Vous êtes sur la page 1sur 1

1 2 3 4 5 6 7 8 9 10

KEY PLAN
PN TN

A A

1 4WW- 20102-BB1

04 20WW- 20101-BB1

EL +11.270

C
B B

620
772
8"

6"
8"
6"

3" 2"

1350

2"
3"

M.3
LIFTING LUG 270 24" LIFTING LUG 90

730
0

SG SG 6PA-20202-BB1

315

45
315

45
M1 M1
24" N4 24"
1"

90 270 90

N1 N1
8" 1" 8"
N4

135

135
225

225
180 180

C
0 0

SG

315

45

45
315

M1 M1
24" N4 24"
1"

NP

90 N2 270 90
8"

N1 N1
8" 1" 8"
N4 0
N4
6"

45

315
135
225 135

225
N1
6"

180 180 M1
20"
270 90

N5
1"

135
225
N3

0 3"

180

SG SG

315

45

45
LIFTING LUG
315

M1 M1
24" N4 24"
1"

0
N4
90 270 90 6"
45

315
N1 N1
8" 1" 8"
N4 N1
6"

M1
20"
270 90

135
225 135

225
N5
1"

180

225

135
N3
3"

180

0 0

SG SG

315

45
315

45
0
N4
6"
M1 M1 45
24" N4 24" 315
1"

N1
6"

270 90 270 90 M1
20"
90

N1 N1
8" 1" 8" N5
N4

2
1"

225
135

135
N3

225 135 3"

180

225
180 180
878

0
N4
6"
0 0 45

315
SG SG

315

315
45

45
N1
6"

M1
20"
M1 M1 270 90
24" N4 24"
1"
N5
NP 1"

270 90 N2 270

135
8"

225
N3
3"
N1 N1 180
8" 1" 8"
N4

135

135
225 LIFTING LUG

225
180 180
0
N4
6"

04
45

315
N1
6"

M1

0 270 90
20"

SG SG

45

45
N5
315 1"

225

135
M1 N3
24" 3"

180
NP

270 90 N2 270
8"

N1 N1
1" 8"
N4

135

225

225
180 180

500
X
Y

N.1
8"
EL +9.420

D
M.2 M.3 NOZZLE LIST
D
24" 24"
N.1 Mark Qty Size
Rating Facing Type Elevation Orientation
FLANGE PROJECTION Operate
315 45
1220

8" N.1 1 8" #150 FF WN +9.420 135 Water InputInlet


N.2 1 520x352 - - - +5.905 270 Air Input
N.3 1 520x352 - - - +5.905 90 Air Input
OR 1 24" - - - +5.170 Center Line Top Opening
1142

M.1 1 24" #150 FF WN +6.320 225 Manhole


M.2 M.2 1 24" #150 FF WN +8.200 135 Manhole
24" M.3 1 24" #150 FF WN +10.190 45 Manhole

E NP.2 1 - - - - +6.820 270 Name Plate


E
NOTE :
270 90 ALL DIMENSION DRAWING ARE IN MILIMETER UNLESS OTHERWISE SPECIFIED

4600
1192

N.2 N.3
DUCT DUCT

NP2 3
1880

04

M.1
F EL +6.820 F
233

24" 135
225
M.1 4 5 FOR APPROVAL OJA DKY DDY RMT 10/02/17
24" 04 5 FOR APPROVAL ATP DKY DDY RMT 11/01/17
455

4 FOR APPROVAL ATP DKY DDY RMT 22/12/16

180 3 FOR APPROVAL ATP DKY DDY RMT 24/10/16


2 FOR APPROVAL ATP DKY DDY RMT 30/08/16
1 FOR APPROVAL ATP DKY DDY RMT 02/06/16
297420

415

0 FOR APPROVAL ATP DKY DDY RMT 25/05/16

N.3 EL +5.905
NOZZLE ORIENTATION REV DESCRIPTION DESIGN CHEKD APPRD AUTHD DATE
A3

1000

N.2 DUCT PROJECT NAME :


G
DUCT AMMONIA - UREA II PROJECT
585

585

2000 MTPD AMMONIA AND 1725 MTPD UREA


GRESIK, EAST JAVA, INDONESIA
EL +5.320

CLIENT NAME :
300

PETROKIMIA
600 GRESIK H

CONTRACTOR :

ELEVATION
PT. ADHI KARYA (Persero) Tbk
BEYOND CONSTRUCTION

VENDOR :
I

BUANAHDIIPT.PAANAUAJUB
HIJAU
PADI
PT.
PT. PADI HIJAU BUANA
PT
. PA D A NA
I H I JA U BU

WITHOUT
REPRODUCED
BE
SHALL
DOCUMENT
THIS
OF
PART
BUANANO
HIJAU
PADI
PT.
OF
PROPERTY
THE
AND
ARECONFIDENTIAL
IN,
THERE
CONTAINED
INFORMATION
AND
DOCUMENT
RESERVEDTHIS
RIGHTS
OWNER:DATEDESCRIPTIONAPPROVEDCHECKEDDRAWNALL
NO.SHEETS:1234567891011121314151612345678910111213141516ACDEFGHIJKACDEFGHIJK00NTS01
NO.DRAWING
NO.PROJECT
BY:SCALE:DATE:APPROVED:REVISION
BY:CHECKED
TITLE:DRAWN
:DRAWING
NOTES:PROJECT:Contractor
:GENERAL
Contractor
PROJECTMain
II
UREA
GRESIKAMMONIA
PETROKIMIA
TbkPT.
(Persero)
KARYA
ADHI
BalancePT.
DemineralizationWater
and
Water
)Filtered
6
x
10
BUANABB(
HIJAU
PADI
PT.
OF
PERMISSION
WRITTEN
PERIOR
THE
MANUFACTURE :

PT. GOLDEN MULTI INDAH GLASSTECH


DEGASSED WATER TOWER DETAIL
DRAWING NAME :

J
SIGNATURE

SCALE : DRAWING NO : REV.


SPECI

DOCUMENT NO : SHEET. OF

1 2 3 4 5 6 7 8 9 10

Vous aimerez peut-être aussi