Item Quantit Method Output Plant Labour Duration Reference

y (days)
BQ NO. 6
ELECTRICAL
WORKS
External
Lighting

Feeder pillar
Supply and install as per drawing and specification.
1 NO - Stainless Steel Weatherproof Outdoor Feeder 1 1 day
Pillar (60A TPN FP-CL) electrician
1 NO - Stainless Steel Weatherproof Outdoor Feeder 1 1 day
Pillar (40A SPN DB-CL1) electrician

Cabling 3000m Install 1 x 2C 10mmsq PVC/SWA/PVC CU cable from 1 1 day


FP-CL to all external light c/w termination. electrician

Fitting
Supply and install as per drawing and specification.
50 NOs - 50W PL Dome Round Type With Louvre
Bollard Light Fitting 1 10 days
50 Nos - 150W SON Compound Light Fitting C/W electrician
Corrosive resitance 3m Pole 2 labours
- 400W Weatherproof Flood Lighting Fitting
30 NOs
- 30W Gate/Post Top Light Fitting
50 NOs

Testing and 1 1 day


Commissioning 1 L/S electrician
External
Communication
Works

Telephone Supply and install precast telephone manhole including


manholes excavation works, backfilling, compaction and fully
making good of all areas affected by works.
4 Nos - JC9C Manhole 1 1 day
electrician

Telephone Supply and install ducts inclusive of draw wires,


Ducting necessary excavation, backfilling, compaction and
making good of all affected areas. 1 13 days
1000m - 4 ways 100mmUPVC electrician
100m - 4 ways 100mm G.I. 2 labours
200m - 2 ways 100mm G.I.

Internal LV
Services
Admin Block

Main Switch Supply, install, testing and commissioning of MSB as per


Board (MSB) drawing and specification. 1 1 day
1 Nos - 415V 1000A self-standing MSB electrician

Sub-switch Supply, install, testing and commissioning of following


Board & metalclad sub-switch Board (SSB) and metalclad 2 1 day
Distribution Distribution Board (DB) as per drawing and specification. electrician
Board 1 Nos - 200A TPN SSB-GF 5 labours
1 Nos - 350A TPN SSB-1F
1 Nos - 200A TPN SSB-2F
- 200A TPN SSB-SR
1 Nos
- 200A TPN DB/DH
1 Nos - 60A TPN DB/SR1
1 Nos - 60A TPN DB/SR2
1 Nos - 100A TPN DB/EPH
1 Nos - 75A TPN DB/1
1 Nos - 60A SPN DB/EGF
1 Nos - 60A SPN DB/GF-L
- 60A SPN DB/GF-P
1 Nos
- 60A SPN DB/CT1
1 Nos - 60A SPN DB/CT2
1 Nos - 40A SPN DB/ELMR
1 Nos - 40A TPN DB/GYM
1 Nos - 40A SPN DB/E1F
1 Nos - 30A SPN DB/EDH
1 Nos - 30A SPN DB/MDF
1 Nos
1 Nos

TNB Metering
Kiosk Nos 1 1 1 day
- 3nos x 2 layers of 150mm G.I pipes electrician
- 4nos x 2 layers of 150mm G.I pipes
- G.I pipes
Ducting L/S 1 1 day
L/S electrician
L/S
- 2x4C 240mmsq XLPE/PVC Copper Cable
Submain - 1x4C 240mmsq XLPE/PVC Copper cable
Cabling - 1x4C 50mmsq XLPE/SWA/PVC Copper cable
80m - 1x4C 50mmsq XLPE/SWA/PVC Copper cable 1 1 day
50m - 1x4C 50mmsq XLPE/SWA/PVC Copper cable electrician
150m - 1x4C 50mmsq XLPE/SWA/PVC Copper cable 10 labours
140m - 4x1C 16mmsq PVC Copper cable
- 1x4C 25mmsq PVC/SWA/PVC Copper cable
160m
- 1x4C 70mmsq XLPE /PVC Copper cable
200m - 1x4C 150mmsq XLPE /PVC Copper cable
40m - 4x1C 50mmsq PVC copper cable
150m - 4x1C 25mmsq PVC copper cable
80m - 1x4C 16mmsq PVC/PVC copper cable
80m - 1x4C 50mmsq PVC copper cable
60m - 2x1C 6mmsq PVC copper cable
- 2x1C 6mmsq PVC copper cable
60m
150m
Supply, install and commissioning of the following
140m
cabling works of
60m
- DB/A (4units) using 4x1C 25mmsq PVC copper
30m
1) From SSB- cable in trunking.
GF to - DB/B (4units) using 4x1C 25mmsq PVC copper
1
following cable in trunking.
- DB/C (1unit) using 4x1C 25mmsq PVC copper electrician
DBs:
480m cable in trunking. 5 labours
- DB/GF-L (1unit) using 4x1C 25mmsq PVC
360m copper cable in trunking.
- DB/GF-P (1unit) using 4x1C 25mmsq PVC
140m copper cable in trunking.

30m Supply, install and commissioning of the following


cabling works of
30m - DB/A (5units) using 4x1C 25mmsq PVC copper
cable in trunking.
2) From SSB- - DB/B (4units) using 4x1C 25mmsq PVC copper
1F to cable in trunking. 1
following - DB/C (1unit) using 4x1C 25mmsq PVC copper electrician
DBs: cable in trunking.
440m 5 labours
- DB/CT1 (1unit) using 4x1C 25mmsq PVC copper
360m cable in trunking.
- DB/CT2 (1unit) using 4x1C 25mmsq PVC copper
140m cable in trunking.
- DB/1F (1unit) using 4x1C 25mmsq PVC copper
80m cable in trunking
- DB/GYM (1unit) using 4x1C 16mmsq PVC
copper cable in trunking.
80m

Supply, install and commissioning of the following


10m
cabling works of
- DB/A (5units) using 4x1C 25mmsq PVC copper
cable in trunking.
50m
- DB/B (4units) using 4x1C 25mmsq PVC copper
cable in trunking.
3) From SSB- - DB/C (1unit) using 4x1C 25mmsq PVC copper
2F to cable in trunking. 1
following - DB/2F (1unit) using 4x1C 16mmsq PVC copper electrician
DBs: 440m cable in trunking. 5 labours

360m Supply, install and commissioning of the following


cabling works of
80m - DB/SR1 (1unit) using 4x1C 70mmsq PVC copper
cable in trunking.
5m - DB/SR2 (1unit) using 4x1C 25mmsq PVC copper
cable in trunking.
4) From SSB- - A/C Control Panel 1 using 4x1C 16mmsq PVC
SR to copper cable in trunking. 1
following - A/C Control Panel 2 using 4x1C 16mmsq PVC electrician
DBs and 10m copper cable in trunking. 5 labours
Control - A/C Control Panel 3 using 4x1C 16mmsq PVC
Panel: 30m copper cable in trunking.
- A/C Control Panel 4 using 4x1C 16mmsq PVC
30m copper cable in trunking.

30m Supply, install and commissioning of the following


cabling works of
50m - Water Pump Control Panel using 4x1C 25mmsq
PVC copper cable in trunking.
50m - Hose Reel Pump Control Panel using 4x1C
16mmsq PVC copper cable in trunking.
5) From
DB/EPH to Supply, install and commissioning from 150Kva Genset to 1
following AMF Board using as cable mentioned in cable trench. electrician
Control 10m
Panel: Supply, install and commissioning from AMF Board to
10m MSB Board using as cable mentioned laid on tray.

6) 4x1C Supply, install and commissioning sensing cable from


95mmsq 20m AMF Board to MSB Board using as cable mentioned laid 1
MIFR cable on tray. electrician
7) 4x1C
95mmsq 40m Supply, install and commissioning sensing cable from tap- 1
MIFR cable off point (1st floor) to DB-E1F using as cable mentioned electrician
8) 1x2C laid in trunking inclusive 40A SPN tap-off unit.
2.5mmsq 40m Supply, install and commissioning sensing cable from tap- 1
PVC/PVC off point (Ground floor) to DB-EDF using as cable electrician
cable mentioned laid in trunking inclusive 40A SPN tap-off
9) 2x1C unit.
16mmsq Supply, install and commissioning sensing cable from tap-
10m 1
PVC cable off point (Ground floor) to DB-EGF using as cable electrician
10) 2x1C mentioned laid in trunking inclusive 60A SPN tap-off
16mmsq
10m unit. 1
PVC cable Supply, install and commissioning sensing cable from tap- electrician
11) 2x1C off point (Lift Motor Room) to DB-ELMR using as cable
25mmsq mentioned laid in trunking inclusive 40A SPN tap-off
PVC cable 10m unit. 1
electrician
12) 2x1C
16mmsq Wiring of lighting points using following cables in
PVC cable 10m concealed conduit c/w earth wire and necessary 1
accessories: electrician
- 2 x 1.5mmsq PVC cable
- 2 x 2.5mmsq PVC cable
Final Sub-
Circuit Wiring Wiring of ceiling fan point in concealed conduit c/w earth
wire and necessary accessories
- 2 x 1.5mmsq PVC cable 1 1 day
electrician
640 Nos Wiring of switch socket outlet in concealed conduit c/w 1 labour
0 Nos earth wire and necessary accessories
- 2 x 2.5mmsq PVC cable

Wiring of switch socket outlet in exposed G.I conduit c/w


16 Nos earth wire and necessary accessories
- 2 x 2.5mmsq PVC cable
120 Nos
Wiring of aircond point outlet in exposed G.I conduit c/w
earth wire and necessary accessories
- 2 x 4mmsq PVC cable
20 Nos
Wiring of 30A 3-phase isolator in exposed G.I conduit
c/w earth wire, 20A 3-phase isolator and necessary
accessories
20 Nos - 4 x 1C 4mmsq PVC cable

Wiring of 60A 3-phase isolator in exposed G.I conduit


c/w earth wire, 60A 3-phase isolator and necessary
2 Nos accessories
- 4 x 1C 10mmsq PVC cable

Bare Channel fluo. Fitting


3 Nos - 1 x 36W
- 2 x 36W
- 1 x 18W
Fittings
1 x 36W Fluo. Fitting c/w corrosive resistance cover

2 x 36W recessed fluo. Fitting c/w crossblade louvre and 1 1 day


25 Nos parabolic reflector electrician
15 Nos 1 labour
15 Nos 2 x 36W recessed fluo. Fitting c/w daikon diffuser

55 Nos 2 x 18W ceiling mounted fluo. Fitting c/w corrosive 1


resistance cover electrician
10 Nos 1
PL Downlight electrician
- 2 x 18W
- 2 x 26W
15 Nos 1
- 50w
electrician
20 Nos 1
Pendant light
electrician
- 50W
- 100W

300 Nos Wall light 1


200 Nos - 30W electrician
60 Nos - 20W
1 x150W Metal Halide Low Bay
30 Nos 1
5 Nos Emergency light (Bomba approved light) electrician

Keluar Sign (Bomba approved light)


15 Nos 1
15 Nos Ceiling fan c/w speed regulator/remote control electrician

50 Nos Decorative light switch(to suit ID requirement) 1


electrician
100 Nos Decorative switch socket outlet (to suit ID requirement) 1
electrician
30 Nos Decorative aircond switch (to suit ID requirement) 1
electrician
20 Nos 1
electrician
300 Nos 1
electrician
300 Nos 1
electrician
50 Nos 1
electrician
Internal LV
Services
Accommodatio
n
Unit Type A

Distribution Supply and install metal clad Distribution Board complete


Boards with earthing and all other associated works as per
drawing
1 NO - 60A TPN DB-A 1 1 day
electrician
1 NO Installation, interacking & accessories of full functioning 1
of key tag system electrician

Final Sub-
circuit Wiring Nos Wiring in concealed conduit and necessary accessories
40 Nos - lighting points using 2 x 1.5mmsq PVC cable 1 1 day
20 - switch socket outlet using 2 x 2.5mmsq PVC electrician
cable 1 labour
4 Nos - fan points using 2 x 1.5mmsq PVC cable
- aircond points/exhaust fan point using 2 x 4mmsq
5 Nos
PVC cable
- water heater points using 2 x 4mmsq PVC cable
1 Nos

- 2 x 18W PL (square type) Down Light Fitting


Fittings 25 Nos - 26W Wall Light Fitting c/w Dimmer and 1 2 days
10 Nos accessories electrician
- 2 x 16W emergency light 1 labour
2 Nos - Decorative ceiling fan c/w speed regulator control
4 Nos - Decorative type switches for light, switch socket
50 Nos outlet, aircond & Water Heater (to suit ID
requirement)
Internal LV
Services
Accommodatio
n
Unit Type B

Distribution Supply and install metal clad Distribution Board complete


Boards with earthing and all other associated works as per
drawing 1 1 day
1 NO - 60A TPN DB-B electrician
1
1 NO Installation, interacking & accessories of full functioning electrician
of key tag system

Final Sub- Wiring in concealed conduit and necessary accessories


circuit Wiring 40 Nos - lighting points using 2 x 1.5mmsq PVC cable 1 1 day
20 Nos - switch socket outlet using 2 x 2.5mmsq PVC electrician
cable 1 labour
4 Nos - fan points using 2 x 1.5mmsq PVC cable
- aircond points/exhaust fan point using 2 x 4mmsq
5 Nos
PVC cable
- water heater points using 2 x 4mmsq PVC cable
1 Nos

- 2 x 18W PL (square type) Down Light Fitting


Fittings 25 Nos - 26W Wall Light Fitting c/w Dimmer and 1 2 days
10 Nos accessories electrician
- 2 x 16W emergency light 1 labour
2 Nos - Decorative ceiling fan c/w speed regulator control
4 Nos - Decorative type switches for light, switch socket
50 Nos outlet, aircond & Water Heater (to suit ID
requirement)

Internal LV
Services
Accommodatio
n
Unit Type C

Distribution Supply and install metal clad Distribution Board complete


Boards with earthing and all other associated works as per
drawing
NO 1 - 60A TPN DB-C 1 1 day
electrician
NO 1 Installation, interacking & accessories of full functioning 1
of key tag system electrician

Final Sub-
circuit Wiring Wiring in concealed conduit and necessary accessories
Nos 40 - lighting points using 2 x 1.5mmsq PVC cable 1 1 day
Nos 20 - switch socket outlet using 2 x 2.5mmsq PVC electrician
cable 1 labour
Nos 5 - fan points using 2 x 1.5mmsq PVC cable
- aircond points/exhaust fan point using 2 x 4mmsq
Nos 6
PVC cable
- water heater points using 2 x 4mmsq PVC cable
Nos 1
- 2 x 18W PL (square type) Down Light Fitting
Fittings Nos 25 - 26W Wall Light Fitting c/w Dimmer and 1 2 days
Nos 10 accessories electrician
- 2 x 16W emergency light 1 labour
- Decorative ceiling fan c/w speed regulator control
Nos 2
- Decorative type switches for light, switch socket
Nos 4
outlet, aircond & Water Heater (to suit ID
Nos 50
requirement)

Internal LV
Services
Accommodatio
n
Unit Type D
(double storey)

Distribution Supply and install metal clad Distribution Board complete


Boards with earthing and all other associated works as per
drawing
NO 1 - 60A TPN DB-D2 1 1 day
NO 1 - 75A TPN DB-D1 electrician
1
NO 1 Installation, interacking & accessories of full functioning electrician
of key tag system

Final Sub-
circuit Wiring Wiring in concealed conduit and necessary accessories 1 1 day
60 Nos - lighting points using 2 x 1.5mmsq PVC cable electrician
30 Nos - switch socket outlet using 2 x 2.5mmsq PVC 1 labour
cable
8 Nos - fan points using 2 x 1.5mmsq PVC cable
10 Nos - aircond points/exhaust fan point using 2 x 4mmsq
PVC cable
2 Nos - water heater points using 2 x 4mmsq PVC cable

1 2 days
Fittings 50 Nos - 2 x 18W PL (square type) Down Light Fitting electrician
- 26W Wall Light Fitting c/w Dimmer and
20 Nos 1 labour
accessories
- 2 x 16W emergency light
4 Nos - Decorative ceiling fan c/w speed regulator control
8 Nos - Decorative type switches for light, switch socket
60 Nos outlet, aircond & Water Heater (to suit ID
requirement)

Internal LV
Services
Substation

Distribution Supply and install metal clad Distribution Board complete


Boards with earthing and all other associated works as per
drawing 1 1 day
1 NO - 30A TPN DB-SS electrician
1 NO - 30A TPN DB-TNB 1
electrician
Final Sub-
circuit Wiring Wiring in concealed conduit and necessary accessories
25 Nos - lighting points using 2 x 1.5mmsq PVC cable
10 Nos - switch socket outlet using 2 x 2.5mmsq PVC 1 1 day
cable electrician
5 Nos - exhaust fan points using 2 x 2.5mmsq PVC cable 1 labour
Fittings Fluorescent Light Fitting
5 Nos - 2 x 36W
10 Nos - 1 x 36W 1 1 day
5 Nos - 1 x 36W weatherproof type electrician
1 labour
5 Nos Emergency light

1 1 day
Earthing for 1 Lot Earthing for TNB sub-station(Switchgear & Transformer electrician
MSB room) as per TNB requirement. 1 labour

1 Lot Earthing for MSB, SSBs, DBs and Genset.

Item Quant Method Output Plant Labour Duration Reference


ity (days)
Standby 1 Lot - Carry out servicing and testing of the existing 1 electrician 3 days
Generator Set 150kVA Diesel Engine Generator Set 2 labours
1 Lot - Install existing 150kVA Diesel Engine Generator
Set
1 Lot - Supply and install 200A Automatic Main Failure
(AMF) Board
- Daily fuel tank for minimum 24 hours, piping,
1 Lot
valves
- Rechargeable batteries (NICad) to suit the system
1 Lot - Acoustic treatment for Genset Room
1 Lot - Earthing for Genset & AMF Board
1 Lot - Testing and commissioning
1 Lot

Item Quant Method Output Plant Labour Duration Reference


ity (days)
Lightning 1 Lot Supply and install Early Streamer Lightning Protection 6 labours 18 days
Protection System c/w HT cabling, earthing pit and all necessary
System accessories.

Item Quant Method Output Plant Labour Duration Reference


ity (days)
Internal
Telecommunica
tion System

Telephone Pit & 1 Lot Construct 760mm x 760mm x 460mm telephone pit 1 electrician 1 day
Ducting 1 Lot Install 2 x 100mm G.I duct from telephone manhole to
telephone pit.

Telephone DP 1 No Supply and install 50 pairs Telephone Main Distribution 1 electrician 1 day
& Outlet Frame (50 pairs incoming and 50 pairs outgoing). 1 labour
Supply and install Telephone DP
3 No - 20 pairs
3 No - 10 pairs

70 Nos Supply and install telephone point c/w RJ11 outlet and
accessories

Telephone 60m Supply and install 30 pairs 0.63mm telephone cable from 1 electrician 2 days
Cabling 50 pairs mdf to PABX in trunking 1 labour

Supply and install 0.63mm telephone cable from mdf to


100m TDP in trunking
100m - 20 pairs
- 10 pairs

1 Lot Wiring of telephone points using 2 pairs o.63mm


telephone cable in concealed conduit.

Digital PABX
System 1 Lot Supply digital PABX System with following natures 1 electrician 1 day
- 40 nos Analogue Extension Line
- 8 nos Digital Extension Line
- 2 nos Analogue Trunk Line
- 1 nos ISDN PRI Interface Card
- Prerecorded music on hold
- Remote maintenance modem
- 1 hour back-up battery
- Voice mall 2 ports 20mi recording

- Digital telephone set


- Analogue telephon e set
Telephone Set 10 Nos 1 electrician 1 day
60 Nos - Operator console 1 labour
1 No

Item Quant Method Output Plant Labour Duration Reference


ity (days)
SMATV System Supply, install, testing and commissioning of SMATV 1 electrician 7 days
System and all accessories as per drawing and 3 labours
specification
2 Nos - UHF antenna
3 Nos - VHF antenna
1 No - Satellite dish
- FM antenna
1 No
- Satellite IF amplifier
1 No - VHF channelized amplifier
1 No - UHF channelized amplifier
1 No - FM channelized amplifier
1 No - Booster amplifier
2 Nos - 240V 50Hz power supply
3 Nos - Headead equipment
- Satellite 4 way splitter
1 No
- Satellite 2 way splitter
12 Nos - Satellite 6 way splitter
4 No - Frequency modulator 45-750Mhz
4 Nos - Connector and endline resistor
6 Nos - SMATV plug-in-outlet
10 No - Coaxial cable type RG11
40 Nos - Coaxial cable type RG6
- HDMI cable
1 Lot
- Lightning surge arrestor for antenna,dish and
1 Lot
power
1 Lot - Complete testing and commissioning
1 Lot

1 Lot

Item Quant Method Output Plant Labour Duration Reference


ity (days)
Public Address Supply, install, testing and commissioning of PA System 6 labours 12 days
(PA) System and all accessories as per drawing and specification
2 Nos - Microprocessor control console
1 Nos - Microprocessor controller receiver mixer with
output adjuster
1 No - Pre-amplifier
- Source selector
1 No
- 240W/100V power amplifier with aqualizer
1 No - Local receiver controller
14 Nos - DVD player
1 No - AM/FM stereo synthesizer tuner
1 No - Double auto-reverse cassete deck
1 No - 3W 100V 6.5 dual cone ceiling speaker
80 Nos - 3W 100V 5 dual cone box speaker
- Amplifier monitor panel
17 No
- Volume controller
1 No - Manual amplifier changeover unit
12 Nos - Battery charger with 24VDC 5A auxiliary
1 No - 19 equipment rack
1 No - Cabling for speaker and volume control in G.I
1 No duct
34 Nos - Interacking and necessary accessories
- Complete testing and commissioning
1 Lot
1 Lot
Item Quant Method Output Plant Labour Duration Reference
ity (days)
CCTV System Supply, install, testing and commissioning of CCTV 6 labours 15 days
System and all accessories as per drawing and
specification
10 Nos - Outdoor PTZ dome camera
1 No - Indoor PTZ dome camera
10 Nos - 1/3 CCD dome camera
- 1/3 CCD colour dome camera
1 No
- 20 channel digital video recorder
1 No - 20 main monitor
1 No - 14 spot monitor
1 No - Keyboard controller
1 No - CCTV Console
1 No - UPS for HDD
1 No - 35 equipment rack
- Cabling, interacking and necessary accessories
1 No
- Lighting and surge arrestor
1 Lot - Complete testing and commissioning
1 Lot
1 Lot
Item Quant Method Output Plant Labour Duration Reference
ity (days)
Audio Visual
(AV) System

Seminar room Supply, install, testing and commissioning of AV System 1 electrician 5 days
and all accessories as per drawing and specification 1 labour
2 Nos - 10 channel audio mixer
2 Nos - AV matrix switcher controller
2 Nos - Multiple controller interface unit
- 120W/100V power amplifier
2 Nos
- Dynamic cardiod microphone
6 Nos - VHF wireless microphone system with hand heid
4 Nos transmitter
- VHF wireless lavallier microphone system with
4 Nos hand heid transmitter
- 30W 100V full range speaker
- Double auto-reverse cassete deck
6 Nos
- 9800 ANSI lumen true XGA LCD projector
2 Nos - Motorised pantograph
2 Nos - 12 x 10 motorised screen
2 Nos - 19 equipment rack
2 Nos - Computer interface
2 Nos - DVD player
2 Nos - RGBH/video/audio
- Microphone/line receptacle point
2 Nos
- 5m microphone extension cable
2 Nos - Cabling for speaker and microphone
6 Nos - Interacking and necessary accessories
6 Nos - Complete testing and commissioning
1 Lot
1 Lot
1 Lot
- 10 channel audio mixer
- AV matrix switcher controller
- Multiple controller interface unit
Portable 1 Nos - 120W/100V power amplifier 1 electrician 5 days
- Dynamic cardiod microphone
(outdoor usage) 1 Nos 1 labour
- VHF wireless microphone system with hand heid
1 Nos
transmitter
1 Nos - VHF wireless lavallier microphone system with
2 Nos hand heid transmitter
1 Nos - 30W 100V full range speaker
- Double auto-reverse cassete deck
2 Nos - 9800 ANSI lumen true XGA LCD projector
- VCR player
2 Nos - 12 x 10 motorised screen
1 Nos - 19 equipment rack
1 Nos - Computer interface
1 Nos - DVD player
- 5m microphone extension cable
1 Nos
- Cabling for speaker and microphone
1 Nos
2 Nos
1 Nos
6 Nos
1 Lot

Item Quant Method Output Plant Labour Duration Reference


ity (days)
Karaoke System Supply, install, testing and commissioning of Karaoke 1 electrician 3 days
System and all accessories as per drawing and 1 labour
specification
2 Nos - Karaoke mixing amplifier with 4 inputs, 2
monitor output and 5 microphone receiver
2 Nos - VHF dual channel dual antenna diversity receiver
2 Nos - PC c/w computerised karaoke selection software
- 29 colour TV
2 Nos
- Equipment console
2 Nos - Cabling and necessary accessories
1 Lot - Complete testing and commissioning
1 Lot

Item Quant Method Output Plant Labour Duration Reference


ity (days)
ICT Networking
System

Network Supply, install, testing and commissioning of ICT 1 electrician 1 day


Server And Networking System and all accessories as per drawing
Accessories and specification
1 Lot - File server, print server and domain controller
server
1 Lot - 15 flat screen monitor, keyboard and mouse
1 Lot - Network file server operating system, anti-virus

Data 1 electrician 1 day


Protection
Application 1 Lot - External tape drive
- Data protection application software
1 Lot

Network - 24 ports switcher


Connectivity 1 Nos 1 electrician 1 day
- 24 port patch panel
1 Nos - Firewall
Equipment
1 Nos - Router
1 Nos - Indoor wireless access point
5 Nos - Outdoor wireless access point
12 Nos
Structure - UTP cat 5e cable
Cabling In 1 Lot - UTP cat 6 cable 1 electrician 1 day
Conduit 1 Lot - Coaxial cable
- Patch cord
1 Lot
- Faceplate and jack
1 Lot
42U 20 Nos
Equipment
1 No 1 electrician 1 day
Rack
5Kva
Uninterruptibl 1 electrician 1 day
e Power
Supply 1 Lot

Testing And
1 electrician 1 day
Commissionin 1 Lot
g