EQOBRUSH
FORHEATEXCHANGERSAND
CONDENSORS
PROJECT:
PROJECTNo.:
EQOBRUSHINSTALLATIONMANUAL
TableofContent
INTRODUCTION 3
MATERIALCHECK 3
1) INSTALLLATIONOFSOCKETS,BASKETS&BRUSHES 4
PROCEDURE 4
FINISHING 7
2) REMARKSONINSTALLATIONOFVALVE 8
3) INSTALLATIONOFCONTROLPANEL 9
4) SAFETYFEATURES 11
A. MOTORCURRENTCONTROL 11
B. RUNWAYCONTROL 12
5) STARTUP/OPERATION/MAINTENANCE 13
A. STARTUP 13
B. AUTOMATICOPERATION 13
C. SERVICEANDMAINTENANCE 13
1. BRUSHANDBASKET 13
2. VALVEANDACTUATOR 13
D. NOTESTOOPERATOR 13
Appendices:
Wirediagram
ReversedWireDiagram
EQOBRUSHINSTALLATIONMANUAL
(July2016) P a g e |2
INTRODUCTION:
Tostarttheinstallationofthebrushcleaningsystemtheheatexchangersinterior
mustbereachablewithoutcovers.Ifonheight,theownermustplaceasafe
scaffoldingtoreachthepipeplates.
Considersafetyofinstallationstaffbymakingsure:
Workingspaceissafelyaccessible
Workersaresecuredwhenworkingonscaffoldingorheights
Sufficientlightintheworkingareatoensuresafetyandqualityofwork
Arrangeforproperventilation
MATERIALCHECK:
CheckiftheBILLOFQUANITY(BOQ)matcheswiththeheatexchanger.
ConfirmthePackinglistdetailswiththeBOQ.Theprovidedcomponents
basicallyconsistoffollowingcomponents:
o Basketsandbrushes
o Reversingvalve
o Actuator(geareddriveforreversingvalve)
o Positionswitch
o Controlbox
o Utilitymaterials(fasteners,cement,cups)
Checkthepipeendwithasocketifthesizingiscorrect.Thesocketendmustgo
smoothinthepipeandstopatthefirstringonthesocket.
Checkthebrushsizebyputtingonebrushinapipe.Thebrushhairmustbe
slightlyoversizedtotheinnerpipediameter.
NOTEIMPORTANT
Makesureallelectricalinstallation
worksareexecutedbyqualified
electricalinstallationpersonnelonly.
EQOBRUSHINSTALLATIONMANUAL
(July2016) P a g e |3
SECTION1: INSTALLLATIONSOCKET,BASKET&BRUSH:
NOTE:
Instructionstobefollowedcarefullytoavoidperformanceloss!Weactually
recommendownersverificationofthequalityofthesocketinstallation.Glue
residueswillobstructbrusheswhichinturnleadtonontreated(dirty)pipesand
possibleunnecessarypressurelossesintheinstallation.
UNITPREPARATION:
Thesocketswillbegluedinthepipesendwithspecialmetalcement.
Thereforethepipeendsneedtobefreefromburrsandgreaseoroil.Beforestarting
thepipeendsneedtobeextracleanedwithPC444CleaningCompound,Solvent
Soluble,GreaseEmulsifyingorequivalentcleaningcompound.
Thepurposeofcleaningcompoundsistoremoveoil,greaseandotherforeign
matterfrompipeendstoensuregoodcontactbetweenthecementandtheinner
pipewall.
PROCEDURE:
Thebrushes,socketsandholderscleaningcloth,cement,papercupsandbrushesare
allprovidedwiththesystemcomponents.Thecleaningsolventneedstobesupplied
bytheowner.
Cleanabout100pipesstartingfromthebottomoftheheatexchanger.
Thecementwillholdsmoothfor30to45min.Preparesmallportions(accordingto
cupsize)havesmoothmaterialavailableatalltimesthroughouttheinstallation
process.
EQOBRUSHINSTALLATIONMANUAL
(July2016) P a g e |4
Mixofblackcementwithwhitehardenerandstiritproperlywiththesupplied
spatula.
Stirtillyouhaveacoherentmass.Duetothechemicalreactionthecementgets
warm.
Withthebrushsuppliedputathinlayerofglueontheringedendofthesocket.
Makesureallringsarecoveredincement.
Gluepencilandbasketholder Cementonbrush
EQOBRUSHINSTALLATIONMANUAL
(July2016) P a g e |5
Applycementonbasketholder Basketholderwithcementlayer
Makesurethatthereisnoglueinsidethebrushchannel.Removegluefrominsideof
brushchannel.
Pushinthebasketholderintothepipeplate.Usehandtoolwhenrequired.
Acementringformsaroundtheholder.
EQOBRUSHINSTALLATIONMANUAL
(July2016) P a g e |6
FINISHING:
Onceallthesocketsareinplace,putinthebrushesatoneend.ONEbrushforeach
pipe.
Onceallthebrushesareinplaceputontheholderandcheckeverysocket,brush
andholderisplacedproperly.
Thecementneedsabout24hourstosetbeforetheheatexchangercanbeused.
Wellgluedsockets.
EQOBRUSHINSTALLATIONMANUAL
(July2016) P a g e |7
SECTION2: INSTALLATIONOFVALVE
INSTRUCTIONANDREQUIREMENTSOFVALVE
Thevalveshouldbeinstalledinthepipingsystemasperdrawingsprovided.Any
typeofstructuretosupportthevalvebodymaybeadded.
Thebottomorbacksideofthevalve(thesidethatconnectstoheat
exchanger/condenser)canbeinstalledinthepipeworkwithoutextraprecautions,
whilethetoporfrontsideofthevalve(atthecoverflangewhereactuatoristobe
installed)thepipingMUSTBEINSTALLEDWITHOUTSTRESSORANYFORCESONTHE
VALVEBODY.
Demountablepipesectionattheinletandoutletfromthevalvefront(SeeFigure1)
isrequired.
Duringinstallationofactuatorandpositionindicatorthemainfeedandreturnpipe
needtoberemovedtoinspecttheinnerbodywhilesettingtheendpositionsof
theactionradiusoftheinsidevalve.
(forhorizontallyinstalledreversingvalves,thesettingofendpositionsneedstobe
completedbeforeinstallingconnectorelbowsontopofthevalve).
TheTeflongliderringinsidetheswingboxshouldbeinthecenteroftheflange
connection.IftheTeflonringisvisible,thevalveiseitherundersteeredorover
steered.Thisshouldbecorrectedwiththesettingsinthecontrolpanel.
Correctundersteeredandoversteeredpositionsasmarkedbelow.
EQOBRUSHINSTALLATIONMANUAL
(July2016) P a g e |8
SECTION3: INSTALLATIONPLCCONTROLPANEL
Installthepanelaccordingthegivenelectricaldetailsandapplythepowerlinesas
welltheconnectionofthemotortothepanel(RST0GR)andthepositionindicator
(8x0.75mm2).
Confirmthatthecontrolpanelreceivespower.
Actuator&PositionIndicator:
Connectthecablesaccordingthediagram(appendix1)andcheckifpowerisbrought
tothepanel.
WARNING:Donotstickanybodypartsintothereversingvalvewhenactuatoris
powered
Afteractuatorandpositionindicatorareproperlymountedandallwiringsare
connectedaccordingtothediagram,followbelowstepstoadjustpositionindicator
whichcontroltheinitialalignmentpositionofvalveinlet/outletholesandswingbox
holeofthevalve.
ThePLCcontrolpanel(5valvesetup)
EQOBRUSHINSTALLATIONMANUAL
(July2016) P a g e |9
Remark: PLCwillautomaticactivatesevery4hourstocompleteacleaning
cycle.Itisprogrammedtorecordthenumberofautomaticcycles
completed(downloadabletoPCwithspecificsoftware)
NOTE: Confirmthepositionoftheswingboxinoperationmode(whichis
wheretheSwingboxcomestorestafteritsinitialrunthatitmakes
whenthesystemispoweredup).
Flowthroughthevalveshouldbestraight,FrontInisstraightopposite
Backoutandviceversa.Ifthisisnotthecase,rearrangewiring
accordingtoreversewirediagraminappendix2.
.
EQOBRUSHINSTALLATIONMANUAL
(July2016) P a g e |10
SECTION4: SAFETYFEATURES
A. MotorCurrentControl.
EveryValvehasadedicatedcurrentcontrolfuseinstalledinthecontrolbox.
Incasetheswingboxisobstructed(byexternalobjectsinthevalve)duringits
movement,theincreasedpowerconsumptionintheactuatorwilltriggertheswing
boxtoreturntoitsstartingposition(eitheroperationalorcleaningposition).The
alarmlightwillblinkandthesystemneedstoberesetforittoresumeoperations.
Motorcurrentresetbutton
Resetofthealarmbyreleasing
theovercurrentrelay.
Iftheproblempersistsitmaybenecessarytoremovethefeedpipesfromthefront
ofvalveandcheckfordebrisblockingtheswingbox.
EQOBRUSHINSTALLATIONMANUAL
(July2016) P a g e |11
B. RunwayControl.
Therunwaytimeisthetimetheswingboxneedstotravelfromstarttoendposition.
ThemaximumrunwaytimeissetinthePLC.
RunwaytimeisdifferentforeachvalvesizeandispreprogrammedintoPLC.
Iftherunwaytakeslongerthenprogrammed,thesafetycontrolwillruntheswing
boxbacktoitsstartingpositionandtriggerthealarm.
Thesystemneedstoberesetforittoresumeoperations.
Iftheproblempersistsitmaybenecessarytoremovethefeedpipesfromthefront
ofvalveandcheckfordebrisblockingtheswingbox.
EQOBRUSHINSTALLATIONMANUAL
(July2016) P a g e |12
SECTION5: STARTUP/OPERATION/MAINTENANCE
A) STARTUP
Tostartupthewatersystemfollowtheinstructionsfromthechiller/heatexchanger.
Makesurethevalveandflangeconnectionsdonotleakandthattherearenoair
buffersinthepipework.(Installairrelievevalvestherewherenecessary).
Oncethesystempump(s)isrunningforawhilethefirstcleaningcyclescanbe
activatedbyhand.Monitorthevalvebehaviorduringoperationandconfirmthatthe
swingboxrunssmoothly.Ifnot,theremaystillbeairlocksinthesystem.
Letthepumprunandtryagainaftersometime.
B) AUTOMATICOPERATION
Oncethepowerisactivatedandthesystemrunssmooth,every4hourstherewillbe
anautomaticcleaningcycle.ThetimeofthecycleisstoredinthePLChistory.
C) SERVICEANDMAINTENANCE
BrushesandBaskets
Thesystemismaintenancefreeandruns1to2yearswithoutanyattention.
Every2to5yearstheheatexchangerheadsshouldbeopenedtocheckthe
conditionofthepipes,brushesandbaskets.
Replaceinternalcomponentsifrequired.
ValveandActuator
Theactualrunningtimeoftheactuatorisquitelimited:+/2minutesadayor+/12
hoursperyear.
Anoilreplacementintheactuatorisadvisedevery2yearsdependingonthe
ambientconditionsofthevalve/actuatorset.ContactWATCOformoredetails.
D) NOTES
EQOBRUSHavoidsfoulingandscalingdepositstosettleintheheat
exchanger/condenserpipes.However,EQOBRUSHdoesnotremovedepositsin
pipesthathavealreadyhardened.
Installaftercleaningoronnewequipment
Itisthereforestronglyrecommendedtoinstalltheunitsonlyoncleanheat
exchangersystems(eitherimmediatelyaftermanualcleaningoronnew
equipment).
EQOBRUSHINSTALLATIONMANUAL
(July2016) P a g e |13
OperateonlywithactiveEQBreversingvalve
Wealsorecommendnotrunningtheheatexchangersystemwithoutactivating
thereversingvalveoverperiodslongerthan12hoursasthismayallowcalcium
depositstodepositandharden.
HeatExchangerwhennotinuse
DuringperiodswhenHeatExchangerorCondenserisnotinusewerecommend
to:
Keepsystem(HeatExchangerandReversingValve)filledwithwater
Donotstopthereversingvalvefrommovinginitssetinterval.Thiswillminimize
riskofvalvegettingstuckinitspositionoverprolongedperiodoftime
Waterinletstrainer
Toremovepossibleforeignobjectsobstructingthevalveitisnecessaryto
disconnectthepiping,hencethisrequiresastopoftheinstallation.Wesuggest
regularcheckingtopreventthis(mostlycausedbydefectstrainersatthewater
inlet)fromhappening.
Placementofcontrolbox
TheEQOBRUSHsystemcanoperatecompletelyindependentanddoesnot
interferewithanyofthethermalsystemsconnectedtotheheatexchangeror
condenser.Itisthereforenotnecessarytoconnecttootheroperationalcontrol
systemsinuse.However,wedostronglyrecommendinstallingthecontrolboxin
apositionwhereitisclearlyvisibletotheoperatingstaffastoensureanyblinking
alarmtobevisible.
EQOBRUSHINSTALLATIONMANUAL
(July2016) P a g e |14