RESUMO
ABSTRACT
This current paper presents the main aspects about the instrumentation monitoring
and the civil structures inspections of HPP Salto Osorio during the occurrence of the
reservoir drawdown, which occurred due to the accident with the release of one of
the gates of the spillway-1 in September 2011. The dam monitoring occurred
continuously after the event, being held daily readings in the existing instruments of
the HPP. The analyzes performed with the instrumentation data linked to the visual
inspections indicated a good behavior of the civil structures during both the
drawdown and during the reservoir filling. There were no significant movements in
marginal slopes.
Na primeira etapa a gerao inicial foi de 700 MW, com a instalao de 4 turbinas
tipo Francis e geradores de potncia nominal de 175 MW. Na segunda etapa, foram
XXIX Seminrio Nacional de Grandes Barragens
2
gerados mais 350 MW, totalizando a potncia instalada final de 1.050 MW. Em 1997,
algumas unidades foram repotencializadas, e a capacidade total chegou a 1.087
MW.
Quedas do
Iguau
VT-2 BP VT-1
TA
CF EC
So Jorge
Rio Iguau d Oeste
SE
3. MONITORAMENTO ATUAL
A Tractebel Energia mantm uma equipe de tcnicos de campo que realiza a leitura
nos instrumentos, inspees visuais de rotina e acompanha servios de manuteno
bem como uma equipe multidisciplinar de engenharia, que realiza a anlise dos
dados de instrumentao de suas usinas e realiza as inspees das barragens e
estruturas associadas.
120
TOTAL DE INSTRUMENTOS INSTALADOS
80
60
40
20
0
Casa de Fora Vertedouro 1 Vertedouro 2 Tomada dgua Barragem Principal
Estrutura
4.2. VERTEDOURO 1
Essas leituras, bem como as que se apresentam com cotas de topo (gotejamento e
vazo de sada), refletem diretamente no comportamento dos medidores de vazo
instalados na galeria de drenagem, os quais sero analisados no prximo subitem.
4.2. VERTEDOURO 2
CS15
400
395
NAMontante(m)
390
385
380
375
y=0,61x2 35,75x 124,36
370 R=0,82
365
38,00 36,00 34,00 32,00 30,00 28,00 26,00
Deformao(cm)
2,50 400
Carga Piezomtrica (kgf/cm)
2,00 395
NA Reservatrio (m)
1,50 390
1,00 385
0,50 380
0,00 375
18-nov-10
26-fev-11
06-jun-11
14-set-11
23-dez-11
Tempo (dias)
M1 M2 M3 M4 M5 NA Reservatrio
2,50 405
Carga Piezomtrica (kgf/cm)
2,00 400
NA Reservatrio (m)
1,50 395
1,00 390
0,50 385
0,00 380
-0,50 375
18-nov-10
26-fev-11
06-jun-11
14-set-11
23-dez-11
Tempo (dias)
M6 M7 M8 M9 M10 M11 NA Reservatrio
Foi realizada uma anlise de percolao com a finalidade de observao das linhas
equipotenciais. Para essa anlise foram utilizadas as cotas piezomtricas obtidas
nos piezmetros Maihak instalados na seo 12+2,50 (PM-7, PM-8, PM-9, PM-10 e
PM-11). A Figura 8 apresenta a malha de elementos finitos e a geometria da seo
que foi utilizada para realizao das anlises.
El. 401m
NA Montante: 396,64m
Enrocamento
Fundao
Enrocamento 1x10-2
Filtro 1x10-3
Ncleo de Argila 1x10-6
Fundao 1x10-10
El. 401m
NA Montante: 396,64m
340
5 .
392
Ncleo de Argila
Enrocamento
Fundao 395
5
2.
33
5
38
337
335
360
.5
338
NA Montante: 378,81m
PM-11 PM-10 Enrocamento
Enrocamento PM-8 PM-9
PM-7380 Enrocamento
38
2
Filtro Filtro
Enrocamento
340
Ncleo de Argila
Enrocamento
Fundao
334
37
332
33
6
354
6. CONCLUSES
7. AGRADECIMENTOS
8. PALAVRAS-CHAVE
9. REFERNCIAS BIBLIOGRFICAS
[3] ICOLD (2000) Bulletin 118: Automated Dam Monitoring Systems - Guidelines
and Case Histories.