Milestones
-----Barrage construction milestones are different from consultants
-----Contract milestones- 1. Prepation work: colonies and client's office 270 da
ys. 2. Overall project completion. Risk of claiming damages by client due to del
ay.
Completion of civil work, mechanical works, engineering works is separat
e milestones.
Monitoring: Scheduled in accordnacce with 3 flood seasons (June-August).
50% barrage damn coffer damn must be made BEFORE flood season arrives to avoid
damage from flood.
Second year milestone requires completion of barrage.
Third year milestone requires
Constraints are kept in mind whilst setting milestones e.g. 20 Jan - 25
Jan repair works
Mitigation report given by contractor for reasons for delay but no fine/
penalty due to delay IF contractor can show how he will bring back on schedule.
Unknowns Uknowns given more time by consultant to allow completion by co
ntractor e.g.
FIDIC is used for International bids- Special FIDIC Version MTP, harmoiz
ed addition for use by International Loan/Funding organizations
Used as
-----Consultant milestones-
3 months to review construction plan/design
3 months to dispatch/allocate designs
Monitoring: Supervision of construction
Tasks
-----Consultant- 3 zones are set up. Zone 1 Main barrage 2. Additional base for
rehabilitation 3. Away from barrage: Removal of sedimentation
Reasons for Zones: all 3 are independant and work is being performed con
current
Areas: Zone 1 has 2 areas: Existing canals & Main bewer
Zone 2 has 2 areas: Additional base & New Head Regulator
Zone 3 has 2 areas: Upstream & Downstream
Areas are broken down in to sub-areas
Sub-Areas are divided into Structures/Group of activities
Structures are
Zones have multiple critical paths
Sectors
WBS
BAC
EV
------Everybody has separate EVs and basis for evaluation, based on stakeholder'
s interests.
Consultant uses multiple systems for e.g. PMS.
Group of acitivities assigned a weightage. Weightage can be financial, e
ffort, time,
Effort based on 1-5 difficulty level
Risks
--------Project Risk assessed by client
Consultant Risk is to deliver and design project
----Consultant Risk is least due to lack of resources involved, rather o
nly services. Time based work hence dependant on other's work, but relatively lo
w.
Contractor Risk is on Planning engineer estimate. Margin included in PC-
1 is Contractor's risk cushion
PC-1
AC
TCPI Calculation
EAC Calculation