Vous êtes sur la page 1sur 6

Understanding The HA2500

Horizontal Output Load Test


Horizontal output stages are part of every The Load Tests detect problems in high Why Use The Horizontal Output Load Test
CRT video display including closed circuit v o l t a g e , d e f l e c t i o n , o r combination
monitors, computer monitors, video horizontal output stages and enables Many problems involving the horizontal
games, medical monitors, TVs. HDTVs, troubleshooting. This Tech Tip explains stages and B+ power supply are difficult
IDTVs, and the like. The horizontal output when to use the Load Test and how it to isolate with AC power applied to the
stage produces CRT high voltage and/or works. It explains how to properly set up chassis. Many defects in the horizontal
horizontal yoke current to deflect the and perform the Load Tests. Tech Tip #220 o u t p u t s t a g e , B+ p o w e r s u p p l y o r
CRTs electron beam side to side. explains how to interpret the LOAD TESTS HV/deflection regulators reduce the B+
Readouts. power supply voltage to the horizontal
output stage. Since the stages interact so
closely, the defect is not easily isolated.

Full AC volts cannot be applied l If horiz. output stage function The horizontal output stage may load the
without component damage is normal or abnormal B+ supply, placing high current stress on
B+ supply is dead or bad l If short or high current load horizontal output, high voltage/deflection
l Horiz. output dead or suspect exists on B+ power supply regulator and B+ power supply
l H.O.T. heats or fails l If horiz. output stage pulse components. Damage to replacement
l Display dead or wont start timing is normal or abnormal horizontal output transistors and B+
l B+ supply squeals, burns-up l If horiz. output stage is efficient supply components often results when the
components or blows fuses or inefficient (high losses) problem is not isolated before applying AC
l X-ray shutdown symptom power.
l Estimating repair costs

Fig. 1: The Load Tests of the Sencore HA2500 Universal Horizontal Analyzer test horizontal output stages with no AC power applied to
the chassis.
Fig. 2: Block diagram of the Load Test and connections to a horizontal output stage.

Especially difficult to detect is a shorted when horizontal output stage problems provides the voltage for the Load Tests. The
flyback turn or a defect in a flyback derived have been corrected and it IS safe to apply DC power supply is adjustable with the
secondary circuit. These problems cause AC voltage. front panel LOAD TEST B+ VOLTS control.
an abnormal increase in current in the The positive voltage is output to the orange
horizontal output stage loading the B+ Understanding the Load Test clip of the LOAD & RINGER TESTS lead in
power supply. This type of short or loading respect to the black clip or ground. The
cannot be detected with resistance tests in The Load Test simulates the operation of power supply current is limited to 250 mA
the horizontal output stage. the horizontal output stage at its normal to provide short circuit protection.
operating frequency and 1/10 its normal B+
The X-Ray or high voltage shutdown voltage. The test energizes the horizontal A MOSFET transistor serves as the chassis
circuits immediately defeat the operation of output stage producing alternating currents horizontal output transistor providing the
the horizontal output stage by interrupting in the flyback and/or yoke just as if the switching action to energize the chassis
horizontal drive or B+ voltage. Since chassis was operating. Measurements horizontal output stage. The HA2500's
conditions are momentary, conventional taken during the simulation are displayed to internal horizontal frequency generator
voltage measurements cannot be made to indicate the conditions of the chassis provides the proper horizontal drive signal
isolate the problem to the B+ power supply. horizontal output stage. To simulate the to the gate of the transistor. The drive
HV/deflection regulator, horizontal output actual operation of a horizontal output stage frequency is adjusted with the front panel
or shutdown circuits. without power to the chassis requires three COARSE and FINE controls to match the
things: frequency of the chassis horizontal output
In the past. many of these difficult stage. Drive may also be decoded from an
symptoms could be isolated using a 1. A B+ or DC voltage applied to external sync signal applied to the
variable AC power supply to reduce the AC the chassis horizontal output HA2500's Ext. Sync Input Jack.
voltage to the chassis. Reducing the AC transformer.
voltage lowered the B+ voltage to the During the Load Test, if the chassis
horizontal output stage permitting 2. A horizontal output transistor horizontal output stage is operational,
conventional measurements. However, the to provide a switched current alternating currents and induced voltages
B+ voltage output from a switching mode path to energize the output or flyback pulses are produced. Since the
power supply cannot be reduced when the transformer or coil. Load Test B+ voltage is 1/10 of normal, the
AC voltage is lowered. Therefore. a variable current and voltages are approximately
AC power supply is ineffective in 3. A drive signal to this horizontal 1/10 of normal providing a low level and
troubleshooting horizontal, Bt supply. output transistor at the proper safer test. However, the LC or resonant
startup, and shutdown symptoms in frequency and duty cycle to timing of the chassis horizontal output
chassis with a switch mode power supply. switch it on and off properly. stage is the same no matter what the level
of applied voltage. This means the flyback
The HA2500's Horizontal Output Load Test The HA2500 satisfies these three voltage pulse duration is nearly the same
provides a functional test to quickly requirements. For a better understanding, during the Load Test as it is during chassis
confirm if the horizontal output stage is free refer to the Load Test block diagram and operation.
of severe defects or if problems exist. It horizontal output stage in Fig. 2.
quickly determines if the horizontal output The Load Test is active in the LOAD TESTS
stage is the cause of problem symptoms. To functionally test the chassis horizontal SETUP and LOAD TESTS positions of the
The Load Test is useful in determining output stage with no AC power to the LOAD & RINGER TESTS Switch. Measuring
potential repair costs or to troubleshoot chassis requires that the B+ voltage to the circuits indicate parameters during the
defects in the horizontal output stage. It horizontal output stage be supplied. A Load Tests Setup and Load Tests functions.
protects replacement parts by verifying variable DC power supply 0 - 18 volts
produces horizontal deflection. A single
horizontal output stage produces both
high voltage and deflection.

Horizontal output transistor(s) are located


near the flyback transformer or yoke
connector plug on the circuit board. Most
horizontal output transistors are variations
of a TO-3P case style and are mounted to
a large metal heat sink. The circuit path of
the collector or drain should lead to a pin
of the flyback or yoke transformer or coil.
If you are unsure if the transistor is a hor-
izontal output type, use a semiconductor
cross reference book to match the transis-
tor number and identify a replacement
Fig. 3: Setup for performing the horizontal output stage Load Tests. transistor. Check the uses specified for the
replacement transistor and the breakdown
voltage rating BVce. Most horizontal
Connecting The Load & Ringer Test Lead The clips on the LOAD/RINGER TEST output bipolar transistors have a rating
LEAD are labeled and color coded for easy greater than 1000 volts (typically 1500 V)
Performing the LOAD TEST requires identification as follows. The labels and MOSFET transistors greater than 800
connecting the three colored clips of the indicate where the clips are connected to volts (typically 1000 V).
supplied LOAD & RINGER TEST LEAD to the chassis horizontal output stage to
the chassis horizontal output stage. Before perform the LOAD TEST. Once you have identified the horizontal
connecting the LOAD & RINGER TEST output transistor(s), connect the yellow
LEAD clips, be sure to unplug or remove Connect the black test lead clip to test lead clip to the center lead (collector
AC power to the chassis being tested. The horizontal ground commonly available at or drain). Identify the ground for the
HA2500 contains internal protectron the emitter or source lead of the horizontal horizontal output circuitry. Horizontal
circuitry, but to remove any chance of output transistor. Connect the orange test ground typically connects to the emitter or
damage to the analyzer and chassis, lead clip to the B+ voltage input to the source lead of the horizontal output
always unplug the chassis AC line cord horizontal output stage transformer transistor directly or through a parasitic
before connecting the test lead clips. primary or coil winding. Connect the inductor or small value resistor. In some
yellow test lead clip to the collector or instances the emitter connects through
CAUTION drain of the horizontal output transistor. several windings of the driver transformer
Only perform the LOAD TEST with AC to ground. The ground circuit path on the
power to the chassis removed. The Load Tests can be performed with or board typically has a large trace size. It
without the chassis horizontal output may also be recognized as the trace on the
transistor in the circuit. If the transistor is circuit board that the negative lead of
Also be careful not to come into contact leaky or shorted, the Load Test Setup may many polarized capacitors share.
with circuit points while performing display a LIMITING message or indicate
the load test or when connecting or a severe output stage problem. If you To identify the B+ voltage input point to the
disconnecting test clips. The LOAD TEST suspect a shorted horizontal output horizontal output stage, trace the circuit
produces current and inductive voltage transistor, remove it from the chassis and path from the collector or drain of the
pulses in the chassis horizontal output repeat the Load Tests Setup. horizontal output transistor to the output
stage. It IS a good idea to reduce the LOAD transformer or coil. This is one side of the
TESTS B+ voltage to minimum when Connecting The Load & Ringer Test Lead primary winding of the output transformer
connecting or disconnecting test clips or Clips Without A Schematic or coil in the horizontal output stage. With
before unsoldering components in the an ohmmeter, identify a pin or pins that
horizontal output stage. To connect the LOAD TEST
LEAD clips without the aid
CAUTION of a schematic diagram,
Do not come in contact with energized first locate the horizontal
Orange B+ B+ input to horiz. output
horizontal output circuits points during output transistor or stage transformer or coil.
the LOAD TEST. Reduce the LOAD TEST transistors. There may be
B+ volts for added safety when one or two horizontal Yellow C or D Collector or drain of
connecting or disconnecting test lead output stages. When two horizontal output transformer.
clips. horizontal output stages
Black E or S Horizontal Ground or
are used, one produces H.O.T. emitter or source lead.
high voltage while the other
To Setup For The LOAD TESTS
(LOAD TESTS SETUP)

1. Remove AC power to the chassis.

2 Reduce the LOAD TEST B+ voltage


to MIN.

3. Connect the LOAD & RINGER TEST


Fig. 4: Use the Load Tests Setup to set the frequency and B+ for an accurate Load Test. LEAD clips to the proper circuit points.

4. Set the LOAD & RINGER TESTS


have continuity to the collector pin of the During the Load Tests Setup, three Switch to LOAD TESTS SETUP.
transformer. Typically, one or two pins parameters are simultaneously metered
may be identified on a flyback and displayed in the center fluorescent
5. Set the HORIZONTAL FREQUENCY
transformer. The B+ input pin may be display. They include the following.
COARSE and FINE Controls to the
Identified on the circuit board for you If horizontal operating frequency For
not, the B+ input typically has an 1. Load Test Horizontal Frequency
multi-frequency monitors. select the
electrolytic capacitor to ground with a (kHz) - Variable with the HORIZONTAL
highest horizontal operating frequency.
coil or low value resistor leading to the FREQUENCY COARSE and FINE
B+ power supply or regulator. A second controls. 6. Increase the LOAD TEST B+ VOLTS
transformer pin that may have shown control to approximately 1/10 of the
continuity to the primary winding likely 2. Load Test B+ voltage (DCV) -
normal B+ voltage to the chassis
has a diode connected to it as it is Variable with the LOAD TEST Bt VOLTS
horizontal output stage.
commonly used as a 200 to 300 volt control.
power supply to the CRT. 7. Read the VPP readout in the digital
3. Peak-to-Peak (PPV)- Amplitude of
display.
If you are unsure of the B+ Input. you induced voltages in the chassis
can use a trial and error method to horizontal output stage resulting from an
The LOAD TESTS SETUP VPP (Volts-
identify the B+ input using the Load Test active LOAD TEST at the frequency and
Peak-to-Peak) readout Indicates the
Setup Alternately connect the B+ or B+ selected. amplitude of the Induced voltage pulses
orange test clips to pins of the produced by the horizontal output stage
transformer which may be the Bt input These three parameters guide you to the
being energized by the Load Test.
while monitoring the Load Tests Setup proper setup for performing the Load
If properly connected, a functional
r e a d o u t s . T h e c o n n e c t i o n which Tests at the chassis 1/10 level and
horizontal output stage produces
produces Load Tests Setup and Load achieving the most accurate test results.
induced voltage pulses relative in
Tests results that are normal or closest The frequency readout indicates the amplitude to the selected test frequency
to normal is likely the proper input horizontal frequency for the Load Tests and applied B+ voltage. In horizontal
Improper c o n n e c t i o n s will s h o w selected with the HORIZONTAL
output stages using bipolar transistors.
unusual Load Tests Setup and Load FREQUENCY COARSE and FINE
VPP readings typically range from 80 to
Tests results. Controls. When the COARSE control is
120 VPP. In horizontal output stages
set to "EXT". the test frequency is
using MOSFET transistors, VPP readings
Understanding The Load Test Setup determined by the frequency of the
during the Load Tests Setup range from
applied sync to the EXT. SYNC INPUT
50 to 80 PPV.
The Load Tests Setup guides you in Jack.
setting the horizontal frequency and B+ To achieve the most accurate Load Tests
volts for the Load Test and confirms The DCV readout indicates the HA2500's of multi-frequency CRT video displays,
proper chassis connections. An Load Test B+ power supply voltage set the horizontal frequency to match the
improper horizontal frequency and/or B+ applied to the horizontal output stage. highest horizontal frequency the display
voltage can cause Load Tests results that The voltage is adjustable with the LOAD
can produce. While a precise frequency
are outside of the typical range for a TEST B+ VOLTS Control. Adjust the
is not important, avoid being more than
particular chassis. Perform the Load LOAD TEST B+ VOLTS Control until the
10 kHz below the monitors highest
Tests Setup before analyzing the Load display indicates a DC voltage that is
frequency. Low test frequencies increase
Tests mA, %, and S readouts. If you approximately 1/10 of the normal B+
the mA readings often above the typical
change the horizontal test frequency or voltage to the horizontal output stage
normal range because mode switched
B+ volts while performing the Load being tested. components are removed from the
Tests, repeat the Load Test Setup. horizontal output stage.

If you are unsure of the chassis normal


B+ voltage, Increase the LOAD TEST B+
Load Tests Setup Readouts drawn by the horizontal output stage from
Frequency (kHz) VDC VPP Most Likely Causes
the chassis Bt power supply. In other
words, this is the power supply load
Display's Highest 1/10 normal B+ 90 -110VPP Proper Load Test Setup current to the horizontal output stage.
Horiz. Freq. (Highest Display Freq.) (Bipolar type)
Since the Load Test B+ supply is
Can't increase DCV 0.0 VPP Load Test mA ~ 250 mA approximately 1/10 of chassis normal Bt
LLow VPP Current Limiting
Severe B+ Load. voltage, the "mA" readout is approximate-
ly 1/10 of the chassis normal. Readings
Display's Highest 1/10 normal B+ 0.0 VPP Improper connections
Horiz. Freq. Open inductor/flyback
typically range from 10 to 70 mA in
circuit path. normal operating horizontal output stages
Display's Highest 1/10 normal B+ Low VPP Load Test B+too low.
and rise significantly when severe loading
Horiz. Freq Load Test Freq. too high. problems exist in the horizontal output
Displays Highest 1/10 normal B+ High VPP
stage.
Load Test B+too high.
Horiz. Freq. Load Test Freq. too low.
The Efficiency " % " readout measures
Chart 1: Likely causes of Load Test Setup Readouts. what percentage of the input energy or
current to the output stage is returned
back to the B+ power supply at the end of
VOLTS Control while monitoring the VPP Tests. Set the Load Tests Setup as close the horizontal cycle. Horizontal output
readout. Increase the voltage until the VPP to normal VPP as you can and perform the stages are primarily tuned LC circuits with
readout is near 110 VPP (bipolar Load Tests. Use the Load Test readouts energy alternating between the magnetic
transistor) or 80 VPP (MOSFET to help determine the nature of the fields of the flyback and/or yoke and
transistor). This establishes a satisfactory horizontal output stage defect or setup capacitance of the output stage. At the end
1/10 l e v e l f o r L o a d T e s t i n g m o s t problem. (See Chart 1) of the horizontal cycle, the magnetic fields
horizontal output stages. collapse returning stored energy back to
Performing The Load Tests the power supply. Defects add power
Occasionally problems in the horizontal losses greatly reducing the efficiency of
output stage, improper circuit In the LOAD TESTS position of the LOAD the horizontal output stage and % of
connections, or an improper test & RINGER TESTS Switch, the HA2500 energy returned to the power supply.
frequency or B+ voltage do not permit a simultaneously meters and displays Efficiency % readouts typically range from
normal Load Test Setup. If the Load Test three automatic measurements. The 55 to 90% in normal horizontal output
B+ voltage cannot be increased beyond a measurements accurately reflect the stages and decrease dramatically in
certain DCV readout, it is likely the power operation of the horizontal output stage problem horizontal output stages.
supply is current limiting to 250 mA. This being tested and indicate if the horizontal
condition is indicated by a Limiting output stage is normal or contains T h e "S" readout is an automatic
readout in the digital display and a Load a defect. The three LOAD TEST measurement of the pulse duration or
Tests mA reading near 250 mA. Common measurements are summarized in Chart 2. time of the inductive voltage produced in
causes include an error in the B+ the horizontal output stage being tested.
connection and a DC short or severe AC The "mA" readout Indicates the current The Load Test measures the time of the
load in the horizontal output stage. being drawn by the horizontal output pulse from the start of its rising edge to
stage from the Load Tests B+ power the end of its falling edge. The pulse
A 0.0 VPP readout during setup with a supply. This current reflects the current duration or time is determined by the
normal VDC applied indicates no inductive
voltage pulses are being produced by the
Load Test Display Readout Description of Test
horizontal output stage. This may be
caused by an improper connection or B+ Current milliamps (mA) The current supplied by the
open in the horizontal output stage. Low Load Test B+ power supply
to the horizontal output
VPP readouts may be caused by lower stage under test.
than normal B+ volts, a higher than
normal horizontal test frequency, or an Efficiency percent (%) The % of the current input
to the horizontal output
output stage loading or timing defect. stage at the beginning of
Higher than normal VPP readouts indicate the horizontal cycle that is
higher than normal B+ volts, a lower than returned to the power
supply at the end of
normal horizontal test frequency, or a the cycle.
timing problem in the horizontal output
stage. Pulse Time microseconds (S) The duration of the induced
voltage pulse produced by
the horizontal output stage
Severe horizontal output stage problems
may prevent normal Load Test Setup. This
does not prohibit you from using the Load Chart 2: Description of the three measurements performed during the LOAD TEST.
Fig. 5: The Load Tests indicate if the horizontal output stage contains a defect.

inductance or capacitance of the flyback or To perform the LOAD TEST:


coil primary, retrace timing capacitor(s),
yoke, and yoke series components. The 1. Perform the LOAD TESTS SETUP.
"S" readout provides an indication of the
LC timing of the horizontal output stage. 2. Set the LOAD & RINGER TESTS
The timing influences the flyback pulse switch to LOAD TESTS
amplitude which determines the amount of
yoke deflectron and CRT high voltage. 3. Read the "mA", "S", and "Eff."
readout of the digital display.

4. Compare readout results to typical


ranges listed in the Pull Chart.

Form #6621
Printed In U.S A.

Vous aimerez peut-être aussi