NAME OF PROJECT : 17HH0015 - Construction / Maintenance of Flood Control and Mitigation Structures

along Lahug River, Brgy. Lahug, Cebu City

SCOPE OF WORK

ESTIMATED DESCRIPTION UNIT TOTAL COST PER


ITEM NO. UNIT
QUANTITY W/ UNIT PRICE IN PESOS COST ITEM
A. FACILITIES FOR THE ENGINEER

Provision of Combined Field Office,


A.1.1(6) 6.64 mos Laboratory and Living Quarters Building
for the Engineer (Rental Basis)
B. OTHER GENERAL REQUIREMENTS

B.3 1 L.S. Permits and Clearance

B.7 6.64 mos Occupational Safety and Health Program

B.9 1 L.S. Mobilization / Demobilization

C. EARTHWORKS

103(1)a 2,897 cu.m. Structure Excavation, Common Soil

DRAINAGE AND SLOPE PROTECTION


G.
STRUCTURES
404(1)a 66,493 kgs Reinforcing Steel (Key), Grade 40

Structural concrete(Key), 20.68 Mpa,


405(1)a3 1,945 cu.m.
Class A, 28 days
404(1)a 41,843 kgs Reinforcing Steel (Facewall), Grade 40

Structural concrete(Facewall), 20.68 Mpa,


405(1)a3 916 cu.m.
Class A, 28 days
506(1) 2,536 cu.m. Stone Masonry

TOTAL IN FIGURES :

TOTAL IN WORDS :

DURATION OF PROJECT :

SIGNATURE :
NAME & TITLE OF SIGNATORY :

SIGNATURE OF WITNESS :
NAME OF WITNESS :

SUBSCRIBE TO AND SWORN before me this _______ day of ________________ 2017.

Affiant exhibited to me his/her Community Tax Receipt No. __________________ issued


on ________________ 2017, at ________________, Philippines.

Doc. No. ,

Page No. ,

Book No. ,

Series of 2017

Vous aimerez peut-être aussi