S.No Items
2014 2014
Administration and
1.1
Planning
x
1.2 Integrated Policy
x
x x
Health, Safety and
1.5
Environment x x
Objectives and
Projects x x
x x
x x
x x
Health, Safety and
x x
Environment
1.6
Activities
Participation x x
x x
Health, Safety and x x
Environment
1.7
Management
Meetings x x
x
Practice 1: Leadership
The Integrated Policy is up to date and available for ALL employees, contractors and the
public.
ALL employees and contractors know ALL of the Integrated Policy key points and correlate
with its activities.
The Environmental or HSE responsible is a professional with higher education course and
specialization in Environment.
The environmental team is sufficient to attend the location's technical and legal demands.
The location has an AAP (Annual Action Plan) until the area level and totally aligned with the
BD PEX and the strategic directions.
Environmental objectives and goals are in place for the next 3 years.
The objectives and goals are sustained by programs, investments, projects, etc.
Objectives, goals and the annual action plan are disseminated and communicated (meetings,
visual management).
ALL Environment or HSE review meetings have their meeting minutes recorded at GMR.
Complied
Not Complied
Note:
Goal: To achive Level 1
Policy Campaign
- Key Points Bappa Sep
- Corrtation with its activities
2
1
Overall Score 1
Poor
Removing unnecessary
2 1S Implementation Zero
items
Implementation Zero
Implementation Zero
Floor unclean
All items, which are not necessary for performing work, are
removed from the workplace. only tools, products and required
documents are present at workstations.
Work-in-process, tools and other material are not left to sit directly
on the floor. Large items such as bins, pallets and boxes are
positioned, on the floor in clearly marked areas delineated by
painted lines
Floor is clean and free of debris, oil and dirt. Cleaning of floor is
done routinely.