Box Door is open. Check the Main Accessory Box Door.
Check connections on switch.
Replace switch.
Replace the CPU.
Replace Bulkhead Board.
Open Door V Bill Acceptor Door is open. Check the Bill Acceptor Door.
Check door lever on left side of Bill Acceptor
housing unit.
Check connections on switch.
Replace switch.
Replace the CPU.
Replace Bulkhead Board.
Please Wait Displays when transferring funds Wait for the transaction to complete.
Transaction In to/from the game.
Progress
Power Cycle Device setting was changed. Power cycle the game.
Required (OS
SSOS-000-1300 NOTE: In OS 1300 and later, the
and later). game no longer requires a RAM
Clear due to machine device
changes.
Power Fault while The Printer lost power while Check power connection to Printer.
Printing printing.
Power Reset The game powered up. No action required. Error clears after one game
is played.
Printer Carriage The Printer reported a carriage Check Printer head for jams.
Jam jam.
Printer Close Error The Printer reported an error after Check Printer cabling.
being closed.
Printer Com Error The Printer communication was Confirm that the Printer communication and
lost. A status reply has not been power cables are securely connected.
received from the Printer for ten
seconds, during an Idle state. Replace Printer Comm. Board.

Printer Com Lost During a print job, the Printer Confirm that the Printer communication and
During Print stopped replying to status power cables are securely connected.
requests.
Printer Config Error The Printer needs to be Check the Printer configuration in the
configured. Administration Menu.
Printer Device Error The Printer reported an error with Test the Printer.
a component.
Replace the Printer.
Head Failure
Voltage Failure
Temperature Failure
Bad Paper Index
Printer Not Set The Printer is not set up. Set the Printer as a Machine Device from the
Setup Menu.
Printer Off Line The Printer reported an offline Check Printer cabling.
status.
Printer Open Error The Printer reported an open Open and close the Printer.
status. For the Seiko/FutureLogic,
the Printer detected a door open
error, or a platen disengaged error.
Printer Out of Paper The Printer detected an out of Refill the paper.
paper status, or a lost paper input
status. Check optic on Printer.

16-022128-03
4-32 Chapter 4: Troubleshooting

Table 4-4 Tilt Codes. (continued)


Display Definition Possible Solution(s)
Printer Paper In For the Netplex only, the Printer Remove paper from chute.
Chute reported a paper in chute status.
Printer Paper Jam The Printer reported a paper jam. Check the Printer for jams and clear path.
Printer Paper Low The Printer reported a paper low Refill the paper.
status.
Check optic on Printer.
Printer Power Off The Printer power is OFF. Check the Aux. power supply.
Check connections between Bulkhead Board
and Printer.
Printer Receive The Printer reported a receive Check Printer cabling.
Error error.
If necessary, replace cable.
Printer System Error The Printer reported a system Test the Printer.
error.
Replace the Printer.
Bad Library References
Bad Printer Region Data
Bad Buffer Space
Bad Job Memory
Bad Command
Printer Timeout For the Ithaca/Transact only, the Test the Printer.
Error Printer reported that a print
process started with no errors, but Replace the Printer.
the ticket complete flag was not
reported.
Printer Transmit The Printer reported a transmit Confirm the Printer communication and power
Error error. cable connections.
Program Error Critical error: A program detected Turn the Attendant Key Switch to display the
an unrecoverable error and all fault information.
processes were suspended.
Turn the Attendant Key Switch a second time to
force a restart.
A RAM Clear may be required.
Progressive The game has received a valid This clears automatically when the game is
Disabled progressive configuration from the enabled by the Progressive Controller.
Progressive Controller and is
waiting for the Progressive Inspect system to establish if a cabling or
Controller to enable the play connection problem exists.
function.
The gaming device has lost
communication with the
progressive system.
Progressive The game has received certain Power cycle the game.
Response Error information from the Progressive
Controller which is unexpected or
deemed incorrect, and the error
cannot be automatically cleared.
Progressive Sign Displayed during game startup. Enter and exit the game Administration Mode
Not Functioning completely.
If after game startup the error is
still displayed, the attempt at In- If the solution above is unsuccessful, replace In-
Game meter configuration failed. Game Meter.
Progressive The WMSP protocol has been Verify connectivity to the Progressive Controller.
Unconfigured configured and the Host has not Verify that game has been entered into the
recognized the required database at the controller and/or central system
configuration information. This and that the data entered matches the actual
may be due to the following: game configuration.
Game has not received a valid Verify that the cables are functional.
progressive configuration from
the Progressive Controller. Replace the Progressive Controller software.

There is no communication Verify that the game has been configured in


with the Progressive Controller Administration Mode.
or the communication is lost for
more than 10 seconds.
Game was explicitly disabled
by the Progressive Controller.

February 2009
Tilt Codes 4-33
Table 4-4 Tilt Codes. (continued)
Display Definition Possible Solution(s)
Protocol Com Error A com port error has occurred. Check Host communication configuration in
Administration Mode.
Verify that the game has been entered into the
casino backend system.
Protocol Config The protocol has not been Check Host communication configuration in
Error configured or the Host has not Administration Mode.
sent the required validation
information. Verify that the game has been entered into the
casino backend system.
RAM Error Critical error: An unrecoverable Turn the Attendant Key Switch to display error
error was detected in the Random information.
Access Memory (RAM) and all
processes were suspended. Turn the key a second time to initiate a game
restart.
If the problem continues, replace both the RAM
Card and the CPU.
Sleeping Forever Message displays: No more tasks Reseat the CPU.
for init - sleeping forever.
Check for bent pins on the Blind Mate
Connectors on the Bulkhead Board.
Stacker Switch Bill Acceptor Stacker Door is open. Check the Bill Acceptor Stacker/Cashbox Door.
Open
Check connections on switch.
Replace switch.
Replace the CPU.
Replace Bulkhead Board.
Touch Screen The controller reported an error Calibrate the Touch Screen.
Calibration Error during calibration.
Check Touch Screen power cable.
Replace LCD.
Touch Screen Com The controller connector is Check Touch Screen connectors.
Error disconnected or a com port open
error has occurred. Check Touch Screen power cable.
Replace LCD.
Touch Screen Data The controller sent invalid data. Check the Bulkhead Board Touch Screen
Error connector.
Replace LCD.
Touch Screen The controller reported an Check the Touch Screen controller.
Device Error initialization error.
Replace LCD.
Waiting For A progressive win has occurred While waiting for the confirmed win amount to
Progressive Win and the game is waiting to receive display, the operator may turn the Attendant Key
Amount the confirmed progressive win Switch to clear the error and cause the game to
amount from the Progressive abort. If this occurs, it is then necessary to
Controller. This condition clears determine the confirmed win amount manually.
itself automatically once the
confirmed win amount is received.
If the game does not receive a
confirmed win amount within 60
seconds of reporting the win to the
controller, Tower Light flashes
slowly to notify attendant that a
manual payout of the win is
required.

16-022128-03
4-34 Chapter 4: Troubleshooting

Bluebird 2 This section describes the start-up sequence for the Bluebird 2 Mechanical (BB2-Mech) after the
Mechanical OLED Button Panel hardware is installed. Complete the following steps to Power Up the game:
(BB2-Mech): 1 Ensure that the Button Panel is completely installed and connected to the game. The correct
Verify OLED images are uploaded to the OLED Button Panel by the game OS during a Power Cycle.
Start-Up
Sequence WARNING: The OLED Button Panel is not hot-swappable.
2 Set the game Power Switch to ON.
The states of the OLED Button Panel during the start-up sequence are shown in Figure 4-39
and described in Table 4-5.
Figure 4-39 Start-up States of OLED Button Panel.

A B

D
C

E F

Table 4-5 Start-up States of OLED Button Panel.


State of Button #1 (largest button) State of Buttons #2 through #13 Meaning
OLED display on, with lowest Same as OLED Button #1. Initial Power-Up, No USB
intensity color, Figure 4-39 (A). Connection detected.
OLED display on, with 16 intensity Same as OLED Button #1. USB Connection detected during
color, Figure 4-39 (B). initial Power-Up.
OLED display blank, One White OLED displays blank, LEDs off. No USB Connection detected
Flashing LED, Figure 4-39 (C). (AFTER an initial USB Connection
had been established).
OLED display blank, red LED, Same as OLED Button #1. Loading images from game
Figure 4-39 (D). software.
OLED display blank, red LED circles OLED display on, with 16 intensity Loading images into Button #1
screen, Figure 4-39 (E). color. only.
Images Display, yellow or blue LEDs Same as OLED Button #1. Ready for game play.
functional, Figure 4-39 (F).

February 2009
OLED Troubleshooting 4-35

OLED If necessary, the OS communicates error messages related to the OLED Button Panel on the
Troubleshooting screen, Figure 4-40. Reference Table 4-6 for a list of Button Panel related error messages and
possible solutions.
Figure 4-40 Example of Error Message.

Table 4-6 Button Panel Related Error Messages and Possible Solutions.
On Screen Error Message Definition Possible Solution[s]
OLED Button Panel The USB or power cable is Check the connections of the 24V power cable,
communications error likely disconnected or Figure 4-41 (A), and USB cable, Figure 4-41 (B),
damaged. to the Button Panel PCB.
Check the connection of the USB cable to the
CPU, Figure 4-41 (C).
Check the entire length of the USB cable for
damage.
Check the connection of the 24V power cable on
the left cable channel at J22 on the Bulkhead
Board, (A).
Check the entire length of the 24V Power Cable
for damage.
Replace the USB cable.
Replace the 24V power cable.
Replace the Button Panel, as the Button Panel
PCB may be damaged.
OLED Button Panel Firmware The Firmware on the Button Verify and reinstall the Button Panel Firmware.
Version mismatch Panel Controller Board
located on the Button
Modules are not what the
game OS expects.

Figure 4-41 Connections of Button Panel USB and Power cables at


Button Panel PCB (left) and CPU (right).

C
B
A

16-022128-03
4-36 Chapter 4: Troubleshooting

CPU-NXT2 Reference Table 4-7 for a list of CPU-NXT2 failure modes and solutions.
Failure Mode
Analysis Table 4-7 CPU-NXT2 Failure Modes and Solutions.
Symptom(s) Possible Cause(s) Solution(s)
No video (LCD indicates there is VGA cable not installed Check cables and
power) properly connections.
VGA cable not working Replace VGA cable.
DVI or VGA cable not installed Check cables and
properly connections.
DVI cable not working Replace DVI cable.
Non-functioning BIOS Verify BIOS is installed
properly.
BIOS not installed
No video (LCD indicates there is LCD is disconnected at the at Verify the LCD is properly
no power) the cable channel connected at both ends.
LCD has blown fuse Check fuse and replace if
necessary.
NOTE: Transmissive LCD has no
fuse. Replace LCD.
Connector is loose from Reconnect cable to power.
power supply
Power rail on the Bulkhead Board Power supply not working Check ATX power supply and
or on the CPU does not power up power supply cable; reseat
Power supply cable loose/ cable or replace power supply
disconnected at J9 if needed.
Non-functioning main switch Check main switch; replace if
CPU not properly seated needed.
CPU damaged Reseat CPU to the backplane.
AC Line cord is disconnected Replace CPU if damaged.
at power supply or outlet Verify AC Line cord is
connected at both ends
CPU fan not running Fan unplugged Check cable and fan
connection to ETX module.
BIOS connected improperly
Replace CPU.
RAM installed incorrectly
Replace fan.
Non-functioning BIOS
Replace fan cable.
Non-functioning RAM
Verify that the BIOS is
properly installed and working;
if not, replace the BIOS.
Verify that the RAM is properly
installed and working; if not,
replace the RAM.
Video is present but CPU does MBR Read Error Power cycle cabinet
not boot up past initial boot
process DSS Validation Failure Verify BIOS, Game
CompactFlash Cards, OS
SPI not present CompactFlash Cards, and SPI
OS/Game flash are are properly installed.
incompatible Verify OS and Game Compact
Flash cards are compatible
Verify OS/Game are
compatible with BIOS and SPI
versions
Video is present but game does ETX board misaligned or Verify that ETX board is
not load properly seated incorrectly properly seated
Non-functioning board Inspect pins on the bottom of
ETX board; if pins are bent,
replace ETX board
Replace ETX board
Hard drive not operational or not Hard drive connected Open CPU Enclosure and
accessible improperly check cables and connection
from CPU to the hard drive
Non-functioning hard drive
Replace hard drive
Replace CPU

February 2009
Chapter 5
BB2 Exploded Views & Block Diagrams

Table of Contents BB2 Power Components........................................................................... 5 - 2


BB2 Upper Door (with Coin) ..................................................................... 5 - 3
BB2 Upper Door (no Coin) ........................................................................ 5 - 4
BB2 Lower Door......................................................................................... 5 - 5
BB2 Bill Acceptor Housing ....................................................................... 5 - 6
BB2 Reel Tray Assembly - 3 Reel............................................................. 5 - 7
BB2 Reel Tray Assembly - 5 Reel............................................................. 5 - 8
BB2 Reel Mechanism - 90 mm (for 3-Reel Cabinet)................................ 5 - 9
BB2 Reel Mechanism - 66 mm (for 5-Reel Cabinet).............................. 5 - 10
BB2 22-in. Accessory Box ...................................................................... 5 - 11
BB2 17-in. Accessory Box ...................................................................... 5 - 12
AC Block Diagram for Bluebird 2 (BB2) Cabinet .................................. 5 - 13
DC Block Diagram for Bluebird 2 (BB2) Cabinet .................................. 5 - 14
Block Diagram for Bluebird 2 (BB2) Cabinet w/CPU-NXT2.................. 5 - 15
Block Diagram for Bluebird 2 (BB2) Cabinet w/CPU-NXT2 -
Transmissive ............................................................................................ 5 - 16
Block Diagram for 3 and 5 Mechanical Reel SPN and DC Power
Distribution Bluebird 2 (BB2) Cabinet w/CPU-NXT2 - Transmissive .. 5 - 17

February 2009
16-022128-03
Chapter 5: BB2 Exploded Views & Block Diagrams 5-2

BB2 Power Components

ITEM DESCRIPTION
1 POWER SWITCH HOUSING
2 24V POWER SUPPLY
3 BULKHEAD PANEL ASSEMBLY
4 CPU ENCLOSURE

February 2009
Chapter 5: BB2 Exploded Views & Block Diagrams 5-3

BB2 Upper Door (with Coin)

ITEM PART NUMBER DESCRIPTION QTY


1 A-021246-XX-YY-ZZZ ASY: UPR-DR-CSTG-22-LCD-900 1
2 A-023833-00-02 ASSY: UPR DR-BPNL-W/COIN-900 1
3 4008-007027-06 8-32x06 PHL HXW F TT ST ZN 7
4 01-021830-00-00 BRKT: DOOR STRUT MTG-900 1
5 A-023826-00-01 ASSY: TCE/CN MECH-MTG-UBV 1

February 2009
Chapter 5: BB2 Exploded Views & Block Diagrams 5-4

BB2 Upper Door (no Coin)

ITEM PART NUMBER DESCRIPTION QTY


1 A-021246-XX-YY-ZZZ ASY: UPR-DR-CSTG-22-LCD-900 1
2 A-023833-00-01 ASSY: UPR DR-BPNL-NO COIN 1
3 4008-007027-06 8-32x06 PHL HXW F TT ST ZN 7
4 01-021830-00-00 BRKT: DOOR STRUT MTG-900 1
5 03-021856-00-00-ZZZ CVR: NO COIN-900 1

February 2009
Chapter 5: BB2 Exploded Views & Block Diagrams 5-5

BB2 Lower Door

ITEM PART NUMBER DESCRIPTION QTY


1 A-019810-01-XX-ZZZ ASSY: LWR-DR-900 1
2 A-021292-01-00 ASY: LIT-WBA-BZL-900 1
3 4700-00060-00 FW: .219x0.500x.062 CRS ZN 2
4 4008-008342-05B 8-32x05 HEX SOC SHL ST ZN 2
PCBA: UNIVERSAL ANIMATOR
5 A-012562-01-00 CONTROLLER 1
6 03-012325 CVR: BAP PCB CNTRLLR-BUX 1
7 31-008237-01 INSRT: LWR DR-INFO-UBV 1
ASY: 13 BTN PNL PROG-
8 A-020296-00-01-ZZZ SSGPBUX 1
9 20-016108-00-00-ZZZ SPCR: LWR DR-PLYR TRK-BUX 1
10 01-008245-XXZZZ PLT: LWR DR-UBV 1
11 A-021293-01-00 ASY: LIT-PRTNR-BZL-900 1
12 01-016114-00-00-ZZZ PLT: CRDR BLANK-BUX 1
13 4408-01128-00 NUT: 8-32 HEX KEPS ST ZN 8
14 08-7737-35 BLNK: LWR MRQ-UBV 1
15 A-019758-01-24 ASSY: LWR DR-24V LMP MTG 1
16 4008-007027-06 8-32x06 PHL HXW F TT ST ZN 2

February 2009
Chapter 5: BB2 Exploded Views & Block Diagrams 5-6

BB2 Bill Acceptor Housing

ITEM PART NUMBER DESCRIPTION QTY


1 01-024112-01-00 HSG: WBA/CAB-MTG-900 1
2 6643-14246-00-00 SW: MOMENTARY DPDT INTERLOCK 2
3 HD-018677-01-00 CBL: BILL DOOR SW EXT, BB2 1
4 20-004576 LOCK: THUMB, NO KEY, SHIPPING 1
5 01-12793-01 CAM: FLT-1.13-DUAL MTG. 1
6 01-021865-00-00 BRKT: BILL ACCPTR-SECURITY-900 1
7 4408-01128-00 NUT: 8-32 HEX KEPS ST ZN 1
8 01-024158-00-02 PLT: BV-SPCR-SW MTG-900 1
9 HD-019672-00-00 CBL: WBA STACKER SW, BB2 1
10 BBU-OC-BILL VALIDATOR BBU-OC-BILL VALIDATOR 1
11 02-021861-01-00 POST: BV MTG-900 2

February 2009
Chapter 5: BB2 Exploded Views & Block Diagrams 5-7

BB2 Reel Tray Assembly - 3 Reel

ITEM PART NUMBER DESCRIPTION QTY


1 01-022368-00-00 TRAY: REEL MECH BUR 1
2 10-022372-00-00 SPRING: REEL MECH TRAY RTNR 2
3 01-022370-00-00 RTNR: REEL MECH TRAY-LEFT 2
4 4700-00009-00 FW: .172x00.437x.032 CRS ZN 2
5 4004-01005-04 4-40x04 PHL PAN MS ST ZN 2
6 01-022371-00-00 RTNR: REEL MECH TRAY-RIGHT 2
7 20-023971-XX-YY REEL MECH: STD RGB 90MM 3

February 2009
Chapter 5: BB2 Exploded Views & Block Diagrams 5-8

BB2 Reel Tray Assembly - 5 Reel

ITEM PART NUMBER DESCRIPTION QTY


1 01-022368-00-00 TRAY: REEL MECH BUR 1
2 10-022372-00-00 SPRING: REEL MECH TRAY RTNR 2
3 01-022370-00-00 RTNR: REEL MECH TRAY-LEFT 2
4 4700-00009-00 FW: .172x00.437x.032 CRS ZN 2
5 4004-01005-04 4-40x04 PHL PAN MS ST ZN 2
6 01-022371-00-00 RTNR: REEL MECH TRAY-RIGHT 2
7 20-023970-XX-YY REEL MECH: STD RGB 66MM 5

February 2009
Chapter 5: BB2 Exploded Views & Block Diagrams 5-9

BB2 Reel Mechanism - 90 mm (for 3-Reel Cabinet)

ITEM PART NUMBER DESCRIPTION QTY


1 01-022368-00-00 TRAY: REEL MECH BUR 1
2 10-022372-00-00 SPRING: REEL MECH TRAY RTNR 2
3 01-022370-00-00 RTNR: REEL MECH TRAY-LEFT 2
4 4700-014380-00 FW: .250x1.000x.030 CRS ZN 1
5 20-8712-25 ERING: .250S SHAFT DIA 1

February 2009
Chapter 5: BB2 Exploded Views & Block Diagrams 5-10

BB2 Reel Mechanism - 66 mm (for 5-Reel Cabinet)

ITEM PART NUMBER DESCRIPTION QTY


1 20-024115-00-00 REEL MECH: STD RGB-66MM-NO DRUM 1
2 20-024219-XX-YY ASY: OPTO BAND-DISK, REEL MECH 1
3 20-024217-00-00 DRUM: 66MM-REEL MECH, RGB 1
4 4700-014380-00 FW: .250x1.000x.030 CRS ZN 1
5 20-8712-25 ERING: .250S SHAFT DIA 1

February 2009
Chapter 5: BB2 Exploded Views & Block Diagrams 5-11

BB2 22-in. Accessory Box

ITEM PART NUMBER DESCRIPTION QUANTITY


1 A-022253-01-00-ZZZ ASY: ACSRY BX-900 1
2 01-021831-00-00-ZZZ MTG: TWR LMP-900 1
3 02-5295-20 .25 HEX POST - 8M/8F 2
4 4008-007026-06 8-32x06 PHL HXW F MS ST ZN 2
5 03-015643-00-XX VACFORM: TWR LT RISER 1.25H 1
6 20-010405-01-XX TWR LT: SHT 2 TIER BB 1
7 4410-01141-01 NUT: 10-32 FLANGEGRIP ST ZN 4
8 A-021838-04-YY display: 22" w/brackets NON-touch 1
9 A-021844-01-YY-ZZZ assy: crwn t/b-lcd 22in-900 1
10* 03-7520-00-02 TIE WRAP: NYLON 3.9" 1
11 6791-13776-00-02 Conn: MINIFIT JR FREE HNG, 2PN 1
12 -39012020 CONN: MOLEX-MF JR-D02-RCPTL 1
13* 5791-004696-03 CON: SNGL ROW MINI-FIT JR 3CIR 1
14 01-022315-00-00QZZZ PLT: T/B-LAM-BCK CVR-BB2 1
15 01-022147-02-YY-ZZZ PLT: T/B-LAM-RH-BB2 1
16 01-022314-00-YYQZZZ PLT: T/B-LAM-LH-BB2 1
17 4408-01128-00 NUT: 8-32 HEX KEPS ST ZN 6
18 01-019991-00-00-ZZZ CVR: MARQUEE FOOT-12"-900 1
19 01-023570-00-00-ZZZ MTG: MARQUEE FOOT -900 1

February 2009
Chapter 5: BB2 Exploded Views & Block Diagrams 5-12

BB2 17-in. Accessory Box

ITEM PART NUMBER DESCRIPTION QUANTITY


1 A-024153-00-00-ZZZ ASY: ACSRY BX-SHRT-900 1
2 A-024147-XX-YY-ZZZ ASSY: CRWN T/B-LCD 17IN-900 1
3 A-024149-00-00 disply: 17" LCD w/brackets, no touch 900* 1
4 01-024165-00-01QZZZ PLT: T/B-7IN-LAM-LH-900 1
5 01-024165-00-02QZZZ PLT: T/B-7IN-LAM-RH-900 1
6 01-024166-00-00QZZZ PLT: T/B-7IN-LAM-BCK-CVR-900 1
7 01-019991-00-00-ZZZ CVR: MARQUEE FOOT-12"-900 1
8 01-021831-00-00-ZZZ MTG: TWR LMP-900 1
9 03-015643-00-XX VACFORM: TWR LT RISER 1.25H 1
10 20-010405-01-XX TWR LT: SHT 2 TIER BB 1
11 4408-01128-00 NUT: 8-32 HEX KEPS ST ZN 6
12 4410-01129-00 NUT: 10-32 HEX KEPS ST ZN 4
13 4008-007026-06 8-32x06 PHL HXW F MS ST ZN 2
14 02-5295-20 .25 HEX POST - 8M/8F 2
15 01-023570-00-00-ZZZ MTG: MARQUEE FOOT -900 1

February 2009
Chapter 5: BB2 Exploded Views & Block Diagrams 5-13

AC Block Diagram for Bluebird 2 (BB2) Cabinet

February 2009
Chapter 5: BB2 Exploded Views & Block Diagrams 5-14

DC Block Diagram for Bluebird 2 (BB2) Cabinet

February 2009
Chapter 5: BB2 Exploded Views & Block Diagrams 5-15

Block Diagram for Bluebird 2 (BB2) Cabinet w/CPU-NXT2

February 2009
Chapter 5: BB2 Exploded Views & Block Diagrams 5-16

Block Diagram for Bluebird 2 (BB2) Cabinet w/CPU-NXT2 - Transmissive

February 2009
Chapter 5: BB2 Exploded Views & Block Diagrams 5-17

Block Diagram for 3 and 5 Mechanical Reel SPN and DC Power Distribution Bluebird 2 (BB2) Cabinet w/CPU-NXT2 - Transmissive

February 2009
Chapter 6
BB2 Replacement Parts

Table of Arm Mechanism ........................................................................... 6-2


Contents Bulbs and Ballasts....................................................................... 6-2
Batteries ....................................................................................... 6-2
Button Panel................................................................................. 6-2
Cables ........................................................................................... 6-2
Decals & Labels ........................................................................... 6-3
Glass ............................................................................................. 6-3
Fans .............................................................................................. 6-3
Fuses ............................................................................................ 6-3
Hardware ...................................................................................... 6-3
Inserts ........................................................................................... 6-4
LCDs ............................................................................................. 6-4
Locks ............................................................................................ 6-4
Meters ........................................................................................... 6-4
Power Supply ............................................................................... 6-4
Printed Circuit Boards................................................................. 6-4
Plates, Brackets, and Covers...................................................... 6-5
Reel Components ........................................................................ 6-5
Sound Components..................................................................... 6-5
Switches ....................................................................................... 6-5
Tower Lights................................................................................. 6-5

Overview The purpose of this chapter is to identify select replacement parts for the Bluebird 2 (BB2) Video and
Mechanical Reel. These parts are current as of February 2009, and may change without notice.
CAUTION: The use of any component not listed in this chapter or any other unapproved hardware
causes non-compliance of the BB2. Only replace BB2 components with WMS-approved
components and parts to ensure compliance with all product and safety certifications and
requirements.
Ordering Parts Order replacement parts by contacting the WMS Customer Product Support Center: 866-967-4457.

February 2009
16-022128-03
6-2 Chapter 6: BB2 Replacement Parts

Arm Mechanism
Table 6-1 Arm Mechanism.
Part Number Description Location
20-9967-01-07 Arm Mech Exterior of main cabinet
03-002497-D01 / D12 Arm Handle Exterior of main cabinet
03-002497-D01 hub sleeve, hndl mech. chrome Exterior of main cabinet
03-002497-D12 hub sleeve, hndl mech. gdpv Exterior of main cabinet

Bulbs and
Table 6-2 Bulbs and Ballasts.
Ballasts
Part Number Description Location
6620-019186-00-24 inverter: ccfl, 24vdc for trapezium bulb Oval Marquee
24-019180-00-00 bulb: ccfl trapezium wht Oval Marquee
A-021628-00-00 ASSY: LED-SVC-LMP-9XX Rear Main Cabinet (Service Lamp
Assembly)
24-019181-00-02 bulb: ccfl 8.3in (212mm) w/blocks wht Lower Door lamp
A-019758-02-24 assy: lwr dr-24v lmp mtg Lower Door

Batteries
Table 6-3 Batteries.
Part Number Description Location
6880-017813-00-00 battery: coin cell, 3v, 20mm CPU

WARNING: Danger of explosion if battery is incorrectly replaced. Replace only with the same or
equivalent type recommended by the manufacturer. Before discarding this appliance the batteries
must be removed and disposed of safely. Disconnect the power supply cord(s) before removing the
batteries.

Button Panel
Table 6-4 Button Panel.
Part Number Description Location
A-020296-01-02-D04 ASY: 13 BTN PNL PROG STNLS- SSG-BUX Main Door
A-020296-01-02-D12 ASY: 13 BTN PNL PROG GLD- SSG-BUX

Cables
Table 6-5 Cables.
Part Number Description Location
HS-019386-00-01 cbl: DVI-D, w/ferrites, 1m Main Door LCD
HS-10581-00-00 CBL: DB09 EXT 6FT db9 Player Tracking
HS-13315-00-06 cbl: rohs - fiber optic cable (6 meter) Player Tracking
6850-011713-00-00 LINE CORD: IEC320/F TO EUR CEE7/R 250V Rear right main cabinet (connects to Power
Supply)
6850-021592-00-00 line cord: nema 5-15p/C13 rt angle, 120v, 3m Rear right main cabinet (connects to Power
Supply)
6850-021593-00-00 line cord: nema 6-15p/c13 rt angle, 240v, 3m Rear right main cabinet (connects to Power
Supply)
6850-023452-00-00 line cord: sabs 164-1/c13 rt angle,240v,9ft Rear right main cabinet (connects to Power
Supply)
6850-023641-00-00 line cord: cee7/7-c13r/a (europe)240v-3m Rear right main cabinet (connects to Power
Supply)
6850-023642-00-00 line cord: bs1363-c13r/a(british)240v-3m Rear right main cabinet (connects to Power
Supply)

February 2009
Decals & Labels 6-3
Table 6-5 Cables.
Part Number Description Location
6850-023643-00-00 line cord:iram u0073:1982-c13r/a-240v-3m Rear right main cabinet (connects to Power
Supply)
6850-023644-00-00 line cord: cei 23-16-c13r/a-250v-3m Rear right main cabinet (connects to Power
Supply)
6850-14052-00-00 LINE CORD: ADAPTER IEC/F TO NEMA/F Rear right main cabinet (connects to Power
Supply)

CAUTION: Always replace a failing cable with a new cable of the same part number. Cables that
appear similar but have different part numbers are not interchangeable.

Decals & Labels


Table 6-6 Decals & Labels.
Part Number Description Location
31-021730-200 kit: insert bill here (IBH) bill acceptor decal kit Bill Acceptor
BB2 Canada only
31X021730-100 dcl: international BB2 bill acceptor Bill Acceptor
31-021730-100 dcl: bill acceptor domestic BB2 Bill Acceptor

Glass
Table 6-7 Glass.
Part Number Description Location
31-021931-AA-01 mrq: BB1 and BB2 Generic WMS Blade logo Lower Door
lower door marquee
31-019855-HPR-01 hpr: Wage Net (WANE) Bluebird Coin Hopper Above Coin Tray
glass

Fans
Table 6-8 Fans.
Part Number Description Location
6651-002832-01-00 FAN ASSY: 12VDC, 80x80x25MM, 6.0", MFM Left side of base cabinet, left side of
Accessory Box
6651-024332-00-00 FAN ASSY: 12VDC, 60X60X15MM, 2.5", MFJ CPU
F-08P

Fuses
Table 6-9 Fuses.
Part Number Description Location
6731-008493-00-00 fuse: 5X20mm,hc,sb,3.15a,250v Power supply, lower right main cabinet

Hardware
Table 6-10 Hardware.
Part Number Description Location
A-015306-00 kit: mtg hdwr - bbu Bag of extra hardware. Included inside main
cabinet when shipped from WMS.
03-7655-12 clamp: cbl 3/4 Throughout cabinet.
03-7655-16 clamp: cbl 1" Throughout cabinet.
03-7655-24 clamp: cbl 1 1/2 Throughout cabinet.
03-7655-8 clamp: cbl 1/2 Throughout cabinet.

16-022128-03
6-4 Chapter 6: BB2 Replacement Parts

Inserts
Table 6-11 Inserts.
Part Number Description Location
20-012686-02-00 pckt: tower light inserts leg bb twr light Inside Tower Light at top of Accessory Box
or Top Box
31-009912-05 ins: UBX TCE insert black with new WMS logo Top Coin Entry

LCDs
Table 6-12 LCDs.
Part Number Description Location
A-021838-04-00 disply: 22" LCD w/brackets, touch BB2 Main Door
A-021838-04-01 disply: 22" LCD w/brackets, no touch BB2 Accessory Box
A-024107-00-03 assy: 22" lava full assy, 3 reel Main Door
A-024107-00-05 assy: 22" lava full assy, 5 reel Main Door

Locks
Table 6-13 Locks.
Part Number Description Location
20-018445-00-00 lock: barrel lock dover downs-DD1 Main Door, Lower Door, Cashbox, or CPU
20-019325-00-00 lock: vsr dimple 3009-cash box-lincoln-ri/ril7 Main Door, Lower Door, Cashbox, or CPU
20-019326-00-00 lock: vsr dimple 2000-cpu door-lincoln-ri/ril6 Main Door, Lower Door, Cashbox, or CPU
20-017081-00-00 lock: door/cpu-gtech-newport-ri-ril4 Main Door, Lower Door, Cashbox, or CPU
20-017082-00-00 lock: bv-gtech-newport-ri/ril3a Main Door, Lower Door, Cashbox, or CPU
20-017083-00-00 lock: door/cpu-gtech-lincoln-ri/dimple 3009/ril2 Main Door, Lower Door, Cashbox, or CPU
20-017084-00-00 lock: bv-gtech-lincoln-ri/dimple 2000/stamped Main Door, Lower Door, Cashbox, or CPU
ril1A

NOTE: Select locks are location or jurisdiction-specific. The Main Door, Lower Door, Cashbox, and
CPU can accommodate an identical lock.

Meters
Table 6-14 Meters.
Part Number Description Location
A-022241-00-00 asy: meter-900 Right main cabinet

Power Supply
Table 6-15 Power Supply.
Part Number Description Location
6765-020716-00-00 Power Supply, 900W, Multi-Output Lower right main cabinet

Printed Circuit
Table 6-16 Printed Circuit Boards (PCBs).
Boards
Part Number Description Location
6901-017963-00-03 pcb: in-line 3chnl led ctrl ovl Oval Marquee
6901-013905-00-01 pcb: led side arc Oval Marquee
6901-013904-00-01 pcb: led top arc Oval Marquee
A-013312-02-00 pcba: audio insolation with spdif On Amplifier. Rear main cabinet
A-006672-04-00 pcba: bluebird bulkhead Lower rear main cabinet

February 2009
Plates, Brackets, and Covers 6-5
Table 6-16 Printed Circuit Boards (PCBs). (continued)
Part Number Description Location
A-006672-04-01 assy: bluebird bulkhead, tito disable plug Lower rear main cabinet
A-15895-01-00 pcba: fiber optic link Player Tracking
A-017999-01-01 asy: cpu nxt2, 1gb, blank 40g hd Rear main cabinet

Plates,
Table 6-17 Plates, Brackets and Covers.
Brackets, and
Covers Part Number Description Location
01-021830-00-00 brkt: door strut mtg-9xx Main Door

Reel
Table 6-18 Reel Components.
Components
Part Number Description Location
20-024115-00-00 reel mech: std rgb 66mm-no drum Inside main cabinet, on reel tray
20-024116-00-00 reel mech: std rgb 90mm-no drum Inside main cabinet, on reel tray
20-024217-00-00 drum: 66mm-reel mech, rgb Inside main cabinet, on reel tray
20-024218-00-00 drum: 90mm-reel mech, rgb Inside main cabinet, on reel tray
20-024219-00-03 asy: opto band-disk, 66mm-18stp-18sym Inside main cabinet, on reel mech
20-024219-00-04 asy: opto band-disk, 66mm-22stp-22sym Inside main cabinet, on reel mech
14-011662 mtr: reel mech-sanyo denki Inside main cabinet, on reel mech
A-022408-00-00 PCBA: Mech Reel Backlight, RGB Inside main cabinet, on reel mech
A-022367-01-02 Assy: Reel Mech Tray-900 Inside main cabinet, on reel shelf

Sound
Table 6-19 Sound Components.
Components
Part Number Description Location
6555-021514-00-00 ASY: BOSE-ACOUSTIC-BB2 Main Door
6901-021515-00-00 PCB: AMP & H/SINK-BOSE-BB2 Rear interior of main cabinet
A-013312-02-00 pcba: audio insolation with spdif Amplifier

Switches
Table 6-20 Switches.
Part Number Description Location
6643-009187-00-00 sw: monentary dpdt chtbl 10A 250V Main Door
6643-14246-00-00 SW: MOMENTARY DPDT INTERLOCK Diagnostic Switch, Cashbox

Tower Lights
Table 6-21 Tower Lights.
Part Number Description Location
20-023742-00-01 twr lt: 3 tier rnd chr Top of Accessory Box or Top Box
20-023742-00-02 twr lt: 3 tier rnd brass Top of Accessory Box or Top Box

16-022128-03
6-6 Chapter 6: BB2 Replacement Parts

February 2009

Vous aimerez peut-être aussi