Académique Documents
Professionnel Documents
Culture Documents
BACKGROUND
Shared Access
Adjacent Ownership
www.theperfumefactory.info
WELCOME TO THE
FUTURE OF RENTING
www.theperfumefactory.info
DESIGN
DEVELOPMENT
The main objective of the design team is to revitalise the northern portion of this
urban site with exceptional design through the delivery of mixed-use development
that will provide homes and retail space in an exemplar landscape setting.
SKETCH PERSPECTIVE
6 Storeys Removed
A block set at the London Living Rent, along with
a range of discounted rents to be offered across
8 Storeys link removed
www.theperfumefactory.info
AMENITY &
PUBLIC REALM
The proposals for the site aim to deliver a vibrant mix of uses that will make a very
positive contribution to the area and complement other regeneration proposals.
www.theperfumefactory.info
CONTEXT
Located on Wales Farm Road, North Acton and at a key entrance point to the
Old Oak and Park Royal Opportunity Area, the site is currently occupied by
buildings totalling approximately 79,000 sq ft. incorporating offices, storage space
and showrooms. Surface level car parking provides approximately 220 spaces.
Station
6. 1 Portal Way - up to 32 storeys
7. Imperial College
www.theperfumefactory.info
SUSTAINABILITY,
TRANSPORTATION & ACCESS
www.theperfumefactory.info
SUMMARY &
WHAT HAPPENS NEXT?
We hope that you will be able to leave your final comments with
us on a feedback form.
COMPUTER GENERATED IMAGE LOOKING EAST FROM VICTORIA ROAD COMPUTER GENERATED IMAGE LOOKING SOUTH FROM VICTORIA ROAD
We expect to submit a planning application in April Introduce exemplary design and provide further
2017. Once the application is submitted, Ealing impetus for the regeneration of the Old Oak and
Council will undertake its own consultation exercise, Park Royal Opportunity Area;
enabling local residents and businesses to comment
on the final planning application. Provide the very best Private Rented Sector homes
in London, managed for the long-term and setting
It is hoped that Ealing Council will be able to make the gold standard for this type of accommodation;
a decision on the plans by the third quarter of 2017,
meaning that work at the site to deliver the new Develop a wide range of residential units with
proposals could commence in late 2017 or early long term leases offering a broad spectrum of
2018. The anticipated completion date for the sizes and rental levels and the ability to easily
project is late 2020 or early 2021. scale up or down;
Essential Livings proposals seek to: Deliver affordable discount to market rent
housing which is tenure blind and dispersed
Respond to the aspirations for the Southern throughout the development;
Gateway as expressed in Ealing Councils planning
policies and the London Plan; Significantly improve landscaping and the local
streetscene as well as introducing enhanced
Refine the principles already established for the public realm and extensive amenity space;
site in the outline planning permission granted in
February 2016; Offer the opportunity to retail and restaurant uses
to further diversify and animate the local area
Revitalise a prominent site at a highly accessible seven days a week; and
location through the provision of an
environmentally sustainable residential-led Enhance the viability and viability of North Acton
mixed-use development; through major investment, the injection of
spending power of new residents, and the creation
Allow for the early regeneration of the overall site to of full time construction jobs and further new jobs
come forward in conjunction with the adjacent associated with the new commercial uses.
Imperial College ownership;
www.theperfumefactory.info