Phase 12
Qatar Power Transmission System Expansion-Phase 12

GTC-643A/2014-Siemens AG & WLL Consortium


Ref.No.: PH12-EPE-3A-DTA-16-03754
DOCUMENT TRANSMITTAL ADVICE
Total Pages: 1+1
Forwarded to: Type of status:
M/s. Siemens AG & WLL Consortium A - Approved (Issue as IFC*)
Al Wakra Tower, 6th Floor, Old Salata Road, B - Approved Except as Noted (Issue as IFC* with incorporated
P.O. Box 21757; Doha, Qatar Fax:+974 4456 comments)
C - Approved Except as Noted & Resubmit
0378
Attn. D - Not Approved
Mr. Sundararaman Doraiswamy, Project E - As Built
Director F - For Information
G - Superseded
CC. H - See Remarks
KM-ENA End User Focal Point I - Collect Stamped Documents from CNS Office
Mr. Rashid Rahimi, Project Manager, Mr. J - Rejected
Tarek El Arabi, Project Manager *IFC = Issued For Construction
Item Document / Drawing No.
DTS No. & Date Rev. Subject Status
No. Rev..
Package S-7: 66/11kV Doha
PH12-SIE-3A-DTS-16-03754 Industrial A Substation - 40MVA and
1 PH12-3A-33-72-C004 1 B
(Rec.Date:15.06.16) 500KVA Transformer Foundation
Structural Design Calculation

Remarks:

Originators Signature Designation Date

Mr. Santhosham Manikandan, Project Manager 22.06.16

Please acknowledge receipt by returning one signed copy of this sheet (or fax confirmation to be attached).

Receivers Signature Designation Date

TL Manikandan Santhosham
Vesna Arsenovic
DTL Dulange Girish

_________________________________________________________________________________________

1 of 2 6/23/2016 10:23 AM
DTA http://10.1.1.17/CEMS/basic.php?doznaka=dtastampa&aHederi=9053...

DTA Ref. No.: PH12-EPE-3A-DTA-16-03754 DTS: PH12-SIE-3A-DTS-16-03754(Rec.Date:15.06.16)

Item Drawing / Document No. Rev. Approval Description


No. PH12-3A-33-72-C004 1 status Package S-7: 66/11kV Doha Industrial A Substation -
1 B 40MVA and 500KVA Transformer Foundation Structural
Design Calculation

COMMENTS CONTRACTOR REPLY


1 D.6.1 Foundation Slab Design Please note that DSM-10 & 11 shows the maximum flexural capacity of
the reinforcement T16-150 + T16-150 & T16-150 + T20-150, which are
DSM 10 & 11 - please mark moments 303kNm & more than the requirement presented in DSM 1- 4. These
375kNm in diagrams on pages DSM 1 - 4. reinforcements are required as per crack width calculation.
2 D.6.1.2 Foundation Slab Crack Width Check
Page DSM 5 Noted.
We confirm that the presented calculations for crack width check on
Please check is it in RC drawings presented pages DSM-5 to DSM-7, are the moment capacity of the
reinforcements provided in the RC drawings.
reinforcement used in crack width check -
T16-150+T16-150.
3 General The outer 250mm skin of the plinth was considered, as it is more than
adequate and results to provision of minimum reinforcement. The
Please clarify why TX plinth is modeled as walls and structural modeling adopted is similar to all other transformer base,
top slab. where the given transformer equipment loading is relatively small by
reference to the required size of the plinth i.e.. the stress induced are
insignificant.Hence the design provided is appropriate .

2 of 2 6/23/2016 10:23 AM