Vous êtes sur la page 1sur 6

from

Vehicle unloading
Proper arrangement of unloading of vehicle
Arrangement of forklift and crane
Check List preparation on vehicle unloading
Placement of material before pre-checking [ unloading monerting time on floor]
Pre Material checking as per material class, A,B.C
Physical counting of A & B Class material
Physical counting of C material
Keeping records in Register
Total

Placement of Material
Location Identification [ Verification of Location before placement of Parts in Store
Location placement:
a) Domestic Material
b) Imported Material
Location alteration
Pallet placement
Total
Retrieval of parts & Line feeding
Retrieval of parts from Location to main line feeding [picking from Location]
Feeding Material at Main Line
Material Issuance at Hot Test Area in the Product Building
Total
Rejection, Perpetual Inventory & Scrap Handling
Shifiting of Rejection from Line to Store

Dispatches like RTC, Spare Parts & Documentation


Packing & Loading monitering of RTV , IPC
Collection of previous date Invoice from Gate No 3

Total
Grand TOTAL
No of Total Total
Owner Frequency Hour
Transaction H / day H/week

Rajesh Daily 2 1/2 1 6


Rajesh Daily 2 1/2 1 6
Rajesh Daily 2 0.10 1/5 1 1/5
Rajesh Daily 2 1/2 1 6
Rajesh Daily 2 1/2 1 6
Rajesh Daily 2 1 2 12
Rajesh+1 Daily 1 5 5 30
Rajesh Daily 2 1/2 1 6

Daily
Rajesh Daily 3 1/2 1 1/2 9

Rajesh Daily 3 1 1/2 4.5 27


Rajesh Daily 1 2 2 12
Rajesh+1 Daily 1 1/2 0.5 3
Rajesh Daily 1 1/2 0.5 3

Rajveer & Hanuman Daily 10 1/2 5 30


Rajveer & Hanuman Daily 10 1 1/2 15 90
Hanuman Daily 1 3

Rajveer & Hanuman Daily 1 1/2 1/2 3

Hanuman Alternate Days 1 3


Hanuman Daily 1 1/2 1/2 3
Total
Comments
H / month
1 Rajesh 208
26 2 Hanuman 208
26 3 Rajvir 208
5 1/5 Total 624
26
26
52
130
26
317 1/5

39

117
52
13
13
234.00

130
390
12
532.00

13

12
13

25.00
1,121.20
from
Vehicle unloading
Proper arrangement of unloading of vehicle
Arrangement of forklift and crane
Check List preparation on vehicle unloading
Placement of material before pre-checking [ unloading monerting time on floor]
Pre Material checking as per material class, A,B.C
Physical counting of A & B Class material
Physical counting of C material
Keeping records in Register
Total

Placement of Material
Location Identification [ Verification of Location before placement of Parts in Store
Location placement:
a) Domestic Material
b) Imported Material
Location alteration
Pallet placement
Total
Retrieval of parts & Line feeding
Retrieval of parts from Location to main line feeding [picking from Location]
Feeding Material at Main Line
Material Issuance at Hot Test Area in the Product Building
Total
Rejection, Perpetual Inventory & Scrap Handling
Shifiting of Rejection from Line to Store

Dispatches like RTC, Spare Parts & Documentation


Packing & Loading monitering of RTV , IPC
Collection of previous date Invoice from Gate No 3

Total
Grand TOTAL
No of Total Total
Owner Frequency Hour
Transaction H / day H/week

Rajesh Daily 2 1/2 1 6


Rajesh Daily 2 1/2 1 6
Rajesh Daily 2 0.10 1/5 1 1/5
Rajesh Daily 2 1/2 1 6
Rajesh Daily 2 1/2 1 6
Rajesh Daily 2 1 2 12
NO Undefine Person Daily 1 5 5 30
Rajesh Daily 2 1/2 1 6

Daily
Rajesh Daily 3 1/2 1 1/2 9

Rajesh Daily 3 1 1/2 4.5 27


Rajesh Daily 1 2 2 12
Rajesh+1 Daily 1 1/2 0.5 3
Rajesh Daily 1 1/2 0.5 3

Rajveer & Hanuman Daily 10 1/2 5 30


Rajveer & Hanuman Daily 10 1 1/2 15 90
Hanuman Daily 1 3

Rajveer & Hanuman Daily 1 1/2 1/2 3

Hanuman Alternate Days 1 3


Hanuman Daily 1 1/2 1/2 3
Total
Comments
H / month
1 Rajesh 208
26 2 Hanuman 208
26 3 Rajvir 208
5 1/5 Total 624
26
26
52
130
26
317 1/5

39

117
52
13
13
234.00

130
390
12
532.00

13

12
13

25.00

Vous aimerez peut-être aussi