Vous êtes sur la page 1sur 66
SOIL INVESTIGATION REPORT PROJECT _ : Soil Investigation Work At Kovan Road / Simon Road LOCATION: Kovan Road / Simon Road CLIENT : Urban Redevelopment Authority V-PILE (SINGAPORE) PTE LTD Date: * October 2011 Certification by PE for SI Report Certification by Professional Engineer For Site Investigation Report 1. 1, Dr. Yong Deung Ming , the Professional Engineer, PE Registration No.3982 certify that the Site Investigation Report Soil Investigation Works For Kovan Road / Simon Road, Comprising all field and laboratory data, tests and result therein has been carried out by me or under my supervision of direction, and I have verified the accuracy of the information given in the site investigation report, and to the best on. my knowledge and belief, all have been prepared in compliance in all respects with the provisions of the building Control Act and Regulations, relevant Codes of Practice and Standards. 2. 1 further certify that I have the appropriate qualifications and experience, and I am familiar with the purpose of the investigation for which this Site Investigation Report is prepared in reference to Project Ref. No: Work Order No : 029, 3. Total number of pages in the Site Investigation Report is 66 GEONAL & CIVIL iG DEU 398 Sens NGA epee Professional Engineer for Site Investigation Date Signature and Stamp TABLE OF CONTENT 2.0 3.0 4.0 INTRODUCTION Ld General SCOPE OF WORK 2.1 Site Condition 2.2 Field Investigation 2.2.1 Drilling 2.2.2 Undisturbed Sampling 2.2.3 Standard Penetration Test LABORATORY TESTING 3.1 General 3.2 Code of practice 3.2.1 Moisture Content 3.2.2. Bulk and Dry Density Determination Test 3.2.3 Unconsolidated Undrained Triaxial Compression Test DESCRIPTION OF SOIL STRATA 41 42 Subsoil Condition General Geology Page aaaaa APPENDICES A TABLE AND CHARTS Table 1. Work-done summary field tests Table 2. Table showing relation of SPT results and consistency LOCATION PLAN AND BOREHOLE LOCATION PLAN Fig I. Location Plan Fig 2. Borehole Location Plan BOREHOLE LOGS Key to Boring Log Bore Hole Log Cross Sections LABORATORY TEST RESULTS D-1 Summary of Laboratory Test Results D-2 Detailed Test Results 1.0 INTRODUCTION Li General This report presents the soil investigation based on 6 boreholes, conducted at the Koven Road / Simon Road, (See location map in APPENDIX-B). The main purpose of the soil investigation is to obtain and understand the geotechnical information on the subsoil conditions required for the design and construction works. a) Name of the Project Soil Investigation Works at Kovan Road / Simon Road b) Location Kovan Road / Simon Road ¢) Client Urban Redevelopment Authority d) Period of Work Field Work 2 September 2011 - 14 September 2011 e) Scope of Work Field Work Number of Borehole 6 nos. Drilling in soil 188 m. Standard Penetration Test (SPT) 52 nos. Undisturbed Sample (UD) 6 nos, 2.0 SCOPE OF WORK 24 Site Condition ‘The project site is located at the Kovan Road / Simon Road is south eastern part of Singapore. Project site, including location of the boreholes, is shown in APPENDIX-B. 2.2 Field Investigation The field work involved in the geotechnical investigation was carried out as recommended in BS 5930: 1999 “Code of Practice for Soil Investigation”, Prior to commencement of the site investigation, tial pit up to 1.5m and follow up drilling manually using hand auger till 3m in depth was conducted at each borehole before drilling, Summary on quantity of field works for this project is listed in APPENDIX ~ A (Table 1). 221 Drilling Drilling was carried out using hydraulic feed rotary boring machine. A metal crown bit a3 a cutting tool was attached at the lower end of the drilling rods and circulated mud water was pumped through hollow rods into the bottom of borehole to wash out the cuttings to ground surface. 6 nos of boreholes were performed at the Kovan Road / Simon Road. ‘The diameter of the borehole is 100mm, ‘The boring log data is summarized in APPENDIX - C. In this project, total drilling depth is 188.00 m. 2.2.2. Undisturbed Sampling Undisturbed sampling was carried out by using a thin-wall tube sampler with outer diameter of 75mm,Prior to do sampling, the borehole was flushed with water to remove the remnants left at the bottom of the borehole. The bottom was measured to confirm the depth at which the soil sample was taken. ‘The sample tube was lowered down to the bottom of the hole and jacked into soil. After the sample tube was jacked to the required depth, the sample tube was taken out to the surface. Wax was then applied to form a seal on both sides of the UD tube and labeled properly before transporting to the laboratory for testing. In this project, total 6 numbers of undisturbed samples were collected by taking UD samples at various depths of every borehole whenever the conditions are favorable. 2.2.3. Standard Penetration Test This test is done in accordance with BS 1377: 1990 Part 9 and covers the determination of the resistance of the penetration of a split-barrel sampler and obtaining disturbed samples of the soil for identification purpose. Once the borehole reached the required test depth, the borehole was cleaned by flushing with water before starting test .Jt was performed using a split-barrel sampler with 2 $0.8 mm external and 34.9 mm internal diameter which is connected to the lower end of boring rods. ‘The sampler was driven into soil by means of a 63.5kg hammer falling freely through a height of 76cm onto an anvil attached to the top of the rods. A trip-release mechanism and guiding assembly were used to control the falling hammer and the driving energy was thus transmitted through the rods to the SPT sampler. The sampler was driven 45em into soil with the number of blows required for each 1Sem of penetration recorded. The resistance, N-value, was taken as the number of blows for the last 30cm of penetration. At the end of the test, the sampler was withdrawn and some extracted soil was placed into a plastic container and then labeled, These samples were used to describe the type of soil existing in the boring points In this project, total 52 numbers of SPT were taken in order to get the information and technical data on the strength and type of soil, 3.0 LABORATORY TESTING 3.1 General ‘The laboratory tests were performed on undisturbed samples based on the available of soil sample. The tests related to physical and mechanical properties were performed in Lab Services Private Limited laboratory. The quantities of laboratory tests are summarized in table. 3.2 Code of practice The laboratory test were performed in accordance with the British standard Code of Practice BS 1377 (1990) an as per terms of accreditation under the Singapore Accreditation Council-Singapore Laboratory accreditation scheme, The summaries and detailed test results are presented in APPENDIX - D. The following Laboratory tests are carried out on the undisturbed samples obtained from the boreholes. Summary of test results are listed in APPENDIX - D. - Moisture Content - Bulk and Dry Density Determination Tests - Unconsolidated Undrained Triaxial Compression Test ‘The purpose of laboratory tests is for the evaluation of shear strength, compressibility characteristics and classification of soil properties, All tests were carried out in accordance to BS 1377. Classification of soil types is based on the Unified Soil Classification System (USCS) 3.2.1 Moisture Content To determine the moisture content of soils, a soil sample is dried at a temperature of 105°C to 110°C for about 24 hours. The loss in weight of the soil sample represents the weight of moisture in the soil. The moisture content of the soil to the dry weight of soil in percentage is the moisture content of the testing soil. This test if performed in accordance with BS 1377: Part 2: 1990 #3 3.2.2. Bulk and Dry Density Determination Test The bulk density of a soil is the mass per unit volume of the soil deposit including any water it contains, The dry density is the mass of dry soil contained in a unit volume. Both are expressed in Mg/m?, which is numerically the same as g/om’, It was determined at the laboratory by using the linear measurement method approached by B.S. 1377: 1990 Part 2 : Test 7:2 3.2.3. Unconsolidated Undrained Triaxial Compression Test (UU) Unconsolidated Undrained Triaxial compression tests were conducted to determine the undrained shear strength of the soil. This test is performed with the drain valve closed for all phases of the test and before the sample has a chance to consolidate. That is, the undisturbed samples (on 38mm diameter x 76mm length) are sheared under undrained condition. It is based on the test method approached by BS 1377: 1990 Part 7 : Test 9. 4.0 DESCRIPTION OF SOIL STRATA 4.1 Subsoil Condi 2 ‘This section briefly describes the soil conditions encountered at site. Detailed soil conditions are presented in each log of boring in the appendices of Borehole Logs, Based on the data collected from boreholes, it can be cl fied the soil layers in this area as follows: Soil layers (1) Top Soil (2) Sandy SILT (F1, Kallang Formation) (3) Sandy CLAY (F1, Kallang Formation) (4) Sandy SILT (Old Alluvium Formation) (5) Clayey SAND (Old Alluvium Formation) (6) Silty SAND (Old Alluvium Formation) (7) Sandy CLAY (Old Alluvium Formation) (1) Top Soil This is top layer of soil in this area. Most of the area is covered with light to dark grey and yellow Sandy SILT and Silty SAND mixed with hard-core and plant remains in some parts, Thickness of this layer is 0.4 to 0.5m. (2) Sandy SILT (F1, Kallang Formation) ‘This soil type can be found in BH 5. The layer consists of yellowish brown mottled with reddish brown Sandy SILT. Thickness is about 6.5 meters and SPT consistency is soft to firm. (3) Sandy CLAY (FI, Kallang Formation) ‘This soil type can be found in every bore hole. The layer consists of yellowish brown to reddish brown and white Sandy CLAY. Thickness is ranging about 4.6 to 11.7 meters and SPT consistency is firm, (4) Sandy SILT (Old Alluvium Formation) This soil type can be found in every bore hole. The layer consists of yellowish brown to reddish brown mottled with yellow and red Sandy SILT. ‘Thickness is about 2.0 meters and SPT consistency is firm, (8) Clayey SAND (Old Alluvium Formation) This soil type can be found in BH 1, 2, 3 and 4 bore hole. The layer consists of reddish brown to pale yellow Clayey SAND. Thickness is about 4.5 to 5.0 meters and SPT consistency is loose (6) Silty SAND (Old Atluvium Formation) This soil type can be found in every bore hole. The layer consists of light greenish grey Silty SAND. Thickness is about 3.0 to 16.3 meters and SPT consistency is medium dense to very dense. (7) Sandy CLAY (Old Alluvium Formation) This soil type can be found in BH 6 bore holes. The layer consists of greenish grey mottled with yellowish brown Sandy CLAY. This layer is starting from the depth of 33 meter to until end of bore holes. SPT consistency is hard 42 General Geology The project area lies on the Kallang Formation which is underlying by Old Alluvial Formation. The Old Alluvium formation consists of Clayey SAND, Silty SAND and Silty CLAY and Sandy SILT (F2) and Sandy CLAY (Fl) are Kallang Formation. They are major soil type observed at these boreholes. 10 APPENDIX - A TABLES & CHARTS Table 1. Work-done summary field tests 7 8:06 zw | 9 oo's8t EVOL eee 6 T 00'€E THoz ‘“saquardas 9 TLOz aquierdas € OHA | 9 LE8Z 8 v 00'8z Troz Wequiardas pr | T1oz ‘sequerdas ET sHa |S ove 6 T o0'ee TrOZ ‘“equiaades ZT | TTOZ “sequiardas ¢ vHa | + eee 6 T oo'ee Troz ‘wequiardasg | rrozuequeides9 | ena | ov'ez 8 1 o0'8z Troz ‘sequiardas Z— | Troe ‘seaquaides6 | cHa | Z Sree 6 1 ours Tog ‘sequardes¢ | Troe sequadase | THe | T {u) sewsy pasubeaatiog ids | an aaeg paysiuls aie payers ON Ha | ON GIT 31d TYOAVONIS) STid-A + FOeUOD quoyny jsudojanapay UeqIN UST peoy uowis / peoy ueAoy 404 ArewiUNs 420M 1S 13 Table 2. Tables showing relation of SPT results and consistency 14 SAND CLAY AND SILT | Relative Density according to ‘Approximate Relation of Consistency to | | Standard Penetration Test Standard Penetration Test N-value Nevalue (slows/@00mm ot Relative Density (olows/aeomm of | CONSISTENCY penotration) penetration) — 7 0-4 | Vary loose <2 Very soft | 2-4 Soft 4-10 | Loose j 4-8 Fim 10-30 Mediurn dense | 8-15 | Stitt 30-50 | Dense neEean Eee EEE Nar ea 250 Very dense 290 j Hard “NOTE: EXTRACTED FROM BS 5930 NOTE: EXTRACTED FROM TERZAGH! AND PECK ROCK WEATHERING CLASSIFICATION CLASSIFICATION OF ROCK QUALITY IN Term Description Gaia} RELATION TO THE DISCONTINUITIES Frost |No visibe sign of rock material weathering; | 1 - perhaps sight dscoortion on major iscontinty surtces. | a Slightly | Discoloration indicates weathering of rock ut Suality Rap Frasture frequency | weathered | material and discontinuity surfaces, All the classification % | por metre rock material may be dioiured by j svetnering. | ea ely] Less than half ofthe rock material is decom posed or disintegrted to a sol Fresh or Siscoloured rock's presant einer as 2 continuous framework or as corestones. |More than hat of the rock material is decom} ed | posed or disintegrated ta a sol, Fresh or ‘discoloured rock is present ether as a |continuous tremework or as corestones. ompletely Ail rock materials decomposed and/or |weatherod |cisintagrated to col. The original mass structure is stil largely intact. Residuat {All rock material is converted to sol. The soit |imass structure and material fabric are destroyed. There i large change in volume] but the soil nas nol been significantly ranspar Very poor | 0-25 Over 15 Poor | 25-50 18-8 Fair 50-75 a-5 Good | 75-90 8-1 Excellent | 90-100) Less than 1 G-TCR Total Gore The length of he total amount of core Recovery sample recovered, expressed as a Percentage ofthe ing of core run R-ROD Rock Quality The collective sae all Description core pieces which af 100mm or nore, ‘expressed as a percehlage of total core length dried, 15 APPENDIX - B LOCATION PLAN & BOREHOLE LOCATION PLAN Fig 1. Location Plan v7 LOCATION PLAN SCALE: 1:5000 Fig 2. Borehole Location Plan 19 APPENDIX —C BOREHOLE LOGS Key to Boring Log ENGINEERING CLASSIFICATION a BR AS. oF BE BR cM co ASPHALT, TAR + BACKFILL : BEDROCK + BRICK + BOULDER + CLAY / MARINE CLAY : SILTY CLAY + ORGANIC CLAY + MUDSTONE 2 SANDY SILT : CLAYEY SILT + ORGANIC SILT : PEAT : SANDY PEAT + GRAVELLY PEAT : SILTY PEAT : SANDY CLAY + GRAVELY CLAY : PEATY CLAY + CONGLOMERATE + CONCRETE 1: SILTY GRAVEL + GRAVEL + SANDY GRAVEL GPt : PEATY GRAVEL GC : CLAYEY GRAVEL GR : GRANITE GO: ORGANIC GRAVEL LU: UNESTONE Mo: SLT Mt: PEATY SILT NG : GRAVELY SILT 1 CLAYEY PEAT BBY Si : SILTSTONE + SAND ES st: sHate : GRAVELLY SAND RH SCH : SCHIST : ORGANIC SAND 3 : SILTY SAND SC : CLAYEY SAND 7] SPt : PEATY SAND SA; SANDSTONE TB: TNBER LEGEND OF SOIL PATTERN 23 gents cu . LEGEND OF SOIL PATTERN 24 BORE HOLE LOG (BH 1 to BH 6) BORELOG SHEET NOL 1 OF 2 PTE LTD. [EROKGI St Woks For Kowan Rod. / Sen Reed LOCATION: Kovan Rood / Sinan Rood PROECT NO 28 sorenoue No BH 1 Inaien DEPT ORLLNG DATE STARTED: 02/08/2011 [BOREHOLE DA _100 mm lreoucen vevex DRULNG DATE COWPLETED;96/o2/2011 [ORE OI 50 in Norio: PREPARED BY: SU MYAT DRUING METHOO:_W leasmn SPT (N-vetue) | Somples & Teste € Wrens 5) [out _uton Restrnt Author a : ir 4a] lf el [ETE oe Fire Yeliowieh_ brown slightly Sandy CLAY oponajas 10 BE CONTHUED LEGEND: Ym eur) Sep oat [)-Attemes (u, (Cr, (3) (2) & 5) “oo See est (0 a Brain Eat et Creo, Bere es WO gy ate sew v9 EE -Peter Tat 0 ste Semen [Bh ~core Run (oR) 26 BORELOG SHEET NOL 2 OF 2 UP V-rite (9) [aout uber Reatnment Aa PTE LTD [EROECE S! Were for Koren Road / Simon Road LOCATION: Kovon Road / Simon Rood PRORCT NO 2 Jorciote no. 8H 1 ware EPR 20m ORLLNG OATE STARTED: 02/09/2011 | BOREKOLE DIA: 100 mm Duce Level ORLUNG DATE COMPLETED;D8/o@/2015 [coRe DIA: 50 enm Norra PREPARED BY: SU MYAT DRILNG WETHOO!_W least SE ge |g | sernvoun [Simo « tent] nos [8 gay sae [fame staal TE ees Description fs ali 3 t gal oon igi wom (Be | # Eifel ae eases? Fal @ |B oysafsie P8l us| 0. i Lob | are = Nstowish brown Signty Soncy CLAY aa ery dense be IGreenish grey mottled | ron a ley |eloe [rsa sity SAND Fe ; Ke be Bast E Ea be ETH +H hovadlier [anon Fos Bae fo FE & ; 1! ee Ea Be boos}es|saco sn es cal [1111] 6 bs Li be t bs Lt || pei sas wopo)iro |ssoe-4 Es I pe BSerehole terminated ot 3. LEGEND: “Y ~Fresreter Test (P47) @ - Vere shor te -Peoesnty Tet (757) EB -Pecar test (Pa) “Spam Peweten ~Uincaturoad Sapo (U0) open Orie Trcewas Semple (C0) exter Semple (M2) sen Sar (05) tapes (UO), (00) (PS). (92) & (08) Bi-Pt» sonpie 3) {f ~core tun (om) 27 BORELOG SHEET NO 1 OF 2 V-PILE. ($) LCuENE. ten Redevelopment kuthoty 7 PROKCI: $1 Mons For Kovan Rood / Simon Rood LOCATION: Kovan Rood / Simen Reed poreuowe No. BH 2 are oer 160m ORILLNG DATE STARTED: 09/08/7011 | BOREHOLE Dia: 100 mm jeepuceo veve: DRILLING DATE coweueTeD:12/09/2011 | cones 50 en — Iworravo: PREPARED BY: SU WYAT ORLUING WETHOD:_W least: a ‘SPT (Neveive) [Somplee & Touts | Rock 98) cron sue ie Description i i TTaad] ow [8 a ‘ean ( EG Seti 31 | acooe| £ [HPs] oo [818 /8| crv Folawma o (2 1E [a Hossa 1 ae frown ond red slightly gravelly Sondy | jeuay | basaper soa | Reddish brown Rainy? jes Sightly Sony SILT Recdish brown or fraors0 nouns] [eg jaja [ot |e eravely Cloyey SAND so Fes loses ish learn aaa te aanee PE r| Nowsh brown apotied bea fre ame Iniite to greenish orey fe Ks | Jinottlec yellowish brown fS Signtiy gravelly sity” | [saKD EE | EE Jeon | FE kes jose bei} 10 BE CONTNUED eas a : ESEN! “Yen To) “Shy Pent [ated (0) 0). 09, 2) & 5) © -Yow Stor ~indstuosd Someta (UD) © ~Pemeoity Open Deve Tckwal Some (0) “eae Somole (2) BERS Sanat 28 Bp -Piten some 3) core Run (CR) BORELOG SHEET NO: 2 OF 2 QV -Piue (S| _wtonseesmant aby PTE LTD [PROECE Si eres Foc Koven Rood / Sinan Rood LOCATION: Koven Rous / Simon Rood PROWECT NO 20 sorsuo.e No BH 2 aes ee 180-m DORILUNG DATE STARTED: 09/09/2011 [SOREHOLE OM: 100 mem eDUcED LEVEL DRILLING DATE cowpueTen:12/09/2011 | core ox: 50 xm orn PREPARED BY: SU MYAT DRWLNG METHOD: W astnc Slee Gel EE pos path ge| - [erecvon enn teu [io Fp] woe sn flomrseeel fF psn Deecrton By hi elise] om EIEN ore Ape |e HES) Selem eaeaat| E (EPA) on 8| suse PS] o 18 LE [a To ifedtars ware Wo aan fstowisn brown spotted ite to greenish gre HL frotties yelowish Srown Signty gravely Sity [SAND TTY heoasteee aco] Hard Greenish grey iS [rotted brown ‘ord purple Lue Sightly Sendy CLAY Very dense TT? hooysolitr | s.00-254s} Icreenish grey mottied anrlX iomian row Ke fanty arava Sil SAND. ea px 2] (-40)] be E psf eo hoyas}sq]p6 | an.o0-z040) [se Borehole termincted at 284m iT] ra: ESEND: eee ee | Raegy Peet 7] -attempes (UD), (00) (#5). (#2) & (08) © -ee Sher Tet cinsstabes Same >) [prec sansie (5) @ ~Permenty To (F%) Si et Ser (>) EE ect) Skee [B core Ron (ce) 29 BORELOG SHEET NO. 1 OF 2 V-PILE, ¢S) [SUENT. Urban Redevelopment Authority PTE LTD PROSE Si works For Kovon Road / Sinan Rood LOCATION: Kevan Rood / Simon Rood PROECT NO. 2 eorewoue vio BH 3 [WATER SEPT 220m RUNG OATE STARTED. 05/09/2011 | aoREHoLE DIA 100 mn Jrenvceo LeveL: RUNG OATE COMPLETED:08/09/2011 [cone OAL 80. mm ormave PREPARED BY. SU MAT RULING METHOO!_W east: lye]. Lsetven [sone «Tete | 20a Tel cen sue Glomrsveel =] awe Description i a h i © leat oom [81S i hae Me] elon B/E" | ecooe| § [BAS wo (LEED cme blued o 2°12 [Te 5 yellow (200) Siightiy gravelly Sondy sic xnxx e 100 Loose Readich brown ond pole yellow Nery gravelly Clayey SAND she tO vary dense Yellowish brown spotted shite [Slightly grovelly Silty ISEND [10 BE_CONTNUED RUS. LEGEND: py ieee Fete en eee [[]—attemped (00. (00) 5). 2) & (5) @ -Yore shen Tort (0 Gf arcs some (U0) Bp -Pt0 sone (3) © -tenesaty tat 7) Copan fae rest Soe (00) EE Pose Tete) EHS Seas [core Run (om) 30 BORELOG \V-PILE. ¢S) [QUENT Urban Redevetooment Authority PTE LTD [PROSCE Si Works for Koven Road / simon Rood CATION: Kowon Road_/ Simon Road PROECT NO._29 _[eorsnoue no. BH 3 WATER DEPTH 2.20 m. ORILUNG DATE STARTED: 06/08/2011 | BORSHOLE OA: 100 mm _ [REDUCED LEVEL: ORILLING DATE COMPLETED:08/09/2014 | CORE DIA: 50_ mm, INoRTAING PREPARED BY: SU MYAT DRILLING METHOD: W EASTING: [ser ov-vetue) [Sompes & Tete | Rose ildsl |e wy | 88 ‘ape Description bense To very dense Yeliowish Brown spotted white Slightly gravelly sity SAND SEH KHER HR RE RK BBE KE ara [Greenish grey mottled yelowish brown Slightly [Sandy CLAY Berehele terminated ot 33.330] TEGEN 7 aoe iia) Dh Brg reves ~Attemped (UD), (00), (PS), (M2) & (08) “Ve Sher Ts ~inattrbed Sampie (>) “Palen Some © ~Porrety tt (P27) crete risen Seve (coy l~Peten Simo 3) EE Petr ts 4 SO -beise tant OB -core mon cor an BORELOG SHEET No: 1 0F 2 VP V-Ptce | sues sete aati PTE LTD. [PROECT Si Woks for Kew Rood / Sinan Read LOCATON Koven Rood / Simon Road PROEST NO-_29 sors Noo BH 4 waTem DEPT 220m DRLLNG DATE STARTED: —07/09/200 | BOREHOLE DIA” —_100 mm euceD Leve ORLLNG DATE couPuETED.12/09/201) |coRE 1 50 men orm PREPARED 8Y: SU MYAT DRILUNG METHOD: W least: Somplee & 7a 8] ye) , [stow [see 2 cae Deerotin Hla 8 Hes] com [elS| Ea some envast| E18" *| Bl crane ag Hop Soi soft Brown ISightly Sendy CLAY slightly gravelly Sondy sit Reddish brown ond pale yellow Slightly gravelly Cloyey SAND rey mottled Stightly gravelly Silty SAND REN RE EK KE RK REX KEKE REE 200 10 BE CONTAUED ewes LEGEND: YP Tat FA) end Pntetin [Jntempes (U0, (0, (9), (Mz) & (0s) @ ~ve su es Bi wineries smote 00 BE -rtn soni (5) @ ~Pemesity Tet P27) “oper bee Tez Spl (0) Gj —wone Sano EB reser ret (xn Gees By core Run (C3) 22 BORELOG SHEET NO. 2. OF 2 \V—PILE. (8) LOUENT.. urbon Redevelopment Authorty PTE LTD PROLGH Si Works for owen Rood / Simon Rood LOCATION: Koven Road / Simen Road PROJECT NO: 29) portHor No BH 4 WATER DEPTH:__2.20 DRILLING DATE, STARTED: 07/08/2011 | BOREHOLE O14: 100 mm jreouceo teva: DRILLING DATE COWPLETED:12/09/2011 | CORE DIA 50 mm Iwona: PREPARED BY: SU MYAT DRLLNG METHOD: EASTING: 2/27 SPT (W-Value) | Sorples & Tests | Ro Ie ‘ran sice [Bs atl H Jao Description # i ; yl 2) one q SPT sncina [Be] © | P (ESSSum co} é eneass| EHP *| oo | BLE P8 eevee o BE fats eatin Sanaa to dense [Greenish grey mottied be yeliowian brown Be Riigntly gravely sity PS ISAND be te foie Nijee |anaones Be % Be: | cnc fs Hu Nery dense eee iI pon. lereenish grey mottied — fe etowsn brow bs 1] fchtly gravelly sity fe AND em Pet an ora eho |soo-ss Joreenish arey mottied brown Lt slightly Sandy CLAY Nery dense [Grotnisn ‘grey rottied i] reddish brown signtly gravely Sity | SAND leven fares BY Borehole termined ot 334m ti rewnes : ae “Siig pat (J -attnses (0, (00 (3), (2) & (08) ene Sh at = Vesa Semele (U0) i @ -Pamesity tet (9) Boor sie ne i Sate con) -Ptn Sami (5) Biron ta en Boers, {B -ovre mn (2) 33 BORELOG SHEET NO: 1 OF 2 VA Vv -PILe poe PTE LTD PEROT 1 Wars For Kovon Rood / Simon Rood Urban Redevelopment Authority __[uoeamon: oven Rod / Simon Rood PROUECT NO: 29 eoreiowe no BH 5 lwateR eer 190 m [pewunc oare sramreD: 15/09/7011 | BOREHOLE O18: 100 mm REDUCED LEVEL DRILLING DATE CONPLETED:14/08/201" | coRE.O4 50 nm INoRTHING: PREPARED BY: SU MYAT DRILLING METHOD: W easTve go) SF] ge |» | Set tvoue) [semtee # Tests | Rock 198] oon se Bee veel FI] [ater Description #3 Hin 4 34] 0m seh mass EEL c | * [2S|o8fur co E|F2 |" [essen | ELH FS) oo [E/E FB eee [Paloma o LE [aT eee Pao IE oatan conse Greenish grey mottied ery dene iGresnish grey mottled Jreddisn yellow slightly grovelly Sity ISAND RW K&R EEE sa-maes [TOBE CONTINUED sewaras: LEGEND: ‘Y ~Prnmenete eat (PU) ® -Vone Shear Test (V) © ~Pemestity Tet (P87) Peck Tet (PRD “Senta Penertin eat Undatcbee Semple (U0) a =e Si matee Sapte (00) Bae ee) 34 [J -Attempes (WD, (00, (PS, (42) & (05) Bh -Pe'o» sono (5) [B core run (8) BORELOG V=PILE (S) | CuENT: Urban Redevelopment Author SEE PTE LTD /2RQESTS ons For Kowon Road / Smon Rood LOCATION: Kovan Read / Simon Reed PROVECT NO: 29. goreHoe No: BH 5 WATER DEPTH: 1.90 m DRILLING DATE STARTED: 13, BOREMOLE DIA: 100 enn lRepuceo Level: DRILLING DATE COMPLETED-14/00/2011 | CORE OlA: 80 mm IwoRTHNG: PREPARED BY: SU MYAT DRILLING METHOD: _W least: 1 ova) [ees fe | mt Fl g2] om [E/E Ly] sre ascent i uss] o> JRE com fcightly gravely Sikty SAND es] Borehole terminated ot 28:37r4 LEGEND: Re ere nee peetene eee -Atteroed (WD), (00), (3), (2) & (08) © 10 se at Tot insets sarete 0) BB -Fetn Seon 9) & ~Porestty To (P07) “open rive Tiswa Same (00) Serie) [Bh ~core run (oR) Pose Tet (747 Denson sams ( 35 BORELOG SHEET NO: 1 OF 2 V-PILE. (S) [OUENE urban Redevelopment Authority 7 Pp PROKGT: Si Works For Kovan Road / Simon Road _[Locamon: Keven Raed / Simon Road PROECTNG 20 aoreiowt No BH 6 [WATER DEPT 1.95 m BOREHOLE OWA: 100 ram IreouceD teva: CORE Dit 0mm Norrie PREPARED GY: SU MYAT DRUNG METHOD: W eastwe I ye) « [ser incts [smn ee ek Tp ean glo wl Description in| i Elles! om ; % . if oneess i |S (on) peas per Reddish brown mottled yellowish brown Stightly Sandy CLAY by (sia Readish brown mottled yeliow Slightly grovelly Sandy sist yellowish Brown Siightly gravelly Sondy jcuay Isanse to very danse [Greenish grey mottled iowish brown, lightly gravelly Sity [SAND EER RR RE BE FE RE a4 ishawaanian i EE ear {C]-Attempes (UD, (00) (PS) mz) & (0S) ten Sha et Laces Sanpse (0 srten Su @ Percy Tes 2) eae eit: Sette (ony -Peton Servi 5) ES pose tat (Pe) BE Sae ees (H ~ceve Ron (8) 36 BORELOG SHEET NO. 2. OF 2 V-PILE. (S) |GUENE: upon Redevelopment Authority — PTE LTD /PROMECK 1 Works For Kown Road / Simon ond 1 [Locamiow: Kevan Raod_/ Simon Rood sorcHoE NO BH 6 [wareR DEPTH: 1.95 PROJECT NO. 29 RUNG OATE STARTED Os GOREHOLE O14 _100 ne Tenuceo weve FALUN DATE conPLer:08/00/201 | cone QIA__—50 nm orn eRePAReD BY. 5) WAT ORUUNG METIOO! W eastn ~ [set va [Sing & et [onc [pl oan se Eloee soa |B pes Descrbton i © Ha] oom [ELSIE] mmm Gale | ¢ Ag/38) envoas| © [EES] OY |BLEED ete Bleed o [22 fa] Dense to vary dense [Greenish grey mottled yellowish brown [Sightly grovelly Sity fSAND | cr) RRR ERE KEK RE RE EEE are Greenish grey mottled yeliowish Brown Siightly Sondy CLAY hexohiler|inaosr rary Tense Yeliowich brown wo) TRE RREREY, [Greenish grey mottled yellowish Brown ae iightly Sondy CLAY ah Borehole terminated at 33.330} on EGEND: eee “Sree Perwetn [[l-natempes (Uo) (00) 5) (he) & (05) © -ee See te BB -irasertes Saree (WD) a aoe a Bh-Paton seme (3) @ Perea To 727) pene Tete Sra (2) Ey -Poctar Tost (Pe) Or eS [B ~core Run (oR) 37 ECTIONS 38 GiL"1 dad (aHOAVONIS) 2114 - A A Poog wouss / pooy usroy, | were” | woe7e7ee [SuSw uM ROZ] —LVAN AS. Fipowny weudojenepay Udy 1 | oes eieetae tte | E : : mano Wage cass “ |. é EE. ce EP] wo ies é—all HE vrs fs 2) avs ius bit SITE) ao sas Sesuewewnsegees ese sasananaesnEeh si/HE oe ee eet ml = EF| sow TE an ws 3sOYd WOS NevEoud wy wre 39 a axiaiacnoavonsiane-a [fi] poy wus / oy wy || — | ae W077 6/E% Buoy UN *OZ] _LYAN TS Zinowny yusudopnepay won el 9 He @ @ Ha —F g Ht ao g oni £ ; = sft tee EEE ‘pee Pe cee ii = . > i ee ave ns é AO ApuS, Ree anys Kaoig, me el ar furs ae Apung SErnEE: eae ata “gb F4O¥d WOs TEvEoud & ie 40 ana] G41 aa (@xoavoNts) ald A IAI pooy wows / pooy uovoy | see | me | aoe Sa TERE r jioz/67ez | Buu uN OZ] LWAM NS juoWNY yuaudojenspey ogi = | ow eases Hae ¢ He ar — os his a9 Ans avs Au, avs dato 18 fs, a0 hos es ox JNsOYd WOS TVEVEoUd we a APPENDIX - D LABORATORY TEST RESULTS 42 D-1 Summary of Laboratory Test Results 43 SUMMARY [Kovan Road 7 Simon Road BER | V1 10] BOTS [Proner | HoROLE RENEE — “pir [Bao PBS PEEa [Bas [ons | [SANOLE NUMBER ubal | up-1 [up-1 | up| up-1 [up-1 [perm am] 7.00 | 7.00 |-7.00-} 7.00" } 7.00] 7.00 L 0 | 7.90 790 7.90 7,90 7.90 7.90 MOISTURE CONTENT (%) 28 20 17 23 29 23, DENSITY Bulk Density 1.98 2.03 2.06 2.02 1.96 2.01 (Mg/n) _| Dry Density 1.55. 1.69 L76 1.64 1.52 1.63. ATTERBERG Liquid Limit 55 54 60 68 44 LIMIT 8%} Plastic Limit 20 20 27 23, 21 Plasticity Index 35, 34 33, 45 23, Soil Group CH CH CH CH cL ae Clay & Silt 49 25 28 30 53, Sand sx | 58 | 47 | os | 46 88) Sieve Analysis | SPA 5 Perel ete . ‘i Type of Test *7 uu vo uu UU Conesim Canim =| 75 «| 88 | 110 | 123 | 79 mange ratdered |_o | Oo | o-| o | 0 Tab Services private i LEGEND * = ‘1 = UU - Usconsotidated Undrained rawial Compression TECHNICAL OFFICER RL Tan ‘APPROVED 7 CHECKED - KG | Sere Tong | SSIES pws (AUTHORISRD SIGNATORY, Lab Services Private Limited: ‘The Results Reported Herein Have Been Pesformed {n Accordance With The Laboratory's Tetms Of Accreditation Under The Singapore Accreditation Council - Singapore Laboratory Accreditation Scheme (SAC-SINGLAS}. 4g D-2 Detailed Test Results 45 UNCONSOLIDATED UNDRAINED TRIAXIAL COMPRESSION fa EST METHOD - BS 1377:1990:Part 7:Test 8] 46 PROJECT Kovan Road / Simon Road BHT UD-1 DESCRIPTION. Firm to still reddish brown & white sandy 7007.90 CLAY 1110/8678 780 COHESION i n/m) g* 7S ls pin ANGLE 3 (degree) 2 ° 5 48 ° ° 90 180 270 60 Total Stress (kPa) 200 HEIGHT (eam) 76 DIAMBTER 160 fam) 38 ¢ = 12 8 3B STAGE 1 g «0 & ic C STAGE 2 40 ° STAGE 3 ° 4 8 12 ‘Axial Strain (%) ceLL CORRECTED | UNDRAINED | MAXIMUM STRAIN BULK 7 DRY] PRESSURE Maximum SHEAR AP FAILURE Densiry exym’—|peviator stress} sTReNaTH, cu (ote) (ave) enn) 150 75 192 | Lar 131 66 2.00 | 1.56 166 83 2.01 | 1.62 Undisturbed SHEARING RATE (m/min) 52 FFICER “APPROVED / CHECKED Y. Simon P. (Authorised Signatory - sense ‘he es en epoeon hve Soo pore czaionce wth aco ee of reaon oc UNCONSOLIDATED UNDRAINED TRIAXIAL COMPRESSION (TEST METHOD - BS 1377:1990:Part 7:Test 8] Kovan Road 7 Simon Road BOREHOLE - Bi] SAMPLE UD VISUAL DESCRIPTION- Medium dense reddish brown gravelly, clayey | DEPTH (ml 7,007.50 SAND [Soe NOMBER- 1110/8678 | 200 COHESION n/m?) ew - 8 8 100 PHI ANOLE é (aeree) 5 0 5 9 ° ° 100 200 300 400 500 Total Stress (kPa) 200 ueronr| J (aa) ‘| 76 DIAMETER 160 (om) 38 g yo = 120 O 6 STAGE 1 5 w 8 STAGE2 “0 ° STAGES ° 4 8 2 6 2 ‘Axial Strain (%) stor] cau CORRECTED | UNDRAINED [NAXMUMSTRAIN] MOISTURE | BULK / DRY PRESSURE MaxiMun SHEAR avpaiure | content DENSITY evn’ |oeviaTor stress] STRENGTH, cu 6 6) (eye) (kNi/m?} (KN/ m4) i, 75 135} 63] 20 To] 2.01 | 1.65 2. 150 185 93 20 21} 2.02 | 1.67 3 300) 187| 94 20 ail 207 | 171 SAMPLETYPE-_ Undisturbed SHEARING RATE (mm/min) 1.52 TESTING OFFICER - “APPROVED / CHECKED = Y, Simon P. (Authorised Signatory - seenlet Fone = _| Te fest reat eat heren hove been pesfrnedin oocerdance win the oberon es of accrediation under RCSNGUAS a7 UNCONSOLIDATED UNDRAINED TRIAXIAL COMPRESSION (TEST METHOD - BS 1377:1990:Part 7:Test 8) PROJECT Kovan Road / Simon Road BOREHOLE BH-3 UD-1 7.00 - 7.90 1110/8678 VISUAL DESCRIPTION. Medium dense reddish brown & pale yellow clayey, very gravelly SAND COHESION (denjm’) ee 110 130 PHI ANGLE (degree) = 0 Shear Stress (kPa) 65 ° 130 260 390 520 650 Total Stress (kPa) 350 HEIGHT (om) 76 3] biamereR 280 a 38 210 2 STAGE 1 0 STAGE | STAGES 140 : Deviator Stress (kPa) 0 ° 4 8 12 16 20 Axial Strain (%) STAGE CELL correcteD | UNDRAINED | NAXIMUNSTRAIN] MOISTURE | BULK / DRY| PRESSURE MAXIMUM, SHEAR AT FAILURE content DENSITY kvm’) pevisTor stRESS| STRENGTH, Cu oo 0) (Mey) tenn’) enn} T 75 154) 7 12| 1a 2.04 | 1.73 2, 150) 208] 103} 16] 17) 2.04 | 1.74 3, 300) 302! 151 19] 17] 2.11 | 1.80 SAMPLE TYPE. Undisturbed ‘SHEARING RATE (ram ain) 1.52 OTRCER TPPROVED | HEORED ¥. Simon P, (authorised Signatory - Senuef Tene) | PRGesaue astctitia The es resus opored here have been pertad in Gecordonce with he bboxtey/s tems of accrediation uncelGAC-SNGLAS: 48 UNCONSOLIDATED UNDRAINED TRIAXIAL COMPRESSION [TEs T METHOD - BS 1377:1990:Part 7:Test 8] PROJECT Rowan Road 7 Simon Road BOREHOLE Bila SAMPLE UD-T VISUAL DESCRIPTION- _ Medium dense reddish brown & pale yellow | DEPTH (am) 7.00 -7.90 slightly gravelly, clayey SAND [soB NumEER-—T1T078678| 240 COHESION ot (ijn?) e w - 123 8 20 PHL ANGLE & 7 (agree) i ° 5 © ° ° 120 240 380 400) 600 Total Stress (kPa) 360 HBIOHT (ram) 76 5 af DIAMETER (com) 38 g 2] = 210 O 8 7 6 STAGE 1 5 to a [} STAGE 2 70 7 STAGE ° 4 8 12 16 20 ‘Axial Strain (%) STAGE, cetL CORRECTED | UNDRAINED [MAXIMUM STRAIN] MOISTURE | BULK / OR PRESSURE Maximum SHEAR AT FAILURE cowrenr Density tym’) |peviator stress] sTRENOTH, cu 1 0 (gy ey’) ym?) 7 70] 192) 96 20 22) 2.00 | 1.64 2 140 234 17 20 24] 2.02 | 1.63 i 280| 310 155 20 22] 2.03 | 1.66 SAMPLE TYPE-_ Undisturbed SHEARING RATE (rama/min) 132 TESTING OFFICER Y. Simon P. sien “2 _| Te ees ones heeintoe tae ptemecin ocodane win elcboain/ fs of occ nde AC ENGAS 49 UNCONSOLIDATED UNDRAINED TRIAXIAL COMPRESSION (TEST METHOD - BS 1377:1990:Part 7:Test 8] PROTECT Kovan Road 7 Simon Road BORER BAS SAME UD- VISUAL DESCRIPTION. Still reddish brown & reddish yellow slightly — [ DEPTH (=) 7.00 - 7.90 gravelly, sandy CLAY JOB NUMBER 1110/8678 180 COHESION (N/m?) Fs 79 Bit Pan anoue 3b (degree) 3 =O. 5 4 ° ° 20 180 270 360 450 Total Stress (kPa) 200 HEIGHT (com) 76 2| DIAMETER 160 (oa) 3} 38 g =~ 120 0 3 STAGE 1 & w é ( STAGE 2 4 9 STAGES ° 4 8 12 16 20 Axial Strain (2%) STAGE CORRECTED | UNDRAINED [MAXIMUMSTRAIN] MOISTURE | BULK / DRY] PRESSURE MAXIMUM SHEAR AT FAILURE content DeNsity tex/m’)— Ipeviator stress] stRENGTH, cu 0 0 (ey) (N/m?) em) T 70 162 aI 19) 3if 1.92 | a7 2. 140 164 82 17 29] 1.96 | 1.52 5 280) 147| a 20 27] 1.99 | 1.57 SAMPLE TYPE-__ Undisturbed ‘SHEARING RATE (mm/min) 152 TESTING OFFICER "APPROVED / CHECKE Y. Simon P. (Authorised Signatory t ST" _|[ Tre tes esas reported nein hove been periomedin accordance wih the abot stems of ooctet RAGES, 50 UNCONSOLIDATED UNDRAINED TRIAXIAL COMPRESSION [TEST METHOD - BS 1377:1990:Part 7:Test 8] PROJECT Rovan Road 7 Simon Road BOREHOLE BIEG SAMPLE UD: VISUAL DESCRIPRON Sti brownish yellow & yellowish brown DEPTH fa) 7.00-7.50 slightly gravelly, sandy CLAY Jou NUMBER: 111078678 720 conesion i xt?) eu ter .. raranais 2 - 0 5 ss 0 ° 10 Ey x0 440 500 Total Stress (kPa) 2s0 neon (mm) F 76 a DIAMETER foam) 1 38 = 160 2 B 3 snot 5 wo au g a stage 2 ° STAGE 3 ° 4 8 a 16 20 Axial Stain (%) since] obuL CORRECTED | UNDRAINED [MAXUM STRAIN] MOISTURE | BULK 7 OR¥| PRESSURE axa sueae arrature | cowrent DENSITY iwx/m? — oeviaror snes] steenetH, cu oo 0 (gy (xm sti? 7 7 150 35 30 2] 159] 158 2 159] 159 80 20 22) 2.02 | 1.66 3 300 231 116 20 21] 2.02 | 1.67 TAMPLETWPE- _ Undisturbed SHEARING RATE Gamn/miny- 1.52 TESTING OFFICER ‘APPROVED 7 CHECKED (Ze) Y. Simon P. (Authorised Signatory - sidetteng) Goes "2" _ [icici pated brentore boon palomedinaccowence wihtielabooiayiemsofercreiaionuaesKcanens | exiGeutess st ATTERBERG LIMIT (TEST METHOD - BS 1377:1990:Part 2:Test 4.3 / 5] TROWEGT Rowan Road’ 7 Simon Road BOREHOLE Br SAMPLE UD TSUAL DESCRIPTION. Reddish brown & white sandy OLAY DEPTH | 7.00- 7.90 Jon NUMBER- 111078678 2 m4 2 22 20 Cone Penetration (mm) 16 re ee Moisture Content (%) SAMPLE HISTORY / PREPARATION - Natural Percentage Retained On 0.425mm Sieve (%) - Not Applicable LIQUID LIMIT (%) PLASTIC LIMIT (%) CONTAINER WEIGHT (g) 3.69 3.64 357 3.73 8.19 8.22 WET MASS + CONTAINER WEIGHT (g) 18.37 18.27 18.70 18.80 18.49 18,83 DRY MASS + CONTAINER WEIGHT (g) 13.58 13.19 13.29 13.19 16.76 17.07 MOISTURE CONTENT (2%) 48.4 53.2 55.7 59.3 20.2 19.9 PENETRATION (mm) 15,60 18.50 20.70 23.30 LIQUID LIM (%) - 55 Notes: PLASTIC LIMIT (96) - 20 M-~ SILT (below A-Line) PLASTICITY INDEX (%) = 35 C- CLAY (above A-Line) cH L- Low, 1- Intermediate, H- High Plasticity TESTING OFFICER Y. Shajahan 52 ATTERBERG LIMIT (EST METHOD - BS 1377:1990:Part 2:Test 4.3 / 5] PROJECT Kovan Road 7 Simon Road BOREHOLE Ba SAMPLE UDA VISUAL DESCRIPTION- Reddish brown gravelly, clayey SAND DEPTH (a= 7007.50 JOB NUMBER 1110/8678 2 Ey 2 2 Ea £ 5 519 é 2 gu ” 16 15 14 «7 4 «9 0 oF 8 5 oF 65 0 7 58 69 60 Moisture Content (%) SAMPLE HISTORY / PREPARATION - Wet Sieved Through 0.425mm Sieve Percentage Retained On 0.425mm Sieve (%) - 63 QUID Lar 6) PLASTIC LIMT 94) CONTAINER WEIGHT (@ 352 372 3.71 3.73 329 8.24 WE MASS + CONTAINER WEIGHT 19.49 19.64 19.57 18.45 1862 18.53, DRY MASS + CONTAINER WEIGHT ( 14,32 14.27 12.98 13.05 1687 16.82 MOISTURE CONTENT (%) 479 80.9 54.4 57.9 | 20.4 19.9 PENETRATION (mm) 15.25 17.70 20.25 23.20 | Liguip tm (- 54 Notes: PLASTIC LIMIT (%) - 20 M- SILT below A-Line PLASTICITY INDEX(@4)- 34 C+ CLAY (above Line) sot oRoUP cH L- Low, 1+ Intermediate, H- High Plasticity TAA | aNG OFCER APPROVED / CHECKED (7) ¥. Shajahan (butted inate “Cod Tong | POC Th ot eb poe he bos alone di oceaner we abooayemsol conden nal AC HIGUS 53 ATTERBERG LIMIT [TEST METHOD - BS 1377:1990:Part 2:Test 4.3 / 5) PROIBCT Kovan Road 7 Simon Road BORENOLE BAS SAMPLE UD VISUAL DESCRIPHON- Reddish brown & pale yellow clayey, very | DEPTH tm 700- 7.90 gravelly SAND JOB NUMBER 1110/8678 25 ™ 2 2 gn & 5» 3 5 19 2 ge ” 6 5 14 ) 5253S SAMPLE HISTORY / PREPARATION - 58 788 Moisture Content (%) Wet Sieved Through 0.425mm Sieve Percentage Retained On 0.425mm Sieve (%) - 42 LIQUID LIMIT (4) PLASTIC LIMIT (%) CONTAINER WEIGHT (g 362 368 3.77 3.75 8.25 8.20 WET MASS + CONTAINER WEIGHT (@) 18.61 18.35 18.82 18.45 18.84 18.93 DRY MASS + CONTAINER WEIGHT (g) 13.36 13.02 13.15 12.71 16.60 16.67 MOISTURE CONTENT (%) 53.9 87.1 604 64.1 26.8 26.7 PENETRATION (mi) 15.85 18.25 20.50 22.85 LIQUID Li (96) 60 Notes: PLASTIC LIMIT 27 M- SILT (below Atine} PLASTICITY INDEX(%)- 33 C= CLAY (above A-Line) SOIL. GROUP cH L- Low, I- Intermediate, Jn Plasticity TESTING OFFICER “APPROVED / CHECKED wa Shajahan (Authorised Signatory -Ganjuél Teng) "2" actos mum ened ero tee boo omadh acannon hie bra ere of oxen dl SHCA 54 ATTERBERG LIMIT (TEST METHOD - BS 1377:1990:Part 2:Test 4.3 / 5] PROJECT Kovan Road 7 Simon Road BOREHOLE Bit SAMPLE UD-1 VISUAL DESCRIPTION. Reddish brown & pale yellow slightly gravelly, | DEPTH (m)~ 7007.90 clayey SAND. jOB NUMBEE TI10/8678 2 2 2 2 a 20 18 Cone Penetration (mm) so 60 61 62 83 68 65 65 G7 68 68 7 OM O28 HOB Moisture Content (%) ‘SAMPLE HISTORY / PREPARATION - Wet Sieved Through 0.425mm Sieve Percentage Retained On 0.425mm Sieve (%)- 54 LIQUID LIMIT (4) PLASTIC LIMIT (%) CONTAINER WEIGHT (a) 3.74 364 3.76 3.75 815 8.12 WET MASS + CONTAINER WEIGHT (g) 20.57 20.25 20.42 20.81 18.82 18.59 DRY MASS + CONTAINER WEIGHT () 14.21 13.64 13.58 13.53 16.82 16.61 MOISTURE CONTENT (9) 60.7 66.1 69.7 74.4 23.1 23.3 ENETRATION (mmm) 15.55 18.25 21.10 23.60 QUID MT (9) 68 Notes: PLASTIC LINAT (5) - 23 M- SILT (below A-Line} PLASTICITY INDEX (%)- 45 C+ CLAY (above A-Line) SOIL GROU! cH Low, 1 Intermediate, 11 TTESTING OFFICER “APPROVED / CHECKED (Ze) Y. Shajahan (Authorised Signatory - Samuél Teng) These epatec bec hove too pane nator he Kn fa forreoen oa HANGS 55. ATTERBERG LIMIT [TEST METHOD - BS 1377:1990:Part 2:Test 4.3 / 5) PROJECT. Kovan Road 7 Simon Road BOREHOLE BAS SAMPLE - UD- VISUAL DESCRIPTION. Reddish brown & reddish yellow slightly DEPTH (ma) 7.00 - 7.90 gravelly, sandy CLAY JOB NUNBER 1110/8678 Cone Penetration (mm) 25 38 39 40 a 42 43 44 45 46 47 48 Moisture Content (%) SAMPLE HISTORY / PREPARATION - Natural Percentage Retained On 0.425mm Sieve (%) -_ Not Applicable LIQUID LIMIT (6) PLASTIC LIMIT (6) ‘CONTAINER WEIGHT (6) 359 3.73 3.77 3.71 8.06 8.09 WET MASS + CONTAINER WEIGHT (g) 19.55 19.39 20.87 20.04 19.01 19.33 DRY MASS + CONTAINER WEIGHT (g) 15.02 14.78 15.67 14.84 17.16 17.34 MOISTURE CONTENT (26) 39.6 41.7 43.7 46.7 20.3 21.5 PENETRATION (ram) 15.30 18.05 20.25 23.35 QUID LIMIT (%) 44 Notes: PLASTIC LIMIT (4) 21 M- SILT (below A-Line) PLASTICITY INDEX (%) 23 C- CLAY (above A-Line) SOIL. GROUP ol L- Low, 1~ Intermediate, H- High Plasticity "TESTING OFFICE! "APPROVED / CHECKED - Y. Shajahan (Authorised Signatory - Teng) KCEove The ie eat eponed fren nav beaparcmedin ancance wih Reloboatoy ema occesicionwecelCaNODe | ema 56 ATTERBERG LIMIT [TEST METHOD - BS 1377:1990:Part 2:Test 4.3 / 5] PROECT Kovan Road 7 Simon Road BOREROLE BIG SAMPLE UD-1 VISUAL DESCRIPTION- _ Brownish yellow & yellowish brown slightly | DEPTH (= 7.00 - 7.90, gravelly, sandy CLAY JOB NUMBER 111078678 Ey 24 2 2 2 20 18 Cone Penetration (mm) ” 6 43 44 45 48 47 48 49 50 51 52 53 54 55 56 57 58 59 GO 51 62 63 64 85 65 67 6B Moisture Content (%) SAMPLE HISTORY / PREPARATION - Natural Percentage Retained On 0.425mm Sieve (%) - _ Not Applicable | LiqutD unate 6) PLASTIC LIMIT) CONTAINER WEIGHT (3) | 3.66 3.79 3.75 3.76 7.85 8.20 WET MASS + CONTAINER WEIGHT () | 19.80 19.57 19.42 19.71 18.53 18.55 DRY MASS + CONTAINER WEIGHT (g) 14.60 14.31 13.67 13.32 16.55 16.62 MOISTURE CONTENT (%) 47.5 50.0 58.0 66.8 22.8 22.9 PENETRATION (mm) | 15.10 17.75 20.75 23.00 LIQUID LIMET (%) = 58 Notes: PLASTIC LIMIT (%) 23 M- SILT (below A-Line) PLASTICITY INDEX (6) - 35 © CLAY (above A-Line} SOIL GROUP, CH L bo H- High Prasticity TESTING OFFICER "APPROVED / CHECKED (Le) Y. Shajahan (authorised Signatory i Teng) Thee ens pateaharch have been pafeealh occodonce th he aber sero ecrettenuncll SASSNGUAS 87 Tron ovs ona conaponce owas ojoora aug DPODET U FoUTOPATINNT | INDO FOUL Tee | \ am Gor amagS - HORUS posaowTN) A) =< saaroano / aanoweev wereyasefey ‘9 - ugOLIIO ontuSaL | AL ansao> tana aNve es avo | [asavoo [iwniasn [ans asavoo [wniaaw [anu | asevoo[ woiaaw | “axis (ww) 621g aonteg 100.9 ° o cc ag oe 3 oa & oS z ox vaavao ve is uve 06 rs FAVED on, AWD Apues am 99 umoag USIPPIY peoy uoug /_peoy wesoy oudiosaa Wwnsia Sreeneres [e6 WALT Wed:0661:ZZET SA - COHLAN Sail SISATVNY HARIS - NOLLNEIYLSICG SZiS STOLL 58 Base Frnt avs ai anna naee cag RESTO U FOUI AT TNS | HSH FHI ITN PE Peeper Tap eames ~ ToyeUBIS pesuowN) ~aaoaH / aanoalday, uereyoseiey “9 “NOLO ONIESSI. @ ays suis /AvID a1ea0> “Teneo anvs ais avo | _[asavoo | worcaw | ans [ssavoo [wniaaw | “awis | asuvoo] waraan | ane (ww) ezg 2 (%) Suisseg aBewaaieg peoy uoung / peoy vesoy CINVS 28:10 03 ouy ‘Kosvlo ‘AijeaAB UmoLQ YsTPPAA _- NOUMRIOSAGTASIA soarowa| le°6 1S9L:% WRVO66T:ZZE1 SA ~ GOHAN ISA) SISATWNY SARIS - NOLLNEIHLSIG 3Zis SIV 59 SaaSe [ToS a SA CaISTD ARNT DRT NPE PDTD FOUN OHO HN DDT PO a ee Guap paps - Loweudig pesuouAy) &) ~azxoaHio / aanousav wormjsefey ‘9 __-Bs0LNdo ONES s1aH09 “aAVED avs as avi asavoo | natcaw | avis | asevoo [wniaaw] axis | asuvoo] wan | aNit (ww) ezig apmed a ‘ ¥o 100 tooo z 2 a & % 8@, ~rgavao % Ly anys: % 82, ams / 419 ‘s298/0111 waENaN Gor O6'L = 00: SEG ANlys 21209 0) ouy ‘étjonssd Kon ‘Koxepo mottos ared 7R UMKOIG USIP = NOWARIOSAC ASIA an TGS, oa — peoy uous / poy ueroyi aganowd [ee 194% WELOGSL:LLET SA - COHIAW LSaL] SISATYNY SAIS - NOLLNSIMLSIG 3ZIS 319d Sar | “Sra Sys aoa vgaypaasa eat NAD Hap OSOROSTT Fonte unay In| INUPASON E FOL ie [Panis Toreuig posowmny) saspioaHo / qanoweav, uorejosetey (9 “NEON ONLISL aay, aus Eo ‘asuvoo | waaay | anne | asuvoo [nnidaw] anit | scuvoo] wna | ants av) (uw) 22g atoued ¥o (s@) Buisseg abeusoieg NYS 981809 03 ou “Kokelo ‘Ayoav.S MHYBHIE Mol|aX oped +p UM YSTPPAY NOWAROSEG TWASIA peoy uous {peo wercy, sdoacoud le 991% UEgOGGL-ZZET SA - COMIN ISAL] SISATWNY SARIS - NOLNEIYLSIC AZIS FIOM 61 T Tbe Ovi Spa saree a oan OOupONSDU PRORST aN aay PSNR aol pray ~ AicieuBig pasuowiny) oe - cayoaHo / aanosday, a1ag0o TaAVeD ‘asavoo | maigaw [ants ‘anys 0s. ssuvoo [anaan | awit wR (%) 6usseg eBewueoeg AVI Apues ‘

Vous aimerez peut-être aussi