1/9/2016

Work station

On job trainee welder welded a


Bay1 1st shift
CS visually nok.

Bay2

Bay3

Bay4

Bay5

FOP

On job trainees

1 Infant Raj After 17/8/2016 no updation


2 Satheesh Date not known
3 S Sathasivam 9th day-just 1/3rd of CS-4, S1-46 welded
4 S Arunkumar Not filled
5 Somasuntharam Date not known. Not welded
6 M.Vignesh Date not known. Not welded
After 18/8/2016 no updation. Inside 1 pass of
K Gopalakrishnan
7 S1-44 welded
8 P Gopalakrishnan
1
9 Jayaram Date not known. Not welded
10 Abhishek Date not known. Not welded
11 Gopinath

After 22/8/2016 no updation. CS8,CS7 -S1-135


Rajesh Kumar 3rd pass welded. CS6 ,CS7 also welded. CS3
S1-46 (Total 5CS 1 pass each)
12
13 Shreeram
14 Leoprakash After 17/8/2016 no updation.
15 S Kishore Not welded at all. 2 weeks!

S2-133 CS4
S2 134 CS4
Prakash S2 134 CS3,CS4 1st pass
S2 135 CS6 finishing pass
16 S3 135 CS6
2
17 Palanisamy Not welded at all. 1 day leave
18 Surya Not welded at all
CS4 finishing pass
CS2 1st pass
S2 137 CS5 1st pass
19 Krishnakumar S2 138 CS5,CS6 1st pass
20 Vijay Not welded
S3 134 CS7 1 pass only
3 21 Vijayakumar S4 133 CS6,CS7
22 K Balaji Not welded
23 Sathasivam No details
24 Utthayaraj Not welded
S4 130 CS9
P Manikandan S4 132 CS10
4
25 S4 134 CS2,CS3,CS9
26 Swaminathan No data
27 Veeramani No data
28 Thamilarasan Not welded
29 Vinoth Not welded
30 M.Vinoth Not welded
5 31 Rahul Not welded
32 Praveen Kumar
33 Karthik
34 Selvakumar S1 45 CS6 1 & 2 pass
2/9/2016 3/9/2016

S1-48 inside welding


Periyasami
S1-48 4 CS completed. 2nd CS flush
S1-46 inside bevel complte. CS1
welding for visual problem
50mm,CS4 40mm
S1 44 4 CS UT cleared. 4 spot
S1 138 Visual work only.Customer
repair.
offer
S1-46 door welding o/s
S1 44 Door repair. CS2 90mm
S1-50 Fit up

S2-47 CS fit up. S2-47 Inside welding.


S2-46 Visual. UT pending S2 46 UT 8 CS completed. 0 repair.

S3-44 I/S welding


S3 44 CS fit up S4 45 UT checked. 9 spots repair.
S4 45 inside welding CS3 30mm
CS5 40+70+100. CS 8
1m,120,40,120. Due to fit up stage
rework issue. CS 4 100mm

S4 46 CS fit up
S4 44 CS4 13mm S4 44 final visual.
S4 136 customer offer S4 46 fit up completed.

S1 49 CS fit up S1 47 I/S welding


S1 45 Ut waiting S1 45 door fit up root gap 10mm
S1 47 o/s welding (Rotator problem- repair. ISSUE
Stopped to fix ) S1 49 fit up stage

Bay 6 Boom stoppage issue


Tandem problem. 2 shell full out
due to high voltage in inside weld.

New sheets to be issued for all bays


by today
7/9/2016 8/9/2016

S1 50 o/s welding completed


S1 46 customer offer
S1 46 door repair
S1 48 door o/s welding
S1 48 door fit up
S1 50 4 cs welding completed.
WCLC 01 stop to fix for
volatge variation

S2 48 customer offer
S2 49 inside welding
S2 49 internal fit up
S2 48 internal fit up
S2 50 i/s welding started.

S3 45 UT complted.Internals
S3 45 i/s welding on.
S3 46 CS fit up S3 46 i/s welding
S3 47 cs fit up
(OCF problem. Stopped)

S4 46 customer offer S4 47 UT going


S4 47 I/s welding S4 48 fit up
S4 48 CS fit up

S1 49 I/S welding
S1 47 door outside BG i/s
S1 49 i/s welding
welding completed
S1 47 door repair. 1.5m
S1 45 final visual
S1 51 CS fit up complted.
S1 51 CS fit up
S1 45 dispatch.
(Bottom 2nd CS 10mm above
root gap for 2m)

Power source cable cut in


No issues
night in sensar boom

NA NA
0 0
0 0
0 0
NA NA
NA NA

0
1
0 0
0 0
0 0.5
0 0

1 (2nd pass)

0
0 0
NA 0
NA

3 CS Qualified

0 2
0 1

NA

Qualified
0 0

0
0
0 0
NA 0
0 0

0
0
Na
0 0
0 0
2 (o/s welds) 0
NA 0
1 (o/s weld) 0
1 (1st pass) 0
0 0
1 (3rd [ass) 0
12/9/2016 13/9/2016 26/9/2016

S1 48 door repair
4 CS UT ok
S4-49 o/s welding S1 48 final visual
S4-10 O/S welding
S1 50 I/s welding S1 50 final 4 CS UT checking
S4-12 O/S welding
S4 49 o/s welding
S4-14 CS fit up
S4 50 CS fit up

S2 09 i/s welding S4-09 final visual


S2 51 customer offer S2 09 3 spots repair S2-14 UT visual
S2 10 CS fit up S3-13 CS fit up

S3 47 rework on one CS spot


Final visual-customer offer
S3-12 I/S welding
S3 49 o/s welding
S3 49 I/S welding S3 11 o/s welding
S3 47 dispatch S3 10 UT-5 spot repair
S3 50 CS fit up (600mm)
S3 14 CS fit up

S3 48 i/s welding
S1 10 CS fit up S1-13 door repair
S3 48 final visual
S1-14 UT visual
S1 10 CS fit up
S4-13 CS fit up
S4-11 o/s welding

S1 51 i/s welding
S1 49 UT checking
S1 09 CS fit up
S1 51 6 repair spot, door
cutting S1 12 i/s welding
S1 09 o/s welding S2 13 o/s welding
S1 49 customer offer S1 11 UT visual
S1 11 CS fit up

Sensor boom problem as MCB


off
Davvy rolling m/c problem ok
28/9/2016 30/9/2016

S4-14 CS fit up
S4-14 i/s welding
S4-10 welding completed-
S4-12 ut visual
Ovality issue(CS2-9)
S4-11 final visual
S4-12 o/s welding
S4-15 cs fit up

S2-16 o/s welding


S3-14 i/s welding
S2-15 ut visual
S2-14 customer offer
S2-17 cs fit up
S2-15 CS fit up

S3-13 ut visual
S3-11 i/s welding
S3-11 internals welding
S3-13 o/s welding
s3-15 o/s welding
S3-12 UT checking
S3-16 o/s welding
S3-15 CS fit up
S3-17 cs fit up

S1-14 UT visual
S1-16 o/s welding
S4-11 UT complete.5 B/T
S4-13 i/s welding
spots yet to weld
S1-14 customer offer
S4-13 i/s welding
S1-18 cs fit up
S1-16 CS fit up

S2-13 i/s welding


S1-12 ut visual-door bevel S1-15 o/s welding
S1-11 internal fit up (3 S2-13 ut visual
spots-CS2 100,CS4- S1-11 customer offer
100,CS7 120,100) S1-12 door repair. CS ut
Door repair 1700mm (6 pending
spots) S1-17 cs fit up
S1-15 CS fit up

Bay 2 boom tandem work to


ok start by 10am
Bay 6 sensor boom going up
No of joints welded
Sl No Bay Name for 2 weeks
(17/8/16-31/8/2016)
1 Infant Raj 0
2 Satheesh 0
3 S Sathasivam 1
4 S Arunkumar 0
5 Somasuntharam 0
6 M.Vignesh 0
7 K Gopalakrishnan 1
1
8 Jayaram 0
9 Abhishek 0
10 Rajesh Kumar 5
11 M Gopinath 0
12 P Gopalakrishnan 0
13 Sriram 0
14 Leoprakash 0
15 S Kishore 0
16 Prakash 6
17 2 Palanisamy 0
18 Surya 0
19 Krishnakumar 5
20 Vijay 0
21 Vijayakumar 3
22 3 K Balaji 0
23 Manikandan 0
24 Sathasivam 0
25 Utthayaraj 0
26 P Manikandan 5
4
27 Swaminathan 0
28 Veeramani 0
29 Thamilarasan 0
30 Vinoth 0
31 5 M.Vinoth 0
32 Rahul 0
33 Selvakumar 2
34 Murali 0
35 FOP Prabakar 0
36 Parthiban 0