Task Name Start Date End date Status Duration %Completed days
Meeting and
administration 22-12-2016 12-22-16 Completed 1 100% 1
Study of consern
departments 11-01-2017 19-01-2017 In Progress 9 95% 8
Study of engine
and transmission 11-01-2017 11-01-2017 In Progress 1 95% 1
Study of
designing of
steering 12-01-2017 13-01-2017 In Progress 2 90% 2
Study and
designing of
braking 14-01-2017 16-01-2017 In Progress 3 90% 2
Preparation of
final design 17-01-2017 18-01-2017 Completed 2 100% 2
Selection of
required tools
and components 22-01-2017 22-01-2017 In Progress 1 99% 1
Verification of
parts 23-01-2017 23-01-2017 Completed 1 100% 1
2 0 Task distribution
Registration for event
2 0 Gokart study
Market analysis
1 0
Weekly meeting
3 0 Study of Design
3 0 Design study
Analysis problems in design
1 0
Weekly meeting
Study of consern departments
5 0
Study of engine and transmission
2 0 Study of designing of steering
Study and designing of braking
Preparation of final design
2 0
Weekly meeting
1 0 Dynamic event(Task-1)
Meeting with administration
Weekly meeting
8 0 Dynamic event(Task-2)
Selection of required tools and components
1 0 Verification of parts
Material testing
Weekly meeting
2 0 Dynamic event(Task-3)
Fabrication of chassis
Preparation for report submission
2 0
Preparation of design report
2 0 Preparation of cost report and gantt chart
Dynamic event (Task-4)
1 0
Assembly of different components
Installation of safety equipments
2 0
Body works and final finishing
1 0 Test drive and correction of errors(if any)
1 0
4 0
1 0
1 0
1 0
1 0
7 0
7 0
3 0
1 0
2 0
0 20
0 8
0 1
0 6
0 5
1-19-17 1-26-17 2-2-17 2-9-17 2-16-17 2-23-17 3-2-17