Vous êtes sur la page 1sur 4
TABLE 13 QUANTITY OF CEMENT, SAND AND GRAVEL FOR SLAB AND WALLS PER SQUARE METER Mixture Class Sand_[_ Gravel [Thick can. 40 kg Cement 50 kg Cement A B el A B cjee |] ae so | 450 | 375 | 300 [350 [300 | 250 | 0250 | 050 75_| 675 | 563 | 450 | 525 | 450 | 375 | .0375 | 075 10.9 | 900_| 750 [600 [700 [600 | 500 | 0500 |" 100 w2s_| 12s | 938 | 750 | 875 | 750 | 625 | .0630 | 125 15.0 _[ 1350 | 1.125 [900 | 1.050 [900 | 750 [0750 | 150 7s [| 1s7s | 1313 [ 1050 | 1225 [ 1050 | 275 [ oxg0 | 175 20.0 [| 1.800 | 1.500 [1200 | 1.400 [1.200 [1.00 [1000 | 200 22s [2030 | tess [1350 | 1575 [ 1350 | 1125 [ 1125 [| 225 25.0 | 2.250 | 1.875 | 1500 | 1.750 [1500 | 1.250 [1250 | 250 2735_| 2.475 | 2.063 | 1650 | 1925 | 1650 | 1375 | 1380 | 275 30.0 [2.700 | 2250 [ 1800 | 2100 [1800 | 1.500 [1300 | 300 TABLE 14 QUANTITY OF CEMENT, SAND AND GRAVEL FOR POST, BEAM AND GIRDER PER ‘METER LENGTH. Sue Mixture Class ‘Sand Geavel Oks. Cement 50 ke. Cement cm A B A B am com 15x15 205 18 158 135 OIL 03 15520 270 225) 210 120 015 030 15x25 338 281 263 205 019 038 15530 405; 338, 315 270) 023 04S 15535, a 394 369 315, 026 053 15x40 340 450 20 360 030 060 20x20 360 300 280) 240 020) 040) 20x25 50 375 350, 300 025 050, 20x30 540 450, 20, 360 030, 060, 20x35 630 525 490, 20 035 070, 20x40 720) 600, EC 480 040, 080, 25x25 38 AO a8 375) 031 062 25530 675 363 525 450 038) 075 25x35 788 656, 613 525 044) O88 25x40 300) 750) 700) 600 050) 100 25x45 1013 a7 788 675) 056) 113 2550 1.125 938 $75 750) 063) 125) 30x30 810 675 630, 40, 045) 050, 30x35 945 788 735 630 053) 105) 30x40 1.080 300) $40) 720) 060) 120 30x45) 1215_[_1.013 945 810) 068) 135 30x50 1350 | L125 | 1.050 ‘900 075) 150 35x35 1103, 319) 858 735 061 123 35x40 1.260_[_1.050 980) 840) 070) 140 35555) 1g [_1is1_| 1.103 945) 079) 158 35.550 1575 | _1313_| 1225 | _1.050 Ogg) 175) 35x55 190 | 1575 | 1470 | 1.260 105 210 x0 1440_[_1200_[ 1.120 960) 080) 160 40x45 1.620_|[_1350_| 1260 | 1.080 090) 180 40x50 1.800_[_ 1.500 | 1400 | 1.200 100 200) 40x55 isso | 1650 | 1540 | 1320 110 220 40x60 2.160 | 1800 | 1680 | 1440 120 240) Bx 1m3_[1si9 | aig 7 1215 101 203) 45x50 205 | ess | 1575 | 1350 113 225) 45x55 ama | 1956 | 1733 | 1495 124 248 Bx 2.430 [2.025 | 1890 | 1.620 135) 270 30x50 2250 | 1875 | 1.750 | 1.500 125) 250) 50x55 247s_| 2063 | 1925 | 1.650 138 275 30x 60 2700 | 2250 | 2100 | 1.800 150 300 35x60 2970 | 2475 | 2310 | 1.980 165 330) 35x70 3465 | 2998 [2695 | 2310 193 385 55x80 3960 | 3300 | 3080 | 2640 220 440 35.290 4455 | 3.713_| 3.465_| 2970 248) 495) 35 x 100 4950 | 4.125 | 3.950 | 3.300 215) 350) 60x 60 3240 | 2700 [2520 [ 2160 180 360, 60x70 3.780_| 3.150 | 2940 | 2520 210 420 60x80 4320 | 3.600 | 3360 | 2.880 240 ASO 60x90 4x60 | 4050 | 3780 | 3.240 270 540 x 100 5400 | 4500 | 4200 | 3.600 300 00) 65x60 3510 | 2925 | 2730 | 2340 195 390, 65.470 4095 | 3413 | 3.185_| 2730 228) 455) 65x80 4680 | 3.900 | 3.640 | 3.120 260 520 65x90 5265 | 4398 | 4.095 | 3.510 293) 585 65x 100 3850_| 4.875 | 4550 | 3.900 325 650, 70x70 440 [| 3.675 [3430 _[ 2940 245) 90 70x80 5010 | 4200 | 3920 | 3.360 280) 560 70x90 3670 | 4725 | 4410 | 3.780 315 630 70x 100 6300 | 3250 [ 4900 [4200 350 700) 75x10 ams_[ 3938 [3675 [3.150 263) 525) 75x80 5400 | 4500 | 4200 | 3.600 300) 720) 75x90 607s | 5063 | 4725 | 4.050 338 675 75x 100 6750 | 5.625_| 5.250 [4.500 375) 730) 80x80 3760 | 4900 [ 4480 [ 3.240 320) 64D 8090 6480 | 5400 | 5.040 | 4.320 360 720 80x 100 7650 | 6375 | 4950 | 5.100 525 350, 85x80 6120 [| 5100 [ 4760 [ 4080 340) 680 $5.90 oss | 5.738 | 5355 | 4.590 385) 765 85x 100 7.650 | 6375 | 5950 | 5.100 425 350, 90x90 7290 | 6075 | 5670 | 4.860 05) 810 90x 100 S100 | 6750 | 6300 | 5400 450 500 95x90 79s | 6413 | 5985 | 5.130 AB $55 95x 100 asso | 7.125 | 6680 | 5700 475 950 100 x 100 3.000 | 7.500 | 7.000 [6.000 500) 1.000 TABLE LS QUANTITY OF CEMENT, SAND AND GRAVEL PER METER LENGTH OF CIRCULAR COLUMN Size Mixture Class Send Gravel WO ke. Cement 50 kg. Cement cm a B a B am am 25 a 368, 3H 295 025 059, 30, 536 530 AS Aa 035 O71 35 366 722, 673 377 048 096) 40, 11S 942 880 754 063 126. 45 L431 1.193 13 954 080) 159) 30, 1.767 1473 1374 LATS 098 16. 35 2.138 1.782 1.663 1.425, 119) 238 0, 2.545) 2.121 1.979 1.695 141 28 65 2.986, 2.488, 233 1991 166 332 70 3464 2.866 2.694 2.309) 192 385 75 3.976 3313 3.093 2.651 221 wD 80 4524 3.770 3.519 3.016 251 303, 5 5.107 4.256 3972 3.405, 284 S567 90, 5.726, ATi 4553 3.817, 318 636, 100 7.069 5890, 5.498 4712 393) 785, TABLE 16 QUANTITY OF CEMENT, SAND AND GRAVEL PER PIPE IN BAGS AND CUBIC ‘METER RESPECTIVELY Diameter Cement in Bags = cm. (Class of Maxture 5 a a 7 cam, cum, 25 15 283 236 O16 052 30, 20, 354 295 020 040 40, 25 ‘689 375 038; O77 45 30, 796 63 04d 088) 35 40, 1.000 340 056 112, a 45 Lit 28 062 124) 6 50 1.220 1016 068, 136. 20 0. 1.980 1.650 110. 220 85 65 2121 1.768 118 26 0 70 2262, 1.885 126 251 100 80 2545 2121 HI 283 110 30, 2228 2357 157, 314 120 100, 3.1L 2592 173 346 145 120, 4.683 3.908 260 520 175 150, 5.743 4786 319 By

Vous aimerez peut-être aussi