Académique Documents
Professionnel Documents
Culture Documents
Degasifier 18-02-2017 Sheet 2 PDF
Degasifier 18-02-2017 Sheet 2 PDF
KEY PLAN
PN TN
A A
EL +11.270
4WW- 20102-BB1
620
EL +10.700
260.8
C
772.2
B B
1350
M.3 EL +10.190
EL +10.298
24"
730
378.1
6"
8"
8" 6"
2"
3"
500.0
EL +9.420 SG SG
0
6PA-20202-BB1
315
45
315
45
M1 M1
24" N4 24"
1"
90 270 90
N1 N1
8" 1" 8"
N4
135
135
225
225
180 180
C
0 0
SG
315
45
45
315
M1 M1
24" N4 24"
1"
NP
90 N2 270 90
8"
N1 N1
8" 8"
1"
N4 0
N4
6"
45
135
315
135
225
225
N1
6"
180 180
20"
M1
270 90
N5
1"
225
135
3"
N3
0
180
SG SG
315
45
45
315
M1 M1
24" N4 24"
1"
0
N4
90 270 90 6"
315
45
N1 N1
8" 1" 8"
N4 N1
6"
M1
20"
270 90
135
135
225
225
N5
1"
180
225
135
N3
3"
180
0 0
SG SG
315
45
315
45
0
N4
6"
M1 M1
45
24" N4 24" 315
1"
N1
6"
270 90 270 90 M1
90 20"
N1 N1
8" 1" 8"
N4 1"
N5
225
135
N3
135
3"
135 180
225
225
180 180
N.1
0
N4
6"
0 0
45
315
SG SG
315
45
45
N1
315 6"
20"
M1
M1 M1 270 90
24" N4 24"
1"
N5
NP 1"
270 N2 270
90
225
8"
135
3"
N3
N1 N1
8" 8" 180
1"
N4
135
LIFTING LUG
M.2
135
225
225
180 180
0
N4
6"
315
45
N1
6"
M1
0 20"
270 90
SG SG
N5
45
315
45
1"
225
M1 135
24" N3
3"
180
NP
N2
270 90 8" 270
N1 N1
1" 8"
N4
8"
135
225
225
180 180
24"
Y
EL +8.200
NOZZLE LIST
4100.0
N.3 1 520x352 - - - +5.905 90 Air Input
NP2 N.4 1 10" #150 FF WN +4.726 45 Over Flow
N.5 1 12" #150 FF WN +0.736 270 Water Output
M.1 N.6 1 2" #150 FF WN +5.070 192 Level Gauge
EL +6.820
24" N.7 1 2" #150 FF WN +0.520 192 Level Gauge
N.8 1 4" #150 FF WN +0.575 45 Drain
M.4 N.2 N.3 FF
E
N.9 1 2" #150 WN +5.241 146 Radar
E
24" DUCT DUCT N.10 1 2" #150 FF WN +0.900 146 Level Transmitter
EL +6.320
N.11 1 2" #150 FF WN +5.370 135 Venting
N.12 1 2" #150 FF WN +5.370 315 Venting
TO 1 24" - - - +5.170 Center Line Top Opening
EL +5.905
M.1 1 24" #150 FF WN +6.320 225 Manhole
M.2 1 24" #150 FF WN +8.200 135 Manhole
LIFTING LUG 270 LIFTING LUG 90 M.3 1 24" #150 FF WN +10.190 45 Manhole
10300.0
EL +5.414 N.11 M.4 1 24" #150 FF WN +5.490 180 Manhole
2" EL +5.320 NP.1 1 - - - - +2.000 270 Name Plate
EL +5.241
EL +5.170
150.0
NP.2 1 - - - - +6.820 270 Name Plate
EL +5.070
NOTE :
F ALL DIMENSION DRAWING ARE IN MILIMETER UNLESS OTHERWISE SPECIFIED F
444.0
N.9 EL +4.726
N.6 5 FOR APPROVAL OJA DKY DDY RMT 10/02/17
PROJECT NAME :
G
AMMONIA - UREA II PROJECT
2000 MTPD AMMONIA AND 1725 MTPD UREA
GRESIK, EAST JAVA, INDONESIA
4770.0
CLIENT NAME :
4151.0
NP1 PETROKIMIA
GRESIK H
EL +2.000
CONTRACTOR :
BUANAHDIIPT.PAANAUAJUB
HIJAU
PADI
PT.
EL +0.400 PT. PADI HIJAU BUANA
475.0
PT
220.0
. PA D A NA
I H I JA U BU
WITHOUT
REPRODUCED
BE
SHALL
DOCUMENT
THIS
OF
PART
BUANANO
HIJAU
PADI
PT.
OF
PROPERTY
THE
AND
ARECONFIDENTIAL
IN,
THERE
CONTAINED
INFORMATION
AND
DOCUMENT
RESERVEDTHIS
RIGHTS
OWNER:DATEDESCRIPTIONAPPROVEDCHECKEDDRAWNALL
NO.SHEETS:1234567891011121314151612345678910111213141516ACDEFGHIJKACDEFGHIJK00NTS01
NO.DRAWING
NO.PROJECT
BY:SCALE:DATE:APPROVED:REVISION
BY:CHECKED
TITLE:DRAWN
:DRAWING
NOTES:PROJECT:Contractor
:GENERAL
Contractor
PROJECTMain
II
UREA
GRESIKAMMONIA
PETROKIMIA
TbkPT.
(Persero)
KARYA
ADHI
BalancePT.
DemineralizationWater
and
Water
)Filtered
6
x
10
BUANABB(
HIJAU
PADI
PT.
OF
PERMISSION
WRITTEN
PERIOR
THE
100.0
300.0
GL +0.100
700.0 MANUFACTURE :
660
OD.749.9
PIPE SUPPORT
PCD.9000.0
PT. GOLDEN MULTI INDAH GLASSTECH
J
SIGNATURE
DOCUMENT NO : SHEET. OF
1 2 3 4 5 6 7 8 9 10