Page1

Total Recesses Total Total amount


amount Total Plaster Pointing, amount of of Brick work
Rate of Rate of in Rs/- for Amount in work and Brick work with Sunken
6" 9" 6"thk Rs/- for 9" External Plastering with both pointing and
Quantity Brickwor brickwo Brick Thk Brick and of the Amount sides Exposed
Sr.No. Description in Sqft k rk walls walls Internal Toilets in Rs/- plastering Brick work

1 Brick walls 1800 75 100 135000 180000

2 Plaster work 1900 100 190000


Sunken
Pointing for
Exposed
3 Brickwork 1600 25 40000
Amount for the
plastering of the
4 toilets 500 90 45000 325000 265000

Transport of Bricks from Pune to our site 20000

Labour for loading and unloading of the Bricks 5000

Transport of Cement, Sand, etc from Nasarapur to Site 15000

Labour for Loading and Unloading of the Cement,Sand etc 5000

Realistic Estimate for Mr.Venkatesh Mudgerikar Sir Prepared by DreamArch Studios


Page2

370000 310000

Notes

Costing is prepared after the discussion with Mr.Venkatesh Mudgerikar Sir, on 27th August 2016.

After the discussion it was decided, that we should construct a pine wood false ceiling as it will add on to the overall asthetics of the space.

Certain Decessions are based on saving the overall costing of the project.

Costing is a realistic costing, hence I have assumed some additional amount

An overall amount of Rs20000/- was reduced as we have already purchased some material, and that material will be used wherever possible.

Although the costing will seem too much, it has taken into consideration the asthetics of the space also,this will add on to the overall asthetic value
of the space.

I have Considered some very nominal overhead charges as it is impossible to project exact, accurate costing.

Realistic Estimate for Mr.Venkatesh Mudgerikar Sir Prepared by DreamArch Studios