LICENSEES
FEEDBACK
RICHARD GENESTE
Senior Process Engineer
MAY 16, 2016

Confidential Information of Scientific Design Company, Inc.


A SABIC Clariant Partnership Company
CATALYST LOADING METHOD
Catalyst Loading Method

4% 13%
LOADING PLATE

MACHINE LOADING

INSERT LOADING
21%
62% OTHER

Confidential Information of Scientific Design Company, Inc.


A SABIC Clariant Partnership Company
TIME REQUIRED FOR CATALYST CHANGEOUT

>3

3
Weeks

0% 10% 20% 30% 40% 50%


% of Respondents
Confidential Information of Scientific Design Company, Inc.
A SABIC Clariant Partnership Company
EO REACTOR INCIDENTS FROM 2012 - 2014
CARBONATE CARRYOVER
POST IGNITION
HIGH REACTOR OUTLET TEMP.
INLET IGNITION/DETONATION
OTHER INCIDENT LEADING TO EXTENDED SHUTDOWN
CYCLE WATER CARRYOVER
ANY OTHER FIRE
OXYGEN FIRE
GAS GAS EXCHANGER RUPTURE DISC BLOWN
REACTOR RUPTURE DISC BLOWN

0 1 2 3 4 5 6 7 8 9
Total # of Reported Incidents in 3 Years

Confidential Information of Scientific Design Company, Inc.


A SABIC Clariant Partnership Company
AVERAGE # OF SHUTDOWNS PER PLANT
9
8 Average Number of
7
Shutdowns Since 2010, Number of
6 Shutdowns have been
5 below average
4
3
Illustrates that operators
2 are becoming more
1 experienced
0
2008 2009 2010 2011 2012 2013 2014

Confidential Information of Scientific Design Company, Inc.


A SABIC Clariant Partnership Company
MAJOR CAUSES OF EO REACTOR SHUTDOWN
2012-2014
16% 19% Instrument Malfunction Power Failure

Loss Of Oxygen Loss Of Utility Steam


3%
4% Mechanical Failure Recycle Compressor Trip

11%
6% Loss Of Ethylene Fast Acting Thermocouples
Malfunction
Human Error Loss Of Other Utilities
6%

11% Other
8%

8% 9%

Confidential Information of Scientific Design Company, Inc.


A SABIC Clariant Partnership Company
MAJOR CAUSES OF EO REACTOR SHUTDOWNS
Top 5 Causes of EO Reactor Shutdown
2005-2009 2009-2011 2012-2014
Instrument Malfunction Instrument Malfunction Instrument Malfunction
Loss of Oxygen Loss of Oxygen Power Failure
Power Failure Power Failure Loss of Oxygen
Mechanical Failure Mechanical Failure Loss of Utility Steam
Loss of Ethylene Loss of Ethylene Mechanical Failure

Confidential Information of Scientific Design Company, Inc.


A SABIC Clariant Partnership Company
PREVENTING INSTRUMENT MALFUNCTION
Upgrade solenoid valves
Use robust, low frequency of failure transmitters
Shorter instrument impulse lines
Redundant 2 o o 3 field and I/O devices when appropriate

Confidential Information of Scientific Design Company, Inc.


A SABIC Clariant Partnership Company
SULFUR IN PETRO ETHYLENE
>5 ppm <1 ppm
21% 21%

2 - 5 ppm
4%

1 - 2 ppm
54%
Confidential Information of Scientific Design Company, Inc.
A SABIC Clariant Partnership Company
ETHYLENE RECOVERY UNIT
Plants Containing an ERU
YES
34%

NO
66%

Confidential Information of Scientific Design Company, Inc.


A SABIC Clariant Partnership Company
CO2 SECTION OPERATIONAL ISSUES

Mechanical Problems

Rupture Disk Failure

Instrument Plugging

Other Problems

Excessive Carbonate
Consumption
0% 5% 10% 15% 20% 25%
% of Respondents

Confidential Information of Scientific Design Company, Inc.


A SABIC Clariant Partnership Company
ANTIFOAM IN CO 2 SYSTEM
Antifoam Type Dosing Methodology
100%
Percent of Respondents

Continuous
32%
75%

As
50% Needed
68%

25%

0%
UCON 50 HB5100 OTHER
RECOMMENDED

Confidential Information of Scientific Design Company, Inc.


A SABIC Clariant Partnership Company
MEG CONC. IN CARBONATE SOLUTION
35%
Percent of Respondents

30%
25%
20%
15%
10%
5%
0%
<2 2-4 4-6 6-8 8 - 10 >10
Normal wt% MEG

Confidential Information of Scientific Design Company, Inc.


A SABIC Clariant Partnership Company
HYDROCARBONS IN REGENERATOR VENT
Measure Hydrocarbons? Hydrocarbon Concentration
As Needed
NO 52% >1000
31%

ppm vol
500 - 1000

100 - 500

<100

Continuously 0% 10% 20% 30% 40%


17% Percent of Respondents

Confidential Information of Scientific Design Company, Inc.


A SABIC Clariant Partnership Company
EO SCRUBBER OPERATIONAL ISSUES

High EO in the Overheads

Other Problems

Foaming

0% 5% 10% 15% 20% 25% 30% 35% 40% 45%


% of Respondents

Confidential Information of Scientific Design Company, Inc.


A SABIC Clariant Partnership Company
EO IN SCRUBBER OVERHEADS
Normal Months Summer Months

14% 4%
25% 0 - 50 ppm
51 - 100 ppm 11%
53% 4% 101 - 200 ppm
18% Over 200 ppm 71%

Confidential Information of Scientific Design Company, Inc.


A SABIC Clariant Partnership Company
EO STRIPPER FEED LINE
Vibrational Issues In Column Feed?
Yes
19%

No
81%

Confidential Information of Scientific Design Company, Inc.


A SABIC Clariant Partnership Company
CYCLE WATER ANTIFOAM TYPE AND
DOSING METHODOLOGY
Antifoam Type Dosing Methodology
100%
Percent of Respondents

Continuous
75% 30%
Batch

50% 70%

25%

0%
Oleyl Alcohol Other RECOMMENDED

Confidential Information of Scientific Design Company, Inc.


A SABIC Clariant Partnership Company
REABSORBER OPERATIONAL ISSUES

High Overhead Pressure

Plugging

Other Problems

0% 5% 10% 15% 20% 25% 30%


% of Respondents
Confidential Information of Scientific Design Company, Inc.
A SABIC Clariant Partnership Company
FREQUENCY OF REABSORBER VENTING
Times/Year for Process Condition
>= 3
5%
2
19%

1
9%
0
67%

Average Vent Duration = 1.7 hours


Confidential Information of Scientific Design Company, Inc.
A SABIC Clariant Partnership Company
PURIFICATION COLUMN RELIEF VALVE LIFT
YES 13%

NO 87%

Confidential Information of Scientific Design Company, Inc.


A SABIC Clariant Partnership Company
GLYCOL REACTOR OUTLET pH
30%
Percent of Respondents

25%

20%

15%

10%

5%

0%
<4 4-5 5-6 6-7 >7
pH
Confidential Information of Scientific Design Company, Inc.
A SABIC Clariant Partnership Company
DI UNIT CYCLE TIME
SOR Avg = 57 hours EOR Avg = 39 hours
9% 14%
19%

23%
48%

<24 hours
25 - 48 hours 33%
49 - 72 hours
54%
>72 hours

Confidential Information of Scientific Design Company, Inc.


A SABIC Clariant Partnership Company
DI UNIT CRITERIA FOR SWITCHOVER

Time

UV Transmittance

Conductivity

pH

Total Cumulative Flow

0% 10% 20% 30%


% of Respondents

Confidential Information of Scientific Design Company, Inc.


A SABIC Clariant Partnership Company
ALDEHYDE IN PURIFIED EO
Concentration of Aldehydes in PEO Method of Measuring Aldehydes in PEO
(ppm) / per sales spec
100 ppm 10 ppm
5% 10%
15 ppm Titration Method
50 ppm 5%
25%
MBTH S-63
20 ppm
10 ppm 15%
15 ppm HPLC RECOMMENDED
20 ppm
30 ppm 0% 20% 40% 60% 80%
50 ppm
100 ppm 30 ppm
40%
Confidential Information of Scientific Design Company, Inc.
A SABIC Clariant Partnership Company
AVERAGE MEG PRODUCT UVs
Before PTR After PTR Sales Spec.
100
% Transmittance

90

80

70

60
@ 220 nm @ 250 nm @ 275 nm @ 350 nm
MEG Product meets spec before PTR @ 220, 275 &
350 nm
PTR improves transmittance for all reported UVs

Confidential Information of Scientific Design Company, Inc.


A SABIC Clariant Partnership Company
CONCLUSION

Data collected will help SD:


Design plants to our clients needs
Aid in helping clients operate more efficiently
Identify and troubleshoot any issues which may occur during
plant operation
Reduce the number of issues which may occur in the field
THANK YOU!!