Geo-Excel Consultants Sdn. Bhd.

Project : Soil Nail Works on Lot 7981, Kajang, Selangor


Project No. : GEP-152

Design fbu 30 kPa


1xWorking load 100 kN
3xWorking load 300 kN
Min. bar dia. 35.29 mm (with FoS=1.5)
Use rebar dia. 32 mm
Drill hole dia. 0.15 mm
Req. grout length 14.15 m

Proposed Loading Sequences for Pull Out Test on Preliminary Soil Nail

Load Load Holding Time Remark


Cycle
(kN)
1st Cycle 10 2 Movement shall be recorded at
25 2 0 & 2 minute
50 2
75 2
Movement recorded at 0, 5, 10, 15, 20,
100 30 25 & 30 minute
50 2 Movement shall be recorded at
10 2 0 & 2 minute
2nd Cycle 10 2
25 2
50 2
75 2
100 2
125 2
150 2
175 2
Movement recorded at 0, 5, 10, 15, 20,
200 30 25 & 30 minute
150 2 Movement shall be recorded at
100 2 0 & 2 minute
50 2
10 2
3rd Cycle 10 2
50 2
100 2
125 2
150 2
175 2
200 2
225 2
250 2
275 2
Movement recorded at 0, 5, 10, 15, 20,
300 30 25 & 30 minute
250 2 Movement shall be recorded at
200 2 0 & 2 minute
150 2
100 2
50 2
10 2
Note :
(1) Failure shall be defined as the nail failing to sustain the load with continuous movement. Once failure occurs, the test load should
be maintained for 30 minutes for a load lower than the failure load. For example, if the nail fails at 200% of nail working load,
the next load on nail should be lowered to 175% of nail working for 30 minutes and thereafter unloaded to zero.
(2) The movement of the nail should be measured by two dial guages and ruler.
(3) Load cell shall be used for measuring of appiled load on nail. However, the loading from pressure guage should be
recorded for reference.
Geo-Excel Consultants Sdn. Bhd.
Project : Proposed Bungalo
Soil Nail Works on Lot 7981, Kajang, Selangor
Project No. : GEP-101 GEP-152

Design fbu 100 kPa


1xWorking load 180 kN
1.5xWorking load 270 kN
Min. bar dia. 33.48 mm (with FoS=1.5)
Use rebar dia. 32 mm
Drill hole dia. 0.15 mm
Grout length 11.50 m
Soil-grout bond at 1xWL 33.21 kPa
Soil-grout bond at 1xWL 49.82 kPa
Proposed Loading Sequences for Pull Out Test on Working Soil Nail
Load % of Nail Load Holding Time Remark
Cycle Working Load
(%) (kN)
1st Cycle 10 18 2 Movement shall be recorded at
25 45 2 0 & 2 minute
50 90 2
75 135 2
Movement recorded at 0, 5, 10, 15, 20,
100 180 30 25 & 30 minute
50 90 2 Movement shall be recorded at
10 18 2 0 & 2 minute
2nd Cycle 50 90 2
75 135 2
100 180 2
125 225 2
Movement recorded at 0, 5, 10, 15, 20,
150 270 30 25 & 30 minute
100 180 2 Movement shall be recorded at
50 90 2 0 & 2 minute
10 18 2
Note :
(1) Failure shall be defined as the nail failing to sustain the load with continuous movement. Once failure occurs, the test
load should be maintained for 30 minutes for a load lower than the failure load. For example, if the nail fails at 150%
nail working load, the next load on nail should be lowered to 125% of nail working for 30 minutes and thereafter unloaded
to zero.
(2) The movement of the nail should be measured by two dial guages and ruler.

be maintained for 30 minutes for a load lower than the failure load. For example, if the nail fails at 200% of nail working load,
the next load on nail should be lowered to 175% of nail working for 30 minutes and thereafter unloaded to zero.
(2) The movement of the nail should be measured by two dial guages and ruler.
(3) Load cell shall be used for measuring of appiled load on nail. However, the loading from pressure guage should be
recorded for reference.