Vous êtes sur la page 1sur 46

PT.

MB-SOI FIREFIGHTING SYSTEM OPERATION INSTR


CODE OF INSTRUCTIONPT-MB/1/FF/SOI/01/1

SYSTEMU1 FireFighting Sys KKS CODE10MA

OPERATION ACTIVITY: U1 FireFighting Sys

Pre-Start Up Check Procedures

START Year Month Day Hr Min

END Year Month Day Hr Min

STEP PREVIOUSLY OPERATION RISK ASSESSMENT CONTROL

1 Confirm all relevant Permit-To-Works have been completed,cancelled and cleared.

2 All working parties have been evacuated from the workplace

Ensure all operational personnel are wearing suitable PPE, such as gloves, safety helmet, safety shoes, insulated
3
earmuffs/plugs etc.

4 Ensure all operators are in good mental state and no drinking phenomenon.

5 No water accumulation nor humid condition in operational area for the prevention of electric short circuit

6 To provide a safe and comfortable workplace all tools and materials must be properly placed

STEP PROCEDURE

1 Check and Confirm Fire Fighting Water Level and Quality is Normal

Check and Confirm U1 Fire Fighting Water Outlet Signal Butterfly Valve (JOSGE08AA001) is Available

Check and Confirm U1 Filter Corner 1 and 2 (J0SGE08AA003) is Normal No Blokage

Check and Confirm U1 Front Corner 1 Signal Butterfly Valve (J0SGE08AA015) is Open

Check and Confirm U1 Corner 1 Deluge Valve (J0SGE08AA013) is Available

Check and Confirm U1 Back Corner 1 Signal Butterfly Valve (J0SGE08AA011) is Open

Check and Confirm U1 Front Corner 2 Signal Butterfly Valve (J0SGE08AA009) is Open

Check and Confirm U1 Corner 2 Deluge Valve (J0SGE08AA007) is Available

Check and Confirm U1 Back Corner 2 Signal Butterfly Valve (J0SGE08AA005) is Open

Check and Confirm U1 Fire Fighting Water Outlet Signal Butterfly Valve (JOSGE08AA017) is Available

Check and Confirm U1 Filter Corner 3 and 4 (J0SGE08AA019) is Normal No Blokage

Check and Confirm U1 Front Corner 3 Signal Butterfly Valve (J0SGE08AA031) is Open

Check and Confirm U1 Corner 3 Deluge Valve (J0SGE08AA027) is Available


Check and Confirm U1 Back Corner 3 Signal Butterfly Valve (J0SGE08AA025) is Open

Check and Confirm U1 Front Corner 4 Signal Butterfly Valve (J0SGE08AA029) is Open

Check and Confirm U1 Corner 4 Deluge Valve (J0SGE08AA023) is Available

Check and Confirm U1 Back Corner 4 Signal Butterfly Valve (J0SGE08AA021) is Open
END OF PROCEDURE

REMARK
STEM OPERATION INSTRUCTION
SHIFT MANAGER :

SUPERVISOR :

OPERATOR :

SITE INSPECTION BY :

EXECUTE
ENT CONTROL NORMAL STATUS
CONFIRMATION

ared. Yes

Yes

safety helmet, safety shoes, insulated gloves,


Yes

Yes

ention of electric short circuit Yes

e properly placed Yes

EXECUTE
RE
CONFIRMATION

SGE08AA001) is Available

kage

is Open

s Open

is Open

s Open

SGE08AA017) is Available

kage

is Open
s Open

is Open

s Open
D OF PROCEDURE
PT.MB-SOI FIREFIGHTING SYSTEM OPERATION INSTR
CODE OF INSTRUCTIONPT-MB/1/FF/SOI/01/2

SYSTEMU1 FireFighting Sys KKS CODE10MA

OPERATION ACTIVITY: U1 FireFighting Sys

Start Up Procedures

START Year Month Day Hr Min

END Year Month Day Hr Min

STEP PREVIOUSLY OPERATION RISK ASSESSMENT CONTROL

1 Confirm all relevant Permit-To-Works have been completed,cancelled and cleared.

2 All working parties have been evacuated from the workplace

Ensure all operational personnel are wearing suitable PPE, such as gloves, safety helmet, safety shoes, insulated
3
earmuffs/plugs etc.

4 Ensure all operators are in good mental state and no drinking phenomenon.

5 No water accumulation nor humid condition in operational area for the prevention of electric short circuit

6 To provide a safe and comfortable workplace all tools and materials must be properly placed

STEP PROCEDURE
END OF PROCEDURE

REMARK
STEM OPERATION INSTRUCTION
SHIFT MANAGER :

SUPERVISOR :

OPERATOR :

SITE INSPECTION BY :

EXECUTE
ENT CONTROL NORMAL STATUS
CONFIRMATION

ared. Yes

Yes

safety helmet, safety shoes, insulated gloves,


Yes

Yes

ention of electric short circuit Yes

e properly placed Yes

EXECUTE
RE
CONFIRMATION
D OF PROCEDURE
PT.MB-SOI FIREFIGHTING SYSTEM OPERATION INSTR
CODE OF INSTRUCTIONPT-MB/1/FF/SOI/01/3

SYSTEMU1 FireFighting Sys KKS CODE10MA

OPERATION ACTIVITY: U1 FireFighting Sys

Normal Shutdown Procedures

START Year Month Day Hr Min

END Year Month Day Hr Min

STEP PREVIOUSLY OPERATION RISK ASSESSMENT CONTROL

1 Confirm all relevant Permit-To-Works have been completed,cancelled and cleared.

2 All working parties have been evacuated from the workplace

Ensure all operational personnel are wearing suitable PPE, such as gloves, safety helmet, safety shoes, insulated
3
earmuffs/plugs etc.

4 Ensure all operators are in good mental state and no drinking phenomenon.

5 No water accumulation nor humid condition in operational area for the prevention of electric short circuit

6 To provide a safe and comfortable workplace all tools and materials must be properly placed

STEP PROCEDURE
END OF PROCEDURE

REMARK
STEM OPERATION INSTRUCTION
SHIFT MANAGER :

SUPERVISOR :

OPERATOR :

SITE INSPECTION BY :

EXECUTE
ENT CONTROL NORMAL STATUS
CONFIRMATION

ared. Yes

Yes

safety helmet, safety shoes, insulated gloves,


Yes

Yes

ention of electric short circuit Yes

e properly placed Yes

EXECUTE
RE
CONFIRMATION
D OF PROCEDURE
PT.MB-SOI FIREFIGHTING SYSTEM OPERATION INSTR
CODE OF INSTRUCTIONPT-MB/1/FF/SOI/01/4

SYSTEMU1 FireFighting Sys KKS CODE10MA

OPERATION ACTIVITY: U1 FireFighting Sys

Operation and Standby Situation Inspection

START Year Month Day Hr Min

END Year Month Day Hr Min

STEP PREVIOUSLY OPERATION RISK ASSESSMENT CONTROL

1 Confirm all relevant Permit-To-Works have been completed,cancelled and cleared.

2 All working parties have been evacuated from the workplace

Ensure all operational personnel are wearing suitable PPE, such as gloves, safety helmet, safety shoes, insulated
3
earmuffs/plugs etc.

4 Ensure all operators are in good mental state and no drinking phenomenon.

5 No water accumulation nor humid condition in operational area for the prevention of electric short circuit

6 To provide a safe and comfortable workplace all tools and materials must be properly placed

STEP PROCEDURE
END OF PROCEDURE

REMARK
STEM OPERATION INSTRUCTION
SHIFT MANAGER :

SUPERVISOR :

OPERATOR :

SITE INSPECTION BY :

EXECUTE
ENT CONTROL NORMAL STATUS
CONFIRMATION

ared. Yes

Yes

safety helmet, safety shoes, insulated gloves,


Yes

Yes

ention of electric short circuit Yes

e properly placed Yes

EXECUTE
RE
CONFIRMATION
D OF PROCEDURE
PT.MB-SOI FIREFIGHTING SYSTEM OPERATION INSTR
CODE OF INSTRUCTIONPT-MB/1/FF/SOI/01/5

SYSTEMU1 FireFighting Sys KKS CODE10MA

OPERATION ACTIVITY: U1 FireFighting Sys

Automatic Protective Function Test Procedures

START Year Month Day Hr Min

END Year Month Day Hr Min

STEP PREVIOUSLY OPERATION RISK ASSESSMENT CONTROL

1 Confirm all relevant Permit-To-Works have been completed,cancelled and cleared.

2 All working parties have been evacuated from the workplace

Ensure all operational personnel are wearing suitable PPE, such as gloves, safety helmet, safety shoes, insulated
3
earmuffs/plugs etc.

4 Ensure all operators are in good mental state and no drinking phenomenon.

5 No water accumulation nor humid condition in operational area for the prevention of electric short circuit

6 To provide a safe and comfortable workplace all tools and materials must be properly placed

STEP PROCEDURE
END OF PROCEDURE

REMARK
STEM OPERATION INSTRUCTION
SHIFT MANAGER :

SUPERVISOR :

OPERATOR :

SITE INSPECTION BY :

EXECUTE
ENT CONTROL NORMAL STATUS
CONFIRMATION

ared. Yes

Yes

safety helmet, safety shoes, insulated gloves,


Yes

Yes

ention of electric short circuit Yes

e properly placed Yes

EXECUTE
RE
CONFIRMATION
D OF PROCEDURE
PT.MB-SOI FIREFIGHTING SYSTEM OPERATION INSTR
CODE OF INSTRUCTIONPT-MB/1/FF/SOI/01/6

SYSTEMU1 FireFighting Sys KKS CODE10MA

OPERATION ACTIVITY: U1 FireFighting Sys

Alarm and Emergency Handling Procedures

START Year Month Day Hr Min

END Year Month Day Hr Min

STEP PREVIOUSLY OPERATION RISK ASSESSMENT CONTROL

1 Confirm all relevant Permit-To-Works have been completed,cancelled and cleared.

2 All working parties have been evacuated from the workplace

Ensure all operational personnel are wearing suitable PPE, such as gloves, safety helmet, safety shoes, insulated
3
earmuffs/plugs etc.

4 Ensure all operators are in good mental state and no drinking phenomenon.

5 No water accumulation nor humid condition in operational area for the prevention of electric short circuit

6 To provide a safe and comfortable workplace all tools and materials must be properly placed

STEP PROCEDURE
END OF PROCEDURE

REMARK
STEM OPERATION INSTRUCTION
SHIFT MANAGER :

SUPERVISOR :

OPERATOR :

SITE INSPECTION BY :

EXECUTE
ENT CONTROL NORMAL STATUS
CONFIRMATION

ared. Yes

Yes

safety helmet, safety shoes, insulated gloves,


Yes

Yes

ention of electric short circuit Yes

e properly placed Yes

EXECUTE
RE
CONFIRMATION
D OF PROCEDURE
PT.MB-SOI FIREFIGHTING SYSTEM OPERATION INSTR
CODE OF INSTRUCTIONPT-MB/1/FF/SOI/01/8

SYSTEMU1 FireFighting Sys KKS CODE10MA

OPERATION ACTIVITY: U1 FireFighting Sys

Isolation Procedures

START Year Month Day Hr Min

END Year Month Day Hr Min

STEP PREVIOUSLY OPERATION RISK ASSESSMENT CONTROL

1 Confirm all relevant Permit-To-Works have been completed,cancelled and cleared.

2 All working parties have been evacuated from the workplace

Ensure all operational personnel are wearing suitable PPE, such as gloves, safety helmet, safety shoes, insulated
3
earmuffs/plugs etc.

4 Ensure all operators are in good mental state and no drinking phenomenon.

5 No water accumulation nor humid condition in operational area for the prevention of electric short circuit

6 To provide a safe and comfortable workplace all tools and materials must be properly placed

STEP PROCEDURE
END OF PROCEDURE

REMARK
STEM OPERATION INSTRUCTION
SHIFT MANAGER :

SUPERVISOR :

OPERATOR :

SITE INSPECTION BY :

EXECUTE
ENT CONTROL NORMAL STATUS
CONFIRMATION

ared. Yes

Yes

safety helmet, safety shoes, insulated gloves,


Yes

Yes

ention of electric short circuit Yes

e properly placed Yes

EXECUTE
RE
CONFIRMATION
D OF PROCEDURE
PT.MB-SOI FIREFIGHTING SYSTEM OPERATION INSTR
CODE OF INSTRUCTIONPT-MB/1/FF/SOI/01/9

SYSTEMU1 FireFighting Sys KKS CODE10MA

OPERATION ACTIVITY: U1 FireFighting Sys

DE-Isolation Procedures

START Year Month Day Hr Min

END Year Month Day Hr Min

STEP PREVIOUSLY OPERATION RISK ASSESSMENT CONTROL

1 Confirm all relevant Permit-To-Works have been completed,cancelled and cleared.

2 All working parties have been evacuated from the workplace

Ensure all operational personnel are wearing suitable PPE, such as gloves, safety helmet, safety shoes, insulated
3
earmuffs/plugs etc.

4 Ensure all operators are in good mental state and no drinking phenomenon.

5 No water accumulation nor humid condition in operational area for the prevention of electric short circuit

6 To provide a safe and comfortable workplace all tools and materials must be properly placed

STEP PROCEDURE
END OF PROCEDURE

REMARK
STEM OPERATION INSTRUCTION
SHIFT MANAGER :

SUPERVISOR :

OPERATOR :

SITE INSPECTION BY :

EXECUTE
ENT CONTROL NORMAL STATUS
CONFIRMATION

ared. Yes

Yes

safety helmet, safety shoes, insulated gloves,


Yes

Yes

ention of electric short circuit Yes

e properly placed Yes

EXECUTE
RE
CONFIRMATION
D OF PROCEDURE

Vous aimerez peut-être aussi