INTRODUCTION TO HYDROCARBON EXPLOITATION

Development Phase

Introduction to Hydrocarbon Exploitation


Well Control

Section
By Pratap Thimaiah

2005 Abalt Solutions Limited. All rights reserved

Abalt Solutions

Kick

An uncontrolled flow of formation fluids into the


wellbore during a drilling operation mainly
Drilling Engineering -Well Control

arising due to the formation pressure being


greater than hydrostatic pressure imposed by
mud column.

2005 Abalt Solutions Limited. All rights reserved

Abalt Solutions

abalt solutions limited - 2005 September October 2005


INTRODUCTION TO HYDROCARBON EXPLOITATION
Development Phase

Causes of Kick

Insufficient mud weight


Low level of fluid column in annulus
Excessive swabbing
Excessive drilling rate in gas bearing formation
Diffusion of gas through mud cake
Drilling Eng inee ring-We ll Contro l

2005 Abalt Solutions Limited. All rights reserved

Abalt Solutions

Insufficient Mud weight

Penetration of geo pressured zone.


Accidental dilution of mud by fluid addition at
surface
Dilution of mud by influx from aquifer exposed
to open hole.
Drilling Engineering -Well Control

gradual decrease in mud density due to gas cut


and failure to degas.
Poor quality control

2005 Abalt Solutions Limited. All rights reserved

Abalt Solutions

abalt solutions limited - 2005 September October 2005


INTRODUCTION TO HYDROCARBON EXPLOITATION
Development Phase

Low level of drilling fluid column

Failure to fill hole during tripping


Lost circulation
Mud loss to caverns and vugs
Penetration of depleted zones
Mud loss to fractures as a result of surge
Drilling Eng inee ring-We ll Contro l

pressures, excessive hydraulics etc.

2005 Abalt Solutions Limited. All rights reserved

Abalt Solutions

Excessive swabbing

Reduction of bottom hole pressure caused by


upward pipe movement
Mud flows down the annulus into the open hole.
Frictional pressure loss in the direction of
surface.
Drilling Engineering -Well Control

Reduced BHP and instantaneous vacuum below


bit.

2005 Abalt Solutions Limited. All rights reserved

Abalt Solutions

abalt solutions limited - 2005 September October 2005


INTRODUCTION TO HYDROCARBON EXPLOITATION
Development Phase

Excessive drilling rate in Gas bearing formations

Influx reduces mud density in annulus.

Mud cut occurs from:


Swabbing
Fluid diffusion due to negative pressure
Drilling Eng inee ring-We ll Contro l

differential
Expansion of gas as it reaches the surface.
Air entrained in mud from the Kelly air trips.

2005 Abalt Solutions Limited. All rights reserved

Abalt Solutions

Pre-Kick Data

Maximum Working Casing Pressure


Casing and BOP are designed for different expected
pressures during each phase.
Determined during well planning-Usually maximum
rating of BOP or 80% burst pressure of last casing
string.
Drilling Engineering -Well Control

MAASP (Maximum Allowable Annular Surface Pressure)


Represents maximum annulus pressure permitted
while controlling a kick.
Annular pressure at surface that corresponds to
weakest point of the hole.

MAASP =0.052 x (Frac - ) x TVD


where Frac=fracture pressure at shoe
in ppg
2005 Abalt Solutions Limited. All rights reserved

Abalt Solutions

abalt solutions limited - 2005 September October 2005


INTRODUCTION TO HYDROCARBON EXPLOITATION
Development Phase

Pre-Kick Data

Pump, String and Hole configurations


Pump capacity
Hole stability
Drilling string capacity
Annular capacity
Drilling Eng inee ring-We ll Contro l

Casing data (size, weight, burst pressure, shoe


depth etc)

2005 Abalt Solutions Limited. All rights reserved

Abalt Solutions

Kick Detection Techniques

Positive Indicators
Mud pit level/flow increase
Incorrect hole fill up during trip
Decrease in stand pipe pressure
Increase in pump rate
Increase/decrease in drill string weight
Drilling Engineering -Well Control

Potential Indicators
Increase in ROP
Lost circulation
Changes in mud density and conductivity.

2005 Abalt Solutions Limited. All rights reserved

Abalt Solutions

abalt solutions limited - 2005 September October 2005


INTRODUCTION TO HYDROCARBON EXPLOITATION
Development Phase

Well Control Procedures

Control Procedures Involve the following:


1. Shut in the well-follow predefined procedures
2. Observe shut in pressures and kick volumes
3. Make kill calculations for
Formation pressure
BHP
Kill mud density
Initial and final circulation pressure
Drill pipe pressure schedules
Drilling Eng inee ring-We ll Contro l

Weighting material volume required.


4. Define weighing up and circulating procedures
Drillers method
Wait and weight method
Concurrent
Top kill method
5. Make interpretation for influx
1. Height and density
2. annular pressure behaviour while circulating

2005 Abalt Solutions Limited. All rights reserved

Abalt Solutions

Well Control Equipment

Wellheads
Control systems
Associated equipment
Blow out Preventers
Annular
Drilling Engineering -Well Control

Ram Type

2005 Abalt Solutions Limited. All rights reserved

Abalt Solutions

abalt solutions limited - 2005 September October 2005


INTRODUCTION TO HYDROCARBON EXPLOITATION
Development Phase

Drilling Eng inee ring-We ll Contro l


Well Control Equipment

2005 Abalt Solutions Limited. All rights reserved

Abalt Solutions

BOP

Annular Preventer
Doughnut shaped elastic
element with bond steel
reinforcement.
Extrusion of element into
wellbore is effected by upwards
movement of hydraulically
actuated piston.
Drilling Engineering -Well Control

Element designed to seal around


any shape or size of pipe and to
close on open hole.
Facilitates stripping of drill pipe
in and out of well, with pressure
on wellhead

2005 Abalt Solutions Limited. All rights reserved

Abalt Solutions

abalt solutions limited - 2005 September October 2005


INTRODUCTION TO HYDROCARBON EXPLOITATION
Development Phase

Drilling Eng inee ring-We ll Contro l


BOP

2005 Abalt Solutions Limited. All rights reserved

Abalt Solutions

BOP

Majority of annular Preventer currently in use are


manufactured by
Hydril (types MSP,GK,GL,GX)
Shaffer (spherical)
Cameron (Type D)
Drilling Engineering -Well Control

2005 Abalt Solutions Limited. All rights reserved

Abalt Solutions

abalt solutions limited - 2005 September October 2005


INTRODUCTION TO HYDROCARBON EXPLOITATION
Development Phase

BOP

Ram Preventers

Two Hydraulically actuated horizontally opposed rams which are


either designed to seal off an open hole or annulus against pipe of
specific diameter.
Working pressure of ram preventers should be atleast equal to
maximum anticipated surface pressures ,plus margin for pumping
Drilling Eng inee ring-We ll Contro l

to the well.

2005 Abalt Solutions Limited. All rights reserved

Abalt Solutions

BOP
Drilling Engineering -Well Control

2005 Abalt Solutions Limited. All rights reserved

Abalt Solutions

abalt solutions limited - 2005 September October 2005


INTRODUCTION TO HYDROCARBON EXPLOITATION
Development Phase

BOP

Types

Pipe Rams
Designed to centralize
and pack-off around
one specific size of drill
pipe or casing.

Variable Pipe Rams


Drilling Eng inee ring-We ll Contro l

Available in different
sizes
One set will provide
back-up for two
different pipe rams.
Have limited hang-off
capacity therefore
depends upon tool joint
size and ram range.

2005 Abalt Solutions Limited. All rights reserved

Abalt Solutions

BOP
Drilling Engineering -Well Control

2005 Abalt Solutions Limited. All rights reserved

Abalt Solutions

abalt solutions limited - 2005 September October 2005


INTRODUCTION TO HYDROCARBON EXPLOITATION
Development Phase

BOP

Hanging Rams
Pipe rams with enhanced load bearing capacities used for
floating operations.
Hardening of bearing area

Blind/shear rams
Used to cut pipe and seal as blind rams.
Drilling Eng inee ring-We ll Contro l

Pipe stub accommodated in a recess.


Care should be taken that pipe body is opposite rams and not
tool joint.
Bop control systems must be adequate to shear the pipe in use.

Offset rams
Available for dual completions

2005 Abalt Solutions Limited. All rights reserved

Abalt Solutions

Control Systems

Provides means of individually closing and


opening each BOP and valve conveniently,
rapidly, repeatedly and at correct
operating pressure.
Designed to operate when in
emergencies, primary rig power may not
be available.
Drilling Engineering -Well Control

Elements of control systems:


Power source
Control manifolds
Accumulators
Connecting pipe works/hose bundle
and wiring

2005 Abalt Solutions Limited. All rights reserved

Abalt Solutions

abalt solutions limited - 2005 September October 2005


INTRODUCTION TO HYDROCARBON EXPLOITATION
Development Phase

Control Systems
Drilling Eng inee ring-We ll Contro l

2005 Abalt Solutions Limited. All rights reserved

Abalt Solutions

Control Systems
Drilling Engineering -Well Control

2005 Abalt Solutions Limited. All rights reserved

Abalt Solutions

abalt solutions limited - 2005 September October 2005


INTRODUCTION TO HYDROCARBON EXPLOITATION
Development Phase

Control Systems -Power Source

Primary power source


Electrically driven pumps.
For a 3000 psi accumulator system, pumps should incorporate a
pressure switch set to cut in & out at 2800 psi and 3000 psi
respectively.
Diesel pumps used on land rigs

Secondary power source


Drilling Eng inee ring-We ll Contro l

Air power pumps located on control manifold.


Stand by diesel driven air compressor piped to pumps should be
provided at location away from primary power source.

Battery packs
Where electric panels are used, a battery pack is required

Manual closing
Extension arms and wheels should be considered for ram
preventers.

2005 Abalt Solutions Limited. All rights reserved

Abalt Solutions

Control Systems-Control Manifolds

Equipped with three control manifolds or panels

Central Manifold
Located away from the rig floor area.
All hydraulic, air-hydraulic or electro-hydraulic
Required features are
Regulator to reduce accumulator pressure to operating
pressure for ram preventers ,annular preventers and
Drilling Engineering -Well Control

valves.
Control handles or switches
Pressure gauges
By pass valves
Vent line for bleeding off accumulator fluid
Relief valve for pumps
Flow meters.

2005 Abalt Solutions Limited. All rights reserved

Abalt Solutions

abalt solutions limited - 2005 September October 2005


INTRODUCTION TO HYDROCARBON EXPLOITATION
Development Phase

Control Systems-Control Manifolds

Driller's Control Panel


Located on the rig floor within access.
Air or electric operated
Required features include:
Control for each BOP Stack and to adjust manifold
regulators.
Read-outs for accumulator pressures, manifold pressures
and flow meters.
Drilling Eng inee ring-We ll Contro l

Air supply pressure read outs.


Schematic showing kill & choke lines
Visual or audible warning devices
Remote Manifold
Located at safe distance from well access
Required features include:
Controls for BOP Stack
Interlocks and covers
Visual and audible warning systems
Schematic of BOP Arrangement.
2005 Abalt Solutions Limited. All rights reserved

Abalt Solutions

Control Systems-Accumulators

Hydraulic fluid required to operate the BOP functions is stored


in accumulators, pressurized against a nitrogen inflated
bladder.
Located near control manifold.
Stores hydraulic energy and high rate supply of fluid for BOP
functions.
Operating pressures are 3000 psi.
Drilling Engineering -Well Control

2005 Abalt Solutions Limited. All rights reserved

Abalt Solutions

abalt solutions limited - 2005 September October 2005


INTRODUCTION TO HYDROCARBON EXPLOITATION
Development Phase

Control Systems-Pipe Works/Wiring

High capacity conduits for individual functions.


For a particular function, fluid flows from accumulators,
through regulators and directly to function.
Control lines should be seamless steel tubing of 1 in
minimum nominal size and pressure rating equal to
working pressure of control system.
Drilling Eng inee ring-We ll Contro l

2005 Abalt Solutions Limited. All rights reserved

Abalt Solutions

Associated equipment

Mud control & Monitoring equipment


Mud gas separators
Drill string valves
Rotating heads
Drilling Engineering -Well Control

2005 Abalt Solutions Limited. All rights reserved

Abalt Solutions

abalt solutions limited - 2005 September October 2005


INTRODUCTION TO HYDROCARBON EXPLOITATION
Development Phase

Associated equipment-Mud control & Monitoring

Pit volume measurement


Calibrated read-out and
audio alarm installed in
Drillers station
Flow line measurements
Measures flow line mud
return rate
Drilling Eng inee ring-We ll Contro l

Trip tank
Used to fill hole during
trips, measure mud
volumes or water into
annulus when
circulation is lost or
logging etc.
Types
Gravity feed
Pump type

2005 Abalt Solutions Limited. All rights reserved

Abalt Solutions

Associated equipment-Mud gas separators


Separates gas from drilling fluids
Provides a means for safety
venting the gas and returning
usable liquid mud to active
system.
Minimizes risk for gas influx
circulation during a kick without
having to shut down the system
Types
Atmospheric
Referred to as gas buster or
Drilling Engineering -Well Control

poor-boy separator.
Simple design and does not
require control valves on
either discharge lines
Pressurised
Operates with moderate back
pressure generally 50 psi or
less.
Overcomes line pressure
losses due to excessive
lengths of vent lines

2005 Abalt Solutions Limited. All rights reserved

Abalt Solutions

abalt solutions limited - 2005 September October 2005


INTRODUCTION TO HYDROCARBON EXPLOITATION
Development Phase

Associated equipment-Drill String Valves

Used to close in well on the drill pipe bore and to protect surface
equipment.
Placed on surface and may be either manual shut-off or automatic check
valve type.
Rated at same pressures as BOP & tested at same frequency.
Types
Kelly Valves
Upper kelly valve closes on drill string when kelly is down through rotary
table and cannot be lifted.
Lower kelly valve allows closing- in on drill string and removing kelly if
required
Drilling Eng inee ring-We ll Contro l

Float valves
Prevents back flow during connections and flow up drill string in the event
of a kick.

Drop-in valves
Held on surface & dropped down to a special landing sub.
Allows pipe to be stripped to bottom and preventing further circulation

Drill pipe safety valves


Installed when kick occurs, allows drill string to be closed-in.

Inside BOP
Surface installed checked valve to close drill string bore.
Available on rig floor as back up and installed above drill pipe safety valve
2005 Abalt Solutions Limited. All rights reserved

Abalt Solutions

Associated equipment-Rotating Heads

Installed above BOP and


provide seal on kelly or
drill pipe.
Drive unit is attached to
Kelly, locates in bearing
assembly
Applications
Drilling Engineering -Well Control

Drilling with air or gas


Permit drilling
Underbalance.
Diverter for surface
hole
Keep gas away from
rotary table, important
when H2S can be
expected

2005 Abalt Solutions Limited. All rights reserved

Abalt Solutions

abalt solutions limited - 2005 September October 2005


INTRODUCTION TO HYDROCARBON EXPLOITATION
Development Phase

Kill Method-Drillers Method

Well shut in after the kick has occurred with appropriate shut in
procedures followed.

Influx circulated out using original mud in hole.


Once kick is out of hole, the hole is filled with the heavier kill mud.
Two circulations:
First circulation-remove influx
Second circulation-circulate kill mud
Drilling Eng inee ring-We ll Contro l

Advantages
Minimum circulation
Minimum idle time
Minimum well information required

Disadvantages
High annular pressure if kick contains gas
Maximum time with well under pressure
Maximum time spent controlling choke

2005 Abalt Solutions Limited. All rights reserved

Abalt Solutions

Kill Method-Drillers Method


Drilling Engineering -Well Control

2005 Abalt Solutions Limited. All rights reserved

Abalt Solutions

abalt solutions limited - 2005 September October 2005


INTRODUCTION TO HYDROCARBON EXPLOITATION
Development Phase

Drilling Eng inee ring-We ll Contro l


Kill Method-Drillers Method

2005 Abalt Solutions Limited. All rights reserved

Abalt Solutions

Kill Method- Wait & Weight (Engineers) Method

Influx is circulated out by the kill mud in one cycle.



Requires manipulation of choke to maintain constant bottom hole
pressure as the new mud moves from surface to bottom.
The kill may require several circulation cycles with mud density raised
in stages.

Advantages

Drilling Engineering -Well Control

Lowest wellbore and surface pressure.



Minimum time spent on choke

Disadvantages

Idle time weighting up with gas migration possible.

Possibility of several cycles if large mud weight increase is
necessary.

2005 Abalt Solutions Limited. All rights reserved

Abalt Solutions

abalt solutions limited - 2005 September October 2005


INTRODUCTION TO HYDROCARBON EXPLOITATION
Development Phase

Kill Method- Wait & Weight (Engineers) Method


Drilling Eng inee ring-We ll Contro l

2005 Abalt Solutions Limited. All rights reserved

Abalt Solutions

Kill Method- Wait & Weight (Engineers) Method


Drilling Engineering -Well Control

2005 Abalt Solutions Limited. All rights reserved

Abalt Solutions

abalt solutions limited - 2005 September October 2005


INTRODUCTION TO HYDROCARBON EXPLOITATION
Development Phase

Kill Method-Concurrent Method

Mixes the features of Drillers & Engineers Methods.


Applied in cases where surface pressures need to be kept as low as
possible and shut-in time minimum.
Circulation starts immediately after observing shut-in pressures using
current mud weight.
Mud weight is then increased in stages.
As each stage of increased mud weight reaches the bit, the driller starts
pumping next stage.
When the new mud reaches the kill mud weight, circulation continues
Drilling Eng inee ring-We ll Contro l

until new mud reaches the surface.


This method requires more choke manipulation to maintain constant
BHP like Engineers method.

Advantages
Minimum idle time
Control starts immediately
Continuous and smooth adjustment of mud density

Disadvantages
Slightly more complex calculations
Maximum time spent circulating under pressure.
2005 Abalt Solutions Limited. All rights reserved

Abalt Solutions

Well control -Without Circulation

If the influx is gas-drill string out of hole ?

Volumetric method to bleed off ,allowing gas to expand as it


migrate.

Most effective method when the kick occurs during swabbing.


Drilling Engineering -Well Control

In most cases mud weight is sufficient to prevent further influx


before the circulation of weighted mud.

2005 Abalt Solutions Limited. All rights reserved

Abalt Solutions

abalt solutions limited - 2005 September October 2005


INTRODUCTION TO HYDROCARBON EXPLOITATION
Development Phase

Well control -Without Circulation

X X X
Gas Pressure
Displace Small Kill Fluid Bled Off at
Amount of Settles Surface
Kill Kill Fluid To Bottom (Process
Fluid Into Well. Gas Gas Repeated)
Drilling Eng inee ring-We ll Contro l

Gas
Compressed
Kill
Fluid

Kill
Fluid

2005 Abalt Solutions Limited. All rights reserved

Abalt Solutions

Top Kill Method

Bullheading
Injection of mud into the closed annulus to force
invading fluids back into formation.
Used in cleaning up well bore after a drill stem test in
cased holes.
Only used in kick control when no other method is
Drilling Engineering -Well Control

possible.
Disadvantage is that there is a high risk of failure of
casing shoe and creation of fissures to surface behind
casing.

2005 Abalt Solutions Limited. All rights reserved

Abalt Solutions

abalt solutions limited - 2005 September October 2005


INTRODUCTION TO HYDROCARBON EXPLOITATION
Development Phase

Safety

To avoid or prevent flowing of wellbore fluids!

A general rule is that at least two independent


and tested barriers should be used.
Drilling Eng inee ring-We ll Contro l

There are two types of barriers:


Mechanical
Hydrostatic

2005 Abalt Solutions Limited. All rights reserved

Abalt Solutions

Mechanical Barriers

Closeable Barriers:
BOP Rams
Xmas Trees Valves
SSV
Annular preventers

Closed Barriers:
Wireline stuffing box
Drilling Engineering -Well Control

Coiled tubing stripper


Snubbing strippers
Coiled tubing check valves

Additional Barriers:
Wireline Plugs
Cement Plugs
Overbalanced hydrostatic fluid
Bridge Plugs

2005 Abalt Solutions Limited. All rights reserved

Abalt Solutions

abalt solutions limited - 2005 September October 2005


INTRODUCTION TO HYDROCARBON EXPLOITATION
Development Phase

Hydrostatic Barriers

As their name says it all, this type of barrier is


provided by liquid.
Typical fluid barriers are:
Drilling Mud
Completion Brines
Drilling Eng inee ring-We ll Contro l

Seawater
Fresh Water

2005 Abalt Solutions Limited. All rights reserved

Abalt Solutions

Pressure Control Devices


Drilling Engineering -Well Control

2005 Abalt Solutions Limited. All rights reserved

Abalt Solutions

abalt solutions limited - 2005 September October 2005


INTRODUCTION TO HYDROCARBON EXPLOITATION
Development Phase

BLOW OUT

When secondary control fails, then blowouts occur.

Massive influx to the wellbore and gusher to surface.


To control this, it maybe useful to close blind rams before
abandonment.
Putting blowouts under full control may require drilling of
a relief well, through which are pumped very heavy mud
or cement to plug off the well affected.
Drilling Eng inee ring-We ll Contro l

During blow outs special blow out control teams are


required.

Types
External Blowout: It is an Uncontrolled flow of influx to
the wellbore and through to the surface.
Internal Blowout or Underground Blowout: It is an
uncontrolled flow of influx to wellbore and entry into a
weak zone

2005 Abalt Solutions Limited. All rights reserved

Abalt Solutions

BLOW OUT
Drilling Engineering -Well Control

2005 Abalt Solutions Limited. All rights reserved

Abalt Solutions

abalt solutions limited - 2005 September October 2005