Vous êtes sur la page 1sur 19

(St) Proj Unit Type Dev.

Serial Rev

(0) - - 0904 SI 002 00


DOCUMENT
HSE INDICATORS
TITLE

CORPORATE HSE PROCEDURE

HSE INDICATORS

INDICATORI HSE

COMPANY DOCUMENT APPROVAL STATUS


DOCUMENT ISSUED FOR INTERNAL USE

SIGNED DATE
DOCUMENT STATUS
(NAME &
INITIALS) DD/MM/YY
APPROVED WITH NO COMMENTS. WORKS CAN
A
PROCEED
APPROVED WITH COMMENTS AS NOTED.
CONTRACTOR CAN PROCEED WITH WORK
B
IMPLEMENTING THE COMMENT INDICATED BY
COMPANY
NOT APPROVED: REVISE AND/OR RESUBMIT.
C
CONTRACTOR CANNOT PROCEED WITH WORKS
RECEIVED FOR INFORMATION ONLY AND
D
REVIEWED

0 Issued for approval / Action S. Migliorati L. Gravina G.P. Riccardi 21/03/2014


Rev. Description Prepared Checked Approved Date
(name & initials) (name & initials) (name & initials) DD/MM/YY

DOCUMENT REVISIONS
This document is the property of SICIM spa who will safeguard its rights according to the civil and penal provisions of the law.

0904-SI-002-00_HSE Indicators.docx Sheet 1 of 16


(St) Proj Unit Type Dev. Serial Rev

(0) - - 0904 SI 002 00


DOCUMENT
HSE INDICATORS
TITLE

CORPORATE HSE PROCEDURE

INDICE CONTENTS

1. SCOPO 1. SCOPE AND PURPOSE 3

2. RIFERIMENTI 2. REFERENCE 4

3. DEFINIZIONI 3. DEFINITIONS 4

4. RESPONSABILIT 4. RESPONSIBILITY 5

5. DESCRIZIONE DELLE ATTIVIT 5. DESCRIPTION OF ACTIVITIES 6

5.1. INDICATORI DI PRODUZIONE 5.1. PRODUCTION INDICATORS 7


5.2. INDICATORI PROATTIVI (LEADING 5.2. LEADING INDICATORS 7
INDICATORS) 5.3. TRAILING INDICATORS 8
5.3. INDICATORI REATTIVI 5.3.1. CLASSIFICATION BY CONSEQUENCE 9
5.3.1. CLASSIFICAZIONE SECONDO LE CONSEGUENZE 5.3.2. CLASSIFICATION BY INCIDENT TYPE 12
5.3.2. CLASSIFICAZIONE PER TIPO DI INCIDENTE 5.4. TRAINING REPORT 15
5.4. RAPPORTO DELLA FORMAZIONE 5.5. DEADLINES FOR DATA REPORTING 15
5.5. SCADENZE PER LINOLTRO DEI DATI 5.6. KPI RELATING TO INJURY RATES 16
5.6. KEY PERFORMANCE INDICATORS
INFORTUNISTICI

0904-SI-002-00_HSE Indicators.docx Sheet 2 of 16


(St) Proj Unit Type Dev. Serial Rev

(0) - - 0904 SI 002 00


DOCUMENT
HSE INDICATORS
TITLE

CORPORATE HSE PROCEDURE

1. SCOPO 1. SCOPE AND PURPOSE

Lobiettivo di questa procedura di definire il The scope of this document is to outline the
flusso minimo di informazioni e di dati information exchange of a minimum set of HSE
statistici HSE tra Uffici, Basi, Cantieri e statistical data between Offices, Base,
Progetti controllati da SICIM S.p.A.. Operational Sites and Projects controlled by
SICIM S.p.A..
Come dichiarato nella Politica della Sicurezza,
Salute e Ambiente lAlta Direzione Following SICIM HSE Policy, Company Top
impegnata nel monitoraggio dei risultati Management is fully committed to monitor the
ottenuti dallorganizzazione in modo da performances of the organization in order to be
garantire il raggiungimento degli obiettivi e il able to check the accomplishment of the
miglioramento continuo. objectives and to move toward continuous
improvement.
La Politica della Sicurezza, Salute e Ambiente
indica i due principali strumenti per garantire HSE Policy lists two main tools for monitoring
la conformit e il miglioramento: verifiche compliance and improvement: audit and
ispettive, visite del Management e lutilizzo di Management visits and the use of reliable and
Indicatori condivisi e affidabili. Il presente common Indicators. The present document
documento specifica lultimo dei due refers to the latter tool detailing those Indicators
strumenti, elencando e definendo quegli and giving information how to calculate, use and
indicatori e fornendo istruzioni su come circulate them.
calcolarli, usarli e condividerli.
It is required that any activity within SICIM
Il presente documento richiede che ogni premises, related to SICIM scope of works as
attivit svolta negli ambienti SICIM oppure well as preparatory to them, carried out by
legata allesecuzione dello scopo di lavoro di SICIM workers subcontractors collaborators is
SICIM, sia essa preparatoria, svolta da reflected in the HSE Indicators reporting in order
lavoratori SICIM o da Subappaltatori venga to be able to have a sound statistic overview of
inclusa negli Indicatori HSE, al fine di the Company activities.
ottenere una significativa visione dinsieme
statistica delle attivit dellAzienda. Hence, the purpose of this Procedure is to
provide details of the process of data collecting
Quindi lo scopo di questa Procedura di and reporting of:
fornire le istruzioni per il processo di raccolta Leading Indicators; indicators of processes
e inoltro di: that aim to prevent incidents,
Leading Indicators; indicatori dei processi Trailing Indicators; indicators that describe
che mirano alla prevenzione degli incidenti, occurred incidents with the aim to avoid
Trailing Indicators; indicatori che recurrence,
descrivono gli eventuali incidenti con Key Performance Indicators relating to
lobiettivo di evitarne la ripetizione, Injury Rates, calculated on the basis of the
Key Performance Indicators infortunistici, trailing indicators.
calcolati sulla base dei Trailing Indicators.

La procedura mira a creare un approccio This Procedure aims to create a common


comune allinterno dellorganizzazione della approach within SICIM Organization, it shall not
SICIM, essa non deve comunque mai essere however be in contrast with national and
in contrasto con le diverse legislazioni international regulation as well as specific Project

0904-SI-002-00_HSE Indicators.docx Sheet 3 of 16


(St) Proj Unit Type Dev. Serial Rev

(0) - - 0904 SI 002 00


DOCUMENT
HSE INDICATORS
TITLE

CORPORATE HSE PROCEDURE

nazionali e gli standard internazionali, e Requirements given by Client. It is therefore


neppure con eventuali specifici requisiti di responsibility of the Project HSE Manager to
progetto definiti dal Cliente. quindi integrate those requirements with this
responsabilit di ciascun Responsabile HSE di Procedure.
progetto integrare le norme di cui sopra con
questa procedura.

2. RIFERIMENTI 2. REFERENCE

OHSAS 18001:2007 OHSAS 18001:2007


Decreto Legislativo 81/2008 e s.m.i. Italian Decreto Legislativo 81/2008 and
integration
UK RIDDOR: Reporting of Injuries, Diseases UK Reporting of Injuries, Diseases and
and Dangerous Occurrences Regulations Dangerous Occurrences Regulations 2013
2013 - (RIDDOR) -
http://www.hse.gov.uk/riddor/reportable- http://www.hse.gov.uk/riddor/reportable-
incidents.htm incidents.htm
0901-SI-001 Politica HSE 0901-SI-001 - HSE Policy
0902-SI-002 - OHS MS Manual OHSAS 0902-SI-002 - OHS MS Manual OHSAS
18001 18001
Linee Guida OGP OGP Guidelines
0904-SI-001 Notifica e investigazione degli 0904-SI-001 - Incident reporting and
incidenti investigation

3. DEFINIZIONI 3. DEFINITIONS

HSE Accident
Salute, Sicurezza e Ambiente. An unplanned event or chain of events that
results in harm to people (injury), damage to
property or to the environment.
Incidente Incident
Evento non pianificato accaduto in ambito Unplanned work related event(s) in which an
lavorativo che ha causato o avrebbe potuto injury or ill health or fatality occurred, or could
causare, un infortunio, anche mortale, o una have occurred.
malattia a persone, o danni allambiente o a Therefore INCIDENTS = ACCIDENTS + NEAR
cose. MISSES
Infortunio Injury
Un incidente che ha causato danni a persone. Result of an event which has caused wounds
or illnesses to personnel.

0904-SI-002-00_HSE Indicators.docx Sheet 4 of 16


(St) Proj Unit Type Dev. Serial Rev

(0) - - 0904 SI 002 00


DOCUMENT
HSE INDICATORS
TITLE

CORPORATE HSE PROCEDURE

Incidente Mancato (Quasi incidente) Near Miss


Un incidente che non ha causato danni a An incident where no injury, ill health, or
persone, a beni o allambiente, ma che, con fatality occurs, but that it may be provoked.
minime differenze al contorno, avrebbe
potuto causarne.

4. RESPONSABILIT 4. RESPONSIBILITY

DIREZIONE / DIRETTORE GENERALE GENERAL MANAGER (GM)


Assicura che le procedure aziendali siano He is responsible for ensuring that the
applicate in tutti Progetti e le attivit SICIM. Company procedure is implemented in all
Insieme allAlta Direzione, partecipa alla SICIM Projects / Premises.
definizione degli obiettivi HSE (Key He participates with the all Top Management
Performance Indicators) e li comunica al in the definition of the HSE performances
Management aziendale. objectives, Key Performance Indicators, and
responsabile della revisione communicates them to the Company
dellandamento dei KPI aziendali, ne Management.
comunica al Management aziendale ed He is responsible for reviewing Company HSE
assicura le risorse per il raggiungimento performances (KPI), communicate them to
degli obiettivi. the Company Management and ensuring
resources to reach the defined targets.

DIPARTIMENTO HSE DI SEDE HEADOFFICE (HQ) HSE DEPARTMENT


Guida il processo dettagliato nel presente Is responsible to lead the Process of the
documento, raccoglie gli Indicatori dalle present document, gather Indicators from
diverse entit aziendali e redige le Company Sites and compile the Company
statistiche globali dellorganizzazione. Performance statistics.
di supporto al Direttore Generale nel Is responsible to support the communication
compito di comunicare i risultati al task of the General Manager, releasing
Management, redigendo periodicamente gli periodically Company Indicators.
Indicatori. Is responsible to implement the present
responsabile di attuare la presente procedure to all Sites, sharing any
procedura presso tutti i cantieri, information and supporting HSE Project
condividendo tutte le necessarie Managers.
informazioni e assistendo i Responsabili HSE
di Progetto.

RESPONSABILE DI PROGETTO (PM) PROJECT MANAGER (PM)


Assicura, anche tramite lallocazione di He shall ensure, with adequate resources,
adeguate risorse, che, nel progetto di propria that HSE Indicators are recorded and
responsabilit, gli Indicatori HSE siano reported to HQ HSE Dpt. within the Project of
raccolti e inoltrati al Dip. HSE. his responsibility.
responsabile della revisione degli Indicatori Reviews the HSE Indicators of his Project
HSE del progetto in relazione agli obiettivi e against the targets and set-up together with

0904-SI-002-00_HSE Indicators.docx Sheet 5 of 16


(St) Proj Unit Type Dev. Serial Rev

(0) - - 0904 SI 002 00


DOCUMENT
HSE INDICATORS
TITLE

CORPORATE HSE PROCEDURE

di pianificare, insieme al Responsabile HSE di HSE Project Manager an action plan to meet
Progetto, un piano dazione per raggiungere i the targets.
detti obiettivi.

RESPONSABILE HSE DI PROGETTO HSE PROJECT MANAGER


responsabile dellattuazione della presente He is in charge to ensure the correct
procedura a livello di progetto e che tutti gli implementation of this procedure and that
Indicatori siano adeguatamente registrati e all indicators are properly reported, and to
inoltrati al Project Manager e al send them to his Project Manager and to
Dipartimento HSE di Sede. SICIM HQ HSE Dpt. as required.
Armonizza eventuali richieste del cliente od He shall harmonize any Client / Statutory
obblighi di legge con la presente procedura Reporting requirement with the present
in ordine di snellire il processo di raccolta procedure in order to streamline data
dati. gathering.
Coordina lattuazione delle azioni He co-ordinates the implementation of
eventualmente emerse nella definizione di actions arising from an action plan.
un piano dazione.

5. DESCRIZIONE DELLE 5. DESCRIPTION OF


ATTIVIT ACTIVITIES

Questa procedura enumera i requisiti minimi This procedure shall be followed as a


della raccolta e circolazione dei dati HSE fra minimum requirement for HSE data reporting
Cantieri, Uffici e Progetti. from Sites and Offices, Base, Operational
Si ribadisce che clausole legislative vigenti Sites and Projects. It is underlined that
sono prioritarie alla presente procedura. da provisions of current International / National
notarsi inoltre che ogni obbligo contrattuale Legislation shall take priority over the present
deve essere soddisfatto in parallelo al Instructions. During operations, each
presente documento. contractual obligation, furthermore, shall be
carried out in parallel with the above
Procedures.

Il Responsabile HSE di Progetto dovr HSE Project Manager will be able to use
utilizzare il database Odin e il modulo Odin Database and form 0906-SI-021 HSE
0906-SI-021 HSE Internal Monthly Internal Monthly report to communicate all
report per riportare tutti i dati richiesti da data to be reported as per the present
questa procedura. Qualsiasi deviazione da procedure. Any deviation shall be discussed
quanto richiesto deve essere preventivamente and agreed on with the involved parties.
concordata con tutte le parti in causa. In the monthly report SICIM direct workers
Nel Report mensile gli indicatori della forza Indicators, as well as Leading and Trailing
lavoro, i Leading Indicators e i Trailing Indicators shall be reported split by the ones
Indicators devono essere riportati suddivisi coming by sub-contractors. All kind of sub-
tra SICIM e Subappaltatori. contract shall be taken into account.
La comunicazione mensile degli Indicatori Every month the HSE Project Manager shall
avviene via e-mail inviando entro l8 del mese collect Indicators and send them via e-mail,
successivo il modulo 0906-SI-021 in using module 0906-SI-021, to the following
formato excel agli indirizzi: mails address:

0904-SI-002-00_HSE Indicators.docx Sheet 6 of 16


(St) Proj Unit Type Dev. Serial Rev

(0) - - 0904 SI 002 00


DOCUMENT
HSE INDICATORS
TITLE

CORPORATE HSE PROCEDURE

f.levati@sicim.eu f.levati@sicim.eu
s.migliorati@sicim.eu s.migliorati@sicim.eu
Il responsabile di progetto (PM) deve essere Within each 8th day of the month.
sempre in copia nellinvio di queste Project Manager of the relevant project / site
informazioni. shall be always in copy to the mail sending to
the Headquarter the report.

5.1. INDICATORI DI PRODUZIONE 5.1. PRODUCTION INDICATORS

I principali indicatori di produzione utilizzati Average Manpower, Worked Man-hours


come denominatore nel calcolo dei KPI, vedi and Km Driven are the basic Production
5.5, sono: Media dei Lavoratori presenti, Indicators used to calculate Key Performance
Ore Uomo Lavorate, Km Percorsi (veicoli Indicators as explained in paragraph 5.5.
trasporto persone e cose). These Indicators shall include all work
Questi Indicatori devono includere tutte le produced in, related to the site, by SICIM
attivit svolte o legate allazienda da workers as well as by all sub-contractors
lavoratori SICIM e da tutti i subappaltatori during the month, including all services
durante il mese corrente, incluso la fornitura providing sub-contractors.
di servizi di manodopera. When no through data is available, i.e. some
Qualora informazioni complete non siano sub-contractors, man-hours can be accounted
disponibili, per esempio nel caso di mancato as per the average monthly manpower on site
rapporto delle ore uomo lavorate dai time the average monthly worker hours.
subappaltatori, le ore uomo possono essere
calcolate come media dei lavoratori presenti
durante il mese moltiplicato per la media
delle ore mese lavorate da un lavoratore.

5.2. INDICATORI PROATTIVI 5.2. LEADING INDICATORS


(LEADING INDICATORS)

Analisi specifica dei rischi Job Hazard Analysis (JHA)


Il numero delle Analisi dei Rischi specifiche The number of task specific Job Hazard
per una lavorazione effettuate durante il Analysis, also called Job Safety Analysis done
mese. Include tutti i tipi di documenti che, during the month.
data una nuova lavorazione o una lavorazione It should include also any kind of specific
di cui cambino le condizioni al contorno, Task Risk Assessment done, as long as it has
riportino, in qualsiasi forma, una sua been reported and recorded in any kind of
valutazione dei rischi. written form.
Riunioni della Sicurezza Safety Meetings
Il numero di tutte le riunioni, a qualsiasi Any kind of Meetings having as Agenda HSE
livello, che hanno avuto come argomento o Issues.
fra gli argomenti la Salute, la Sicurezza o la Meetings shall be reported also if HSE is only
Tutela ambientale sul luogo di lavoro. Deve a part of Agenda, as long as the agenda is
esistere ed essere mantenuto in cantiere recorded or the minutes of meeting are
lordine del giorno o il verbale di riunione. available.

0904-SI-002-00_HSE Indicators.docx Sheet 7 of 16


(St) Proj Unit Type Dev. Serial Rev

(0) - - 0904 SI 002 00


DOCUMENT
HSE INDICATORS
TITLE

CORPORATE HSE PROCEDURE

Riunione pre-attivit Pre-Job and Toolbox Meetings


Tutti gli incontri effettuati con una squadra di Any kind of Toolbox Talks or Pre-Job
lavoratori prima dellinizio del turno di lavoro Meetings. If Toolbox Talks are done in
o prima di una specifica attivit lavorativa. different groups each single group shall
Solitamente incontri informali, non account for 1 Toolbox Talks; i.e. if the
verbalizzati di ca. 15 minuti che vedono Toolbox talks are done in 4 groups every day
coinvolti i lavoratori, i capisquadra, i I will have 4 reported every day, 24 toolbox
responsabili della sicurezza e tutto il talks every 6 working days week.
personale di cantiere.
Ore di Formazione della Sicurezza Safety Training Hours
Il numero di ore complessive di formazione Any kind of training given to workers at any
fornita ai lavoratori, a qualsiasi livello, incluso level, including Induction.
la Formazione obbligatoria. See paragraph 5.1.4 for more specific
Vedi anche paragrafo 5.1.4. information.
Verifiche Ispettive Audits
Numero di Verifiche Ispettive ufficiali Number of Official Inspections and Audits
effettuate dal Cliente, da Parti Terze. done by Client, any Third Party.
Verifiche Ispettive Interne effettuate sulla Internal Audit done as per specific Project
scorta di una specifica procedura di progetto. Procedure.
Di ogni Verifica Ispettiva deve essere agli atti Each audit must result in an audit report, not
il report (non deve essere comunque inviato to be submitted together with the Indicators.
insieme agli indicatori).
Ispezioni della Sicurezza Safety Inspections
Il numero di tutte le Ispezioni interne, anche Any kind of Internal Inspection, resulting
effettuate tramite Checklist utilizzate from checklist routine use or walkabout done
periodicamente. on site.
Il numero di tutte le Visite di Cantiere se la
Sicurezza, Salute e Ambiente stato uno
degli argomenti che la visita ha riguardato.
Denuncia di Atto o Condizione pericolosa Unsafe Act / Condition reports
Il numero di ciascun atto o condizione Any kind of unsafe act or condition reported,
pericolosa denunciata o riportata in qualsiasi also verbally, as long as the resulting action
modo, anche verbalmente, da un lavoratore. is recorded or followed in any way.
Simulazione demergenza Emergency Drill
Numero delle simulazioni di situazioni di Any emergency drill performed during the
emergenza effettuate e formalizzate durante month.
il mese.

5.3. INDICATORI REATTIVI 5.3. TRAILING INDICATORS

Gli Indicatori Reattivi riguardano il numero di Trailing Indicators report the number of
Incidenti (Incidente Mancato e Infortuni) incidents (Near Miss and Accidents) happened
accaduti durante il mese in oggetto. during the month, this part of the report is
Questa parte del Report mensile suddivisa divided into two sections, both sections report
in due sezioni, ciascuna sezione riporta i the same incidents but accordingly to different

0904-SI-002-00_HSE Indicators.docx Sheet 8 of 16


(St) Proj Unit Type Dev. Serial Rev

(0) - - 0904 SI 002 00


DOCUMENT
HSE INDICATORS
TITLE

CORPORATE HSE PROCEDURE

medesimi incidenti secondo due differenti classifications.


classificazioni. Ci implica che il numero This means that monthly the total number of
totale degli Incidenti riportati nella incidents reported in the Classification by
Classificazione secondo le Conseguenze Consequence shall be same as the total
sar sempre uguale al numero totale riportato number reported in the Classification by
nella Classificazione secondo la Tipologia. Incident type section.
La comunicazione di questi Indicatori avviene The notification of these indicators is done
automaticamente se il cantiere ha adottato automatically if the site has adopted Odin for
Odin, deve avvenire mensilmente, con le reporting, if not, it must be done on a monthly
modalit illustrate al paragrafo 5, se si basis, in the manner described in paragraph 5,
utilizza unicamente il modulo 0906-SI-021 using the form 0906-SI-021 Internal
HSE Internal Monthly report. Monthly HSE report.

5.3.1. CLASSIFICAZIONE SECONDO LE 5.3.1. CLASSIFICATION BY


CONSEGUENZE CONSEQUENCE

Casi di Primo Soccorso First Aid Case (FAC)


Tutti gli Infortuni minori che non richiedono o Term to define any minor injuries that usually
potrebbero non richiedere lintervento di un do not require medical care by a physician
medico, ad esempio graffi, piccoli tagli, (i.e. scratches, cuts, burns, splinters, not
piccole scottature, schegge. embedded foreign bodies in the eyes, etc.)
Tali trattamenti sono considerati FAC anche and its eventual subsequent visits. Such
se sono forniti da un medico. treatment is considered FAC even if provided
by a physician.
Casi di Trattamento Medico Medical Treatment Case (MTC)
Tutti gli Infortuni non classificati come LTI A work related injury, which results in neither
(vedi sotto), o come RWC (vedi sotto) ma che lost time nor restricted work but which
hanno comunque richiesto lintervento di un requires treatment by a medical doctor.
medico.
Casi di temporanea restrizione delle
Restricted Work Case (RWC)
capacit lavorativa
Tutti gli Infortuni sul lavoro che hanno come A work related injury, which results in a
conseguenza una temporanea restrizione delle Restricted Work assignment on any day after
capacit lavorativa. Include tutti i casi di the day on which the accident occurred OR in a
Infortuni che risultano in unassenza dal posto absence from workplace but could have resulted
di lavoro ma che sarebbero potuti risultare in in a Restricted Work assignment.
un temporaneo assegnamento ad altre
mansioni.
Il nuovo assegnamento deve essere una parte The Restricted Work assignment must be
significativa o porzione indispensabile del lavoro meaningful or a substantial part of a regular job
regolare dellinfortunato. Come esempio si Example of RWC are RIDDOR Reportable over-
prendano i casi Over-three-day injuries, three-day injuries is one which is not "major"
RIDDOR (legislazione inglese). but results in the injured person being away
from work OR unable to do their full range of
their normal duties for more than three days.

0904-SI-002-00_HSE Indicators.docx Sheet 9 of 16


(St) Proj Unit Type Dev. Serial Rev

(0) - - 0904 SI 002 00


DOCUMENT
HSE INDICATORS
TITLE

CORPORATE HSE PROCEDURE

Casi di Infortuni con giorni di assenza dal


Loss Time Injury (LTI)
lavoro
Tutti i casi di Infortuni sul lavoro che Any work-related injury which renders the
conseguono nella temporanea inabilit injured person temporarily unable to perform
dellinfortunato di compiere un qualsiasi any regular Job or Restricted Work as per
lavoro regolare o una parte significativa o RWC definition. In this case Lost Time
porzione di esso (vedi RWC). I giorni persi includes rest day, weekend day, holiday. The
includono, le festivit ed eventuali giorni di day of the Accident is not counted when
ferie, non includono il giorno dellinfortunio. calculating Lost Workdays; i.e. RIDDOR 2013
ref. I casi di Specified injuries to workers, Specified injuries to workers:
RIDDOR 2013 (legislazione inglese), sono
LTI:
Qualsiasi frattura con lesclusione di frattura fractures, other than to fingers, thumbs and
di dita; toes
Amputazioni; amputations
Infortuni che potrebbero causare la any injury likely to lead to permanent loss of
permanente perdita o riduzione della capacit sight or reduction in sight
visiva; any crush injury to the head or torso causing
Infortunio alla testa o al torso che causi danni damage to the brain or internal organs
ad organi interni; serious burns (including scalding) which:
Ustioni o bruciature che: covers more than 10% of the body
Coprano pi del 10% del corpo; causes significant damage to the eyes,
Causino danni significativi to occhi, respiratory system or other vital organs
sistema respiratorio o altri organi vitali; any scalping requiring hospital treatment
Qualsiasi infortunio alla testa che richieda any loss of consciousness caused by head
trattamento ospedaliero; injury or asphyxia
Infortunio che causi perdita di coscienza a any other injury arising from working in an
seguito di infortunio alla testa o asfissia; enclosed space which:
Ogni infortunio avvenuto in spazi confinati cui leads to hypothermia or heat-induced
consegua: illness
Ipotermia o danni da esposizione al requires resuscitation or admittance to
calore hospital for more than 24 hours
Richieda rianimazione o ospitalizzazione
per pi di 24 ore.
Disabilit Disability
La disabilit comprende le menomazioni Disability covers both physical and mental
fisiche e mentali e riguarda tutti i dipendenti impairments and covers all employees who
che potrebbero esserne coinvolti durante le might be hampered in work performance.
prestazioni di lavoro. Ci comprende le This includes people with long term or
persone con condizioni a lungo termine o progressive conditions as well as people with
progressive, cos come le persone con disturbi more stable disorders.
pi stabili. The days lost arising from disability are not
I giorni persi non sono riportati come Days reported as days lost.
lost.
Infortunio mortale Fatality (FAT)
Un decesso conseguente a un Infortunio sul A death resulting from a Work Related Injury,
lavoro, indipendentemente dal lasso di tempo regardless of the time intervening between
che intercorre tra lInfortunio e il decesso. the injury and the death.
I giorni persi derivanti da un infortunio The days lost arising from fatal injury are not
mortale non sono riportati come Giorni persi. reported as days lost.

0904-SI-002-00_HSE Indicators.docx Sheet 10 of 16


(St) Proj Unit Type Dev. Serial Rev

(0) - - 0904 SI 002 00


DOCUMENT
HSE INDICATORS
TITLE

CORPORATE HSE PROCEDURE

Giorni Persi Days Lost


Numero mensile totale di giorni persi in Total monthly number of days lost in
conseguenza a un LTI, con esclusione dei casi consequence of an LTI incident other than a
di infortunio mortale e di invalidit fatal injury or permanent disability.
permanente.
Incidente Mancato (Near Miss) Near Miss (NM)
Un Incidente Mancato o Quasi Incidente It is a hazardous Event/Incident which neither
un Incidente, cio un evento pericoloso, che harm to personnel nor damage to assets or
avrebbe potuto causare danni a persone o environment but had the potential to cause
cose o avere un impatto ambientale negativo. such harm or damage.
Danno Materiale Asset Damage Incident
Tutti i casi di Incidente sul lavoro che abbiano Any work related incident which results in an
come unica conseguenza un danno materiale, asset damage only, with no consequence to
senza aver arrecato danni a persone o personnel or to the environment. If the Asset
allambiente. Se il danno materiale inferiore Damage is lower than the minimum
al minimo, valutare se notificare lincidente eventually report the Incident as a Near Miss.
come Near Miss. Si consiglia di riportare come Sometimes it is recommended to report
NM quegli incidenti, classificabili anche come incidents, classifiable as Asset Damages, as
Danno Materiale, di cui si voglia sottolineare Near Miss; in this case we want to emphasize
pi che il limitato danno materiale subto, la more the characteristic of Near Miss -
caratteristica di NM scampato pericolo di un escaped danger from a possible serious injury
possibile infortunio grave. - than the limited material damage suffered.
Incidente con impatto ambientale Minore Minor Environmental Impact Incident
1) Impatto sulle Acque: 1) Impact on Water:
Effetto limitato e localizzato sulla qualit Limited and localised effect on water quality
dell'acqua che ha un impatto minimo sulla which has a minimal impact on the quality or
qualit o l'uso di tale acqua. use of that water.
2) Impatto sul Suolo (Sversamenti / Rifiuti): 2) Impact on the Ground (Spills / Waste):
- Contaminazione trascurabile o - Insignificant or temporary contamination
temporanea di terreni senza alcun effetto of land having no overall effect on the use
globale sull'uso o la qualit di quella terra. or quality of that land.
- Danni molto limitati per la fauna e la flora - Very limited damage to terrestrial fauna
terrestre, riparabili naturalmente in un and flora, which is naturally reparable
breve lasso di tempo e senza danni alle over a short timescale and no damage to
popolazioni di specie protette. populations of protected species.
- Terreno agricolo o sito commerciale - Agricultural land or commercial site
colpito tra i 3 - 6 mesi, ma non dichiarati affected between 3 - 6 months, but not
inidonei per l'attivit agricola o declared unfit for agricultural or
commerciale, dopo questo periodo. commercial activity after this period.
3) Impatto sullAria: 3) Impact on Air:
Effetto locale e a breve termine sulla qualit Shorter term, local effect on air quality
dell'aria derivante da odori o da impatti visivi arising from smells or visible impact (smoke
(fumo e polvere) con danni molto limitati per and dust) with very limited damage to fauna
la fauna e la flora e nessun danno alle and flora and no damage to populations of
popolazioni di specie protette. protected species.
4) Impatti da rumore: 4) Impacts from Noise:
- Rumore con effetti minori o transitori su - Noise resulting in a minor or transitory
servizi locali e aree di svago. effect on local amenities and leisure
areas.

0904-SI-002-00_HSE Indicators.docx Sheet 11 of 16


(St) Proj Unit Type Dev. Serial Rev

(0) - - 0904 SI 002 00


DOCUMENT
HSE INDICATORS
TITLE

CORPORATE HSE PROCEDURE

Incidente con impatto ambientale


Major Environmental Impact Incident
Maggiore
1) Impatto sulle Acque: 1) Impact on Water:
Un effetto persistente e / o esteso sulla A persistent and / or extensive effect on
qualit dell'acqua che ha un grave effetto water quality which has a serious effect on
sulla qualit o l'uso di tale acqua. the quality or use of that water.
2) Impatto sul Suolo (Sversamenti / Rifiuti): 2) Impact on the Ground (Spills / Waste)
- Contaminazione persistente e / o estesa di - Persistent and/or extensive contamination
terreno che ha un forte impatto sull'uso o of land which has a major impact on the
la qualit dello stesso. use or quality of that land.
- Inquinamento, danneggiamento o - Pollution, damage or destruction of the
distruzione dell'ambiente terrestre che ha terrestrial environment that has a major
un importante effetto negativo su un sito adverse effect on a statutory protected
protetto per legge o su una specie. site or on a species.
- Gravi danni all'attivit agricola. - Major damage to agricultural activity.
3) Impatto sullAria: 3) Impact on Air:
Un effetto persistente e / o esteso sulla A persistent and / or extensive effect on air
qualit dell'aria, tra cui: quality including:
- Rilascio di materiali che causano - release of materials which directly cause
direttamente o porteranno a significativi or will lead to significant exceedence of
superamenti degli standard di qualit the standards in the air quality;
dell'aria; - release causing damage that has a major
- Rilascio con importante effetto negativo adverse effect on a statutory protected
su un sito protetto per legge o su una site or on a species.
specie. 4) Impacts from Noise
4) Impatti da rumore Noise causing:
Rumore che causa: - a major adverse effect on an important
- Un importante effetto negativo su una recreation activity or large public event.
importante attivit di svago o evento
pubblico.

5.3.2. CLASSIFICAZIONE PER TIPO DI 5.3.2. CLASSIFICATION BY INCIDENT


INCIDENTE TYPE

Incidente Industriale Industrial Incident


Tutti i casi di Incidente sul lavoro che abbia Any accident involving personnel or company
coinvolto il personale, lambiente o beni asset on site or Company facilities which
aziendali in cantieri, officine, magazzini, uffici may not be described as Fire, Road Traffic,
e che non possano essere descritti come Occupational Illness or Environmental
Incendi sul Lavoro, Malattie Professionali, Incident.
Incidenti Stradali o Incidenti Ambientali.
Incidente con impatto ambientale Environmental Impact Incident
Tutti i casi di Incidente sul lavoro che abbiano Any work related incident which results in an
comportato un impatto dannoso per Environmental Damage, with no consequence
lambiente, indipendentemente dallentit del to personnel.
danno, senza aver arrecato danni alle
persone.

0904-SI-002-00_HSE Indicators.docx Sheet 12 of 16


(St) Proj Unit Type Dev. Serial Rev

(0) - - 0904 SI 002 00


DOCUMENT
HSE INDICATORS
TITLE

CORPORATE HSE PROCEDURE

Incidenti Stradali Road Traffic Incident (RTA)

Tutti i casi di Incidenti che hanno coinvolto Any Incident which has involved a vehicle and
veicoli circolanti su strade o su piste di which has resulted in actual Injury and/or
cantiere, indipendentemente che abbiano Damage to Assets.
comportato danni a persone o a cose.

In Itinere Commuting incident

Tutti gli incidenti RTA che si verificano mentre All RTA incidents which occur whereas a
un lavoratore in viaggio tra il luogo di worker is travelling between a place of
residenza e il luogo di lavoro e viceversa. residence and the workplace and vice-versa.
Gli incidenti in itinere non sono classificati per Commuting incidents are not classified by
conseguenza e quindi non vengono conteggiati consequence and therefore are not counted in
negli indicatori di Trailing. Essi non sono the Trailing indicator calculation. They are not
inclusi nel calcolo degli indicatori di frequenza: included in TRCFR or RTAFR. Incidents in
TRCFR o RTAFR. Gli incidenti in cui un which a worker is injured whilst travelling on
lavoratore ferito durante un viaggio di duty are not deemed to be Commuting
missione lavorativa non si considerano incidents, but as RTA, and are included within
incidenti in itinere, ma RTA, e sono classificati LTI, RWC, MTC or FAC depending on the
come LTI, RWC, MTC o FAC a seconda della consequence of the incidents.
conseguenza.

Incendi sul Lavoro Fire

Tutti i casi di Incidente sul lavoro che risulti Any accident resulting directly in the
nello sviluppo di un Incendio, di qualsiasi occurrence of fire.
entit o grandezza esso sia.

Incidente di Ordine Pubblico Security

Tutti i casi di Incidenti che abbiano Any Incident involving intentional and violent
comportato un uso intenzionale e violento use of force by any of the person involved
della forza da parte di qualsiasi delle parti resulting in actual Injury and/or Damage to
coinvolte. Assets or to the Environment.

Malattia professionale Occupational illness


Qualsiasi evento lavorativo che risulti in una Any work related event or activities which
malattia, indipendentemente dal lasso di resulted in a ill health, regardless of the time
tempo che intercorre tra la causa e il intervening between the cause and the effect.
manifestarsi dei sintomi. Occupational diseases are due to harmful, slow
Le malattie professionali sono dovute and protracted action of employment,
all'azione nociva, lenta e protratta nel tempo, materials or negative factors present in the
di un lavoro o di sostanze o di fattori negativi workplaces (such as black lung disease
presenti nell'ambiente in cui si svolge l'attivit contracted by miners or cancer among
lavorativa (come la malattia del polmone nero asbestos installers).
contratta dai minatori o il tumore tra gli Illnesses and injuries can include the same
installatori di amianto). conditions (e.g. back pain), however the
Malattie e infortuni possono essere il risultato nature of the causative event or exposure is
di una stessa condizione (es. mal di schiena), different. An injury results from a single
tuttavia la natura dell'evento scatenante o instantaneous - violent event or exposure,
l'esposizione differente. Un infortunio deriva while an illness results from repeated
da un evento violento e istantaneo o una exposures/events or exposure over a period of
singola esposizione, mentre una malattia time (typical example: hearing loss).

0904-SI-002-00_HSE Indicators.docx Sheet 13 of 16


(St) Proj Unit Type Dev. Serial Rev

(0) - - 0904 SI 002 00


DOCUMENT
HSE INDICATORS
TITLE

CORPORATE HSE PROCEDURE

deriva da eventi o esposizioni ripetute o da Ill health conditions, both reversible or not,
una esposizione prolungata per un periodo di need to be reported as Occupational illness if
tempo (es. tipico: ipoacusia). they are originated by the exposure of the
Sono da riportarsi come malattie professionali worker to hygienical or environmental
anche malattie reversibili o non dovute alle conditions due to the work site remote
condizioni igieniche o ambientali cui il location.
lavoratore sottoposto a causa della The latter applies if the hygienical or
localizzazione remota del luogo di lavoro; environmental conditions are direct
laddove le suddette condizioni igieniche e consequence of the work site location (i.e.
ambientali siano o diretta conseguenza del where malaria is endemic) or under direct
luogo in cui si svolge il cantiere (ambienti in control of Sicim (i.e. catering services)
cui la malaria endemica) o sotto il controllo
di Sicim (gestione o subappalto servizi di
catering).
Correlato al lavoro Work Related
Quelle attivit per le quali sono in atto o Those activities for which management
avrebbero dovuto essere in atto controlli di controls are in place, or should have been in
gestione. Gli incidenti che si verificano place. Incidents occurring during such
durante tali attivit devono essere riportati e activities must be reported and will be
inclusi nelle statistiche di rendimento. included in performance statistics.
Le seguenti attivit sono considerate come The following activities are considered to be
correlate al lavoro in quanto suscettibili ad work related, as they are susceptible to
incidenti con impatto significativo, per i quali incidents with significant impact, for which
dovrebbero essere in atto controlli da parte di Sicim controls should be in place:
SICIM: All work by company personnel,
Tutti i lavori svolti da personale aziendale, All work by Subcontractor personnel on
Tutti i lavori svolti da personale di Sicim site-project, and
Subappaltatori nei cantieri SICIM, e All work by Subcontractor personnel on
Tutti i lavori svolti da Subappaltatori in siti non-Sicim premises for which it is
che non sono di propriet di SICIM, per i evaluated on the basis of risk assessment
quali stato stabilito che siano necessari that Sicim and Subcontractor
controlli da parte di Sicim e del management controls are required.
subappaltatore, sulla base di valutazione For Sicim personnel, work includes overtime,
del rischio. attending courses, conferences and
Per il personale Sicim, il lavoro comprende: Company organised events, business travel,
gli straordinari, la partecipazione a corsi, field visits, or any other activity where the
conferenze e eventi organizzati dalla societ, employees presence is expected by the
viaggi d'affari, visite sul campo, o qualsiasi employer.
altra attivit in cui la presenza del dipendente Where it is impossible or inappropriate for the
sia prevista dal datore di lavoro. Company to seek to impose management
Qualora sia impossibile o inopportuno cercare control on a contractor, exceptions may be
di imporre il proprio controllo di gestione su justifiable. Examples may be found in areas
un appaltatore, Sicim pu prevedere where contractor services are not dedicated
eccezioni. Possono essere considerati come to the company e.g.
esempio le aree dove i servizi dellappaltatore Manufacturing of components in a factory
non sono dedicati alla societ: together with the manufacture of
Produzione di componenti in una fabbrica components for other customers;
insieme alla fabbricazione di componenti Construction at a contractors fabrication
per altri clienti; site shared by other customers;
Costruzione presso il sito di fabbricazione Delivery of goods or products to Sicim
di un appaltatore condivisa da altri clienti; locations by a contractor who is also
Consegna di beni o prodotti in luoghi employed to deliver goods or products to

0904-SI-002-00_HSE Indicators.docx Sheet 14 of 16


(St) Proj Unit Type Dev. Serial Rev

(0) - - 0904 SI 002 00


DOCUMENT
HSE INDICATORS
TITLE

CORPORATE HSE PROCEDURE

SICIM da parte di un appaltatore che other companies during the same


trasporta merci o prodotti ad altre aziende journey;
nel corso dello stesso viaggio; Customer collection of Sicim products,
Raccolta di prodotti SICIM da parte del where the vehicle and drivers are under
cliente, quando il veicolo e lautista sono the control of the customer;
sotto il controllo del cliente; Security services moving around
Servizi di sicurezza durante gli personnel and vehicles without specific
spostamenti di personale e mezzi senza order or out of operational needs.
ordine specifico o fuori da esigenze
operative.

5.4. RAPPORTO DELLA 5.4. TRAINING REPORT


FORMAZIONE

Le Ore di Formazione della Sicurezza riportate The Training Hours reported as per 5.2 shall be
mensilmente come indicato in 5.2 devono detailed in order to record the names and
essere dettagliate indicando il nome dei number of participants to each course, the type
partecipanti ai singoli corsi, i nomi dei corsi e se of courses and if they were internal or external
sono stati forniti internamente o da altre (i.e. client) provided.
organizzazioni (cliente o parti terze).
Per linoltro delle informazioni seguire la HSE Training procedure has to be followed:
procedura HSE Training: Database Odin Database Odin (Training Management section)
(sezione Training Management) o modulo can be used or 0906-SI-034-00_Monthly
0906-SI-034-00_Monthly HSE Training HSE Training report form reporting the same
report. information.

5.5. SCADENZE PER LINOLTRO DEI 5.5. DEADLINES FOR DATA


DATI REPORTING

La reportistica dei Leading Indicators, Trailing Previous month data shall be submitted using
Indicators e Ore della Formazione relativa al Odin database or sent to HSE Department and
mese precedente deve essere notificata via Odin Project Manager within 8th of each month.
o inoltrata via e-mail al Dipartimento HSE e in
copia conoscenza al Project Manager entro il
giorno 8 di ciascun mese.

0904-SI-002-00_HSE Indicators.docx Sheet 15 of 16


(St) Proj Unit Type Dev. Serial Rev

(0) - - 0904 SI 002 00


DOCUMENT
HSE INDICATORS
TITLE

CORPORATE HSE PROCEDURE

5.6. KEY PERFORMANCE 5.6. KPI RELATING TO INJURY


INDICATORS INFORTUNISTICI RATES

I Key Performance Indicator (Indicatori Key Performance Indicator will be calculated on


strategici dei risultati) sono calcolati sulla base the basis of the HSE Indicator reported from site
dei rapporti inviati mensilmente da ciascun each month:
progetto:
Indice di frequenza degli Infortuni con Lost Time Injury Frequency Rate LTIFR
assenza dal lavoro
Casi di Infortuni con giorni di assenza dal Rate of LTI
lavoro (LTI) + Permanent Disabilities cases
+ Casi di Invalidit Permanente every 1,000,000 Man-hours worked.
ogni 1,000,000 Ore Uomo Lavorate.
Indice di frequenza totale degli incidenti
Total Recordable Frequency Rate TRCFR
sul lavoro
Casi di Infortuni con giorni di assenza dal Rate of Permanent Disability
lavoro (LTI) + LTI
+ Casi di Invalidit Permanente + RWC
+ Casi di temporanea restrizione delle + MTC cases
capacit lavorativa (RWC) every 1,000,000 Man-hours worked.
+ Casi di Trattamento Medico (MTC)
ogni 1,000,000 Ore Uomo Lavorate.
Indice di Severit Severity Rate (SR)
Numero di Giorni Persi ogni 1,000,000 di Ore Number of Lost days every 1,000,000 Man-
Uomo Lavorate. hours worked.
Indice degli Incidenti Stradali Road Traffic Accident Frequency Rate
RTAFR
Numero degli Incidenti Stradali ogni Number of RTA every 1,000,000 km driven.
1,000,000 di Km Percorsi.

0904-SI-002-00_HSE Indicators.docx Sheet 16 of 16


(St)-Project-Unit-Type-Dev-Serial Rev

(-) - - 0906 - SI - 21 0

DOCUMENT
TITLE HSE INTERNAL MONTHLY REPORT

PROJECT: MONTH: YEAR: 20__

MANPOWER - FORZA LAVORO


Project Total up to date
Subcontractors
INDICATORS - INDICATORI SICIM Totale di Progetto da inizio
Subappaltatori
progetto
Average Manpower
Media dei Lavoratori presenti
Man hours
Ore Uomo Lavorate
Km Driven
Km Percorsi
HEALTH AND SAFETY LEADING INDICATORS - INDICATORI PROATTIVI SALUTE E SICUREZZA
Project Total up to date
Subcontractors
INDICATORS - INDICATORI SICIM Totale di Progetto da inizio
Subappaltatori
progetto
Job Hazard Analysis
Analisi specifica dei rischi
Safety Meetings
Riunioni della Sicurezza
Safety Training Hours
Ore di Formazione della Sicurezza
Pre-Job and Toolbox Meetings
Riunione pre-attivit
Safety Inspections and walkabouts
Ispezioni della Sicurezza
Audit from Client
Audit di Parte seconda (Cliente)
Audit third part (government - agencies)
Audit di Parte terza (Agenzie Enti governativi, etc.)
Unsafe Act/Conditions reports
Denuncia di Atto o Condizione pericolosa
Emergency Drill
Simulazioni demergenza
Any HSE Non-conformity notification from Client or
Agencies or third parties (attach)
Notifiche o comunicazioni ufficiali da parte di Cliente o Enti
terzi o Terze parti di non conformit o di rilievi riguardanti
Salute Sicurezza e Ambiente (allegare comunicazione o suo
contenuto)
ENVIRONMENTAL INDICATORS - INDICATORI AMBIENTALI
Project Total up to date
Subcontractors
INDICATORS - INDICATORI SICIM Totale di Progetto da inizio
Subappaltatori
progetto
Environmental training hours
Ore di formazione ambientale
Water consumption (hydrotest) [m3]
Consumo Acqua (Hydro testing) [m3]
Energy consumption (office - site accomodation)
[kWh]
Consumo Energia (base cantiere) [kWh]
Diesel fuel consumption [l]
Consumo Gasolio [l]
Non hazardous waste - Rifiuti Non Pericolosi
Reusable/Recycable - Recuperabili [kg]
Other - Non Recuperabili [kg]
Hazardous waste - Rifiuti Pericolosi
Reusable/Recycable - Recuperabili [kg]
Other - Non Recuperabili [kg]
Contaminated ground / soil from spill [kg]
Terreno contaminato (olio+gasolio+ altre sostanze
contaminanti) [kg]
Environmental Audit from Client
Audit Ambientali di Parte seconda (Cliente)
Environmental Audit third part (government -
agencies)
Audit Ambientali di Parte terza (Agenzie Enti governativi,
etc.)
(St)-Project-Unit-Type-Dev-Serial Rev

(-) - - 0906 - SI - 21 0

DOCUMENT
TITLE HSE INTERNAL MONTHLY REPORT

PROJECT: MONTH: YEAR: 20__

TRAILING INDICATORS - INDICATORI REATTIVI SALUTE E SICUREZZA


Note: Number of incident reported by Consequence shall be same as Number of incident reported as Type
NB: Numero di incidenti riportati per Conseguenza deve coincidere con numero di incidenti riportati per Tipo

Classification By Consequence - Classificazione secondo le Conseguenze


Project Total up to date
Subcontractors
INDICATORS - INDICATORI SICIM Totale di Progetto da inizio
Subappaltatori
progetto
Days lost
Giorni Persi
Asset Damage (only) Incident
Danno Materiale
Environmental effect Incident
Incidente con impatto ambientale
First Aid Case (FAC)
Casi di Primo Soccorso (FAC)
Medical Treatment Case (MTC)
Casi di Trattamento Medico (MTC)
Restricted Work Case (RWC)
Casi di temporanea restrizione delle capacit lavorativa (RWC)
Lost Time Injury (LTI)
Casi di Infortuni con giorni di assenza dal lavoro (LTI)
Permanent Disability
Invalidit Permanente
Fatality
Infortunio mortale (FAT)
Near miss
Incidente Mancato

Classification by Incident Type - Classificazione per Tipo di Incidente


Project Total up to date
Subcontractors
INDICATORS - INDICATORI SICIM Totale di Progetto da inizio
Subappaltatori
progetto
Industrial Incident
Incidente Industriale
Fire Incident
Incendi sul Lavoro
Occupational Illness
Malattia Professionale
Environmental Incident
Incidenti Ambientali
Road Traffic Accident (RTA)
Incidenti Stradali
Security Incident
Incidente di Ordine Pubblico
Near miss
Incidente Mancato
(St)-Project-Unit-Type-Dev-Serial Rev

(-) - - 0906 - SI - 034 0

DOCUMENT
TITLE MONTHLY HSE TRAINING REPORT

PROJECT: MONTH: YEAR: 2013

INTERNAL TRAINING EXTERNAL TRAINING


COURSE TITLE: HS ISSUES ENV ISSUES HS ISSUES ENV ISSUES
TITOLO DEL CORSO: COURSE TITLE COURSE TITLE COURSE TITLE COURSE TITLE COURSE TITLE COURSE TITLE COURSE TITLE COURSE TITLE COURSE TITLE COURSE TITLE
NOME DEL CORSO NOME DEL CORSO NOME DEL CORSO NOME DEL CORSO NOME DEL CORSO NOME DEL CORSO NOME DEL CORSO NOME DEL CORSO NOME DEL CORSO NOME DEL CORSO

COURSE DURATION (hours)


4 6 4 4 4 4 4 4 4 4
DURATA DEL CORSO (ore)
Participants - Partecipanti
Surname - Cognome Name - Nome Job - Posizione Nationality - Nazionalit

TOTAL PARTICIPANTS - TOTALE PARTECIPANTI 0 0 0 0 0 0 0 0 0 0


TOTAL HOURS - ORE TOTALI 0 0 0 0 0 0 0 0 0 0
TOTAL HS ISSUES 0 TOTAL ENV ISSUES 0 TOTAL HS ISSUES 0 TOTAL ENV ISSUES 0